CN106246187A - Multiple spot arranges a kind of self well digging construction method of interior shaft sinking shaft facility - Google Patents

Multiple spot arranges a kind of self well digging construction method of interior shaft sinking shaft facility Download PDF

Info

Publication number
CN106246187A
CN106246187A CN201610716117.9A CN201610716117A CN106246187A CN 106246187 A CN106246187 A CN 106246187A CN 201610716117 A CN201610716117 A CN 201610716117A CN 106246187 A CN106246187 A CN 106246187A
Authority
CN
China
Prior art keywords
shaft
chamber
facility
sinking
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610716117.9A
Other languages
Chinese (zh)
Other versions
CN106246187B (en
Inventor
李文光
张小刚
刘焕鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SANSHANDAO GOLD MINE SHANDONG GOLD MINING (LAIZHOU) CO Ltd
Original Assignee
SANSHANDAO GOLD MINE SHANDONG GOLD MINING (LAIZHOU) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SANSHANDAO GOLD MINE SHANDONG GOLD MINING (LAIZHOU) CO Ltd filed Critical SANSHANDAO GOLD MINE SHANDONG GOLD MINING (LAIZHOU) CO Ltd
Priority to CN201610716117.9A priority Critical patent/CN106246187B/en
Publication of CN106246187A publication Critical patent/CN106246187A/en
Application granted granted Critical
Publication of CN106246187B publication Critical patent/CN106246187B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/04Lining shafts; Linings therefor with brick, concrete, stone, or similar building materials
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/12Accessories for making shaft linings, e.g. suspended cradles, shutterings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D7/00Shaft equipment, e.g. timbering within the shaft
    • E21D7/02Arrangement of guides for cages in shafts; Connection of guides for cages to shaft walls

Abstract

The present invention relates to multiple spot and arrange a kind of self well digging construction method of interior shaft sinking shaft facility, change the pattern that conventional sinking shaft measures engineering list is horizontally disposed, make full use of existing engineering, achieve multiple spot in the range of vertical space and arrange the new approaches of interior shaft sinking shaft facility, also achieve pit shaft hanging scaffold signal, 600m hole top signal, 575m turns over gangue dumping platform, 555m mixing plant, 537m hoist engine runs device signal uniform synchronization and carries out, and is feasible in theory and lifting safety requirements.

Description

Multiple spot arranges a kind of self well digging construction method of interior shaft sinking shaft facility
Technical field
The present invention relates to the construction method of self well digging.
Background technology
As in the interior shaft engineering construction of prior art, interior shaft sinking shaft facility typically uses single horizontally disposed form, Its major defect is: the first, the single horizontally disposed sinking shaft narrow space in down-hole, potential safety hazard is big;The second, the single horizontally disposed need in down-hole Wanting more interim sinking shaft chamber, the stability of permanent system engineering is created than more serious damaging influence by this;The Three, the driving amount of measures engineering is big, and long construction period adds construction cost.
Summary of the invention
The technical problem to be solved is to provide a kind of multiple spot and arranges a kind of pit shaft pick of interior shaft sinking shaft facility Build construction method, make full use of existing measures engineering and the permanent works constructed, to decrease the driving of measures engineering Amount, and improve working security.
Technical scheme is as follows:
Multiple spot arranges a kind of self well digging construction method of interior shaft sinking shaft facility, it is characterised in that comprise the following steps:
The first step: using parallel construction mode to construct interior shaft well cap engineering, step is as follows:
1), in the position in respectively working measure tunnel, interior shaft-537m ,-555m and-600m place to pit shaft, then interior shaft- Above 537m construction hoisting machine chamber and-555m working measure engineering tunnel, mixing plant chamber, yellow sand cement chamber and Stone chamber, and start to construct-600m respectively to-575m ore storage bin and-600m to the light section of-555m pit shaft from-600m;
2), after step 1) engineering construction terminates, implement pit shaft at-600m to-555m section and expand brush, and in-575m construction distribution Dolly chamber;
3), in step 2) after engineering construction terminates, close-555m well head;Then at-537m to-555m construction guide wheel chamber, and P-600m pours to-575m ore storage bin, then installs ore drawing facility at-600m to-575m ore storage bin end opening.
Second: carry out interior shaft wellbore section-600m to the layout of top sinking shaft facility of-1240m, installment work, step Rapid as follows:
1), promote erection of equipment what-537m elevator chamber and guide wheel chamber carried out sinking shaft respectively: at guide wheel chamber temporarily Sinking headframe is installed;And utilize-537m elevator chamber, guide wheel chamber ,-537m return aircourse and-537m cross hairs chamber Some stable cars of space mounting;And separately dig big section and in this big section setting winch;
2), utilize working measure tunnel at-555m, be stirred stand chamber, yellow sand cement chamber and stone chamber respectively Arrange;
3), utilize distribution dolly chamber at-575m, in the pit shaft of well cap, reinforce-575m and turn over gangue dumping platform and turn over cash groove, make well The barren rock of cylinder driving turns over gangue dumping platform through well-bucket entrance and is directly entered in described-575m ore storage bin, is then transported to newly found main shaft And it is promoted to earth's surface;
4), at-600m, hole top signal system and distribution system are installed.
In the step 4) of second, personnel, transferring of material are each provided at-600m well head;Former discarded chamber becomes as interim Electricity institute and compressor house, be respectively mounted pressure fan, transformator and corresponding low-tension switch cabinet for pressure fan, temporary drainage, suspending pump And inferior power electricity consumption on well head.
The step 3) of the first step is prepared from accordance with the following methods for the material closing-555m well head: use 40# I-steel 120m, I-steel two diameter 32mm twisted steel anchor rod fixes, 38kg rail 200m, and thick 8mm steel plate 60 is completed, welded After, pour the thick concrete of 0.5m above, after solidification, pad the thick buffering slag of 2m.
The positive effect of the present invention is: in the inventive method, and interior shaft is arranged fully at the facility that faces greatly of shaft excavation Make use of existing measures engineering and the permanent works constructed, arrange chisel at-537m ,-555m ,-575m and-600m respectively Well installations and facilities, it is achieved that cost efficiency also improves working security.It is in particular in the following aspects:
1, change the pattern that conventional sinking shaft measures engineering list is horizontally disposed, reached multiple spot in the range of vertical space and arranged blind The purpose of vertical shaft sinking shaft facility, has reached pit shaft hanging scaffold signal ,-600m hole top signal ,-575m turns over gangue dumping platform ,-555m stirs simultaneously Mix station and-537m hoist engine runs the purpose that device signal uniform synchronization is carried out.
2, utilize the permanent ore storage bin of-575m to-600m as unloading ore storage bin, change original direct truck and be transported to earth's surface Means of transportation, be directly transported to newly to stand main shaft hooist by electric locomotive to earth's surface by main haulage roadway after unloading, be greatly saved fortune Defeated cost.Through adjusting, 9.11 yuan/t of actual saving.
3, carry out sinking shaft at-537m elevator chamber and guide wheel chamber, erection of equipment is faced greatly in interim lifting, at directive wheel base A set of sinking headframe is installed in the upper processing in plinth hole, takes full advantage of construction work, it also avoid simultaneously and dig too many at-537m The chamber destruction to the steadiness of whole elevator chamber.
4, at-600m, hole top signal and distribution system, the well head head of the horse take full advantage of former discarded chamber, constructing are installed Door and cage assemble chamber.Solve personnel and equipment up and down and the stacking problem of material, safe efficient for pit shaft, Quickly driving creates condition.
Detailed description of the invention
The method further illustrating the present invention below in conjunction with specific embodiment.
The first step: use parallel construction mode (parallel construction: construction simultaneously or respectively construction) construction interior shaft well cap Engineering, acts on one: the layout for interior shaft pit shaft sinking shaft facility provides condition;Effect two: in interior shaft well cap is constructed, it is achieved Multilevel parallel, the speedy drivage of cross-operation.Specifically comprise the following steps that
1), in the position in respectively working measure tunnel, interior shaft-537m ,-555m and-600m place to pit shaft, then interior shaft- Above 537m construction hoisting machine chamber (long 18.7m, wide 14.1m, high 15.65m) and at-555m working measure engineering tunnel, stir Mix station chamber, yellow sand cement chamber and stone chamber, and from-600m start to construct respectively-600m to-575m ore storage bin and- The light section of 600m extremely-555m pit shaft.
2), after step 1) engineering construction terminates, implement pit shaft at-600m to-555m section and expand brush, and construct at-575m Distribution dolly chamber.
3), in step 2) after engineering construction terminates, close-555m well head;Then at-537m to-555m construction guide wheel cave Room (long 12m, wide 10.5m, high 9m), and p-600m pours to-575m ore storage bin, then under-600m to-575m ore storage bin Mouth installs ore drawing facility.
Closing-555m well head: use 40# I-steel 120m, I-steel two diameter 32mm twisted steel anchor rod is fixed, 38kg Rail 200m, thick 8mm steel plate 60 completes, weld after, pour the thick concrete of 0.5m above, after solidification, pad the thick buffering of 2m Slag, is used for closing-555m well head.
Second: carry out interior shaft wellbore section-600m to the layout of top sinking shaft facility of-1240m, installment work.
1) the large-scale interim lifting erection of equipment of sinking shaft, is carried out respectively at-537m elevator chamber and guide wheel chamber: Guide wheel chamber installs a set of sinking headframe;And utilize-537m elevator chamber, guide wheel chamber ,-537m return aircourse and-537m 9 stable cars of the space mounting of cross hairs chamber, wherein 3 10 tons of stable cars of hanging scaffold, 3 10 tons of stable cars of synovial membrane, pipeline 1 10 tons are surely Car, 1, suspending pump double 16 tons of stable cars, the special 5 tons of stable cars of emergency staircase 1.And dig big section separately and in this big section One 2.5m winch is installed.
Take full advantage of the engineerings such as elevator chamber, guide wheel chamber ,-537 meters of return aircoursies ,-537m cross hairs chambers;Profit Doing temporary transformer station with-537m switchgear house, install corresponding high-tension switch cabinet, to winch and transformer-supplied, winch high pressure is 600KW/6000V, installs a 400KVA transformator and corresponding low-tension switch cabinet simultaneously, supplies to stable vehicles and electric controll winch Electricity.
2), utilize working measure tunnel at-555m, be stirred stand chamber, yellow sand cement chamber and stone cave respectively The layout of room.
3), utilize distribution dolly chamber at-575m, in the pit shaft of well cap, reinforce-575m and turn over gangue dumping platform and turn over cash groove, The barren rock making shaft excavation turns over gangue dumping platform through well-bucket entrance and is directly entered in described-575m ore storage bin, is then transported to new vertical Main shaft is also promoted to earth's surface.
4), at-600m, hole top signal system and distribution system are installed.Personnel, transferring of material are each provided at-600m well head. Former discarded chamber, as temporary transformer station and compressor house, is installed the pressure fan of two 20m, is installed a 800KVA transformator And corresponding low-tension switch cabinet, for power electricity consumption inferior on pressure fan, temporary drainage, suspending pump and well head.

Claims (3)

1. multiple spot arranges a kind of self well digging construction method of interior shaft sinking shaft facility, it is characterised in that comprise the following steps:
The first step: using parallel construction mode to construct interior shaft well cap engineering, step is as follows:
1), in the position in respectively working measure tunnel, interior shaft-537m ,-555m and-600m place to pit shaft, then interior shaft- Above 537m construction hoisting machine chamber and-555m working measure engineering tunnel, mixing plant chamber, yellow sand cement chamber and Stone chamber, and start to construct-600m respectively to-575m ore storage bin and-600m to the light section of-555m pit shaft from-600m;
2), after step 1) engineering construction terminates, implement pit shaft at-600m to-555m section and expand brush, and in-575m construction distribution Dolly chamber;
3), in step 2) after engineering construction terminates, close-555m well head;Then at-537m to-555m construction guide wheel chamber, and P-600m pours to-575m ore storage bin, then installs ore drawing facility at-600m to-575m ore storage bin end opening;
Second: carrying out the interior shaft wellbore section-600m extremely layout of top sinking shaft facility of-1240m, installment work, step is such as Under:
1), promote erection of equipment what-537m elevator chamber and guide wheel chamber carried out sinking shaft respectively: at guide wheel chamber temporarily Sinking headframe is installed;And utilize-537m elevator chamber, guide wheel chamber ,-537m return aircourse and-537m cross hairs chamber Some stable cars of space mounting;And separately dig big section and in this big section setting winch;
2), utilize working measure tunnel at-555m, be stirred stand chamber, yellow sand cement chamber and stone chamber respectively Arrange;
3), utilize distribution dolly chamber at-575m, in the pit shaft of well cap, reinforce-575m and turn over gangue dumping platform and turn over cash groove, make well The barren rock of cylinder driving turns over gangue dumping platform through well-bucket entrance and is directly entered in described-575m ore storage bin, is then transported to newly found main shaft And it is promoted to earth's surface;
4), at-600m, hole top signal system and distribution system are installed.
2. multiple spot as claimed in claim 1 arranges a kind of self well digging construction method of interior shaft sinking shaft facility, and its feature exists In: in the step 4) of second, personnel, transferring of material are each provided at-600m well head;Former discarded chamber as temporary transformer station with Compressor house, is respectively mounted pressure fan, transformator and corresponding low-tension switch cabinet for pressure fan, temporary drainage, suspending pump and well head Upper inferior power electricity consumption.
3. multiple spot as claimed in claim 1 or 2 arranges a kind of self well digging construction method of interior shaft sinking shaft facility, its feature It is that the step 3) of the first step is prepared from accordance with the following methods for the material closing-555m well head: use 40# I-steel 120m, I-steel two diameter 32mm twisted steel anchor rod fixes, 38kg rail 200m, and thick 8mm steel plate 60 is completed, welded After, pour the thick concrete of 0.5m above, after solidification, pad the thick buffering slag of 2m.
CN201610716117.9A 2016-08-25 2016-08-25 Multiple spot arranges a kind of self well digging construction method of interior shaft sinking shaft facility Active CN106246187B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610716117.9A CN106246187B (en) 2016-08-25 2016-08-25 Multiple spot arranges a kind of self well digging construction method of interior shaft sinking shaft facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610716117.9A CN106246187B (en) 2016-08-25 2016-08-25 Multiple spot arranges a kind of self well digging construction method of interior shaft sinking shaft facility

Publications (2)

Publication Number Publication Date
CN106246187A true CN106246187A (en) 2016-12-21
CN106246187B CN106246187B (en) 2018-04-27

Family

ID=57596126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610716117.9A Active CN106246187B (en) 2016-08-25 2016-08-25 Multiple spot arranges a kind of self well digging construction method of interior shaft sinking shaft facility

Country Status (1)

Country Link
CN (1) CN106246187B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577988A (en) * 2018-11-16 2019-04-05 北京中煤矿山工程有限公司 A kind of blind oblique vertical shaft parallel construction method of metal mine
CN109630179A (en) * 2018-12-18 2019-04-16 中煤第建设有限公司 The permanent fore shaft of return air shafts and wind cave piling wall combined construction method
CN113356859A (en) * 2021-06-10 2021-09-07 山东黄金矿业(莱州)有限公司三山岛金矿 Pouring and mounting construction method between permanent engineering layers of blind shaft well cap

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3608822A1 (en) * 1986-03-17 1987-09-24 Deilmann Haniel Gmbh Guide arrangement for blind shafts
CN203199861U (en) * 2013-01-11 2013-09-18 玉溪大红山矿业有限公司 Bearing device for operations at mouth of blind shaft
CN203374282U (en) * 2013-06-13 2014-01-01 中国瑞林工程技术有限公司 Head sheave chamber arrangement structure of mine underground grounded multi-rope lifting system
CN103953368A (en) * 2014-05-14 2014-07-30 山东黄金矿业(莱州)有限公司三山岛金矿 Three-layer combined tunneling construction method for chamber of extra-large elevator
CN103967503A (en) * 2014-05-07 2014-08-06 中钢集团马鞍山矿山研究院有限公司 Production-stop-free transformation method for tower type interior shaft elevating system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3608822A1 (en) * 1986-03-17 1987-09-24 Deilmann Haniel Gmbh Guide arrangement for blind shafts
CN203199861U (en) * 2013-01-11 2013-09-18 玉溪大红山矿业有限公司 Bearing device for operations at mouth of blind shaft
CN203374282U (en) * 2013-06-13 2014-01-01 中国瑞林工程技术有限公司 Head sheave chamber arrangement structure of mine underground grounded multi-rope lifting system
CN103967503A (en) * 2014-05-07 2014-08-06 中钢集团马鞍山矿山研究院有限公司 Production-stop-free transformation method for tower type interior shaft elevating system
CN103953368A (en) * 2014-05-14 2014-07-30 山东黄金矿业(莱州)有限公司三山岛金矿 Three-layer combined tunneling construction method for chamber of extra-large elevator

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577988A (en) * 2018-11-16 2019-04-05 北京中煤矿山工程有限公司 A kind of blind oblique vertical shaft parallel construction method of metal mine
CN109577988B (en) * 2018-11-16 2021-07-02 北京中煤矿山工程有限公司 Parallel construction method for blind inclined shaft of metal mine
CN109630179A (en) * 2018-12-18 2019-04-16 中煤第建设有限公司 The permanent fore shaft of return air shafts and wind cave piling wall combined construction method
CN113356859A (en) * 2021-06-10 2021-09-07 山东黄金矿业(莱州)有限公司三山岛金矿 Pouring and mounting construction method between permanent engineering layers of blind shaft well cap
CN113356859B (en) * 2021-06-10 2024-02-20 山东黄金矿业(莱州)有限公司三山岛金矿 Interlayer pouring and installing construction method for permanent engineering of blind vertical shaft cap

Also Published As

Publication number Publication date
CN106246187B (en) 2018-04-27

Similar Documents

Publication Publication Date Title
CN103032073B (en) Urban subway mudstone stratum connected aisle and shield tunneling parallel construction method
CN106437737B (en) Pipe jacking type coal mine small-section roadway tunneling method
CN103696774B (en) Aboveground down-hole parallel construction staple shaft frame development method
CN111810180B (en) Construction method for ultra-large-diameter earth pressure balance jacking pipe to penetrate through expressway
CN106246187B (en) Multiple spot arranges a kind of self well digging construction method of interior shaft sinking shaft facility
CN111852521A (en) Mouth-shaped piece assembling trolley for construction of internal structure of large-section shield tunnel and synchronous construction method
CN103174131A (en) Underground engineering guiding-cavity-excavating small-diameter pile construction complete equipment system
CN103964285B (en) A kind of many rope floor types change tower interior shaft elevator system non-stop production reformation method
CN111550259A (en) Construction method of small-section long-distance soft rock tunnel
CN111255513A (en) Method for improving roof-contacting rate of filling of mine room by using roof-picking
CN202703579U (en) Large slope inclined shaft rail transport construction apparatus
CN112727470B (en) Construction reinforcing method for shield tunnel at overlapped section
CN113530558A (en) Double-chute-inclined roadway combined layered construction method for big and high chamber
CN103967052B (en) A kind of method of protecting the new and old frame core-tube system substrate discrepancy in elevation soil body
CN106337687A (en) Convenient segmented support method for mine slant chute
CN113374480A (en) Dismantling and well-exiting process for well drilling equipment of vertical shaft heading machine
CN108517795A (en) Railroad bridge protecting canopy frame structure and its construction method
CN103244121A (en) Track and trackless coupled bottom ore removal system
CN102704952B (en) Self-propelled tunnel grouting trolley
CN104088665A (en) Steel pipe column construction process for underground excavated station
CN212270945U (en) Existing railway line foundation pit supporting system
CN110158647B (en) Material transportation method in narrow space of urban underground comprehensive pipe gallery
CN202659249U (en) Self-propelled tunnel grouting trolley
CN110388221B (en) Mounting method of large-tonnage bridge crane in blind shaft super-large elevator chamber
CN111828086A (en) Mechanized matched construction equipment for large-gradient inclined shaft and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Wenguang

Inventor after: Zhang Xiaogang

Inventor after: Liu Huanxin

Inventor after: Li Yang

Inventor after: Lv Yinglei

Inventor after: Wang Jiaoyan

Inventor after: Ye Lisheng

Inventor after: Li Wenbo

Inventor after: Shi Mingchao

Inventor before: Li Wenguang

Inventor before: Zhang Xiaogang

Inventor before: Liu Huanxin

GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Wenguang

Inventor after: Zhang Xiaogang

Inventor after: Liu Huanxin

Inventor after: Li Yang

Inventor after: Lv Yinglei

Inventor after: Wang Jiaoyan

Inventor after: Ye Lisheng

Inventor after: Li Wenbo

Inventor after: Shi Mingchao

Inventor before: Li Wenguang

Inventor before: Zhang Xiaogang

Inventor before: Liu Huanxin

Inventor before: Li Yang

Inventor before: Lv Yinglei

Inventor before: Wang Jiaoyan

Inventor before: Ye Lisheng

Inventor before: Li Wenbo

Inventor before: Shi Mingchao