CN106245533B - A kind of both wired jacking protection construction method - Google Patents
A kind of both wired jacking protection construction method Download PDFInfo
- Publication number
- CN106245533B CN106245533B CN201610762980.8A CN201610762980A CN106245533B CN 106245533 B CN106245533 B CN 106245533B CN 201610762980 A CN201610762980 A CN 201610762980A CN 106245533 B CN106245533 B CN 106245533B
- Authority
- CN
- China
- Prior art keywords
- jacking
- vault
- abutment wall
- cutting shoe
- culverts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The invention discloses a kind of both wired jacking protection construction method, comprise the following steps:1) according to the physical dimension of bridges and culverts, the prefabricated abutment wall of difference and vault;2) abutment wall cutting shoe device, vault cutting shoe device are installed respectively in the front end of abutment wall and vault;3) push construction method is used, jacking operation is carried out to abutment wall, vault respectively;4) after the completion of jacking operation, abutment wall cutting shoe device and vault cutting shoe device are dismantled respectively, complete both wired jacking construction of prevention work.Existing jacking framework is divided into abutment wall, vault using push construction method and carries out jacking operation respectively by the present invention, can reduce project scale, and and can reduces difficulty of construction, both wired jacking protection construction method of construction risk.
Description
Technical field
The present invention relates to both wired jacking bridge and culvert technical field of construction, in particular to a kind of both wired jacking construction of prevention work side
Method.
Background technology
The frame construction of existing railway jacking at present method (as shown in figures 1-4) is on the premise of ground is firm, pre-
Frame culvert 23 in place, in the case where not cutting off traffic, is pushed into both by the pushing tow of frame culvert 23 made with high-power jack group
Have under railway line 22.However, suitable for the relatively small bridges and culverts in across footpath, aperture when technology origin, and under Modern Traffic
Road width is more and more wider, and the aperture of frame culvert 23 the more is done the more big, continue to continue to use prior art can cause project scale, difficulty of construction,
Construction risk etc. is increasing.Particularly construction temporary project amount is big, in the case of complex procedures, can bring bigger construction
Difficulty and construction risk.
The content of the invention
Present invention aim to provide one kind to reduce project scale, and can reduces difficulty of construction, construction risk
Both wired jacking protection construction method.
To achieve the above object, a kind of both wired jacking protection construction method designed by the present invention, comprises the following steps:
1) according to the physical dimension of bridges and culverts, the prefabricated abutment wall of difference and vault;
2) abutment wall cutting shoe device, vault cutting shoe device are installed respectively in the front end of abutment wall and vault;
3) push construction method is used, jacking operation is carried out to abutment wall, vault respectively;
4) after the completion of jacking operation, abutment wall cutting shoe device and vault cutting shoe device are dismantled respectively, are completed both wired jackings and are prevented
Shield construction.
Further, in the step 3), when opposite side wall top enters operation in the ban, concretely comprise the following steps:Buried depth according to abutment wall
Degree excavates soil box on the outside of bridges and culverts, and slideway is laid in bottom land, and incremental launching device is set in one end away from bridges and culverts of slideway, then by side
Wall lifting is put into slideway, and the one end of abutment wall with abutment wall cutting shoe device is then remote to abutment wall by incremental launching device towards bridges and culverts
One end from bridges and culverts applies jacking active force, and continuous jacking, spoir move in circles after the completion of pushing tow to setting position, pushing tow
The jacking operation of one of abutment wall is carried out down using identical push construction method, until completing the jacking operation of all abutment walls.
Further, in the step 3), after the completion of abutment wall jacking, it is specially to vault jacking operation:Encircleing
The both sides on top set supporting apparatus, and set incremental launching device in the one end of vault away from bridges and culverts, and vault carries vault cutting shoe
One end of device is shelved on abutment wall, then applies jacking active force to the one end of vault away from bridges and culverts by incremental launching device, no
Disconnected jacking, spoir move in circles up to pushing tow to setting position.
Further, in the step 3), in the ban to vault jacking operation when, concretely comprise the following steps:According to the height of bridges and culverts,
Soil box is excavated in corresponding height position on the outside of bridges and culverts, lays slideway in bottom land, and set pushing tow in the one end of slideway away from bridges and culverts
Equipment, then vault lifting is put into slideway, the one end of vault with vault cutting shoe device is then set towards bridges and culverts by pushing tow
Standby one end away from bridges and culverts to vault applies jacking active force, and continuous jacking, spoir move in circles up to pushing tow to setting position.
Further, in the step 3), after the completion of vault jacking, opposite side wall top enters operation and is specially:According to
Abutment wall embedded depth excavates soil box on the outside of bridges and culverts, lays slideway in bottom land, and set pushing tow in the one end of slideway away from bridges and culverts
Equipment, then abutment wall lifting is put into slideway, the top end face of abutment wall and the bottom face of vault are on same horizontal plane, abutment wall band
There is one end of abutment wall cutting shoe device towards bridges and culverts, jacking is then applied to the one end of abutment wall away from bridges and culverts by incremental launching device and acted on
Power, continuous jacking, spoir move in circles is entered after the completion of pushing tow to setting position, pushing tow using identical push construction method
The jacking operation of lower one of the abutment wall of row, until completing the jacking operation of all abutment walls.
Further, in the step 2), abutment wall cutting shoe device include be bonded with abutment wall jacking end face end plate, be arranged on
First top plate of end plate top connection fixed thereto, the first bottom plate for being arranged on the connection fixed thereto of end plate bottom and symmetrical
The the first abutment wall cutting shoe side plate and the second abutment wall for being arranged between the first top plate and the first bottom plate and being fixedly connected with end plate both sides
Cutting shoe side plate, first top plate is towards the length that jacking direction extends more than the length that the first bottom plate extends towards jacking direction;Institute
End plate, the first top plate, the first bottom plate, the first abutment wall cutting shoe side plate and the second abutment wall cutting shoe side plate is stated to enclose to form front opening
The special-shaped wedge-shaped framework of hollow form, be provided with vertical baffle in the wedge-shaped framework of abnormal shape, the vertical baffle is by the wedge-shaped frame of abnormal shape
Frame is divided into unearthed area and Qie Tu areas, and soil outlet, the top-side in the Qie Tu areas are provided with first top plate in the unearthed area
Provided with operation Control Room, the bottom of the vertical baffle, which is provided with, to be passed through for soil and connects unearthed area and Tu Kou is entered in Qie Tu areas.
Further, the cycle lifting device for muck haulage is provided with the unearthed area of the abutment wall cutting shoe device, it is described to follow
Ring lowering or hoisting gear is provided with several muck haulage frames of the hanging on conveyer chain.
Further, the bottom of the operation Control Room is provided with the screw rod that loosens the soil extended downwardly, described to loosen the soil under screw rod
End is provided with leading screw, and the motor for being used for driving screw rod rotation of loosening the soil is provided with the operation Control Room, described to loosen the soil on screw rod
Screw rod stabilizing ring is arranged with, the fixing end of the screw rod stabilizing ring is fixedly connected with vertical baffle, outside the operation Control Room
Week is provided with protective grille, and the manipulator for aiding in loosening the soil is additionally provided with the top of the Qie Tu areas.
Further, in the step 2), vault cutting shoe device include be detachably connected with vault jacking end riser, set
Put in riser top the second top plate normal thereto being fixedly connected, be arranged on riser bottom the second bottom normal thereto being fixedly connected
Plate and it is symmetricly set between the second top plate and the second bottom plate and the first vault sword being fixedly connected vertical with the vertical edge of riser two
Pin side plate and the second vault cutting shoe side plate, second top plate are more than the second bottom plate towards jacking side towards the length that jacking direction extends
To the length of extension, the first vault cutting shoe side plate and the second vault cutting shoe side plate are in chamfer trapezium structure;The riser,
Enclose to form front opening between second top plate, the second bottom plate, the first vault cutting shoe side plate and the second vault cutting shoe side plate
Hollow form wedge shape frame structure, second bottom plate are provided with several unearthed holes being arranged in juxtaposition, described unearthed hole the inner
Periphery is provided with circular baffle plate.
Further, in the step 2), lead between abutment wall and abutment wall the cutting shoe device, vault and vault cutting shoe device
U-bolt component is crossed to be fixedly connected.
Compared with prior art, the invention has the advantages that:
First, existing frame culvert is divided into vault, abutment wall using push construction method and carries out jacking work respectively by the present invention
Industry, can reduce project scale, and and can reduces difficulty of construction, both wired jacking protection construction method of construction risk.
Second, vault cutting shoe device, abutment wall cutting shoe device are installed in the vault of the present invention and the front end of abutment wall respectively, for nothing
In disturbance ground incision subgrade soil, and transport and empty the soil body, make not produce extruding to the soil body when top plate, abutment wall jacking and disturbance is made
With keeping the original state in situ of subgrade soils, reduce further construction risk.
Third, both wired jacking protection construction method step of the present invention is simple, safe and reliable, operation is flexible, solve
The construction difficult problem of framework jacking, and put into construction cost reduction.
Brief description of the drawings
Fig. 1 is existing both wired side structure schematic view;
Fig. 2 is Fig. 1 cross section structure diagram;
Fig. 3 is the side structure schematic view after the completion of existing jacking construction of frame culvert;
Fig. 4 is Fig. 3 main structure diagram;
Fig. 5 is the side structure schematic view before abutment wall jacking construction of the present invention;
Fig. 6 is Fig. 5 side structure schematic view;
Fig. 7 is the side structure schematic view after the completion of abutment wall jacking construction of the present invention;
Fig. 8 is Fig. 6 side structure schematic view;
Fig. 9 be abutment wall jacking construction of the present invention after the completion of again jacking vault construction before side structure schematic view;
Figure 10 is Fig. 9 side structure schematic view;
Figure 11 is the side structure schematic view after the completion of jacking vault of the present invention construction;
Figure 12 is Figure 11 side structure schematic view;
Figure 13 is the side structure schematic view of the abutment wall cutting shoe device of the present invention;
Figure 14 is structural representations of the Figure 13 along A-A directions;
Figure 15 is the side structure schematic view of the vault cutting shoe device of the present invention;
Figure 16 is Figure 15 overlooking the structure diagram.
Wherein:1- abutment walls, 2- vaults, 3- abutment wall cutting shoes device, 3.1- end plates, the top plates of 3.2- first, the bottom plates of 3.3- first,
3.4- the first abutment wall cutting shoes side plate, 3.5- the second abutment wall cutting shoes side plate, 4- vault cutting shoes device, 4.1- risers, 4.2- second are pushed up
Plate, the bottom plates of 4.3- second, 4.4- the first vault cutting shoes side plate, 4.5- the second vault cutting shoes side plate, 4.6- circular baffle plates, 5- are interim
The unearthed area of support meanss, 6- vertical baffles, 7-, 8- Qie Tu areas, 9- soil outlets, 10- operations Control Room, 11- enter Tu Kou, 12- and followed
Ring lowering or hoisting gear, 13- muck haulage frame, 14- loosen the soil screw rod, 15- leading screws, 16- motors, 17- screw rods stabilizing ring, 18- protection lattice
Be unearthed hole, 21-U types bolt assembly, 22- both wired, 23- frame culverts, 24- vaults of grid, 19- manipulators, 20- is unearthed passage, 25-
Rail level line, 26- ground, 27- road surfaces.
Embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
As shown in Fig. 5~12, a kind of both wired jacking protection construction method of the present embodiment, comprise the following steps:
1) according to the physical dimension of bridges and culverts, place is selected to distinguish prefabricated abutment wall 1 and vault 2 beyond circuit safe distance;
2) abutment wall cutting shoe device 3, vault cutting shoe device 4 are combined into using steel plate welding, in the front end of abutment wall 1 and vault 2
Abutment wall cutting shoe device 3, vault cutting shoe device 4 are installed respectively;
3) the jacking order to abutment wall 1, vault 2 is selected according to actual conditions, is divided into two kinds of situations:
In the ban to the jacking operation of abutment wall 1, after to 2 jacking operation of vault when, specific method is:According to the embedded depth of abutment wall 1
Soil box is excavated on the outside of bridges and culverts, slideway is laid in bottom land, and incremental launching device is set in one end away from bridges and culverts of slideway, then by abutment wall
1 lifting is put into slideway, and the one end of abutment wall 1 with abutment wall cutting shoe device 3 adjusts the placement location of abutment wall 1 to protect towards bridges and culverts
Card pushing tow is traveling on desired trajectory, then applies jacking active force to the one end of abutment wall 1 away from bridges and culverts by incremental launching device, no
Disconnected jacking, spoir move in circles until pushing tow is to setting position, and that the soil body caves in such as be present can use mud off or other
Feasible method is protected, while existing trajectory, roadbed etc. are monitored by design detection requirement, holds be advanced in time
Situation in journey, the especially bad symptom of a trend, tackled by the early warning scheme pre-established, one of abutment wall 1 is carried out down after the completion of pushing tow
Jacking operation, until completing the jacking operation of all abutment walls 1;After the completion of the jacking of abutment wall 1, to the jacking operation of vault 2
Specially:Supporting apparatus 5 is set in the both sides of vault 2, and incremental launching device, arch are set in the one end of vault 2 away from bridges and culverts
The one end of top 2 with vault cutting shoe device is shelved on abutment wall 1, then by incremental launching device to the one end of vault 2 away from bridges and culverts
Apply jacking active force, one side jacking forms the unearthed passage 24 of vault while digging, and the channel width is much smaller than vault width, constantly
Jacking, spoir move in circles up to pushing tow to setting position;
In the ban to the jacking operation of vault 2, after to 1 jacking operation of abutment wall when, specific method is:According to the height of bridges and culverts,
Soil box is excavated in corresponding height position on the outside of bridges and culverts, lays slideway in bottom land, and set pushing tow to set in the one end of slideway away from bridges and culverts
It is standby, then the lifting of vault 2 is put into slideway, the one end of vault 2 with vault cutting shoe device 4 then passes through pushing tow towards bridges and culverts
Equipment applies jacking active force to the one end of vault 2 away from bridges and culverts, and continuous jacking, spoir move in circles up to pushing tow to setting position
Put;After the completion of the jacking of vault 2, it is specially to the jacking operation of abutment wall 1:Opened according to the embedded depth of abutment wall 1 on the outside of bridges and culverts
Shoveling groove, slideway is laid in bottom land, and incremental launching device is set in the one end of slideway away from bridges and culverts, then the lifting of abutment wall 1 is put into cunning
In road, for the top end face of abutment wall 1 with the bottom face of vault 2 on same horizontal plane, abutment wall 1 carries the one of abutment wall cutting shoe device 3
End then applies jacking active force, continuous jacking, spoir by incremental launching device towards bridges and culverts to the one end of abutment wall 1 away from bridges and culverts
Move in circles until pushing tow arrives setting position, use after the completion of pushing tow identical push construction method to carry out down one abutment wall 1
Jacking operation, until completing the jacking operation of all abutment walls 1.
4) after the completion of jacking operation, abutment wall cutting shoe device 3 and vault cutting shoe device 4 are dismantled respectively, complete both wired jackings
Construction of prevention work.
In implementation process, the sequencing of abutment wall 1 and the progress jacking construction of vault 2 can be exchanged, you can first to carry out
The jacking operation of abutment wall 1, it is rear to carry out the jacking operation of vault 2;The jacking operation of vault 2 can also be first carried out, it is rear to carry out the jacking of abutment wall 1 work
Industry.Abutment wall 1 and vault 2 are constantly unearthed, constantly advanced, in order to ensure not disturbing existing subgrade soils during jacking moves ahead
Body, it can push up more, can not dig more.When ground carrier strip part is preferable, can using abutment wall 1 now and vault 2 as permanent structure,
As long as then cut out soil body construction road or the circuit below top plate;In abutment wall 1, vault if also other permanent structures
If continuing construction further part engineering ratio under 2 protection has the problem of underground water, a U groove structure can be done.
As shown in Figs. 13 and 14, abutment wall cutting shoe device 3 include be bonded with the jacking end face of abutment wall 1 end plate 3.1, be arranged on end
First top plate 3.2 of the top of plate 3.1 connection fixed thereto, the first bottom plate for being arranged on the connection fixed thereto of the bottom of end plate 3.1
3.3 and the first side for being symmetricly set between the first top plate 3.2 and the first bottom plate 3.3 and being fixedly connected with the both sides of end plate 3.1
Wall cutting shoe side plate 3.4 and the second abutment wall cutting shoe side plate 3.5, the first top plate 3.2 are more than the first bottom towards the length that jacking direction extends
The length that plate 3.3 extends towards jacking direction;End plate 3.1, the first top plate 3.2, the first bottom plate 3.3, the first abutment wall cutting shoe side plate 3.4
And second abutment wall cutting shoe side plate 3.5 enclose the special-shaped wedge-shaped framework of hollow form to form front opening, set in special-shaped wedge-shaped framework
There is vertical baffle 6, special-shaped wedge-shaped framework is divided into unearthed area 7 and Qie Tu areas 8 by vertical baffle 6, first top plate in area 7 of being unearthed
Soil outlet 9 is provided with 3.2, the top-side in Qie Tu areas 8 is provided with operation Control Room 10, and the bottom of vertical baffle 6 is provided with wears for soil
That crosses and connect unearthed area 7 and Qie Tu areas 8 enters native mouth 11.The circulation for muck haulage is provided with the unearthed area 7 of abutment wall cutting shoe device 3
Lowering or hoisting gear 12, cycle lifting device 12 are provided with several muck haulage frames 13 of the hanging on conveyer chain.Operate Control Room 10
Bottom is provided with the screw rod 14 that loosens the soil extended downwardly, and the lower end for the screw rod 14 that loosens the soil is provided with leading screw 15, is provided with and uses in operation Control Room 10
Loosen the soil the motor 16 of the rotation of screw rod 14 in driving, is arranged with screw rod stabilizing ring 17, screw rod stabilizing ring 17 on the screw rod 14 that loosens the soil
Fixing end be fixedly connected with vertical baffle 6, operation Control Room 10 periphery be provided with protective grille 18, the top in Qie Tu areas 8 is also
Provided with the manipulator 19 for aiding in loosening the soil.
As shown in figs, vault cutting shoe device 4 includes riser 4.1, the setting being detachably connected with the jacking end of vault 2
On the top of riser 4.1 the second top plate 4.2 normal thereto being fixedly connected, be arranged on that the bottom of riser 4.1 is normal thereto to be fixedly connected
The second bottom plate 4.3 and be symmetricly set between the second top plate 4.2 and the second bottom plate 4.3 and vertical with 4.1 liang of vertical edges of riser
The the first vault cutting shoe side plate 4.4 and the second vault cutting shoe side plate 4.5 being fixedly connected, the second top plate 4.2 extend towards jacking direction
Length be more than the length that extends towards jacking direction of the second bottom plate 4.3, the first vault cutting shoe side plate 4.4 and the second vault cutting shoe side
Plate 4.5 is in chamfer trapezium structure;Riser 4.1, the second top plate 4.2, the second bottom plate 4.3, the first vault cutting shoe side plate 4.4 and
The hollow form wedge shape frame structure to form front opening is enclosed between second vault cutting shoe side plate 4.5, the second bottom plate 4.3 is provided with
Several unearthed holes 20 being arranged in juxtaposition, the inner periphery in hole 20 of being unearthed are provided with circular baffle plate 4.6.Abutment wall 1 fills with abutment wall cutting shoe
Put and be fixedly connected between 3, vault 2 and vault cutting shoe device 4 by U-bolt component 21.By before abutment wall 1 and vault 2
Abutment wall cutting shoe device 3, vault cutting shoe device 4 are installed in end respectively, cut in subgrade soil, and transport and empty soil for undisturbed
Body, make not produce extruding and perturbation action to the soil body when vault 2,1 jacking of abutment wall, keep the original state in situ of subgrade soils, further
Reduce construction risk.
The foregoing is only a specific embodiment of the invention, it is noted that any those skilled in the art exist
In disclosed technical scope, the change or replacement that can readily occur in, should all cover protection scope of the present invention it
It is interior.
Claims (10)
1. a kind of both wired jacking protection construction method, it is characterised in that comprise the following steps:
1) according to the physical dimension of bridges and culverts, the prefabricated abutment wall (1) of difference and vault (2);
2) abutment wall cutting shoe device (3), vault cutting shoe device (4) are installed respectively in the front end of abutment wall (1) and vault (2);
3) push construction method is used, jacking operation is carried out to abutment wall (1), vault (2) respectively;
4) after the completion of jacking operation, abutment wall cutting shoe device (3) and vault cutting shoe device (4) are dismantled respectively, complete both wired jackings
Construction of prevention work.
2. according to claim 1 both wired jacking protection construction method, it is characterised in that in the step 3), in the ban
During to abutment wall (1) jacking operation, concretely comprise the following steps:Soil box is excavated on the outside of bridges and culverts according to abutment wall (1) embedded depth, spread in bottom land
If slideway, and incremental launching device is set in the one end of slideway away from bridges and culverts, then abutment wall (1) lifting is put into slideway, abutment wall (1) band
There is one end of abutment wall cutting shoe device (3) towards bridges and culverts, top is then applied to the one end of abutment wall (1) away from bridges and culverts by incremental launching device
Enter active force, continuous jacking, spoir move in circles and use identical incremental launching construction after the completion of pushing tow to setting position, pushing tow
Method carries out down the jacking operation of one of abutment wall (1), until completing the jacking operation of all abutment walls (1).
3. according to claim 1 both wired jacking protection construction method, it is characterised in that in the step 3), work as side
After the completion of wall (1) jacking, it is specially to vault (2) jacking operation:In the both sides of vault (2), supporting apparatus is set
(5), and in the one end of vault (2) away from bridges and culverts incremental launching device is set, the one end of vault (2) with vault cutting shoe device is shelved on
On abutment wall (1), jacking active force, continuous jacking, spoir are then applied to the one end of vault (2) away from bridges and culverts by incremental launching device
Move in circles up to pushing tow to setting position.
4. according to claim 1 both wired jacking protection construction method, it is characterised in that in the step 3), in the ban
During to vault (2) jacking operation, concretely comprise the following steps:According to the height of bridges and culverts, soil box is excavated in corresponding height position on the outside of bridges and culverts,
Slideway is laid in bottom land, and incremental launching device is set in the one end of slideway away from bridges and culverts, then vault (2) lifting is put into slideway,
The one end of vault (2) with vault cutting shoe device (4) is towards bridges and culverts, then by incremental launching device to the remote bridges and culverts of vault (2)
One end applies jacking active force, and continuous jacking, spoir move in circles up to pushing tow to setting position.
5. according to claim 1 both wired jacking protection construction method, it is characterised in that in the step 3), work as arch
After the completion of pushing up (2) jacking, it is specially to abutment wall (1) jacking operation:Excavated according to abutment wall (1) embedded depth on the outside of bridges and culverts
Soil box, slideway is laid in bottom land, and incremental launching device is set in the one end of slideway away from bridges and culverts, then abutment wall (1) lifting is put into cunning
In road, for the top end face of abutment wall (1) with the bottom face of vault (2) on same horizontal plane, abutment wall (1) carries abutment wall cutting shoe device
(3) one end then applies jacking active force, constantly by incremental launching device towards bridges and culverts to the one end of abutment wall (1) away from bridges and culverts
Jacking, spoir move in circles next using the progress of identical push construction method after the completion of pushing tow to setting position, pushing tow
The jacking operation of road abutment wall (1), until completing the jacking operation of all abutment walls (1).
6. according to claim 1 both wired jacking protection construction method, it is characterised in that in the step 2), abutment wall
Cutting shoe device (3) include be bonded with abutment wall (1) jacking end face end plate (3.1), be arranged on end plate (3.1) top company fixed thereto
The first top plate (3.2) for connecing, it is arranged on the first bottom plate (3.3) of end plate (3.1) bottom connection fixed thereto and is symmetrical arranged
The first abutment wall cutting shoe side plate being fixedly connected between the first top plate (3.2) and the first bottom plate (3.3) and with end plate (3.1) both sides
(3.4) and the second abutment wall cutting shoe side plate (3.5), first top plate (3.2) are more than the first bottom towards the length that jacking direction extends
The length that plate (3.3) extends towards jacking direction;The end plate (3.1), the first top plate (3.2), the first bottom plate (3.3), the first side
Wall cutting shoe side plate (3.4) and the second abutment wall cutting shoe side plate (3.5) enclose the special-shaped wedge-shaped framework of hollow form to form front opening,
Vertical baffle (6) is provided with the wedge-shaped framework of abnormal shape, special-shaped wedge-shaped framework is divided into unearthed area by the vertical baffle (6)
(7) soil outlet (9), the top of the Qie Tu areas (8) and Qie Tu areas (8), are provided with the first top plate (3.2) of the unearthed area (7)
Portion side is provided with operation Control Room (10), and the bottom of the vertical baffle (6), which is provided with, to be passed through for soil and connect unearthed area (7) and cut
Tu Qu's (8) enters Tu Kou (11).
7. according to claim 6 both wired jacking protection construction method, it is characterised in that the abutment wall cutting shoe device
(3) cycle lifting device (12) for muck haulage is provided with unearthed area (7), the cycle lifting device (12) is provided with some
Muck haulage frame (13) of the individual hanging on conveyer chain.
8. according to claim 6 both wired jacking protection construction method, it is characterised in that the operation Control Room (10)
Bottom be provided with the screw rod that loosens the soil (14) that extends downwardly, the lower end of the screw rod that loosens the soil (14) is provided with leading screw (15), the operation
The motor (16) for screw rod (14) rotation of being loosened the soil for driving is provided with Control Room (10), is arranged on the screw rod that loosens the soil (14)
There is screw rod stabilizing ring (17), the fixing end of the screw rod stabilizing ring (17) is fixedly connected with vertical baffle (6), the operation monitoring
The periphery of room (10) is provided with protective grille (18), and the manipulator for aiding in loosening the soil is additionally provided with the top of the Qie Tu areas (8)
(19)。
9. according to claim 1 both wired jacking protection construction method, it is characterised in that described in the step 2)
Vault cutting shoe device (4) include be detachably connected with vault (2) jacking end riser (4.1), be arranged on riser (4.1) top with
The second top plate (4.2) being vertically fixedly connected, be arranged on riser (4.1) bottom the second bottom plate normal thereto being fixedly connected
(4.3) and it is symmetricly set between the second top plate (4.2) and the second bottom plate (4.3) and vertical with the vertical edge of riser (4.1) two solid
Surely the first vault cutting shoe side plate (4.4) and the second vault cutting shoe side plate (4.5) connected, second top plate (4.2) is towards jacking
The length of direction extension is more than the length that the second bottom plate (4.3) extends towards jacking direction, the first vault cutting shoe side plate (4.4)
It is in chamfer trapezium structure with the second vault cutting shoe side plate (4.5);The riser (4.1), the second top plate (4.2), the second bottom plate
(4.3), enclose to be formed in front opening between the first vault cutting shoe side plate (4.4) and the second vault cutting shoe side plate (4.5)
Empty shape wedge shape frame structure, second bottom plate (4.3) are provided with several unearthed holes (20) being arranged in juxtaposition, the unearthed hole
(20) inner periphery is provided with circular baffle plate (4.6).
10. according to claim 1 both wired jacking protection construction method, it is characterised in that described in the step 2)
It is fixed by U-bolt component (21) between abutment wall (1) and abutment wall cutting shoe device (3), vault (2) and vault cutting shoe device (4)
Connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610762980.8A CN106245533B (en) | 2016-08-30 | 2016-08-30 | A kind of both wired jacking protection construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610762980.8A CN106245533B (en) | 2016-08-30 | 2016-08-30 | A kind of both wired jacking protection construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106245533A CN106245533A (en) | 2016-12-21 |
CN106245533B true CN106245533B (en) | 2018-03-13 |
Family
ID=57596840
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610762980.8A Active CN106245533B (en) | 2016-08-30 | 2016-08-30 | A kind of both wired jacking protection construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106245533B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6157767A (en) * | 1984-08-30 | 1986-03-24 | 岡部株式会社 | Construction of culvert by running moving type outer mold frame |
JP2004225529A (en) * | 2004-03-17 | 2004-08-12 | Ando Corp | Continuous laying method for precast concrete slab |
CN102359069A (en) * | 2011-07-05 | 2012-02-22 | 中铁十局集团有限公司 | Existing line reinforcing method in under-crossing railway frame bridge small-included angle large-height inclined jacking construction |
CN203346799U (en) * | 2013-07-10 | 2013-12-18 | 中铁第四勘察设计院集团有限公司 | Double-layer frame bridge structure applicable to existing railway jacking construction |
CN103614970A (en) * | 2013-12-10 | 2014-03-05 | 中铁二十局集团第一工程有限公司 | Longitudinal-pulling and transverse-pushing sliding system used for assembly and erection construction of steel truss girder |
CN103866694A (en) * | 2014-03-18 | 2014-06-18 | 中铁二十二局集团第一工程有限公司 | Deep water silt layer geological large-span multi-line reinforcing system and jacking culvert construction method |
CN102808381B (en) * | 2012-08-21 | 2014-09-03 | 中铁十局集团有限公司 | High-water-level silty-soil underneath-pass multi-track railway frame bridge jacking and butting construction method |
-
2016
- 2016-08-30 CN CN201610762980.8A patent/CN106245533B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6157767A (en) * | 1984-08-30 | 1986-03-24 | 岡部株式会社 | Construction of culvert by running moving type outer mold frame |
JP2004225529A (en) * | 2004-03-17 | 2004-08-12 | Ando Corp | Continuous laying method for precast concrete slab |
CN102359069A (en) * | 2011-07-05 | 2012-02-22 | 中铁十局集团有限公司 | Existing line reinforcing method in under-crossing railway frame bridge small-included angle large-height inclined jacking construction |
CN102808381B (en) * | 2012-08-21 | 2014-09-03 | 中铁十局集团有限公司 | High-water-level silty-soil underneath-pass multi-track railway frame bridge jacking and butting construction method |
CN203346799U (en) * | 2013-07-10 | 2013-12-18 | 中铁第四勘察设计院集团有限公司 | Double-layer frame bridge structure applicable to existing railway jacking construction |
CN103614970A (en) * | 2013-12-10 | 2014-03-05 | 中铁二十局集团第一工程有限公司 | Longitudinal-pulling and transverse-pushing sliding system used for assembly and erection construction of steel truss girder |
CN103866694A (en) * | 2014-03-18 | 2014-06-18 | 中铁二十二局集团第一工程有限公司 | Deep water silt layer geological large-span multi-line reinforcing system and jacking culvert construction method |
CN103866694B (en) * | 2014-03-18 | 2016-04-27 | 中铁二十二局集团第一工程有限公司 | Deep water silty sand ground geology large span multi-line hardened system and jacking culvert construction method |
Non-Patent Citations (2)
Title |
---|
既有线顶进涵施工技术;谭波;《企业技术开发 》;20111101;第30卷(第11期);第115-116页 * |
管涵下穿铁路既有线顶进施工方法;王娟;《中小企业管理与科技(下旬刊)》;20110225(第2期);第18-20页 * |
Also Published As
Publication number | Publication date |
---|---|
CN106245533A (en) | 2016-12-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2020286274B2 (en) | Aquifer connection method for inner dump in open-pit mine | |
CN108005664A (en) | A kind of hole pile construction method of platform structure | |
CN105507908B (en) | A kind of large cross-section tunnel branch-cut bridge Duan Sanlian encircles construction technology | |
KR20060049741A (en) | Construction method of three arch excavation tunnel | |
CN104533426B (en) | An ultra shallow buries the method for tunnel construction of underpass of freeways large span cap excavation method | |
WO2018133740A1 (en) | Underground building and construction method for same | |
CN102400713B (en) | Method for auxiliary construction of water falling in tunnel by communicated channel | |
KR100877452B1 (en) | Construction method of middle wall of three arch excavation tunnel | |
CN107964971B (en) | A kind of precipitation method of the subway station using the construction of PBA engineering method | |
CN111720126A (en) | Construction method for entering tunnel through ingate of underground excavation tunnel | |
CN109973115B (en) | Construction method for drainage of vault of tunnel in karst area | |
CN109989407B (en) | Roadbed pile tube curtain supporting structure behind newly-added two-line platform of railway | |
CN106978814A (en) | A kind of Fabricated Structure for Support of Excavation | |
CN106759486A (en) | A kind of underground structure being made up of stake and wall and its construction method | |
CN106245533B (en) | A kind of both wired jacking protection construction method | |
ITTO940288A1 (en) | PROCESS AND EXCAVATION EQUIPMENT FOR ACCESS, FOR MAINTENANCE AND / OR REGENERATION PURPOSES, TO UNDERGROUND PIPES, | |
CN104895100B (en) | Building close quarters builds underground space Caisson method | |
CN110486062A (en) | A kind of method of mechanical tunneling multilayer multispan underground engineering in weak soil | |
DE10256421B4 (en) | Method and apparatus for making a tunnel or trough | |
CN207960680U (en) | A kind of lock wall for underground coal mine waterproof | |
CN110670420A (en) | Underground excavation maintenance method for ballastless track subgrade of operation railway | |
CN108729469A (en) | The construction method of underground structure | |
CN212477836U (en) | Flexible connection structure before post-cast strip seals | |
CN107090834A (en) | A kind of construction method of Fabricated Structure for Support of Excavation | |
KR100837340B1 (en) | Length Control Type Steel Pipe Strut |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |