CN106245666A CN201610610955.8A CN201610610955A CN106245666A CN 106245666 A CN106245666 A CN 106245666A CN 201610610955 A CN201610610955 A CN 201610610955A CN 106245666 A CN106245666 A CN 106245666A
Authority
CN
China
Prior art keywords
casing
hypotenuse
reaming bit
arc
arc backplate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610610955.8A
Other languages
Chinese (zh)
Other versions
CN106245666B (en
Inventor
张慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Xiaoshan Zhijiang Foundation Engineering Co., Ltd.
Original Assignee
张慧
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 张慧 filed Critical 张慧
Priority to CN201610610955.8A priority Critical patent/CN106245666B/en
Publication of CN106245666A publication Critical patent/CN106245666A/en
Application granted granted Critical
Publication of CN106245666B publication Critical patent/CN106245666B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of construction method, be specially a kind of piling Technology.The present invention is to solve the technical problem that the pile foundation hole in soft foundation is constructed, it is provided that a kind of piling Technology.Use reaming bit that ground is holed, casing is set outside reaming bit, between drilling diameter and the casing diameter of reaming bit, gap is 2 4cm, during reaming bit is drilled down into, arc backplate is added piecewise in space between casing and ground, the direction that arc backplate inserts is consistent with the direction that drill bit rotates, in reaming bit drilling process, use water that casing inside is washed away process, and mud extraction constantly will be washed away with pump, after creeping into end, drill bit and casing are extracted out, arc backplate one complete combined fender pile hole cylinder of composition, finally it is irrigated concrete construction.

Description

A kind of piling Technology
Technical field
The present invention relates to a kind of construction method, be specially a kind of piling Technology.
Background technology
In high-building construction, before architecture construction, it is required for piling and does basis, carry out Construction of High-rise the most again. By stake and the pile framing that connects stake top, the deep foundation of composition or the single-pile foundation being connected with pile foundation by post, abbreviation pile foundation.High level is built In building, pile foundation is widely used.Pile foundation construction, after making column pile body with armored concrete, steel, timber etc., with pile sinking machinery Until watering again after solid soil, or first pore-forming and building up concrete column shape pile body in squeezing into or being pressed into stratum, strengthen pile framing whereby The technique of bearing capacity.The construction master operation of bored concrete pile is pore-forming and concrete perfusion.Poor for pile foundation geological conditions, as Fine sand layer in some degree of depth is loose condition (of surface), and strongly weathered sand-rock and middle weathered rock formation locally lie in serious broken (boring Coring is chunky shape or fragment shape);Fine sand layer and broken rock all belong to unfavorable geology, easily occur seepage in boring procedure The phenomenons such as slurry, hole wall collapse, serious still has the situation of a large amount of rubble landing to occur when two is clear, even occurs that collapse hole causes protecting Cylinder periphery surface depression.For ensureing the smooth pore-forming of pile foundation construction and pile quality, it is necessary to take measures pile foundation surrounding is added Gu.In existing building foundation construction technology, utilize slurry injection technique to flabbiness ground strengthened be a kind of relatively conventional way.For The reinforcing of pile foundation, pile foundation is reinforced by the technology that can utilize slip casting also to have document to point out.
But above-mentioned construction thinking needs material resources of employing a tremendous amount of manpower, and efficiency of construction is relatively low.Especially grouting method, if right Geologic structure detection is not clear, and slip casting is uneven, makes ground have local change, has place not inject, add difficulty of construction.For this We need to design a kind of technology that pile foundation hole quickly carries out supporting.
Summary of the invention
The present invention is to solve the technical problem that the pile foundation hole in soft foundation is constructed, it is provided that a kind of pile foundation construction skill Art.
The technical scheme is that a kind of piling Technology uses reaming bit to hole ground, in reaming Setting casing outside drill bit, between drilling diameter and the casing diameter of reaming bit, gap is 2-4cm, is drilled down at reaming bit During, adding arc backplate in the space between casing and ground piecewise, described arc backplate is tetragon, described Four limits be divided into hypotenuse, lower hypotenuse, left hypotenuse, the right hypotenuse, described upper hypotenuse or lower hypotenuse with horizontal plane angle to be, The arc line shaped that the orthographic projection of described arc backplate presents, and the circle at camber line place is positioned at horizontal plane, camber line to angle be 40-60 °, arc protective plate thickness 2cm, the direction that arc backplate inserts is consistent with the direction that drill bit rotates, and creeps at reaming bit During, use water that casing inside is washed away process, and constantly will wash away mud extraction with pump, after creeping into end, will Drill bit and casing are extracted out, arc backplate one complete combined fender pile hole cylinder of composition, are finally irrigated concrete construction.
Compared with prior art, conceptual design of the present invention is reasonable, uses pottery or plastics or tile etc. to hold Easily arc backplate made by the material of processing, during drill bit creeps into, is sent in boring by arc backplate section by section, forms one Spiral helicine combination casing.All of arc backplate is stitched together mutually, forms a cylindrical shape, mutually extruding can be formed to The tubular article of anti-certain pressure, effectively prevents boring from collapsing, gains time for filling concrete and solidification, once construct Pore-forming, it is not necessary to hole is carried out reprocessing and can carry out pile foundation construction operation, improve efficiency of construction and hole quality.
Accompanying drawing explanation
Fig. 1 is constructing structure schematic diagram of the present invention
Fig. 2 is that arc protective hardens composition
Fig. 3 is the top view of Fig. 2
Fig. 4 is the cut-away view after pore-forming
In figure: 1-ground, 2-reaming bit, 3-casing, 4-arc backplate.
Detailed description of the invention
As schematically shown in Figure 1, a kind of piling Technology, use reaming bit 2 ground 1 to be holed, at reaming bit 2 Outside sets casing 3, and between drilling diameter and casing 3 diameter of reaming bit 2, gap is 2-4cm, is drilled down at reaming bit 2 During, add arc backplate 4, as schematically shown in Figure 2, described arc protective in the space between casing 3 and ground 1 piecewise Plate 4 is tetragon, and four described limits are divided into hypotenuse a, lower hypotenuse c, left hypotenuse d, right hypotenuse b, as schematically shown in Figure 3, described Upper hypotenuse a or lower hypotenuse c with horizontal plane angle be, the arc line shaped that the orthographic projection of described arc backplate 4 presents, and camber line The circle at place is positioned at horizontal plane, camber line to angle be 40-60 °, arc protective plate thickness 2cm, arc backplate insert side To consistent with the direction that drill bit rotates, in reaming bit drilling process, use water that casing inside is washed away process, and use Pump constantly will wash away mud and extract out, after creeping into end, drill bit and casing be extracted out, as schematically shown in Figure 4, and arc backplate composition one Individual complete combined fender pile hole cylinder, is finally irrigated concrete construction.

Claims (2)

1. a piling Technology, uses reaming bit to hole ground, sets casing, reamer outside reaming bit Between drilling diameter and the casing diameter of head, gap is 2-4cm, during reaming bit is drilled down into, at casing and ground Between space in add arc backplate piecewise, the direction that arc backplate inserts is consistent with the direction that drill bit rotates, at reamer In head drilling process, use water that casing inside is washed away process, and constantly will wash away mud extraction with pump, when creeping into end After, drill bit and casing are extracted out, arc backplate one complete combined fender pile hole cylinder of composition, be finally irrigated concrete and execute Work.
Piling Technology the most according to claim 1, described arc backplate is tetragon, and four described limits are divided into Upper hypotenuse, lower hypotenuse, left hypotenuse, right hypotenuse, described upper hypotenuse or lower hypotenuse with horizontal plane angle be, described arc protective The arc line shaped that the orthographic projection of plate presents, and the circle at camber line place is positioned at horizontal plane, camber line to angle be 40-60 °, arc protective Plate thickness 2cm.
CN201610610955.8A 2016-07-30 2016-07-30 A kind of piling Technology Expired - Fee Related CN106245666B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610610955.8A CN106245666B (en) 2016-07-30 2016-07-30 A kind of piling Technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610610955.8A CN106245666B (en) 2016-07-30 2016-07-30 A kind of piling Technology

Publications (2)

Publication Number Publication Date
CN106245666A true CN106245666A (en) 2016-12-21
CN106245666B CN106245666B (en) 2019-01-15

Family

ID=57605001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610610955.8A Expired - Fee Related CN106245666B (en) 2016-07-30 2016-07-30 A kind of piling Technology

Country Status (1)

Country Link
CN (1) CN106245666B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004092025A (en) * 2002-08-29 2004-03-25 Daia Soil Kk Foundation pile and construction method thereof
CN103526747A (en) * 2013-09-26 2014-01-22 浙江钱塘江水利建筑工程公司 Construction method for impact holing of filling pile in tidal environment
CN105178291A (en) * 2015-08-21 2015-12-23 中国路桥工程有限责任公司 Large pile foundation construction method
CN205314093U (en) * 2016-01-12 2016-06-15 中国建筑第二工程局有限公司 Excavation supporting structure of stake

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004092025A (en) * 2002-08-29 2004-03-25 Daia Soil Kk Foundation pile and construction method thereof
CN103526747A (en) * 2013-09-26 2014-01-22 浙江钱塘江水利建筑工程公司 Construction method for impact holing of filling pile in tidal environment
CN105178291A (en) * 2015-08-21 2015-12-23 中国路桥工程有限责任公司 Large pile foundation construction method
CN205314093U (en) * 2016-01-12 2016-06-15 中国建筑第二工程局有限公司 Excavation supporting structure of stake

Also Published As

Publication number Publication date
CN106245666B (en) 2019-01-15

Similar Documents

Publication Publication Date Title
US20210292987A1 (en) Construction method for pouring concrete in karst cave
CN105735251B (en) Cutting type full-casing follow-up pile-forming construction method and system of bridge pile foundation rotary drilling rig
WO2018210019A1 (en) Pile formation method for down-the-hole impact rotary jet composite piles
CN106284317B (en) A kind of building pile foundation construction method
CN1236146C (en) Method and apparatus for forming shaped pile by drilling, high-pressure letting to enlarge hole and pressure pouring of concrete
CN103556628B (en) Spiral conical soil compaction pile construction method
CN104831705A (en) Ultra-deep hole grouting method during underground excavation of tunnel
CN110656947A (en) Method for tunneling raised section of seabed bedrock
CN106837382A (en) A kind of subway tunnel country rock pre grouting from the surface reinforcement process
CN104005768B (en) The construction reinforcing method of vertical shaft interlude Unfavorable geology layer
CN102235152A (en) Hole-forming construction method for bored pile on high-strength stabilized soil layer
CN112196494B (en) Construction process and construction equipment for geological pipeline jointed between rock and soil layer
CN103074887B (en) High-pressure vibro-grouting method for processing foundation and specific drilling tool assembly
CN111042121B (en) Construction method of bored backfill end pile foundation
CN210918893U (en) Drill bit for rapidly repairing wall of pile hole
CN105714832B (en) A kind of large size prefabricated building enclosure of deep basal pit and construction method
CN110259456B (en) Karst cave treatment method for tunnel construction
CN204225100U (en) The construction equipment of concrete pile
CN106192987A (en) A kind of construction method that stake periphery is crushed geology reinforcing
CN204252120U (en) The construction equipment of concrete pile
CN106245666B (en) A kind of piling Technology
CN214993798U (en) Double-layer steel pile casing structure for rotary drilling pile in quicksand layer
CN107142930A (en) A kind of embedded stake of high pressure jet grouting base expanding and base expanding and preparation method
CN112282638A (en) Pipe following drilling pore-forming backfill grouting construction method
RU2305153C2 (en) Method and device for loose foundation base consolidation by directed horizontal pattern hydraulic fracturing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181129

Address after: 311202 Beigan Street Industrial Park, Xiaoshan District, Hangzhou City, Zhejiang Province (Xingyi Village)

Applicant after: Hangzhou Xiaoshan Zhijiang Foundation Engineering Co., Ltd.

Address before: 100010 Xueyuan Road, Haidian District, Beijing, No. 115

Applicant before: Zhang Hui

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190115