CN106245533B - A kind of both wired jacking protection construction method - Google Patents

A kind of both wired jacking protection construction method Download PDF

Info

Publication number
CN106245533B
CN106245533B CN201610762980.8A CN201610762980A CN106245533B CN 106245533 B CN106245533 B CN 106245533B CN 201610762980 A CN201610762980 A CN 201610762980A CN 106245533 B CN106245533 B CN 106245533B
Authority
CN
China
Prior art keywords
jacking
vault
abutment wall
cutting shoe
culverts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610762980.8A
Other languages
Chinese (zh)
Other versions
CN106245533A (en
Inventor
饶少臣
徐勇
曾敏
文望青
薛照钧
史娣
任征
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201610762980.8A priority Critical patent/CN106245533B/en
Publication of CN106245533A publication Critical patent/CN106245533A/en
Application granted granted Critical
Publication of CN106245533B publication Critical patent/CN106245533B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a kind of both wired jacking protection construction method, comprise the following steps:1) according to the physical dimension of bridges and culverts, the prefabricated abutment wall of difference and vault;2) abutment wall cutting shoe device, vault cutting shoe device are installed respectively in the front end of abutment wall and vault;3) push construction method is used, jacking operation is carried out to abutment wall, vault respectively;4) after the completion of jacking operation, abutment wall cutting shoe device and vault cutting shoe device are dismantled respectively, complete both wired jacking construction of prevention work.Existing jacking framework is divided into abutment wall, vault using push construction method and carries out jacking operation respectively by the present invention, can reduce project scale, and and can reduces difficulty of construction, both wired jacking protection construction method of construction risk.

Description

A kind of both wired jacking protection construction method
Technical field
The present invention relates to both wired jacking bridge and culvert technical field of construction, in particular to a kind of both wired jacking construction of prevention work side Method.
Background technology
The frame construction of existing railway jacking at present method (as shown in figures 1-4) is on the premise of ground is firm, pre- Frame culvert 23 in place, in the case where not cutting off traffic, is pushed into both by the pushing tow of frame culvert 23 made with high-power jack group Have under railway line 22.However, suitable for the relatively small bridges and culverts in across footpath, aperture when technology origin, and under Modern Traffic Road width is more and more wider, and the aperture of frame culvert 23 the more is done the more big, continue to continue to use prior art can cause project scale, difficulty of construction, Construction risk etc. is increasing.Particularly construction temporary project amount is big, in the case of complex procedures, can bring bigger construction Difficulty and construction risk.
The content of the invention
Present invention aim to provide one kind to reduce project scale, and can reduces difficulty of construction, construction risk Both wired jacking protection construction method.
To achieve the above object, a kind of both wired jacking protection construction method designed by the present invention, comprises the following steps:
1) according to the physical dimension of bridges and culverts, the prefabricated abutment wall of difference and vault;
2) abutment wall cutting shoe device, vault cutting shoe device are installed respectively in the front end of abutment wall and vault;
3) push construction method is used, jacking operation is carried out to abutment wall, vault respectively;
4) after the completion of jacking operation, abutment wall cutting shoe device and vault cutting shoe device are dismantled respectively, are completed both wired jackings and are prevented Shield construction.
Further, in the step 3), when opposite side wall top enters operation in the ban, concretely comprise the following steps:Buried depth according to abutment wall Degree excavates soil box on the outside of bridges and culverts, and slideway is laid in bottom land, and incremental launching device is set in one end away from bridges and culverts of slideway, then by side Wall lifting is put into slideway, and the one end of abutment wall with abutment wall cutting shoe device is then remote to abutment wall by incremental launching device towards bridges and culverts One end from bridges and culverts applies jacking active force, and continuous jacking, spoir move in circles after the completion of pushing tow to setting position, pushing tow The jacking operation of one of abutment wall is carried out down using identical push construction method, until completing the jacking operation of all abutment walls.
Further, in the step 3), after the completion of abutment wall jacking, it is specially to vault jacking operation:Encircleing The both sides on top set supporting apparatus, and set incremental launching device in the one end of vault away from bridges and culverts, and vault carries vault cutting shoe One end of device is shelved on abutment wall, then applies jacking active force to the one end of vault away from bridges and culverts by incremental launching device, no Disconnected jacking, spoir move in circles up to pushing tow to setting position.
Further, in the step 3), in the ban to vault jacking operation when, concretely comprise the following steps:According to the height of bridges and culverts, Soil box is excavated in corresponding height position on the outside of bridges and culverts, lays slideway in bottom land, and set pushing tow in the one end of slideway away from bridges and culverts Equipment, then vault lifting is put into slideway, the one end of vault with vault cutting shoe device is then set towards bridges and culverts by pushing tow Standby one end away from bridges and culverts to vault applies jacking active force, and continuous jacking, spoir move in circles up to pushing tow to setting position.
Further, in the step 3), after the completion of vault jacking, opposite side wall top enters operation and is specially:According to Abutment wall embedded depth excavates soil box on the outside of bridges and culverts, lays slideway in bottom land, and set pushing tow in the one end of slideway away from bridges and culverts Equipment, then abutment wall lifting is put into slideway, the top end face of abutment wall and the bottom face of vault are on same horizontal plane, abutment wall band There is one end of abutment wall cutting shoe device towards bridges and culverts, jacking is then applied to the one end of abutment wall away from bridges and culverts by incremental launching device and acted on Power, continuous jacking, spoir move in circles is entered after the completion of pushing tow to setting position, pushing tow using identical push construction method The jacking operation of lower one of the abutment wall of row, until completing the jacking operation of all abutment walls.
Further, in the step 2), abutment wall cutting shoe device include be bonded with abutment wall jacking end face end plate, be arranged on First top plate of end plate top connection fixed thereto, the first bottom plate for being arranged on the connection fixed thereto of end plate bottom and symmetrical The the first abutment wall cutting shoe side plate and the second abutment wall for being arranged between the first top plate and the first bottom plate and being fixedly connected with end plate both sides Cutting shoe side plate, first top plate is towards the length that jacking direction extends more than the length that the first bottom plate extends towards jacking direction;Institute End plate, the first top plate, the first bottom plate, the first abutment wall cutting shoe side plate and the second abutment wall cutting shoe side plate is stated to enclose to form front opening The special-shaped wedge-shaped framework of hollow form, be provided with vertical baffle in the wedge-shaped framework of abnormal shape, the vertical baffle is by the wedge-shaped frame of abnormal shape Frame is divided into unearthed area and Qie Tu areas, and soil outlet, the top-side in the Qie Tu areas are provided with first top plate in the unearthed area Provided with operation Control Room, the bottom of the vertical baffle, which is provided with, to be passed through for soil and connects unearthed area and Tu Kou is entered in Qie Tu areas.
Further, the cycle lifting device for muck haulage is provided with the unearthed area of the abutment wall cutting shoe device, it is described to follow Ring lowering or hoisting gear is provided with several muck haulage frames of the hanging on conveyer chain.
Further, the bottom of the operation Control Room is provided with the screw rod that loosens the soil extended downwardly, described to loosen the soil under screw rod End is provided with leading screw, and the motor for being used for driving screw rod rotation of loosening the soil is provided with the operation Control Room, described to loosen the soil on screw rod Screw rod stabilizing ring is arranged with, the fixing end of the screw rod stabilizing ring is fixedly connected with vertical baffle, outside the operation Control Room Week is provided with protective grille, and the manipulator for aiding in loosening the soil is additionally provided with the top of the Qie Tu areas.
Further, in the step 2), vault cutting shoe device include be detachably connected with vault jacking end riser, set Put in riser top the second top plate normal thereto being fixedly connected, be arranged on riser bottom the second bottom normal thereto being fixedly connected Plate and it is symmetricly set between the second top plate and the second bottom plate and the first vault sword being fixedly connected vertical with the vertical edge of riser two Pin side plate and the second vault cutting shoe side plate, second top plate are more than the second bottom plate towards jacking side towards the length that jacking direction extends To the length of extension, the first vault cutting shoe side plate and the second vault cutting shoe side plate are in chamfer trapezium structure;The riser, Enclose to form front opening between second top plate, the second bottom plate, the first vault cutting shoe side plate and the second vault cutting shoe side plate Hollow form wedge shape frame structure, second bottom plate are provided with several unearthed holes being arranged in juxtaposition, described unearthed hole the inner Periphery is provided with circular baffle plate.
Further, in the step 2), lead between abutment wall and abutment wall the cutting shoe device, vault and vault cutting shoe device U-bolt component is crossed to be fixedly connected.
Compared with prior art, the invention has the advantages that:
First, existing frame culvert is divided into vault, abutment wall using push construction method and carries out jacking work respectively by the present invention Industry, can reduce project scale, and and can reduces difficulty of construction, both wired jacking protection construction method of construction risk.
Second, vault cutting shoe device, abutment wall cutting shoe device are installed in the vault of the present invention and the front end of abutment wall respectively, for nothing In disturbance ground incision subgrade soil, and transport and empty the soil body, make not produce extruding to the soil body when top plate, abutment wall jacking and disturbance is made With keeping the original state in situ of subgrade soils, reduce further construction risk.
Third, both wired jacking protection construction method step of the present invention is simple, safe and reliable, operation is flexible, solve The construction difficult problem of framework jacking, and put into construction cost reduction.
Brief description of the drawings
Fig. 1 is existing both wired side structure schematic view;
Fig. 2 is Fig. 1 cross section structure diagram;
Fig. 3 is the side structure schematic view after the completion of existing jacking construction of frame culvert;
Fig. 4 is Fig. 3 main structure diagram;
Fig. 5 is the side structure schematic view before abutment wall jacking construction of the present invention;
Fig. 6 is Fig. 5 side structure schematic view;
Fig. 7 is the side structure schematic view after the completion of abutment wall jacking construction of the present invention;
Fig. 8 is Fig. 6 side structure schematic view;
Fig. 9 be abutment wall jacking construction of the present invention after the completion of again jacking vault construction before side structure schematic view;
Figure 10 is Fig. 9 side structure schematic view;
Figure 11 is the side structure schematic view after the completion of jacking vault of the present invention construction;
Figure 12 is Figure 11 side structure schematic view;
Figure 13 is the side structure schematic view of the abutment wall cutting shoe device of the present invention;
Figure 14 is structural representations of the Figure 13 along A-A directions;
Figure 15 is the side structure schematic view of the vault cutting shoe device of the present invention;
Figure 16 is Figure 15 overlooking the structure diagram.
Wherein:1- abutment walls, 2- vaults, 3- abutment wall cutting shoes device, 3.1- end plates, the top plates of 3.2- first, the bottom plates of 3.3- first, 3.4- the first abutment wall cutting shoes side plate, 3.5- the second abutment wall cutting shoes side plate, 4- vault cutting shoes device, 4.1- risers, 4.2- second are pushed up Plate, the bottom plates of 4.3- second, 4.4- the first vault cutting shoes side plate, 4.5- the second vault cutting shoes side plate, 4.6- circular baffle plates, 5- are interim The unearthed area of support meanss, 6- vertical baffles, 7-, 8- Qie Tu areas, 9- soil outlets, 10- operations Control Room, 11- enter Tu Kou, 12- and followed Ring lowering or hoisting gear, 13- muck haulage frame, 14- loosen the soil screw rod, 15- leading screws, 16- motors, 17- screw rods stabilizing ring, 18- protection lattice Be unearthed hole, 21-U types bolt assembly, 22- both wired, 23- frame culverts, 24- vaults of grid, 19- manipulators, 20- is unearthed passage, 25- Rail level line, 26- ground, 27- road surfaces.
Embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
As shown in Fig. 5~12, a kind of both wired jacking protection construction method of the present embodiment, comprise the following steps:
1) according to the physical dimension of bridges and culverts, place is selected to distinguish prefabricated abutment wall 1 and vault 2 beyond circuit safe distance;
2) abutment wall cutting shoe device 3, vault cutting shoe device 4 are combined into using steel plate welding, in the front end of abutment wall 1 and vault 2 Abutment wall cutting shoe device 3, vault cutting shoe device 4 are installed respectively;
3) the jacking order to abutment wall 1, vault 2 is selected according to actual conditions, is divided into two kinds of situations:
In the ban to the jacking operation of abutment wall 1, after to 2 jacking operation of vault when, specific method is:According to the embedded depth of abutment wall 1 Soil box is excavated on the outside of bridges and culverts, slideway is laid in bottom land, and incremental launching device is set in one end away from bridges and culverts of slideway, then by abutment wall 1 lifting is put into slideway, and the one end of abutment wall 1 with abutment wall cutting shoe device 3 adjusts the placement location of abutment wall 1 to protect towards bridges and culverts Card pushing tow is traveling on desired trajectory, then applies jacking active force to the one end of abutment wall 1 away from bridges and culverts by incremental launching device, no Disconnected jacking, spoir move in circles until pushing tow is to setting position, and that the soil body caves in such as be present can use mud off or other Feasible method is protected, while existing trajectory, roadbed etc. are monitored by design detection requirement, holds be advanced in time Situation in journey, the especially bad symptom of a trend, tackled by the early warning scheme pre-established, one of abutment wall 1 is carried out down after the completion of pushing tow Jacking operation, until completing the jacking operation of all abutment walls 1;After the completion of the jacking of abutment wall 1, to the jacking operation of vault 2 Specially:Supporting apparatus 5 is set in the both sides of vault 2, and incremental launching device, arch are set in the one end of vault 2 away from bridges and culverts The one end of top 2 with vault cutting shoe device is shelved on abutment wall 1, then by incremental launching device to the one end of vault 2 away from bridges and culverts Apply jacking active force, one side jacking forms the unearthed passage 24 of vault while digging, and the channel width is much smaller than vault width, constantly Jacking, spoir move in circles up to pushing tow to setting position;
In the ban to the jacking operation of vault 2, after to 1 jacking operation of abutment wall when, specific method is:According to the height of bridges and culverts, Soil box is excavated in corresponding height position on the outside of bridges and culverts, lays slideway in bottom land, and set pushing tow to set in the one end of slideway away from bridges and culverts It is standby, then the lifting of vault 2 is put into slideway, the one end of vault 2 with vault cutting shoe device 4 then passes through pushing tow towards bridges and culverts Equipment applies jacking active force to the one end of vault 2 away from bridges and culverts, and continuous jacking, spoir move in circles up to pushing tow to setting position Put;After the completion of the jacking of vault 2, it is specially to the jacking operation of abutment wall 1:Opened according to the embedded depth of abutment wall 1 on the outside of bridges and culverts Shoveling groove, slideway is laid in bottom land, and incremental launching device is set in the one end of slideway away from bridges and culverts, then the lifting of abutment wall 1 is put into cunning In road, for the top end face of abutment wall 1 with the bottom face of vault 2 on same horizontal plane, abutment wall 1 carries the one of abutment wall cutting shoe device 3 End then applies jacking active force, continuous jacking, spoir by incremental launching device towards bridges and culverts to the one end of abutment wall 1 away from bridges and culverts Move in circles until pushing tow arrives setting position, use after the completion of pushing tow identical push construction method to carry out down one abutment wall 1 Jacking operation, until completing the jacking operation of all abutment walls 1.
4) after the completion of jacking operation, abutment wall cutting shoe device 3 and vault cutting shoe device 4 are dismantled respectively, complete both wired jackings Construction of prevention work.
In implementation process, the sequencing of abutment wall 1 and the progress jacking construction of vault 2 can be exchanged, you can first to carry out The jacking operation of abutment wall 1, it is rear to carry out the jacking operation of vault 2;The jacking operation of vault 2 can also be first carried out, it is rear to carry out the jacking of abutment wall 1 work Industry.Abutment wall 1 and vault 2 are constantly unearthed, constantly advanced, in order to ensure not disturbing existing subgrade soils during jacking moves ahead Body, it can push up more, can not dig more.When ground carrier strip part is preferable, can using abutment wall 1 now and vault 2 as permanent structure, As long as then cut out soil body construction road or the circuit below top plate;In abutment wall 1, vault if also other permanent structures If continuing construction further part engineering ratio under 2 protection has the problem of underground water, a U groove structure can be done.
As shown in Figs. 13 and 14, abutment wall cutting shoe device 3 include be bonded with the jacking end face of abutment wall 1 end plate 3.1, be arranged on end First top plate 3.2 of the top of plate 3.1 connection fixed thereto, the first bottom plate for being arranged on the connection fixed thereto of the bottom of end plate 3.1 3.3 and the first side for being symmetricly set between the first top plate 3.2 and the first bottom plate 3.3 and being fixedly connected with the both sides of end plate 3.1 Wall cutting shoe side plate 3.4 and the second abutment wall cutting shoe side plate 3.5, the first top plate 3.2 are more than the first bottom towards the length that jacking direction extends The length that plate 3.3 extends towards jacking direction;End plate 3.1, the first top plate 3.2, the first bottom plate 3.3, the first abutment wall cutting shoe side plate 3.4 And second abutment wall cutting shoe side plate 3.5 enclose the special-shaped wedge-shaped framework of hollow form to form front opening, set in special-shaped wedge-shaped framework There is vertical baffle 6, special-shaped wedge-shaped framework is divided into unearthed area 7 and Qie Tu areas 8 by vertical baffle 6, first top plate in area 7 of being unearthed Soil outlet 9 is provided with 3.2, the top-side in Qie Tu areas 8 is provided with operation Control Room 10, and the bottom of vertical baffle 6 is provided with wears for soil That crosses and connect unearthed area 7 and Qie Tu areas 8 enters native mouth 11.The circulation for muck haulage is provided with the unearthed area 7 of abutment wall cutting shoe device 3 Lowering or hoisting gear 12, cycle lifting device 12 are provided with several muck haulage frames 13 of the hanging on conveyer chain.Operate Control Room 10 Bottom is provided with the screw rod 14 that loosens the soil extended downwardly, and the lower end for the screw rod 14 that loosens the soil is provided with leading screw 15, is provided with and uses in operation Control Room 10 Loosen the soil the motor 16 of the rotation of screw rod 14 in driving, is arranged with screw rod stabilizing ring 17, screw rod stabilizing ring 17 on the screw rod 14 that loosens the soil Fixing end be fixedly connected with vertical baffle 6, operation Control Room 10 periphery be provided with protective grille 18, the top in Qie Tu areas 8 is also Provided with the manipulator 19 for aiding in loosening the soil.
As shown in figs, vault cutting shoe device 4 includes riser 4.1, the setting being detachably connected with the jacking end of vault 2 On the top of riser 4.1 the second top plate 4.2 normal thereto being fixedly connected, be arranged on that the bottom of riser 4.1 is normal thereto to be fixedly connected The second bottom plate 4.3 and be symmetricly set between the second top plate 4.2 and the second bottom plate 4.3 and vertical with 4.1 liang of vertical edges of riser The the first vault cutting shoe side plate 4.4 and the second vault cutting shoe side plate 4.5 being fixedly connected, the second top plate 4.2 extend towards jacking direction Length be more than the length that extends towards jacking direction of the second bottom plate 4.3, the first vault cutting shoe side plate 4.4 and the second vault cutting shoe side Plate 4.5 is in chamfer trapezium structure;Riser 4.1, the second top plate 4.2, the second bottom plate 4.3, the first vault cutting shoe side plate 4.4 and The hollow form wedge shape frame structure to form front opening is enclosed between second vault cutting shoe side plate 4.5, the second bottom plate 4.3 is provided with Several unearthed holes 20 being arranged in juxtaposition, the inner periphery in hole 20 of being unearthed are provided with circular baffle plate 4.6.Abutment wall 1 fills with abutment wall cutting shoe Put and be fixedly connected between 3, vault 2 and vault cutting shoe device 4 by U-bolt component 21.By before abutment wall 1 and vault 2 Abutment wall cutting shoe device 3, vault cutting shoe device 4 are installed in end respectively, cut in subgrade soil, and transport and empty soil for undisturbed Body, make not produce extruding and perturbation action to the soil body when vault 2,1 jacking of abutment wall, keep the original state in situ of subgrade soils, further Reduce construction risk.
The foregoing is only a specific embodiment of the invention, it is noted that any those skilled in the art exist In disclosed technical scope, the change or replacement that can readily occur in, should all cover protection scope of the present invention it It is interior.

Claims (10)

1. a kind of both wired jacking protection construction method, it is characterised in that comprise the following steps:
1) according to the physical dimension of bridges and culverts, the prefabricated abutment wall (1) of difference and vault (2);
2) abutment wall cutting shoe device (3), vault cutting shoe device (4) are installed respectively in the front end of abutment wall (1) and vault (2);
3) push construction method is used, jacking operation is carried out to abutment wall (1), vault (2) respectively;
4) after the completion of jacking operation, abutment wall cutting shoe device (3) and vault cutting shoe device (4) are dismantled respectively, complete both wired jackings Construction of prevention work.
2. according to claim 1 both wired jacking protection construction method, it is characterised in that in the step 3), in the ban During to abutment wall (1) jacking operation, concretely comprise the following steps:Soil box is excavated on the outside of bridges and culverts according to abutment wall (1) embedded depth, spread in bottom land If slideway, and incremental launching device is set in the one end of slideway away from bridges and culverts, then abutment wall (1) lifting is put into slideway, abutment wall (1) band There is one end of abutment wall cutting shoe device (3) towards bridges and culverts, top is then applied to the one end of abutment wall (1) away from bridges and culverts by incremental launching device Enter active force, continuous jacking, spoir move in circles and use identical incremental launching construction after the completion of pushing tow to setting position, pushing tow Method carries out down the jacking operation of one of abutment wall (1), until completing the jacking operation of all abutment walls (1).
3. according to claim 1 both wired jacking protection construction method, it is characterised in that in the step 3), work as side After the completion of wall (1) jacking, it is specially to vault (2) jacking operation:In the both sides of vault (2), supporting apparatus is set (5), and in the one end of vault (2) away from bridges and culverts incremental launching device is set, the one end of vault (2) with vault cutting shoe device is shelved on On abutment wall (1), jacking active force, continuous jacking, spoir are then applied to the one end of vault (2) away from bridges and culverts by incremental launching device Move in circles up to pushing tow to setting position.
4. according to claim 1 both wired jacking protection construction method, it is characterised in that in the step 3), in the ban During to vault (2) jacking operation, concretely comprise the following steps:According to the height of bridges and culverts, soil box is excavated in corresponding height position on the outside of bridges and culverts, Slideway is laid in bottom land, and incremental launching device is set in the one end of slideway away from bridges and culverts, then vault (2) lifting is put into slideway, The one end of vault (2) with vault cutting shoe device (4) is towards bridges and culverts, then by incremental launching device to the remote bridges and culverts of vault (2) One end applies jacking active force, and continuous jacking, spoir move in circles up to pushing tow to setting position.
5. according to claim 1 both wired jacking protection construction method, it is characterised in that in the step 3), work as arch After the completion of pushing up (2) jacking, it is specially to abutment wall (1) jacking operation:Excavated according to abutment wall (1) embedded depth on the outside of bridges and culverts Soil box, slideway is laid in bottom land, and incremental launching device is set in the one end of slideway away from bridges and culverts, then abutment wall (1) lifting is put into cunning In road, for the top end face of abutment wall (1) with the bottom face of vault (2) on same horizontal plane, abutment wall (1) carries abutment wall cutting shoe device (3) one end then applies jacking active force, constantly by incremental launching device towards bridges and culverts to the one end of abutment wall (1) away from bridges and culverts Jacking, spoir move in circles next using the progress of identical push construction method after the completion of pushing tow to setting position, pushing tow The jacking operation of road abutment wall (1), until completing the jacking operation of all abutment walls (1).
6. according to claim 1 both wired jacking protection construction method, it is characterised in that in the step 2), abutment wall Cutting shoe device (3) include be bonded with abutment wall (1) jacking end face end plate (3.1), be arranged on end plate (3.1) top company fixed thereto The first top plate (3.2) for connecing, it is arranged on the first bottom plate (3.3) of end plate (3.1) bottom connection fixed thereto and is symmetrical arranged The first abutment wall cutting shoe side plate being fixedly connected between the first top plate (3.2) and the first bottom plate (3.3) and with end plate (3.1) both sides (3.4) and the second abutment wall cutting shoe side plate (3.5), first top plate (3.2) are more than the first bottom towards the length that jacking direction extends The length that plate (3.3) extends towards jacking direction;The end plate (3.1), the first top plate (3.2), the first bottom plate (3.3), the first side Wall cutting shoe side plate (3.4) and the second abutment wall cutting shoe side plate (3.5) enclose the special-shaped wedge-shaped framework of hollow form to form front opening, Vertical baffle (6) is provided with the wedge-shaped framework of abnormal shape, special-shaped wedge-shaped framework is divided into unearthed area by the vertical baffle (6) (7) soil outlet (9), the top of the Qie Tu areas (8) and Qie Tu areas (8), are provided with the first top plate (3.2) of the unearthed area (7) Portion side is provided with operation Control Room (10), and the bottom of the vertical baffle (6), which is provided with, to be passed through for soil and connect unearthed area (7) and cut Tu Qu's (8) enters Tu Kou (11).
7. according to claim 6 both wired jacking protection construction method, it is characterised in that the abutment wall cutting shoe device (3) cycle lifting device (12) for muck haulage is provided with unearthed area (7), the cycle lifting device (12) is provided with some Muck haulage frame (13) of the individual hanging on conveyer chain.
8. according to claim 6 both wired jacking protection construction method, it is characterised in that the operation Control Room (10) Bottom be provided with the screw rod that loosens the soil (14) that extends downwardly, the lower end of the screw rod that loosens the soil (14) is provided with leading screw (15), the operation The motor (16) for screw rod (14) rotation of being loosened the soil for driving is provided with Control Room (10), is arranged on the screw rod that loosens the soil (14) There is screw rod stabilizing ring (17), the fixing end of the screw rod stabilizing ring (17) is fixedly connected with vertical baffle (6), the operation monitoring The periphery of room (10) is provided with protective grille (18), and the manipulator for aiding in loosening the soil is additionally provided with the top of the Qie Tu areas (8) (19)。
9. according to claim 1 both wired jacking protection construction method, it is characterised in that described in the step 2) Vault cutting shoe device (4) include be detachably connected with vault (2) jacking end riser (4.1), be arranged on riser (4.1) top with The second top plate (4.2) being vertically fixedly connected, be arranged on riser (4.1) bottom the second bottom plate normal thereto being fixedly connected (4.3) and it is symmetricly set between the second top plate (4.2) and the second bottom plate (4.3) and vertical with the vertical edge of riser (4.1) two solid Surely the first vault cutting shoe side plate (4.4) and the second vault cutting shoe side plate (4.5) connected, second top plate (4.2) is towards jacking The length of direction extension is more than the length that the second bottom plate (4.3) extends towards jacking direction, the first vault cutting shoe side plate (4.4) It is in chamfer trapezium structure with the second vault cutting shoe side plate (4.5);The riser (4.1), the second top plate (4.2), the second bottom plate (4.3), enclose to be formed in front opening between the first vault cutting shoe side plate (4.4) and the second vault cutting shoe side plate (4.5) Empty shape wedge shape frame structure, second bottom plate (4.3) are provided with several unearthed holes (20) being arranged in juxtaposition, the unearthed hole (20) inner periphery is provided with circular baffle plate (4.6).
10. according to claim 1 both wired jacking protection construction method, it is characterised in that described in the step 2) It is fixed by U-bolt component (21) between abutment wall (1) and abutment wall cutting shoe device (3), vault (2) and vault cutting shoe device (4) Connection.
CN201610762980.8A 2016-08-30 2016-08-30 A kind of both wired jacking protection construction method Active CN106245533B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610762980.8A CN106245533B (en) 2016-08-30 2016-08-30 A kind of both wired jacking protection construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610762980.8A CN106245533B (en) 2016-08-30 2016-08-30 A kind of both wired jacking protection construction method

Publications (2)

Publication Number Publication Date
CN106245533A CN106245533A (en) 2016-12-21
CN106245533B true CN106245533B (en) 2018-03-13

Family

ID=57596840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610762980.8A Active CN106245533B (en) 2016-08-30 2016-08-30 A kind of both wired jacking protection construction method

Country Status (1)

Country Link
CN (1) CN106245533B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6157767A (en) * 1984-08-30 1986-03-24 岡部株式会社 Construction of culvert by running moving type outer mold frame
JP2004225529A (en) * 2004-03-17 2004-08-12 Ando Corp Continuous laying method for precast concrete slab
CN102359069A (en) * 2011-07-05 2012-02-22 中铁十局集团有限公司 Existing line reinforcing method in under-crossing railway frame bridge small-included angle large-height inclined jacking construction
CN203346799U (en) * 2013-07-10 2013-12-18 中铁第四勘察设计院集团有限公司 Double-layer frame bridge structure applicable to existing railway jacking construction
CN103614970A (en) * 2013-12-10 2014-03-05 中铁二十局集团第一工程有限公司 Longitudinal-pulling and transverse-pushing sliding system used for assembly and erection construction of steel truss girder
CN103866694A (en) * 2014-03-18 2014-06-18 中铁二十二局集团第一工程有限公司 Deep water silt layer geological large-span multi-line reinforcing system and jacking culvert construction method
CN102808381B (en) * 2012-08-21 2014-09-03 中铁十局集团有限公司 High-water-level silty-soil underneath-pass multi-track railway frame bridge jacking and butting construction method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6157767A (en) * 1984-08-30 1986-03-24 岡部株式会社 Construction of culvert by running moving type outer mold frame
JP2004225529A (en) * 2004-03-17 2004-08-12 Ando Corp Continuous laying method for precast concrete slab
CN102359069A (en) * 2011-07-05 2012-02-22 中铁十局集团有限公司 Existing line reinforcing method in under-crossing railway frame bridge small-included angle large-height inclined jacking construction
CN102808381B (en) * 2012-08-21 2014-09-03 中铁十局集团有限公司 High-water-level silty-soil underneath-pass multi-track railway frame bridge jacking and butting construction method
CN203346799U (en) * 2013-07-10 2013-12-18 中铁第四勘察设计院集团有限公司 Double-layer frame bridge structure applicable to existing railway jacking construction
CN103614970A (en) * 2013-12-10 2014-03-05 中铁二十局集团第一工程有限公司 Longitudinal-pulling and transverse-pushing sliding system used for assembly and erection construction of steel truss girder
CN103866694A (en) * 2014-03-18 2014-06-18 中铁二十二局集团第一工程有限公司 Deep water silt layer geological large-span multi-line reinforcing system and jacking culvert construction method
CN103866694B (en) * 2014-03-18 2016-04-27 中铁二十二局集团第一工程有限公司 Deep water silty sand ground geology large span multi-line hardened system and jacking culvert construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
既有线顶进涵施工技术;谭波;《企业技术开发 》;20111101;第30卷(第11期);第115-116页 *
管涵下穿铁路既有线顶进施工方法;王娟;《中小企业管理与科技(下旬刊)》;20110225(第2期);第18-20页 *

Also Published As

Publication number Publication date
CN106245533A (en) 2016-12-21

Similar Documents

Publication Publication Date Title
AU2020286274B2 (en) Aquifer connection method for inner dump in open-pit mine
CN108005664A (en) A kind of hole pile construction method of platform structure
CN105507908B (en) A kind of large cross-section tunnel branch-cut bridge Duan Sanlian encircles construction technology
KR20060049741A (en) Construction method of three arch excavation tunnel
CN104533426B (en) An ultra shallow buries the method for tunnel construction of underpass of freeways large span cap excavation method
WO2018133740A1 (en) Underground building and construction method for same
CN102400713B (en) Method for auxiliary construction of water falling in tunnel by communicated channel
KR100877452B1 (en) Construction method of middle wall of three arch excavation tunnel
CN107964971B (en) A kind of precipitation method of the subway station using the construction of PBA engineering method
CN111720126A (en) Construction method for entering tunnel through ingate of underground excavation tunnel
CN109973115B (en) Construction method for drainage of vault of tunnel in karst area
CN109989407B (en) Roadbed pile tube curtain supporting structure behind newly-added two-line platform of railway
CN106978814A (en) A kind of Fabricated Structure for Support of Excavation
CN106759486A (en) A kind of underground structure being made up of stake and wall and its construction method
CN106245533B (en) A kind of both wired jacking protection construction method
ITTO940288A1 (en) PROCESS AND EXCAVATION EQUIPMENT FOR ACCESS, FOR MAINTENANCE AND / OR REGENERATION PURPOSES, TO UNDERGROUND PIPES,
CN104895100B (en) Building close quarters builds underground space Caisson method
CN110486062A (en) A kind of method of mechanical tunneling multilayer multispan underground engineering in weak soil
DE10256421B4 (en) Method and apparatus for making a tunnel or trough
CN207960680U (en) A kind of lock wall for underground coal mine waterproof
CN110670420A (en) Underground excavation maintenance method for ballastless track subgrade of operation railway
CN108729469A (en) The construction method of underground structure
CN212477836U (en) Flexible connection structure before post-cast strip seals
CN107090834A (en) A kind of construction method of Fabricated Structure for Support of Excavation
KR100837340B1 (en) Length Control Type Steel Pipe Strut

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant