CN106759486A - A kind of underground structure being made up of stake and wall and its construction method - Google Patents

A kind of underground structure being made up of stake and wall and its construction method Download PDF

Info

Publication number
CN106759486A
CN106759486A CN201710038299.3A CN201710038299A CN106759486A CN 106759486 A CN106759486 A CN 106759486A CN 201710038299 A CN201710038299 A CN 201710038299A CN 106759486 A CN106759486 A CN 106759486A
Authority
CN
China
Prior art keywords
stake
wall
chain
chain knife
knife
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710038299.3A
Other languages
Chinese (zh)
Inventor
王燏斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710038299.3A priority Critical patent/CN106759486A/en
Publication of CN106759486A publication Critical patent/CN106759486A/en
Priority to PCT/CN2018/072526 priority patent/WO2018133746A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/15Geometrical or physical properties including at least a hinge
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

Proposed by the present invention is a kind of underground structure being made up of stake and wall and its construction method, and the chain knife for excavating ground is arranged when constructing at the bottom of its wall, and the two ends of wall and stake are embedded mutually or are solidly fixed.Stake is the stake of trough of belt, and the two ends of wall are embedded in stake groove when mounted.The bottom of the stake of trough of belt, the bottom of side and wall, side are provided with track, and equipped with the chain knife for excavating ground on track, chain type excavating gear is made up of chain knife, sprocket wheel and drive device, and base track has difference in height, is easy to the operation of chain knife intersection;Drive device drive chain knife during construction, chain knife runs along track, the cutter excavation ground in stake base track, the ground band that will have been excavated when chain knife runs bottom-up to top, and the chain knife of stake bottom and stake decline together.Advantages of the present invention:The wall of building and stake can be segmented in precasting yard and manufacture, and entire lowering after Assembling, construction is simple, and quality is good, short construction period, low cost, adapts to various regions.

Description

A kind of underground structure being made up of stake and wall and its construction method
Technical field
The present invention relates to a kind of underground structure being made up of stake and wall and its construction method, belong to civil engineering basis Technical field of construction.
Background technology
Existing hypogee builds general by the way of overall excavation construction, and pattern foundation pit supporting structure typically uses slope, slopes Reinforcing, campshed and Diaphragm Wall.Area that the form of construction work reinforced using slope, slopes there are excavation is big, to week Surrounding environment requirement is high, the problem that foundation ditch Yield rainfall relation difficulty is big;Being excavated using campshed supporting foundation pit needs prefabricated campshed, to bottom soil It is required that higher, support engineering amount is huge, and safety coefficient is low;Excavated using after diaphram wall retaining wall, matter of being constructed under its trough inner water Amount be difficult to control to and detect, long construction period, groove section between interface constructional difficulties and easily infiltration.
The content of the invention
Proposed by the present invention is a kind of underground structure being made up of stake and wall and its construction method, and its purpose is intended to overcome existing With the presence of the defect of technology.Its major advantage:The wall of building and stake can be segmented in precasting yard and manufacture, overall after Assembling Decline, construction is simple, and quality is good, short construction period, low cost, adapt to various regions.
Technical solution of the invention:The chain knife for excavating ground is arranged when constructing at the bottom of wall, and the two ends of wall and stake are mutual Mutually it is embedded in or is solidly fixed.
Stake is the stake of trough of belt, and the two ends of wall are embedded in stake groove when mounted.
The bottom and side of wall are provided with track, and equipped with the chain knife for excavating ground on track, chain type excavating gear is by chain knife, chain Wheel and drive device composition, chain knife are made up of chain and the cutter being fixed on chain;Drive device drive chain during construction, chain Band cutter runs along track, and the cutter of wall bottom excavates ground, the rock that will have been excavated when chain knife runs bottom-up Soil zone to top, the chain knife and wall of wall bottom synchronously declines together, drops to projected depth, is in the milk again after removing chain knife.
The bottom and side of the stake of trough of belt are provided with track, on track equipped with excavate ground chain knife, chain type excavating gear by Chain knife, sprocket wheel and drive device composition, chain knife are made up of chain and the cutter being fixed on chain, and base track has difference in height, It is easy to the operation of chain knife intersection;Drive device drive chain knife during construction, chain knife runs along track, the knife in stake base track Tool excavates ground, and the ground band that will have been excavated when chain knife runs bottom-up to top, the chain knife of stake bottom and stake one are removed Drop, drops to projected depth, is in the milk again after removing chain knife.
Advantages of the present invention:The wall of building and stake can be segmented in precasting yard and manufacture, and entire lowering after Assembling is applied Work is simple, and quality is good, short construction period, low cost, adapts to various regions.
Brief description of the drawings
Fig. 1 is the structural representation of a word wall or word stake 1, when being also that chain type excavating gear 2 excavates foundation bottom ground Structural representation;
Fig. 2 is the A direction views of Fig. 1, is also the structure of the sprocket wheel 6, drive device 4 and tensioning apparatus 5 that constitute chain type excavating gear 2 Schematic diagram;
Fig. 3 is the B-B sectional views of Fig. 1, and to be also chain knife 3 in foundation bottom not only excavated ground but also be that the structure of ground horizontal feed is shown It is intended to, is also the structural representation of the mud channel 1-4 that the track 1-1 of basic 1 bottom operation chain knife 3 and basic 1 bottom are provided with;
Fig. 4 is the C-C sectional views of Fig. 1, is also that the structure for covering the vertical ground conveying device that 1-3 is constituted by chain knife 3 and side is shown It is intended to;
Fig. 5 is the structural representation of chain knife 3,(a)It is the structural representation of chain 3-1 and cutter 3-2, is also by A crossed joints 3- The structural representation of the crossed joint of the chain 3-1 of 1-1 and B crossed joints 3-1-2 compositions;It is also that chain 3-1 realizes curvature of space Structural representation.(b)It is structural representation that chain knife 3 is made up of flexible-belt 3-1B and cutter 3-2B;Be also flexible-belt 3-1B and The structural representation of cutter 3-2B;
Fig. 6 is the A methods construction schematic diagram of a word wall or word stake 1;
Fig. 7 is the B methods construction schematic diagram of a word wall or word stake 1, is also base track B-1, the structural representation of formwork for placing B-4 Figure, is that upper unit is fixed on the structural representation that job platform is not lifted;
Fig. 8 is the A direction views of Fig. 9, is also the structural representation of intermediate stand B-2 and upper unit B-3;
A in Fig. 9 is original state schematic diagram when B methods are constructed, and is also the top that upper unit B-3 is fixed on intermediate stand B-2 The structural representation in portion, b is that bottom starts to excavate the schematic diagram that top starts to pour;
C in Figure 10 is a word wall or B methods construction schematic diagram when word stake 1 sinks down into certain depth, and d is a word wall or a word Stake 1 reaches the schematic diagram after projected depth Demolition Construction equipment;
Figure 11 be L-type stake 8 with bottom chain knife 3 together integral sinking when structural representation;
Figure 12 is the A direction views of Figure 11, is also the knot of the sprocket wheel 6, drive device 4 and tensioning apparatus 5 that constitute chain type excavating gear 2 Structure schematic diagram;
Figure 13 be H types stake 9 with bottom chain knife 3 together integral sinking when structural representation;
Figure 14 is the A direction views of Figure 13, is also the knot of the sprocket wheel 6, drive device 4 and tensioning apparatus 5 that constitute chain type excavating gear 2 Structure schematic diagram;
Figure 15 is the B-B sectional views of Figure 13;
Figure 16 is the top view of intersecting parallels stake 10;
Figure 17 is made up of the structural representation of diaphram wall 7 four L-type walls 8 and some H types 9 and some word walls 1, is also The two ends of wall and stake are structural representations that is embedded mutually or being solidly fixed;
The structural representation of the load bearing wall 11 that Figure 18 is made up of some word walls 1 and some intersecting parallels stake 10, is also the two of wall 1 End is embedded in intersecting parallels 10 grooves of stake when mounted, and the two ends of wall 1 and intersecting parallels stake 10 are mutual embedded structural representations;
The structural representation of the built pile 12 that Figure 19 is made up of some words stake 1;
Figure 20 is the structural representation of the H types stake 13 that bottom is solidly fixed without chain knife and with wall or stake, is also by L-type stake 8, The structural representation of the underground structure of the composition of H types stake 13 that word wall 1 and bottom are solidly fixed without chain knife and with wall;
Figure 21 is the base track and the structural representation of side rails of a word wall or word stake 1, the type of track include a1, Totally 5 kinds of a2, b, c and d, wherein a1, a2 are matrixs, and b is plane, and c is convex;
Figure 22 is the structural representation of d types track and chain knife;
Figure 23 is that d is that the multiple rows of track in longitudinal direction staggers into tapered structural representation;
In figure 1 is a word wall or word stake of the bottom with chain knife 3 when constructing;1-1 is the rail that chain knife 3 is run in the bottom of wall 1 Road;1-2 is the track that chain knife 3 is run in the side of wall 1;1-3 is the side cover of the wall 1 of the bottom belt basil;1-4 is that the bottom of wall 1 is provided with Mud channel;The 2 chain type excavating gears being made up of chain knife 3, drive device 4, tensioning apparatus 5, sprocket wheel 6 etc.;3 is composition chain The chain knife of formula excavating gear 2;3-1 is the chain for constituting chain knife 3, including crawler belt, rope and flexible-belt;3-1-1 is composition chain The A crossed joints of crossed joint;3-1-2 is the B crossed joints for constituting chain crossed joint;3-1B is the flexible-belt for constituting chain knife 3;3-2 is The cutter of the excavation ground being fixed on chain 3-1;3-2B is integrally fixed at the cutter of the excavation ground on flexible-belt 3-1B;4 are The drive device of chain 3-1;5 is the tensioning apparatus of chain 3-1;6 is the sprocket wheel for running chain 3-1;7 is diaphram wall, by Four L-type walls 8, some H types 9 and some word walls 1 are constituted;8 is that hypogee is L-type stake;9 is that hypogee is the stake of H types;10 It is that hypogee is intersecting parallels stake;11 is that hypogee is load bearing wall, is made up of some word walls 1 and some intersecting parallels stake 10; 12 is built pile;13 is the H types stake that bottom is solidly fixed without chain knife and with wall;B-1 is the base track in B methods;B-2 is B Intermediate stand in method;B-3 is the upper unit in B methods;B-4 is the formwork for placing in B methods.
Specific embodiment
The chain knife for excavating ground, the two ends of wall and stake are arranged when constructing at a kind of underground structure being made up of stake and wall, the bottom of wall Mutual insertion is solidly fixed.
Described stake is the stake of trough of belt, and the two ends of wall are embedded in stake groove when mounted.
The bottom and side of described wall are provided with track, on track equipped with excavate ground chain knife, chain type excavating gear by Chain knife, sprocket wheel and drive device composition, chain knife are made up of chain and the cutter being fixed on chain;Drive device drives during construction Chain, chain-driving cutter runs along track, and the cutter of wall bottom excavates ground, will have been dug when chain knife runs bottom-up The ground band of pick to top, the chain knife and wall of wall bottom synchronously declines together, drops to projected depth, is filled again after removing chain knife Slurry.
The bottom and side of the stake of described trough of belt are provided with track, and equipped with the chain knife for excavating ground on track, chain type is excavated Device is made up of chain knife, sprocket wheel and drive device, and chain knife is made up of chain and the cutter being fixed on chain, and base track has height Degree is poor, is easy to the operation of chain knife intersection;Drive device drive chain knife during construction, chain knife runs along track, stake base track On cutter excavate ground, the ground band that will have been excavated when chain knife runs bottom-up to top, the chain knife of stake bottom and stake Decline together, drop to projected depth, be in the milk again after removing chain knife.
The construction procedure of described wall is as follows:
1)The bottom of dry wall;
2)The bottom of wall is installed at the scene, and chain knife is installed on its track;
3)The upper part two ways of wall:
(a)Prefabrication, Assembling;
(b)In-site installation fixes formwork for placing, and wall top trailing edge is poured;
4)Sprocket wheel, drive device and chain knife are installed, chain type excavating gear is formed;
5)Drive chain, the chain knife of wall bottom excavates ground, and the ground that the chain knife run by bottom up will have been excavated is delivered to Top, the chain knife and wall of wall bottom decline therewith;
6)Projected depth is dropped to, is in the milk again after removing the chain knife on wall.
The construction procedure of described stake is as follows:
1)The bottom of prefabricated pile;
2)The bottom of stake is installed at the scene, and chain knife is installed on its track;
3)The upper part two ways of stake:
(a)Prefabrication, Assembling;
(b)In-site installation fixes formwork for placing, and stake side trailing edge is poured;
4)Sprocket wheel, drive device and chain knife are installed, chain type excavating gear is formed;
5)Drive chain, the chain knife of stake bottom excavates ground, and the ground that will have been excavated when chain knife is run by bottom up is delivered to Top, the chain knife of stake bottom and stake decline therewith;
6)Projected depth is dropped to, is in the milk again after removing the chain knife in stake.
Described underground structure is diaphram wall.
The stake of described diaphram wall is the stake of H types and/or intersecting parallels stake.
The corner of described diaphram wall is L-type wall.
Described diaphram wall is load bearing wall.
Technical scheme is further described below in conjunction with the accompanying drawings:
As shown in Fig. 1~Fig. 5, the bottom and side of wall or stake 1 are respectively equipped with track 1-1 and track 1-1, equipped with excavation on track The chain knife 3 of ground, chain type excavating gear 2 is made up of chain knife 3, drive device 4, tensioning apparatus 5 and sprocket wheel 6, and chain knife 3 is by chain 3- 1 constitutes with the cutter 3-2 being fixed on chain 3-1;Drive device 4 drive chain 3-1, chain 3-1 band cutter 3-2 during construction Run along track, the cutter 3 of wall or the bottom of stake 1 excavates ground, the ground band that chain knife 3 will have been excavated when running bottom-up To top, the chain knife 3 and wall or stake 1 of wall or the bottom of stake 1 are synchronous together to be declined, and drops to projected depth, is filled again after removing chain knife 3 Slurry.
As shown in fig. 6, wall or stake 1 are using prefabrication point following steps:
1)In factory's precast block wall or stake 1, on-site consolidation wall or stake 1 and squatting position are transported to, and installed on the track of its bottom Chain knife 3, installs the grade device of chain drive 4, the chain 3-1 of digging cutter is connected and installed with, as shown in a in figure;
2)Drive chain 3-1, chain knife excavates the ground of bottom, and top is delivered to through ground conveying device 7, and wall or stake 1 decline therewith, As shown in b in figure;
3)After dropping to certain depth, in installation on ground wall or the prefabricated component of stake 1, also can be assembled in sinking, such as c institutes in figure Show;
4)It is in the milk again after dropping to projected depth post-grouting, or dismounting chain knife 3, as shown in d in figure.
As shown in Fig. 7~Figure 10, wall or stake 1 are using the cast-in-place method of B methods point following steps:
1)Site clearing, builds job platform;
2)Assembling base track B-1 and the bottom squatting position of formwork for placing B-4, i.e. wall or stake 1, and installed on the track of its bottom Chain knife 3;
3)Assembling intermediate stand B-2, upper unit B-3;
4)Chain drive 4, tensioning apparatus 5 are installed, by base track B-1, intermediate stand B-2, upper unit B-3 and chain 3-1 links into an integrated entity, composition chain type excavating gear 2;
5)Steel reinforcement cage is made, intermediate stand B-2 is integrally welded with steel reinforcement cage, and intermediate stand is also simultaneously the group of formwork for placing Into part;
6)The casting concrete in template B-4;
7)Drive chain 3-1, chain knife 3 excavates the ground of bottom, and the ground that will have been excavated is delivered to through intermediate stand B-2 Side, wall or stake 1 decline therewith;
8)With the excavation of wall or the bottom of stake 1, wall or stake 1 in template B-4 decline when pouring;
9)Drop to projected depth and remove the post-grouting of chain knife 3;
10)Upper unit and intermediate stand are removed higher than wall or the part of stake 1, formwork for placing is removed;
Above to a word wall or the description that has carried out of word stake 1, below the stake of various structures may be considered by several words What wall or word stake 1 were combined.
As shown in Figure 11~Figure 12, hypogee is L-type stake 8, its chain knife 3, the tensioning apparatus 5 of drive device 4, sprocket wheel 6 etc. Correlation and structure and construction method, by constituting for two words 1.
As shown in Figure 13~Figure 15, hypogee is H types stake 8, its chain knife 3, the tensioning apparatus 5 of drive device 4, sprocket wheel 6 etc. Correlation and structure and construction method, by constituting for three words 1.
As shown in figure 16, hypogee is intersecting parallels stake 10, the phase such as its chain knife 3, the tensioning apparatus 5 of drive device 4, sprocket wheel 6 Mutual relation and structure and construction method, by constituting for four words 1.
As shown in figure 17, hypogee is diaphram wall 7, by four L-type walls 8, some H types 9 and some 1 group of word walls Into.
As shown in figure 18, hypogee is load bearing wall 11, is made up of some word walls 1 and some intersecting parallels stake 10.
As shown in figure 19, hypogee is built pile 12, is made up of some words stake 1.
As shown in figure 20, underground structure is solidly fixed by L-type 8, one word wall 1 of stake and bottom without chain knife and with wall The composition of H types stake 13.

Claims (10)

1. a kind of underground structure being made up of stake and wall, it is characterized in that the chain knife for excavating ground, wall are arranged when constructing at the bottom of wall Two ends and stake be embedded mutually or be solidly fixed.
2. a kind of underground structure being made up of stake and wall according to claim 1, it is characterised in that described stake is band The stake of groove, the two ends of wall are embedded in stake groove when mounted.
3. a kind of underground structure being made up of stake and wall according to claim 2, it is characterized in that the bottom of described wall Track is provided with side, equipped with the chain knife for excavating ground on track, chain type excavating gear is by chain knife, sprocket wheel and drive device group Into chain knife is made up of chain and the cutter being fixed on chain;Drive device drive chain during construction, chain-driving cutter along Track runs, and the cutter of wall bottom excavates ground, the ground band that will have been excavated when chain knife runs bottom-up to top, wall bottom The chain knife and wall in portion synchronously decline together, drop to projected depth, are in the milk again after removing chain knife.
4. a kind of underground structure being made up of stake and wall according to claim 2, it is characterized in that the stake of described trough of belt Bottom and side be provided with track, on track equipped with excavate ground chain knife, chain type excavating gear by chain knife, sprocket wheel and drive dress Composition is put, chain knife is made up of chain and the cutter being fixed on chain, and base track has difference in height, is easy to the fortune of chain knife intersection OK;Drive device drive chain knife during construction, chain knife runs along track, and cutter in stake base track excavates ground, chain knife from To top, the chain knife of stake bottom and stake decline the ground band that bottom up will have been excavated when running together, drop to projected depth, It is in the milk again after removing chain knife.
5. a kind of underground structure being made up of stake and wall according to claim 3, it is characterized in that the construction of described wall Step is as follows:
1)The bottom of dry wall;
2)The bottom of wall is installed at the scene, and chain knife is installed on its track;
3)The upper part two ways of wall:
(a)Prefabrication, Assembling;
(b)In-site installation fixes formwork for placing, and wall top trailing edge is poured;
4)Sprocket wheel, drive device and chain knife are installed, chain type excavating gear is formed;
5)Drive chain, the chain knife of wall bottom excavates ground, and the ground that the chain knife run by bottom up will have been excavated is delivered to Top, the chain knife and wall of wall bottom decline therewith;
6)Projected depth is dropped to, is in the milk again after removing the chain knife on wall.
6. a kind of underground structure being made up of stake and wall according to claim 4, it is characterized in that the construction of described stake Step is as follows:
1)The bottom of prefabricated pile;
2)The bottom of stake is installed at the scene, and chain knife is installed on its track;
3)The upper part two ways of stake:
(a)Prefabrication, Assembling;
(b)In-site installation fixes formwork for placing, and stake side trailing edge is poured;
4)Sprocket wheel, drive device and chain knife are installed, chain type excavating gear is formed;
5)Drive chain, the chain knife of stake bottom excavates ground, and the ground that will have been excavated when chain knife is run by bottom up is delivered to Top, the chain knife of stake bottom and stake decline therewith;
6)Projected depth is dropped to, is in the milk again after removing the chain knife in stake.
7. a kind of underground structure being made up of stake and wall according to claim 3, it is characterized in that described hypogee Thing is diaphram wall.
8. a kind of underground structure being made up of stake and wall according to claim 4,7, it is characterised in that described underground The stake of diaphragm wall is the stake of H types and/or intersecting parallels stake.
9. a kind of underground structure being made up of stake and wall according to claim 7, it is characterised in that described underground connects The corner of continuous wall is L-type wall.
10. a kind of underground structure being made up of stake and wall according to claim 7, it is characterised in that described underground connects Continuous wall is load bearing wall.
CN201710038299.3A 2017-01-18 2017-01-18 A kind of underground structure being made up of stake and wall and its construction method Pending CN106759486A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710038299.3A CN106759486A (en) 2017-01-18 2017-01-18 A kind of underground structure being made up of stake and wall and its construction method
PCT/CN2018/072526 WO2018133746A1 (en) 2017-01-18 2018-01-13 Underground building formed of piles and walls, and method for constructing same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710038299.3A CN106759486A (en) 2017-01-18 2017-01-18 A kind of underground structure being made up of stake and wall and its construction method

Publications (1)

Publication Number Publication Date
CN106759486A true CN106759486A (en) 2017-05-31

Family

ID=58945253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710038299.3A Pending CN106759486A (en) 2017-01-18 2017-01-18 A kind of underground structure being made up of stake and wall and its construction method

Country Status (2)

Country Link
CN (1) CN106759486A (en)
WO (1) WO2018133746A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018133739A1 (en) * 2017-01-18 2018-07-26 王燏斌 Foundation having chain cutter at base during construction and construction method of same
WO2018133746A1 (en) * 2017-01-18 2018-07-26 王燏斌 Underground building formed of piles and walls, and method for constructing same
WO2018133740A1 (en) * 2017-01-18 2018-07-26 王燏斌 Underground building and construction method for same
CN114164929A (en) * 2021-10-21 2022-03-11 王树生 Wall foundation and construction device thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62233328A (en) * 1986-04-01 1987-10-13 Fusao Sakano Method and apparatus for setting retaining wall by excavator
CN101619573A (en) * 2009-07-24 2010-01-06 徐州文鹏工程机械制造有限公司 Machine for forming underground continuous water-retaining walls by one step
CN205475087U (en) * 2016-01-29 2016-08-17 俞向阳 Bank dyke revetment
CN207228156U (en) * 2017-01-18 2018-04-13 王燏斌 A kind of underground structure being made of stake and wall

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1024029C (en) * 1989-08-19 1994-03-16 陆祖荫 Direct sink-and-insert method and equipment for constructing underground building with combined and interlocked prefabricated concrete components
JPH0686729B2 (en) * 1991-07-10 1994-11-02 北辰工業株式会社 Drilling rig for continuous underground wall
JP2554451B2 (en) * 1993-12-22 1996-11-13 トーメン建機株式会社 Endless chain cutter for underground continuous wall excavator and method for excavating trench for underground continuous wall
JP4683138B2 (en) * 2009-03-25 2011-05-11 株式会社大林組 Retaining wall structure, method for constructing retaining wall structure
CN106759486A (en) * 2017-01-18 2017-05-31 王燏斌 A kind of underground structure being made up of stake and wall and its construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62233328A (en) * 1986-04-01 1987-10-13 Fusao Sakano Method and apparatus for setting retaining wall by excavator
CN101619573A (en) * 2009-07-24 2010-01-06 徐州文鹏工程机械制造有限公司 Machine for forming underground continuous water-retaining walls by one step
CN205475087U (en) * 2016-01-29 2016-08-17 俞向阳 Bank dyke revetment
CN207228156U (en) * 2017-01-18 2018-04-13 王燏斌 A kind of underground structure being made of stake and wall

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018133739A1 (en) * 2017-01-18 2018-07-26 王燏斌 Foundation having chain cutter at base during construction and construction method of same
WO2018133746A1 (en) * 2017-01-18 2018-07-26 王燏斌 Underground building formed of piles and walls, and method for constructing same
WO2018133740A1 (en) * 2017-01-18 2018-07-26 王燏斌 Underground building and construction method for same
CN114164929A (en) * 2021-10-21 2022-03-11 王树生 Wall foundation and construction device thereof

Also Published As

Publication number Publication date
WO2018133746A1 (en) 2018-07-26

Similar Documents

Publication Publication Date Title
US9322137B2 (en) Method for building structures, particularly passages under operating railways or the like
CN107059877A (en) Basis and its construction method of the bottom with chain knife during a kind of construction
CN107542108B (en) A kind of reverse construction method of building basement structure
US11746493B2 (en) Wall sinking construction method
US4697955A (en) Method of constructing reinforced concrete works such as underground galleries, road tunnels, et cetera; pre-fabricated contrete elements for constructing such works
WO2018133740A1 (en) Underground building and construction method for same
CN101761068A (en) Box-raft pressure-bearing type foundation underpinning and construction reinforcing method for tunnel across pile foundation of bridge above river
CN102444142A (en) Pile group column replacement expanded basement and construction method of same
CN110306593A (en) A kind of station construction method
CN102352590A (en) Method for splicing highfill roadbed by adopting pile-sheet retaining wall
CN106759486A (en) A kind of underground structure being made up of stake and wall and its construction method
CN113235601A (en) Deep foundation pit construction risk control structure and method for collapsible loess adjacent building
CN108035379B (en) Comprehensive pipe gallery and construction method thereof
CN106759418A (en) A kind of pier footing and its construction method
CN207228156U (en) A kind of underground structure being made of stake and wall
CN113914327A (en) Construction method for foundation pit enclosure and earth excavation
CN110258600B (en) Vertical cofferdam construction method suitable for deepwater area
CN109024670B (en) Underground comprehensive pipe gallery protection and reinforcement system penetrating through buried high-voltage cable and reinforcement method
CN114961336B (en) Protective demolition construction method for foundation pile of basement close to existing subway line
CN103866787B (en) A kind of spacious reverse masonry method concrete cut that digs builds construction technology
CN115450221A (en) Construction method for subway crossing river channel
CN115506382A (en) Construction method for pile plate wall of island building platform
CN211172070U (en) Assembled type suspended wall retaining wall structure of reinforced concrete member
CN110685719A (en) Quick construction method for double-span simply-supported inverted arch trestle
CN106759068A (en) A kind of hydraulic structure and its construction method being made up of stake and wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 214000 No. 226, Xi Da Road, Mei Cun town, Xin Wu District, Wuxi, Jiangsu

Applicant after: Wang Yubin

Address before: 214000 Xinhua Road 121, Meishan Town, Wuxi New District, Jiangsu

Applicant before: Wang Yubin

CB02 Change of applicant information
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170531

WD01 Invention patent application deemed withdrawn after publication