CN106245666A - A kind of piling Technology - Google Patents
A kind of piling Technology Download PDFInfo
- Publication number
- CN106245666A CN106245666A CN201610610955.8A CN201610610955A CN106245666A CN 106245666 A CN106245666 A CN 106245666A CN 201610610955 A CN201610610955 A CN 201610610955A CN 106245666 A CN106245666 A CN 106245666A
- Authority
- CN
- China
- Prior art keywords
- casing
- hypotenuse
- reaming bit
- arc
- arc backplate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/04—Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The present invention relates to a kind of construction method, be specially a kind of piling Technology.The present invention is to solve the technical problem that the pile foundation hole in soft foundation is constructed, it is provided that a kind of piling Technology.Use reaming bit that ground is holed, casing is set outside reaming bit, between drilling diameter and the casing diameter of reaming bit, gap is 2 4cm, during reaming bit is drilled down into, arc backplate is added piecewise in space between casing and ground, the direction that arc backplate inserts is consistent with the direction that drill bit rotates, in reaming bit drilling process, use water that casing inside is washed away process, and mud extraction constantly will be washed away with pump, after creeping into end, drill bit and casing are extracted out, arc backplate one complete combined fender pile hole cylinder of composition, finally it is irrigated concrete construction.
Description
Technical field
The present invention relates to a kind of construction method, be specially a kind of piling Technology.
Background technology
In high-building construction, before architecture construction, it is required for piling and does basis, carry out Construction of High-rise the most again.
By stake and the pile framing that connects stake top, the deep foundation of composition or the single-pile foundation being connected with pile foundation by post, abbreviation pile foundation.High level is built
In building, pile foundation is widely used.Pile foundation construction, after making column pile body with armored concrete, steel, timber etc., with pile sinking machinery
Until watering again after solid soil, or first pore-forming and building up concrete column shape pile body in squeezing into or being pressed into stratum, strengthen pile framing whereby
The technique of bearing capacity.The construction master operation of bored concrete pile is pore-forming and concrete perfusion.Poor for pile foundation geological conditions, as
Fine sand layer in some degree of depth is loose condition (of surface), and strongly weathered sand-rock and middle weathered rock formation locally lie in serious broken (boring
Coring is chunky shape or fragment shape);Fine sand layer and broken rock all belong to unfavorable geology, easily occur seepage in boring procedure
The phenomenons such as slurry, hole wall collapse, serious still has the situation of a large amount of rubble landing to occur when two is clear, even occurs that collapse hole causes protecting
Cylinder periphery surface depression.For ensureing the smooth pore-forming of pile foundation construction and pile quality, it is necessary to take measures pile foundation surrounding is added
Gu.In existing building foundation construction technology, utilize slurry injection technique to flabbiness ground strengthened be a kind of relatively conventional way.For
The reinforcing of pile foundation, pile foundation is reinforced by the technology that can utilize slip casting also to have document to point out.
But above-mentioned construction thinking needs material resources of employing a tremendous amount of manpower, and efficiency of construction is relatively low.Especially grouting method, if right
Geologic structure detection is not clear, and slip casting is uneven, makes ground have local change, has place not inject, add difficulty of construction.For this
We need to design a kind of technology that pile foundation hole quickly carries out supporting.
Summary of the invention
The present invention is to solve the technical problem that the pile foundation hole in soft foundation is constructed, it is provided that a kind of pile foundation construction skill
Art.
The technical scheme is that a kind of piling Technology uses reaming bit to hole ground, in reaming
Setting casing outside drill bit, between drilling diameter and the casing diameter of reaming bit, gap is 2-4cm, is drilled down at reaming bit
During, adding arc backplate in the space between casing and ground piecewise, described arc backplate is tetragon, described
Four limits be divided into hypotenuse, lower hypotenuse, left hypotenuse, the right hypotenuse, described upper hypotenuse or lower hypotenuse with horizontal plane angle to be,
The arc line shaped that the orthographic projection of described arc backplate presents, and the circle at camber line place is positioned at horizontal plane, camber line to angle be
40-60 °, arc protective plate thickness 2cm, the direction that arc backplate inserts is consistent with the direction that drill bit rotates, and creeps at reaming bit
During, use water that casing inside is washed away process, and constantly will wash away mud extraction with pump, after creeping into end, will
Drill bit and casing are extracted out, arc backplate one complete combined fender pile hole cylinder of composition, are finally irrigated concrete construction.
Compared with prior art, conceptual design of the present invention is reasonable, uses pottery or plastics or tile etc. to hold
Easily arc backplate made by the material of processing, during drill bit creeps into, is sent in boring by arc backplate section by section, forms one
Spiral helicine combination casing.All of arc backplate is stitched together mutually, forms a cylindrical shape, mutually extruding can be formed to
The tubular article of anti-certain pressure, effectively prevents boring from collapsing, gains time for filling concrete and solidification, once construct
Pore-forming, it is not necessary to hole is carried out reprocessing and can carry out pile foundation construction operation, improve efficiency of construction and hole quality.
Accompanying drawing explanation
Fig. 1 is constructing structure schematic diagram of the present invention
Fig. 2 is that arc protective hardens composition
Fig. 3 is the top view of Fig. 2
Fig. 4 is the cut-away view after pore-forming
In figure: 1-ground, 2-reaming bit, 3-casing, 4-arc backplate.
Detailed description of the invention
As schematically shown in Figure 1, a kind of piling Technology, use reaming bit 2 ground 1 to be holed, at reaming bit 2
Outside sets casing 3, and between drilling diameter and casing 3 diameter of reaming bit 2, gap is 2-4cm, is drilled down at reaming bit 2
During, add arc backplate 4, as schematically shown in Figure 2, described arc protective in the space between casing 3 and ground 1 piecewise
Plate 4 is tetragon, and four described limits are divided into hypotenuse a, lower hypotenuse c, left hypotenuse d, right hypotenuse b, as schematically shown in Figure 3, described
Upper hypotenuse a or lower hypotenuse c with horizontal plane angle be, the arc line shaped that the orthographic projection of described arc backplate 4 presents, and camber line
The circle at place is positioned at horizontal plane, camber line to angle be 40-60 °, arc protective plate thickness 2cm, arc backplate insert side
To consistent with the direction that drill bit rotates, in reaming bit drilling process, use water that casing inside is washed away process, and use
Pump constantly will wash away mud and extract out, after creeping into end, drill bit and casing be extracted out, as schematically shown in Figure 4, and arc backplate composition one
Individual complete combined fender pile hole cylinder, is finally irrigated concrete construction.
Claims (2)
1. a piling Technology, uses reaming bit to hole ground, sets casing, reamer outside reaming bit
Between drilling diameter and the casing diameter of head, gap is 2-4cm, during reaming bit is drilled down into, at casing and ground
Between space in add arc backplate piecewise, the direction that arc backplate inserts is consistent with the direction that drill bit rotates, at reamer
In head drilling process, use water that casing inside is washed away process, and constantly will wash away mud extraction with pump, when creeping into end
After, drill bit and casing are extracted out, arc backplate one complete combined fender pile hole cylinder of composition, be finally irrigated concrete and execute
Work.
Piling Technology the most according to claim 1, described arc backplate is tetragon, and four described limits are divided into
Upper hypotenuse, lower hypotenuse, left hypotenuse, right hypotenuse, described upper hypotenuse or lower hypotenuse with horizontal plane angle be, described arc protective
The arc line shaped that the orthographic projection of plate presents, and the circle at camber line place is positioned at horizontal plane, camber line to angle be 40-60 °, arc protective
Plate thickness 2cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610610955.8A CN106245666B (en) | 2016-07-30 | 2016-07-30 | A kind of piling Technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610610955.8A CN106245666B (en) | 2016-07-30 | 2016-07-30 | A kind of piling Technology |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106245666A true CN106245666A (en) | 2016-12-21 |
CN106245666B CN106245666B (en) | 2019-01-15 |
Family
ID=57605001
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610610955.8A Expired - Fee Related CN106245666B (en) | 2016-07-30 | 2016-07-30 | A kind of piling Technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106245666B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004092025A (en) * | 2002-08-29 | 2004-03-25 | Daia Soil Kk | Foundation pile and construction method thereof |
CN103526747A (en) * | 2013-09-26 | 2014-01-22 | 浙江钱塘江水利建筑工程公司 | Construction method for impact holing of filling pile in tidal environment |
CN105178291A (en) * | 2015-08-21 | 2015-12-23 | 中国路桥工程有限责任公司 | Large pile foundation construction method |
CN205314093U (en) * | 2016-01-12 | 2016-06-15 | 中国建筑第二工程局有限公司 | Excavation supporting structure of stake |
-
2016
- 2016-07-30 CN CN201610610955.8A patent/CN106245666B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004092025A (en) * | 2002-08-29 | 2004-03-25 | Daia Soil Kk | Foundation pile and construction method thereof |
CN103526747A (en) * | 2013-09-26 | 2014-01-22 | 浙江钱塘江水利建筑工程公司 | Construction method for impact holing of filling pile in tidal environment |
CN105178291A (en) * | 2015-08-21 | 2015-12-23 | 中国路桥工程有限责任公司 | Large pile foundation construction method |
CN205314093U (en) * | 2016-01-12 | 2016-06-15 | 中国建筑第二工程局有限公司 | Excavation supporting structure of stake |
Also Published As
Publication number | Publication date |
---|---|
CN106245666B (en) | 2019-01-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20210292987A1 (en) | Construction method for pouring concrete in karst cave | |
CN105735251B (en) | Cutting type full-casing follow-up pile-forming construction method and system of bridge pile foundation rotary drilling rig | |
WO2018210019A1 (en) | Pile formation method for down-the-hole impact rotary jet composite piles | |
CN106284317B (en) | A kind of building pile foundation construction method | |
CN1236146C (en) | Method and apparatus for forming shaped pile by drilling, high-pressure letting to enlarge hole and pressure pouring of concrete | |
CN103556628B (en) | Spiral conical soil compaction pile construction method | |
CN104831705A (en) | Ultra-deep hole grouting method during underground excavation of tunnel | |
CN110656947A (en) | Method for tunneling raised section of seabed bedrock | |
CN106837382A (en) | A kind of subway tunnel country rock pre grouting from the surface reinforcement process | |
CN104005768B (en) | The construction reinforcing method of vertical shaft interlude Unfavorable geology layer | |
CN102235152A (en) | Hole-forming construction method for bored pile on high-strength stabilized soil layer | |
CN112196494B (en) | Construction process and construction equipment for geological pipeline jointed between rock and soil layer | |
CN103074887B (en) | High-pressure vibro-grouting method for processing foundation and specific drilling tool assembly | |
CN111042121B (en) | Construction method of bored backfill end pile foundation | |
CN210918893U (en) | Drill bit for rapidly repairing wall of pile hole | |
CN105714832B (en) | A kind of large size prefabricated building enclosure of deep basal pit and construction method | |
CN110259456B (en) | Karst cave treatment method for tunnel construction | |
CN204225100U (en) | The construction equipment of concrete pile | |
CN106192987A (en) | A kind of construction method that stake periphery is crushed geology reinforcing | |
CN204252120U (en) | The construction equipment of concrete pile | |
CN106245666B (en) | A kind of piling Technology | |
CN214993798U (en) | Double-layer steel pile casing structure for rotary drilling pile in quicksand layer | |
CN107142930A (en) | A kind of embedded stake of high pressure jet grouting base expanding and base expanding and preparation method | |
CN112282638A (en) | Pipe following drilling pore-forming backfill grouting construction method | |
RU2305153C2 (en) | Method and device for loose foundation base consolidation by directed horizontal pattern hydraulic fracturing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20181129 Address after: 311202 Beigan Street Industrial Park, Xiaoshan District, Hangzhou City, Zhejiang Province (Xingyi Village) Applicant after: Hangzhou Xiaoshan Zhijiang Foundation Engineering Co., Ltd. Address before: 100010 Xueyuan Road, Haidian District, Beijing, No. 115 Applicant before: Zhang Hui |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190115 Termination date: 20200730 |