CN106247048A - A kind of efficient sealed flange - Google Patents

A kind of efficient sealed flange Download PDF

Info

Publication number
CN106247048A
CN106247048A CN201610606805.XA CN201610606805A CN106247048A CN 106247048 A CN106247048 A CN 106247048A CN 201610606805 A CN201610606805 A CN 201610606805A CN 106247048 A CN106247048 A CN 106247048A
Authority
CN
China
Prior art keywords
flange
wax
sand
degrees celsius
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610606805.XA
Other languages
Chinese (zh)
Other versions
CN106247048B (en
Inventor
宋大帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANCHENG FENGGONG MACHINERY Co Ltd
Original Assignee
YANCHENG FENGGONG MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANCHENG FENGGONG MACHINERY Co Ltd filed Critical YANCHENG FENGGONG MACHINERY Co Ltd
Priority to CN201610606805.XA priority Critical patent/CN106247048B/en
Publication of CN106247048A publication Critical patent/CN106247048A/en
Application granted granted Critical
Publication of CN106247048B publication Critical patent/CN106247048B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L23/00Flanged joints
    • F16L23/02Flanged joints the flanges being connected by members tensioned axially
    • F16L23/032Flanged joints the flanges being connected by members tensioned axially characterised by the shape or composition of the flanges
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D35/00Filtering devices having features not specifically covered by groups B01D24/00 - B01D33/00, or for applications not specifically covered by groups B01D24/00 - B01D33/00; Auxiliary devices for filtration; Filter housing constructions
    • B01D35/02Filters adapted for location in special places, e.g. pipe-lines, pumps, stop-cocks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/02Sand moulds or like moulds for shaped castings
    • B22C9/04Use of lost patterns
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C33/00Making ferrous alloys
    • C22C33/04Making ferrous alloys by melting
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/002Ferrous alloys, e.g. steel alloys containing In, Mg, or other elements not provided for in one single group C22C38/001 - C22C38/60
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/005Ferrous alloys, e.g. steel alloys containing rare earths, i.e. Sc, Y, Lanthanides
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/007Ferrous alloys, e.g. steel alloys containing silver
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/008Ferrous alloys, e.g. steel alloys containing tin
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/02Ferrous alloys, e.g. steel alloys containing silicon
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/06Ferrous alloys, e.g. steel alloys containing aluminium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/08Ferrous alloys, e.g. steel alloys containing nickel
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/12Ferrous alloys, e.g. steel alloys containing tungsten, tantalum, molybdenum, vanadium, or niobium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/14Ferrous alloys, e.g. steel alloys containing titanium or zirconium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/16Ferrous alloys, e.g. steel alloys containing copper
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/32Ferrous alloys, e.g. steel alloys containing chromium with boron
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/60Ferrous alloys, e.g. steel alloys containing lead, selenium, tellurium, or antimony, or more than 0.04% by weight of sulfur
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16JPISTONS; CYLINDERS; SEALINGS
    • F16J15/00Sealings
    • F16J15/02Sealings between relatively-stationary surfaces
    • F16J15/06Sealings between relatively-stationary surfaces with solid packing compressed between sealing surfaces
    • F16J15/10Sealings between relatively-stationary surfaces with solid packing compressed between sealing surfaces with non-metallic packing
    • F16J15/102Sealings between relatively-stationary surfaces with solid packing compressed between sealing surfaces with non-metallic packing characterised by material

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Compositions Of Macromolecular Compounds (AREA)
  • Mold Materials And Core Materials (AREA)

Abstract

The present invention relates to a kind of efficient sealed flange, including the first flange, the second flange, circular filter screen, fastening bolt and nut, the correspondence position of the first flange, the second flange and circular filter screen offers arcuate socket respectively, and fastening bolt sequentially passes through the arcuate socket of the first flange, circular filter screen and the second flange and is connected with nut thread;Second flange is provided with annular contiguous block near the first flange side, is shaped with external screw thread outside annular contiguous block, and the first flange offers link slot, and link slot inwall is shaped with female thread;First flange and the second flange opposite side surface have been covered each by the first rubber sealant and the second rubber sealant, fastening bolt and nut and the first flange and the second flange contact side has been covered each by the 3rd rubber sealant and the 4th rubber sealant;Circular filter screen outer ledge is coated with rubber seal ring;The present invention cooperation by four layers of rubber sealant, it is ensured that the efficient stable of the sealing property of flange, prevents from revealing at connecting portion at flange.

Description

A kind of efficient sealed flange
Technical field
The present invention relates to a kind of efficient sealed flange, belong to technical field of pipeline connection.
Background technology
Flange is again ring flange or bead, makes pipe and the interconnective part of pipe, is connected to pipe end.On flange porose Eye, can wear bolt, it is common that refer to open several fixing hole for connecting it at the periphery of the metallic object of a similar plate-like Its thing.Existing Flange joint is exactly two pipelines, pipe fitting or equipment, is first individually fixed on a ring flange, two Between individual ring flange, add flange gasket, tighten together with bolt, complete to connect.Flange joint is the important company of pipeline construction Connecing mode, Flange joint is easy to use, it is possible to bear bigger pressure, and in industrial pipeline, the use of Flange joint is the widest General, but during the installation or removal of common flange, need bolt to need installation or removal one by one, relatively time-consuming take Power.Also needing to filter to the material after circulation after in actual life, two pipelines connect, this is accomplished by the most separately installed one Drainage screen, wastes substantial amounts of manpower and materials, has dragged slowly construction speed.And the big multiplex fastening bolt of current flange connects, When fastening bolt disabling damage, Flange joint also can lose efficacy.
Summary of the invention
The technical problem to be solved in the present invention is, not enough for prior art, proposes a kind of efficient sealed flange.
The present invention solves that the technical scheme that above-mentioned technical problem proposes is: a kind of efficient sealed flange, including the first method Orchid, the second flange, circular filter screen, fastening bolt and nut, the correspondence position of the first flange, the second flange and circular filter screen is respectively Offering at least two arcuate socket, fastening bolt sequentially passes through the first flange, circular filter screen and the arcuate socket of the second flange and spiral shell Box thread connects;Second flange is provided with annular contiguous block near the first flange side, is shaped with external screw thread outside annular contiguous block, First flange offers the link slot matched with annular contiguous block, and link slot inwall is shaped with and the external screw thread phase of annular contiguous block The female thread of coupling;First flange and the second flange opposite side surface have been covered each by the first rubber sealant and the second rubber Sealant, fastening bolt and nut and the first flange and the second flange contact side have been covered each by the 3rd rubber sealant and Four rubber sealants;Circular filter screen outer ledge is coated with rubber seal ring;
In first flange and the second flange, the mass percent of each composition is: C:0.02-0.05%, Al:1.06-1.13%, Zn: 0.23-0.34%, Si:0.13-0.21%, Mn:0.67-0.78%, S :≤0.030%, P :≤0.030%, Cr:0.02-0.04%, Ni:0.33-0.39%, Cu:0.05-0.11%, V:0.12-0.14%, Mo:0.11-0.13%, Ti:0.47-0.59%, B:0.01- 0.02%, Pd:0.02-0.04%, Pt:0.16-0.19%, W:0.23-0.26%, Ta:0.01-0.02%, Nd:0.05-0.11%, Ce:0.01-0.02%, Eu:0.12-0.13%, Lu:0.11-0.13%, Au:0.12-0.14%, Ag:0.35-0.44%, Ga: 0.01-0.02%, Y:0.22-0.25%, Sn:0.34-0.47%, Zr:0.06-0.17%, Re:0.02-0.05%, Os:0.01- 0.02%, Hf:0.05-0.13%, Bi:0.11-0.14%, calcium oxide: 0.22-0.33%, Pulvis Talci: 0.13-0.16%, oxidation Magnesium: 0.19-0.25%, copper oxide: 0.35-0.48%, ferrum oxide: 0.24-0.31%, manganese dioxide: 0.26-0.34%, hydrogen Copper oxide: 0.14-0.18%, hydrated ferric oxide.: 0.05-0.09%, calcium hydroxide: 0.06-0.08%, barium hydroxide: 0.04- 0.07%, sodium chloride: 0.01-0.02%, calcium carbonate: 0.06-0.11%, potassium nitrate: 0.21-0.26%, magnesium chloride: 0.13- 0.18%, calcium chloride: 0.13-0.22%, potassium chlorate: 0.26-0.32%, barium sulfate: 0.23-0.37%, copper sulfate: 0.24- 0.31%, surplus is Fe;
The casting technique of the first flange and the second flange comprises the following steps:
(i) melting raw material:
A, add raw materials in smelting furnace by the mass percent of composition each in predetermined flange, the temperature in smelting furnace is brought up to 1450 degrees Celsius to 1480 degrees Celsius, raw material is smelted formation alloy solution;
B, being cooled down by alloy solution obtained in the previous step, during cooling, water-cooled is combined with air cooling, first uses water-cooled with 20-22 DEG C/alloy solution water-cooled forms alloy to 430-450 DEG C by the cooldown rate of s, then air cooling is to 320-340 DEG C, then uses water The cold cooldown rate with 11-12 DEG C/s by alloy water-cooled to room temperature;
C, heating, the alloy after previous step being cooled down carries out secondary smelting in adding smelting furnace, the temperature in smelting furnace is brought up to 1570 degrees Celsius to 1610 degrees Celsius, alloy is formed alloy solution by secondary smelting;
D, boiling hot bag, pour the alloy solution in smelting furnace into casting ladle, carries out scalding bag;
After e, boiling hot bag, the alloy solution in casting ladle is poured in electric furnace, the temperature in electric furnace is warming up to 1590 degrees Celsius To 1610 degrees Celsius, heat 14 minutes to 18 minutes, the alloy solution in electric furnace is poured into casting ladle, ladle-to-ladle cooling;
F, ladle-to-ladle after, pour the alloy solution in casting ladle into electric furnace, temperature is down to 1480 to 1510 degrees Celsius, casting ladle bag cheat In be sequentially added into the nodulizer of 1.4% to 1.5% and the inovulant of 0.2% to 0.3%, with 5 to 6kg sheet metal, steel-sheet thickness For 0.5mm to 1mm, sheet metal is covered on nodulizer, inovulant, and consolidates;
G into, the alloy solution in electric furnace is poured the opposite side of casting ladle indent, spheroidizing reacion 70s to 75s, spheroidizing reacion fully after, Spread the slag agent of one layer of collection, quickly skim;
H, quickly skim after, be sprinkled into swelling perlite powder immediately on alloy solution surface, slag hitting twice, after slag hitting completes, formed Alloy solution to be cast, was poured in five minutes;
(ii) prepared by wax-pattern: uses low-temperature wax and machinery casting technology, makes wax that is consistent with cast member and that include insulated feeder Mould, and wax-pattern is repaired, use wax base abluent that wax-pattern is carried out afterwards;
(iii) on the wax-pattern that (ii) step prepares, shell model sand mold is made: this step comprises the steps of
A, wax-pattern place insulated feeder position on, with EVA adhesive film cover place insulated feeder surface, in case this surface is subject to To polluting;
B, it is coated with the first surface layer at wax pattern surface:
First, preparing serosity at wax pattern surface dip-coating zirconium powder with silica sol binder, the viscosity number of this serosity was at 52~56 seconds;
Then, manually float sand with the zircon sand of 150 mesh at the wax pattern surface through dip-coating serosity, after floating sand, EVA glue should be cleared up Residual slurry on film and zircon sand;
3rd, the wax-pattern after manually floating sand carries out natural drying, and drying time is 13~15 hours;
C, the wax pattern surface prepared in step B are coated with the second transition zone:
First, in the wax pattern surface dip-coating serosity of Malaysia powder with silica sol binder preparation that step B is prepared, gluing of this serosity Angle value was at 41~45 seconds;
Then, manually float sand with the Malaysia sand of 65~80 mesh at the wax pattern surface through dip-coating serosity, should clear up after floating sand Residual slurry in EVA adhesive film and Malaysia sand;
3rd, the wax-pattern after manually floating sand is dried in being put in vacuum drying oven, and the temperature controlled in vacuum drying oven is 45~55 degrees Celsius, the air pressure controlled in vacuum drying oven is 110~130Pa, and drying time is 25~30 hours;
D, the wax pattern surface prepared in step C are coated with the 3rd back-up coat:
First, in the wax pattern surface dip-coating serosity of Malaysia powder with silica sol binder preparation that step C is prepared, gluing of this serosity Angle value was at 22~25 seconds;
Then, manually float sand with the Malaysia sand of 15~20 mesh at the wax pattern surface through dip-coating serosity, should clear up after floating sand Residual slurry in EVA adhesive film and Malaysia sand;
3rd, it is dried in wax-pattern is put in vacuum drying oven, the temperature controlled in vacuum drying oven is 58~68 degrees Celsius, The air pressure controlled in vacuum drying oven is 65~95Pa, and drying time is 12~15 hours;
E, the wax pattern surface prepared in step D are coated with the 4th slurry seal layer:
First, in the wax pattern surface dip-coating serosity of Malaysia powder with silica sol binder preparation that step D is prepared, gluing of this serosity Angle value was at 8~12 seconds;
Then, the residual slurry in cleaning EVA adhesive film;
3rd, the wax-pattern after manually floating sand is put under the wind speed of 1.1~1.2 meter per seconds and is dried, and drying time is 12~36 Hour;
(iv) dewaxing: using steam dewaxing, the pressure of steam is 0.6MPa, and the time is 18~55 minutes, and should first will protect before dewaxing Temperature emits the EVA adhesive film of port part and takes off, and prepares shell mould;
(v) shell mould roasting
Use temperature-gradient method baking modes that step shell mould (iv) is carried out roasting, in roasting: first liter 500 degrees Celsius before Temperature speed controlling is at 100 degrees Celsius/hour, secondly, is incubated 1 hour at 500 degrees Celsius, then, is warmed up to 1050 at full speed Celsius Degree, and keep 1050 degrees Celsius of half an hours, cooling of finally coming out of the stove;
(vi) the shell mould that (v) step is prepared by employing wire cutting machine cuts along the centre of each arcuate socket;
(vii) fix with adhesive tape after the shell mould of step (vi) well cutting being spliced completely, put in the sandbox by formative technology preparation, and Seal on this shell mould for the cast gate poured into a mould and insulated feeder with adhesive tape, be then placed in the mixed sand through preparation, pile mixing Carry out ram-jolt with foundry jolter again after sand, form sand mold;
(viii) the sand mold after step (vii) ram-jolt and sandbox plane are struck off, and prick a core at mould surface at interval of 15cm, This core is pricked to from model surface 3~5cm;
(ix) pour into a mould
With the hot-air blower of constant temperature 400~420 degrees Celsius, shell mould being toasted 1 hour, during cast before Jiao Zhu, pouring temperature is 1550~1650 degrees Celsius, after cast, foundry goods is incubated 2~3 hours in sand mold;
(x) after moulding by casting, carry out the demoulding, every part shell mould is taken off successively, the insulated feeder of excision foundry goods, obtain foundry goods.
The improvement of technique scheme is: the arcuate socket on the first flange, the second flange and circular filter screen is respectively four, Four arcuate sockets are symmetrical arranged two-by-two.
The improvement of technique scheme is: the first flange and the opposing both sides of the second flange are separately installed with pipe joint.
The improvement of technique scheme is: in the first flange and the second flange, the mass percent of each composition is: C: 0.04%, Al:1.07%, Zn:0.24%, Si:0.14%, Mn:0.68%, S :≤0.030%, P :≤0.030%, Cr:0.03%, Ni:0.34%, Cu:0.06%, V:0.12%, Mo:0.11%, Ti:0.48%, B:0.01%, Pd:0.02%, Pt:0.16%, W: 0.23%, Ta:0.01%, Nd:0.05%, Ce:0.01%, Eu:0.12%, Lu:0.11%, Au:0.12%, Ag:0.36%, Ga: 0.01%, Y:0.23%, Sn:0.35%, Zr:0.07%, Re:0.03%, Os:0.01%, Hf:0.06%, Bi:0.12%, calcium oxide: 0.23%, Pulvis Talci: 0.13%, magnesium oxide: 0.19%, copper oxide: 0.36%, ferrum oxide: 0.25%, manganese dioxide: 0.27%, Copper hydrate: 0.15%, hydrated ferric oxide.: 0.06%, calcium hydroxide: 0.07%, barium hydroxide: 0.05%, chlorination Sodium: 0.01%, calcium carbonate: 0.07%, potassium nitrate: 0.22%, magnesium chloride: 0.14%, calcium chloride: 0.15%, potassium chlorate: 0.27%, barium sulfate: 0.24%, copper sulfate: 0.26%, surplus is Fe.
The improvement of technique scheme is: in the first flange and the second flange, the mass percent of each composition is: C: 0.02%, Al:1.12%, Zn:0.33%, Si:0.21%, Mn:0.77%, S :≤0.030%, P :≤0.030%, Cr:0.04%, Ni:0.38%, Cu:0.11%, V:0.14%, Mo:0.13%, Ti:0.59%, B:0.02%, Pd:0.04%, Pt:0.18%, W: 0.25%, Ta:0.02%, Nd:0.09%, Ce:0.02%, Eu:0.13%, Lu:0.13%, Au:0.14%, Ag:0.44%, Ga: 0.02%, Y:0.23%, Sn:0.46%, Zr:0.16%, Re:0.05%, Os:0.02%, Hf:0.13%, Bi:0.14%, calcium oxide: 0.31%, Pulvis Talci: 0.15%, magnesium oxide: 0.24%, copper oxide: 0.44%, ferrum oxide: 0.29%, manganese dioxide: 0.33%, Copper hydrate: 0.17%, hydrated ferric oxide.: 0.08%, calcium hydroxide: 0.07%, barium hydroxide: 0.06%, chlorination Sodium: 0.02%, calcium carbonate: 0.11%, potassium nitrate: 0.26%, magnesium chloride: 0.18%, calcium chloride: 0.21%, potassium chlorate: 0.31%, barium sulfate: 0.37%, copper sulfate: 0.29%, surplus is Fe.
The improvement of technique scheme is: the step of the casting technique of the first flange and the second flange (i) in: b, by upper The alloy solution that step obtains cools down, and during cooling, water-cooled is combined with air cooling, first uses water-cooled with the cooldown rate of 22 DEG C/s Alloy solution water-cooled to 450 DEG C is formed alloy, and then air cooling is to 320 DEG C, then uses water-cooled to incite somebody to action with the cooldown rate of 11 DEG C/s Alloy water-cooled is to room temperature.
The improvement of technique scheme is: the step of the casting technique of the first flange and the second flange (i) in: f, ladle-to-ladle after, Pouring the alloy solution in casting ladle into electric furnace, temperature is down to 1490 degrees Celsius, is sequentially added into the ball of 1.4% in the bag hole of casting ladle Agent and the inovulant of 0.3%, using 6kg sheet metal, steel-sheet thickness is 1mm, covers sheet metal at nodulizer, inovulant On, and consolidate.
The improvement of technique scheme is: the step of the casting technique of the first flange and the second flange (ix) in, cast before use Shell mould is toasted 1 hour, during cast by the hot-air blower that constant temperature is 410 degrees Celsius, and pouring temperature is 1650 degrees Celsius, after cast, Foundry goods is incubated 3 hours in sand mold.
The present invention uses technique scheme to provide the benefit that: (1) is due to the first flange, the second flange and circular filter screen Correspondence position offer at least two arcuate socket respectively, during installation, bolt only need to pass sequentially through arcuate socket just can be by first Flange, the second flange and circular filter screen are fixed, it is not necessary to slowly by the installing hole on the first flange, the second flange and circular filter screen The most slowly align, substantially increase installation effectiveness so that flange is installed and become efficient quick, can effectively accelerate engineering and enter Degree;(2) due to the second flange, the first flange side is provided with annular contiguous block, outside annular contiguous block, is shaped with external screw thread, First flange offers the link slot matched with annular contiguous block, and link slot inwall is shaped with and the external screw thread phase of annular contiguous block The female thread of coupling, first passes through contiguous block when the first flange and the second Flange joint threaded, then is bolted, two Connected mode cooperates so that the connection of the first flange and the second flange more firm stable, greatly reduces because connecting loosely Admittedly the problems such as the leakage caused;(3) owing to being provided with circular filter screen between the first flange and the second flange, can filter and stop Impurity in pipeline and foreign body, as long as periodic cleaning circular filter screen, can effectively prevent line clogging, and clear up and installation side Just quick, less maintenance cost at ordinary times;(4) it has been covered each by due to the first flange and the second flange opposite side surface One rubber sealant and the second rubber sealant, fastening bolt and nut and the first flange and the second flange contact side cover respectively It is stamped the 3rd rubber sealant and the 4th rubber sealant, by the cooperation of four layers of rubber sealant, it is ensured that the sealing of flange The efficient stable of performance, prevents from revealing at connecting portion at flange;(5) it is coated with rubber due to circular filter screen outer ledge Sealing ring, further increases the sealing property of flange, coordinates with four layers of rubber sealant so that flange is complete at connecting portion Hermetically sealed, greatly reduce the probability of leakage;(6) first flange and the of the Ingredient percent casting of the present invention is used Two flanges, have corrosion-resistant, high temperature resistant, intensity is high and the advantage of length in service life;(7) during raw material melting of the present invention, by scalding Bag, ladle-to-ladle, spheroidizing reacion, skimming and the cooperation of slag hitting so that raw material melting is more thorough, that can effectively remove in raw material is miscellaneous Matter, improves casting quality;(8), during raw material melting of the present invention, water-cooled after melting, is used to be combined quickly cooling with air cooling for the first time, after Carry out second time melting, by quickly cooling and secondary smelting, the impurity in greatly reducing originally, improve final casting Quality;(9) using low-temperature wax and the machinery cured mould of casting fabrication techniques, prepared model is the most careful;(10) shell is made During model sand mold, cover the surface placing insulated feeder by EVA adhesive film, can effectively prevent that this surface is contaminated, relative to tradition The method placing band sword iron plate, is suitable for the rising head of all size by EVA adhesive film, convenient efficiently, cost is lower;(11) make During shell model sand mold, combined by the method using vacuum drying oven to be dried with natural-wind dry so that shell mould is dried more thorough The end, is efficient, and the shell mould better quality intensity prepared is higher;(12) use temperature-gradient method baking modes that shell mould is carried out roasting, improve Roasting quality, reduces the probability of shell mould explosion;(13) the shell mould edge that the present invention uses wire cutting machine step (v) to be prepared is every The centre of individual arcuate socket is cut so that after casting, can be conveniently stripped, it is not necessary to crush shell mould so that shell mould Can be used for multiple times, greatly reduce casting cost.
Accompanying drawing explanation
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of the efficient sealed flange of the embodiment of the present invention;
Fig. 2 is the structural representation of the first flange of the efficient sealed flange of the embodiment of the present invention;
Wherein: 1-the first pipe joint;2-nut;3-the 4th rubber sealant;4-the first flange;4a-arcuate socket;5-the first rubber Glue sealant;6-circular filter screen;7-rubber seal ring;8-annular contiguous block;9-the second rubber sealant;10-the second flange; 11-the 3rd rubber sealant;12-fastening bolt;13-second pipe interface.
Detailed description of the invention
Embodiment one
The efficient sealed flange of the present embodiment as illustrated in fig. 1 and 2, including first flange the 4, second flange 10, circular filter screen 6, tight Fixing bolt 12 and nut 2, the correspondence position of first flange the 4, second flange 10 and circular filter screen 6 offers arcuate socket 4a respectively, Fastening bolt 12 sequentially passes through the arcuate socket 4a of the first flange 4, circular filter screen 6 and the second flange 10 and threadeds with nut 2;The Two flanges 10 are provided with annular contiguous block 8 near the first flange 4 side, are shaped with external screw thread, the first flange outside annular contiguous block 8 4 offer the link slot matched with annular contiguous block 8, and the external screw thread that link slot inwall is shaped with annular contiguous block 8 matches Female thread;First flange 4 and the second flange 10 opposite side surface have been covered each by the first rubber sealant 5 and the second rubber Sealant 9, fastening bolt 12 and nut 2 contact side with the first flange 4 and the second flange 10, and to be covered each by the 3rd rubber close Sealing 11 and the 4th rubber sealant 3;Circular filter screen 6 outer ledge is coated with rubber seal ring 7.First flange the 4, second flange 10 and circular filter screen 6 on arcuate socket 4a be respectively four, four arcuate socket 4a are symmetrical arranged two-by-two.First flange 4 and second The opposing both sides of flange 10 are separately installed with the first pipe joint 1 and second pipe interface 13.
In first flange and the second flange, the mass percent of each composition is: C:0.04%, Al:1.07%, Zn:0.24%, Si:0.14%, Mn:0.68%, S :≤0.030%, P :≤0.030%, Cr:0.03%, Ni:0.34%, Cu:0.06%, V:0.12%, Mo:0.11%, Ti:0.48%, B:0.01%, Pd:0.02%, Pt:0.16%, W:0.23%, Ta:0.01%, Nd:0.05%, Ce: 0.01%, Eu:0.12%, Lu:0.11%, Au:0.12%, Ag:0.36%, Ga:0.01%, Y:0.23%, Sn:0.35%, Zr:0.07%, Re:0.03%, Os:0.01%, Hf:0.06%, Bi:0.12%, calcium oxide: 0.23%, Pulvis Talci: 0.13%, magnesium oxide: 0.19%, Copper oxide: 0.36%, ferrum oxide: 0.25%, manganese dioxide: 0.27%, Copper hydrate: 0.15%, hydrated ferric oxide.: 0.06%, Calcium hydroxide: 0.07%, barium hydroxide: 0.05%, sodium chloride: 0.01%, calcium carbonate: 0.07%, potassium nitrate: 0.22%, chlorine Change magnesium: 0.14%, calcium chloride: 0.15%, potassium chlorate: 0.27%, barium sulfate: 0.24%, copper sulfate: 0.26%, surplus is Fe;
The casting technique of the first flange and the second flange comprises the following steps:
(i) melting raw material:
A, add raw materials in smelting furnace by the mass percent of composition each in predetermined flange, the temperature in smelting furnace is brought up to 1450 degrees Celsius to 1480 degrees Celsius, raw material is smelted formation alloy solution;
B, being cooled down by alloy solution obtained in the previous step, during cooling, water-cooled is combined with air cooling, first use water-cooled with 22 DEG C/ Alloy solution water-cooled to 450 DEG C is formed alloy by the cooldown rate of s, and then air cooling is to 320 DEG C, then uses water-cooled with 11 DEG C/s's Cooldown rate by alloy water-cooled to room temperature;
C, heating, the alloy after previous step being cooled down carries out secondary smelting in adding smelting furnace, the temperature in smelting furnace is brought up to 1570 degrees Celsius to 1610 degrees Celsius, alloy is formed alloy solution by secondary smelting;
D, boiling hot bag, pour the alloy solution in smelting furnace into casting ladle, carries out scalding bag;
After e, boiling hot bag, the alloy solution in casting ladle is poured in electric furnace, the temperature in electric furnace is warming up to 1590 degrees Celsius To 1610 degrees Celsius, heat 14 minutes to 18 minutes, the alloy solution in electric furnace is poured into casting ladle, ladle-to-ladle cooling;
F, ladle-to-ladle after, pour the alloy solution in casting ladle into electric furnace, temperature is down to 1490 degrees Celsius, casting ladle bag cheat in successively Adding nodulizer and the inovulant of 0.3% of 1.4%, using 6kg sheet metal, steel-sheet thickness is 1mm, covers sheet metal at ball On agent, inovulant, and consolidate;
G into, the alloy solution in electric furnace is poured the opposite side of casting ladle indent, spheroidizing reacion 70s to 75s, spheroidizing reacion fully after, Spread the slag agent of one layer of collection, quickly skim;
H, quickly skim after, be sprinkled into swelling perlite powder immediately on alloy solution surface, slag hitting twice, after slag hitting completes, formed Alloy solution to be cast, was poured in five minutes;
(ii) prepared by wax-pattern: uses low-temperature wax and machinery casting technology, makes wax that is consistent with cast member and that include insulated feeder Mould, and wax-pattern is repaired, use wax base abluent that wax-pattern is carried out afterwards;
(iii) on the wax-pattern that (ii) step prepares, shell model sand mold is made: this step comprises the steps of
A, wax-pattern place insulated feeder position on, with EVA adhesive film cover place insulated feeder surface, in case this surface is subject to To polluting;
B, it is coated with the first surface layer at wax pattern surface:
First, preparing serosity at wax pattern surface dip-coating zirconium powder with silica sol binder, the viscosity number of this serosity was at 52~56 seconds;
Then, manually float sand with the zircon sand of 150 mesh at the wax pattern surface through dip-coating serosity, after floating sand, EVA glue should be cleared up Residual slurry on film and zircon sand;
3rd, the wax-pattern after manually floating sand carries out natural drying, and drying time is 13~15 hours;
C, the wax pattern surface prepared in step B are coated with the second transition zone:
First, in the wax pattern surface dip-coating serosity of Malaysia powder with silica sol binder preparation that step B is prepared, gluing of this serosity Angle value was at 41~45 seconds;
Then, manually float sand with the Malaysia sand of 65~80 mesh at the wax pattern surface through dip-coating serosity, should clear up after floating sand Residual slurry in EVA adhesive film and Malaysia sand;
3rd, the wax-pattern after manually floating sand is dried in being put in vacuum drying oven, and the temperature controlled in vacuum drying oven is 45~55 degrees Celsius, the air pressure controlled in vacuum drying oven is 110~130Pa, and drying time is 25~30 hours;
D, the wax pattern surface prepared in step C are coated with the 3rd back-up coat:
First, in the wax pattern surface dip-coating serosity of Malaysia powder with silica sol binder preparation that step C is prepared, gluing of this serosity Angle value was at 22~25 seconds;
Then, manually float sand with the Malaysia sand of 15~20 mesh at the wax pattern surface through dip-coating serosity, should clear up after floating sand Residual slurry in EVA adhesive film and Malaysia sand;
3rd, it is dried in wax-pattern is put in vacuum drying oven, the temperature controlled in vacuum drying oven is 58~68 degrees Celsius, The air pressure controlled in vacuum drying oven is 65~95Pa, and drying time is 12~15 hours;
E, the wax pattern surface prepared in step D are coated with the 4th slurry seal layer:
First, in the wax pattern surface dip-coating serosity of Malaysia powder with silica sol binder preparation that step D is prepared, gluing of this serosity Angle value was at 8~12 seconds;
Then, the residual slurry in cleaning EVA adhesive film;
3rd, the wax-pattern after manually floating sand is put under the wind speed of 1.1~1.2 meter per seconds and is dried, and drying time is 12~36 Hour;
(iv) dewaxing: using steam dewaxing, the pressure of steam is 0.6MPa, and the time is 18~55 minutes, and should first will protect before dewaxing Temperature emits the EVA adhesive film of port part and takes off, and prepares shell mould;
(v) shell mould roasting
Use temperature-gradient method baking modes that step shell mould (iv) is carried out roasting, in roasting: first liter 500 degrees Celsius before Temperature speed controlling is at 100 degrees Celsius/hour, secondly, is incubated 1 hour at 500 degrees Celsius, then, is warmed up to 1050 at full speed Celsius Degree, and keep 1050 degrees Celsius of half an hours, cooling of finally coming out of the stove;
(vi) the shell mould that (v) step is prepared by employing wire cutting machine cuts along the centre of each arcuate socket;
(vii) fix with adhesive tape after the shell mould of step (vi) well cutting being spliced completely, put in the sandbox by formative technology preparation, and Seal on this shell mould for the cast gate poured into a mould and insulated feeder with adhesive tape, be then placed in the mixed sand through preparation, pile mixing Carry out ram-jolt with foundry jolter again after sand, form sand mold;
(viii) the sand mold after step (vii) ram-jolt and sandbox plane are struck off, and prick a core at mould surface at interval of 15cm, This core is pricked to from model surface 3~5cm;
(ix) pour into a mould
With the hot-air blower of constant temperature 410 degrees Celsius, shell mould being toasted 1 hour, during cast before Jiao Zhu, pouring temperature is 1650 to take the photograph Family name's degree, after cast, foundry goods is incubated 3 hours in sand mold;
(x) after moulding by casting, carry out the demoulding, every part shell mould is taken off successively, the insulated feeder of excision foundry goods, obtain foundry goods.
Embodiment two
The efficient sealed flange of the present embodiment is essentially identical with embodiment one, and difference is in the first flange and the second flange The mass percent of each composition is: C:0.02%, Al:1.12%, Zn:0.33%, Si:0.21%, Mn:0.77%, S :≤ 0.030%, P :≤0.030%, Cr:0.04%, Ni:0.38%, Cu:0.11%, V:0.14%, Mo:0.13%, Ti:0.59%, B: 0.02%, Pd:0.04%, Pt:0.18%, W:0.25%, Ta:0.02%, Nd:0.09%, Ce:0.02%, Eu:0.13%, Lu: 0.13%, Au:0.14%, Ag:0.44%, Ga:0.02%, Y:0.23%, Sn:0.46%, Zr:0.16%, Re:0.05%, Os:0.02%, Hf:0.13%, Bi:0.14%, calcium oxide: 0.31%, Pulvis Talci: 0.15%, magnesium oxide: 0.24%, copper oxide: 0.44%, oxygen Change ferrum: 0.29%, manganese dioxide: 0.33%, Copper hydrate: 0.17%, hydrated ferric oxide.: 0.08%, calcium hydroxide: 0.07%, Barium hydroxide: 0.06%, sodium chloride: 0.02%, calcium carbonate: 0.11%, potassium nitrate: 0.26%, magnesium chloride: 0.18%, chlorination Calcium: 0.21%, potassium chlorate: 0.31%, barium sulfate: 0.37%, copper sulfate: 0.29%, surplus is Fe.
The present invention is not limited to above-described embodiment.The technical scheme that all employing equivalents are formed, all falls within the present invention and wants The protection domain asked.

Claims (8)

1. an efficient sealed flange, it is characterised in that: include the first flange, the second flange, circular filter screen, fastening bolt and spiral shell Mother, the correspondence position of described first flange, the second flange and circular filter screen offers at least two arcuate socket, described fastening respectively Bolt sequentially passes through the arcuate socket of the first flange, circular filter screen and the second flange and is connected with described nut thread;Described second method The blue annular contiguous block that is provided with near described first flange side, is shaped with external screw thread outside described annular contiguous block, and described first Flange offers the link slot matched with described annular contiguous block, and described link slot inwall is shaped with and described annular contiguous block The female thread that external screw thread matches;Described first flange and the second flange opposite side surface have been covered each by the first rubber seal Layer and the second rubber sealant, described fastening bolt and nut are covered each by with described first flange and the second flange contact side There are the 3rd rubber sealant and the 4th rubber sealant;Described circular filter screen outer ledge is coated with rubber seal ring;
In described first flange and the second flange, the mass percent of each composition is: C:0.02-0.05%, Al:1.06-1.13%, Zn:0.23-0.34%, Si:0.13-0.21%, Mn:0.67-0.78%, S :≤0.030%, P :≤0.030%, Cr:0.02- 0.04%, Ni:0.33-0.39%, Cu:0.05-0.11%, V:0.12-0.14%, Mo:0.11-0.13%, Ti:0.47-0.59%, B: 0.01-0.02%, Pd:0.02-0.04%, Pt:0.16-0.19%, W:0.23-0.26%, Ta:0.01-0.02%, Nd:0.05- 0.11%, Ce:0.01-0.02%, Eu:0.12-0.13%, Lu:0.11-0.13%, Au:0.12-0.14%, Ag:0.35-0.44%, Ga:0.01-0.02%, Y:0.22-0.25%, Sn:0.34-0.47%, Zr:0.06-0.17%, Re:0.02-0.05%, Os:0.01- 0.02%, Hf:0.05-0.13%, Bi:0.11-0.14%, calcium oxide: 0.22-0.33%, Pulvis Talci: 0.13-0.16%, oxidation Magnesium: 0.19-0.25%, copper oxide: 0.35-0.48%, ferrum oxide: 0.24-0.31%, manganese dioxide: 0.26-0.34%, hydrogen Copper oxide: 0.14-0.18%, hydrated ferric oxide.: 0.05-0.09%, calcium hydroxide: 0.06-0.08%, barium hydroxide: 0.04- 0.07%, sodium chloride: 0.01-0.02%, calcium carbonate: 0.06-0.11%, potassium nitrate: 0.21-0.26%, magnesium chloride: 0.13- 0.18%, calcium chloride: 0.13-0.22%, potassium chlorate: 0.26-0.32%, barium sulfate: 0.23-0.37%, copper sulfate: 0.24- 0.31%, surplus is Fe;
The casting technique of described first flange and the second flange comprises the following steps:
(i) melting raw material:
A, add raw materials in smelting furnace by the mass percent of composition each in predetermined flange, the temperature in smelting furnace is brought up to 1450 degrees Celsius to 1480 degrees Celsius, raw material is smelted formation alloy solution;
B, being cooled down by alloy solution obtained in the previous step, during cooling, water-cooled is combined with air cooling, first uses water-cooled with 20-22 DEG C/alloy solution water-cooled forms alloy to 430-450 DEG C by the cooldown rate of s, then air cooling is to 320-340 DEG C, then uses water The cold cooldown rate with 11-12 DEG C/s by alloy water-cooled to room temperature;
C, heating, the alloy after previous step being cooled down carries out secondary smelting in adding smelting furnace, the temperature in smelting furnace is brought up to 1570 degrees Celsius to 1610 degrees Celsius, alloy is formed alloy solution by secondary smelting;
D, boiling hot bag, pour the alloy solution in smelting furnace into casting ladle, carries out scalding bag;
After e, boiling hot bag, the alloy solution in casting ladle is poured in electric furnace, the temperature in electric furnace is warming up to 1590 degrees Celsius To 1610 degrees Celsius, heat 14 minutes to 18 minutes, the alloy solution in electric furnace is poured into casting ladle, ladle-to-ladle cooling;
F, ladle-to-ladle after, pour the alloy solution in casting ladle into electric furnace, temperature is down to 1480 to 1510 degrees Celsius, casting ladle bag cheat In be sequentially added into the nodulizer of 1.4% to 1.5% and the inovulant of 0.2% to 0.3%, with 5 to 6kg sheet metal, steel-sheet thickness For 0.5mm to 1mm, sheet metal is covered on nodulizer, inovulant, and consolidates;
G into, the alloy solution in electric furnace is poured the opposite side of casting ladle indent, spheroidizing reacion 70s to 75s, spheroidizing reacion fully after, Spread the slag agent of one layer of collection, quickly skim;
H, quickly skim after, be sprinkled into swelling perlite powder immediately on alloy solution surface, slag hitting twice, after slag hitting completes, formed Alloy solution to be cast, was poured in five minutes;
(ii) prepared by wax-pattern: uses low-temperature wax and machinery casting technology, makes wax that is consistent with cast member and that include insulated feeder Mould, and wax-pattern is repaired, use wax base abluent that wax-pattern is carried out afterwards;
(iii) on the wax-pattern that (ii) step prepares, shell model sand mold is made: this step comprises the steps of
A, wax-pattern place insulated feeder position on, with EVA adhesive film cover place insulated feeder surface, in case this surface is subject to To polluting;
B, it is coated with the first surface layer at wax pattern surface:
First, preparing serosity at wax pattern surface dip-coating zirconium powder with silica sol binder, the viscosity number of this serosity was at 52~56 seconds;
Then, manually float sand with the zircon sand of 150 mesh at the wax pattern surface through dip-coating serosity, should clear up described after floating sand Residual slurry in EVA adhesive film and zircon sand;
3rd, the wax-pattern after manually floating sand carries out natural drying, and drying time is 13~15 hours;
C, the wax pattern surface prepared in step B are coated with the second transition zone:
First, in the wax pattern surface dip-coating serosity of Malaysia powder with silica sol binder preparation that step B is prepared, gluing of this serosity Angle value was at 41~45 seconds;
Then, manually float sand with the Malaysia sand of 65~80 mesh at the wax pattern surface through dip-coating serosity, should clear up after floating sand Residual slurry in described EVA adhesive film and Malaysia sand;
3rd, the wax-pattern after manually floating sand is dried in being put in vacuum drying oven, and the temperature controlled in vacuum drying oven is 45~55 degrees Celsius, the air pressure controlled in vacuum drying oven is 110~130Pa, and drying time is 25~30 hours;
D, the wax pattern surface prepared in step C are coated with the 3rd back-up coat:
First, in the wax pattern surface dip-coating serosity of Malaysia powder with silica sol binder preparation that step C is prepared, gluing of this serosity Angle value was at 22~25 seconds;
Then, manually float sand with the Malaysia sand of 15~20 mesh at the wax pattern surface through dip-coating serosity, should clear up after floating sand Residual slurry in described EVA adhesive film and Malaysia sand;
3rd, it is dried in wax-pattern is put in vacuum drying oven, the temperature controlled in vacuum drying oven is 58~68 degrees Celsius, The air pressure controlled in vacuum drying oven is 65~95Pa, and drying time is 12~15 hours;
E, the wax pattern surface prepared in step D are coated with the 4th slurry seal layer:
First, in the wax pattern surface dip-coating serosity of Malaysia powder with silica sol binder preparation that step D is prepared, gluing of this serosity Angle value was at 8~12 seconds;
Then, the residual slurry in described EVA adhesive film is cleared up;
3rd, the wax-pattern after manually floating sand is put under the wind speed of 1.1~1.2 meter per seconds and is dried, and drying time is 12~36 Hour;
(iv) dewaxing: using steam dewaxing, the pressure of steam is 0.6MPa, and the time is 18~55 minutes, and should first will protect before dewaxing Temperature emits the EVA adhesive film of port part and takes off, and prepares shell mould;
(v) shell mould roasting
Use temperature-gradient method baking modes that step shell mould (iv) is carried out roasting, in roasting: first liter 500 degrees Celsius before Temperature speed controlling is at 100 degrees Celsius/hour, secondly, is incubated 1 hour at 500 degrees Celsius, then, is warmed up to 1050 at full speed Celsius Degree, and keep 1050 degrees Celsius of half an hours, cooling of finally coming out of the stove;
(vi) the shell mould that (v) step is prepared by employing wire cutting machine cuts along the centre of each arcuate socket;
(vii) fix with adhesive tape after the shell mould of step (vi) well cutting being spliced completely, put in the sandbox by formative technology preparation, and Seal on this shell mould for the cast gate poured into a mould and insulated feeder with adhesive tape, be then placed in the mixed sand through preparation, pile mixing Carry out ram-jolt with foundry jolter again after sand, form sand mold;
(viii) the sand mold after step (vii) ram-jolt and sandbox plane are struck off, and prick a core at mould surface at interval of 15cm, This core is pricked to from model surface 3~5cm;
(ix) pour into a mould
With the hot-air blower of constant temperature 400~420 degrees Celsius, shell mould being toasted 1 hour, during cast before Jiao Zhu, pouring temperature is 1550~1650 degrees Celsius, after cast, foundry goods is incubated 2~3 hours in sand mold;
(x) after moulding by casting, carry out the demoulding, every part shell mould is taken off successively, the insulated feeder of excision foundry goods, obtain foundry goods.
Efficient sealed flange the most according to claim 1, it is characterised in that: described first flange, the second flange and circle Arcuate socket on filter screen is respectively four, and described four arcuate sockets are symmetrical arranged two-by-two.
Efficient sealed flange the most according to claim 2, it is characterised in that: described first flange and the second flange are opposing Both sides are separately installed with pipe joint.
Efficient sealed flange the most according to claim 3, it is characterised in that: described first flange and the second flange respectively become The mass percent divided is: C:0.04%, Al:1.07%, Zn:0.24%, Si:0.14%, Mn:0.68%, S :≤0.030%, P: ≤ 0.030%, Cr:0.03%, Ni:0.34%, Cu:0.06%, V:0.12%, Mo:0.11%, Ti:0.48%, B:0.01%, Pd: 0.02%, Pt:0.16%, W:0.23%, Ta:0.01%, Nd:0.05%, Ce:0.01%, Eu:0.12%, Lu:0.11%, Au: 0.12%, Ag:0.36%, Ga:0.01%, Y:0.23%, Sn:0.35%, Zr:0.07%, Re:0.03%, Os:0.01%, Hf:0.06%, Bi:0.12%, calcium oxide: 0.23%, Pulvis Talci: 0.13%, magnesium oxide: 0.19%, copper oxide: 0.36%, ferrum oxide: 0.25%, manganese dioxide: 0.27%, Copper hydrate: 0.15%, hydrated ferric oxide.: 0.06%, calcium hydroxide: 0.07%, hydroxide Barium: 0.05%, sodium chloride: 0.01%, calcium carbonate: 0.07%, potassium nitrate: 0.22%, magnesium chloride: 0.14%, calcium chloride: 0.15%, potassium chlorate: 0.27%, barium sulfate: 0.24%, copper sulfate: 0.26%, surplus is Fe.
Efficient sealed flange the most according to claim 3, it is characterised in that: described first flange and the second flange respectively become The mass percent divided is: C:0.02%, Al:1.12%, Zn:0.33%, Si:0.21%, Mn:0.77%, S :≤0.030%, P: ≤ 0.030%, Cr:0.04%, Ni:0.38%, Cu:0.11%, V:0.14%, Mo:0.13%, Ti:0.59%, B:0.02%, Pd: 0.04%, Pt:0.18%, W:0.25%, Ta:0.02%, Nd:0.09%, Ce:0.02%, Eu:0.13%, Lu:0.13%, Au: 0.14%, Ag:0.44%, Ga:0.02%, Y:0.23%, Sn:0.46%, Zr:0.16%, Re:0.05%, Os:0.02%, Hf:0.13%, Bi:0.14%, calcium oxide: 0.31%, Pulvis Talci: 0.15%, magnesium oxide: 0.24%, copper oxide: 0.44%, ferrum oxide: 0.29%, manganese dioxide: 0.33%, Copper hydrate: 0.17%, hydrated ferric oxide.: 0.08%, calcium hydroxide: 0.07%, hydroxide Barium: 0.06%, sodium chloride: 0.02%, calcium carbonate: 0.11%, potassium nitrate: 0.26%, magnesium chloride: 0.18%, calcium chloride: 0.21%, potassium chlorate: 0.31%, barium sulfate: 0.37%, copper sulfate: 0.29%, surplus is Fe.
6. according to the efficient sealed flange described in any claim of claim 1-5, it is characterised in that: described first flange With the step of the casting technique of the second flange (i) in: b, alloy solution obtained in the previous step is cooled down, water-cooled during cooling Be combined with air cooling, first use water-cooled, with the cooldown rate of 22 DEG C/s, alloy solution water-cooled to 450 DEG C is formed alloy, then air cooling To 320 DEG C, then use water-cooled with the cooldown rate of 11 DEG C/s by alloy water-cooled to room temperature.
7. according to the efficient sealed flange described in any claim of claim 1-5, it is characterised in that: described first flange With the step of the casting technique of the second flange (i) in: f, ladle-to-ladle after, pour the alloy solution in casting ladle into electric furnace, temperature is down to 1490 degrees Celsius, in the bag hole of casting ladle, it is sequentially added into the nodulizer of 1.4% and the inovulant of 0.3%, uses 6kg sheet metal, Bao Gang The thickness of plate is 1mm, is covered on nodulizer, inovulant by sheet metal, and consolidates.
8. according to the efficient sealed flange described in any claim of claim 1-5, it is characterised in that: described first flange With the step of the casting technique of the second flange (ix) in, with the hot-air blower of constant temperature 410 degrees Celsius, shell mould is toasted 1 before cast little Time, during cast, pouring temperature is 1650 degrees Celsius, and after cast, foundry goods is incubated 3 hours in sand mold.
CN201610606805.XA 2016-07-29 2016-07-29 A kind of efficient sealed flange Active CN106247048B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610606805.XA CN106247048B (en) 2016-07-29 2016-07-29 A kind of efficient sealed flange

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610606805.XA CN106247048B (en) 2016-07-29 2016-07-29 A kind of efficient sealed flange

Publications (2)

Publication Number Publication Date
CN106247048A true CN106247048A (en) 2016-12-21
CN106247048B CN106247048B (en) 2018-08-31

Family

ID=57603816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610606805.XA Active CN106247048B (en) 2016-07-29 2016-07-29 A kind of efficient sealed flange

Country Status (1)

Country Link
CN (1) CN106247048B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107166116A (en) * 2017-05-26 2017-09-15 东台市建东机械制造有限公司 A kind of novel flange
CN107387508A (en) * 2017-07-11 2017-11-24 江苏盐发机械有限公司 A kind of high pressure resistant flange and its production technology
CN107385331A (en) * 2017-07-07 2017-11-24 安徽同盛环件股份有限公司 A kind of high-strength corrosion-resisting flange forge piece and its production technology
CN107574760A (en) * 2017-09-30 2018-01-12 中铁大桥局第七工程有限公司 Assembled displacement steel pipe column coupling bar and its installation method
CN107676478A (en) * 2017-11-17 2018-02-09 东台市富康机械有限公司 Hydraulic pressure handling machinery alternating expression seal
CN107699743A (en) * 2017-09-30 2018-02-16 南京惠德机械有限公司 A kind of production technology of corrosion resistant automobile exhaust system adpting flange
CN108119712A (en) * 2017-12-29 2018-06-05 广州市上腾电子科技有限公司 A kind of flange and the connection system using the flange
CN108330400A (en) * 2018-01-19 2018-07-27 辽宁顺通机械科技有限公司 Edge face sealing member material
CN112769312A (en) * 2020-12-30 2021-05-07 北京航空航天大学 Dynamic seal transmission device
CN112945301A (en) * 2021-02-03 2021-06-11 南京国中环保工程有限公司 Intelligent environment on-line monitoring device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2450664A1 (en) * 1973-10-24 1975-04-30 Johnson Matthey Co Ltd CATALYST
CN101104201A (en) * 2006-07-10 2008-01-16 浙江高中压阀门有限公司 Sand mould casting method for large-scale high-temperature alloy cast
CN202708402U (en) * 2012-06-17 2013-01-30 无锡市优耐特石化装备有限公司 Flange cover connection structure with precoating sealing layer
CN202946806U (en) * 2012-08-10 2013-05-22 江苏瀚森不锈钢有限公司 Pipe flange
CN203533028U (en) * 2013-10-23 2014-04-09 钟波 Slipknot type flange
CN105689653A (en) * 2016-01-19 2016-06-22 大丰市洪联铸钢有限责任公司 Casting process for high-temperature water-pressure-resisting combined flange

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2450664A1 (en) * 1973-10-24 1975-04-30 Johnson Matthey Co Ltd CATALYST
CN101104201A (en) * 2006-07-10 2008-01-16 浙江高中压阀门有限公司 Sand mould casting method for large-scale high-temperature alloy cast
CN202708402U (en) * 2012-06-17 2013-01-30 无锡市优耐特石化装备有限公司 Flange cover connection structure with precoating sealing layer
CN202946806U (en) * 2012-08-10 2013-05-22 江苏瀚森不锈钢有限公司 Pipe flange
CN203533028U (en) * 2013-10-23 2014-04-09 钟波 Slipknot type flange
CN105689653A (en) * 2016-01-19 2016-06-22 大丰市洪联铸钢有限责任公司 Casting process for high-temperature water-pressure-resisting combined flange

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107166116A (en) * 2017-05-26 2017-09-15 东台市建东机械制造有限公司 A kind of novel flange
CN107385331A (en) * 2017-07-07 2017-11-24 安徽同盛环件股份有限公司 A kind of high-strength corrosion-resisting flange forge piece and its production technology
CN107387508A (en) * 2017-07-11 2017-11-24 江苏盐发机械有限公司 A kind of high pressure resistant flange and its production technology
CN107574760A (en) * 2017-09-30 2018-01-12 中铁大桥局第七工程有限公司 Assembled displacement steel pipe column coupling bar and its installation method
CN107699743A (en) * 2017-09-30 2018-02-16 南京惠德机械有限公司 A kind of production technology of corrosion resistant automobile exhaust system adpting flange
CN107574760B (en) * 2017-09-30 2023-10-20 中铁大桥局第七工程有限公司 Assembled variable-pitch steel pipe column connecting rod and installation method thereof
CN107676478A (en) * 2017-11-17 2018-02-09 东台市富康机械有限公司 Hydraulic pressure handling machinery alternating expression seal
CN108119712A (en) * 2017-12-29 2018-06-05 广州市上腾电子科技有限公司 A kind of flange and the connection system using the flange
CN108330400A (en) * 2018-01-19 2018-07-27 辽宁顺通机械科技有限公司 Edge face sealing member material
CN112769312A (en) * 2020-12-30 2021-05-07 北京航空航天大学 Dynamic seal transmission device
CN112945301A (en) * 2021-02-03 2021-06-11 南京国中环保工程有限公司 Intelligent environment on-line monitoring device

Also Published As

Publication number Publication date
CN106247048B (en) 2018-08-31

Similar Documents

Publication Publication Date Title
CN106247048A (en) A kind of efficient sealed flange
CN106224667B (en) A kind of quick firm flange of connection
CN106244953A (en) A kind of connection filters flange efficiently
CN106247058B (en) A kind of multi-pipeline connecting flange
CN108968667B (en) Electric pressure cooker
CN202193830U (en) Smelting device for copper-phosphorus brazing filler metal
CN103268963B (en) One is internalized into storage battery manufacture craft
CN106762071A (en) A kind of automobile engine to exhaust joint and its production technology
CN106837507A (en) A kind of internal combustion engine cooling water pump and its production technology
CN106636927A (en) Production process of cooling water pump for high-speed gear box
CN107723611A (en) A kind of processing technology of valve Anti-corrosion flange
US4004790A (en) Plate-type radiator suitable for shaft furnaces, particularly for blast furnaces, and a method for fabrication of this radiator
US3186042A (en) Hot top gasket
CN107893193A (en) A kind of processing technology of valve fire resisting flange
CN107904499A (en) A kind of processing technology of valve seal ring
CN104089483A (en) Intermediate frequency smelting furnace building technology
CN101665852A (en) Method for repairing metal mixer casting lining
CN107699743A (en) A kind of production technology of corrosion resistant automobile exhaust system adpting flange
CN107782131A (en) The recovery system of aluminum alloy doors and windows waste material
CN206571565U (en) A kind of internal combustion engine cooling water pump
CN106481426A (en) A kind of automobile engine to exhaust adapter and its production technology
CN107774935A (en) A kind of melting furnace that can completely cut off air in the casting stage
CN107790651B (en) A method of improving steel ingot cooling condition
CN204685983U (en) A kind of material collecting device of pot type rewinding vacuum induction melting rapid hardening furnace
CN218818550U (en) Exhaust valve heat preservation cover

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant