CN106244174B - A kind of carbonization furnace wall mending device and method - Google Patents
A kind of carbonization furnace wall mending device and method Download PDFInfo
- Publication number
- CN106244174B CN106244174B CN201610859599.3A CN201610859599A CN106244174B CN 106244174 B CN106244174 B CN 106244174B CN 201610859599 A CN201610859599 A CN 201610859599A CN 106244174 B CN106244174 B CN 106244174B
- Authority
- CN
- China
- Prior art keywords
- plc
- logic controller
- programmable logic
- sealing plate
- positioning mechanism
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10B—DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
- C10B29/00—Other details of coke ovens
- C10B29/06—Preventing or repairing leakages of the brickwork
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10B—DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
- C10B29/00—Other details of coke ovens
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10B—DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
- C10B41/00—Safety devices, e.g. signalling or controlling devices for use in the discharge of coke
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Organic Chemistry (AREA)
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
The invention discloses a kind of carbonization furnace wall mending device and methods, belong to coking technology field.The carbonization furnace wall mending device includes: that positioning mechanism one end is movably arranged in sliding slot;The other end of positioning mechanism is arranged in high temperature imager;The other end of positioning mechanism is arranged in sealing plate;Blowing mechanism one end is arranged on flat coal car, and the side of sealing plate is arranged in the other end;Refractory wass conveying mechanism one end is arranged on flat coal car, and the other end is connected to sealing plate, and refractory wass conveying mechanism is connected to blowing mechanism one end;Programmable logic controller (PLC) is connect with positioning mechanism, high temperature imager, blowing mechanism, refractory wass conveying mechanism and flat coal car.Present invention carbonization furnace wall mending device and method can replace being manually entered carbonization chamber high-temperature reparation operation, effectively alleviate labor intensity, ensure that production safety, it is handled without cooling, both the repairing time is shortened, it is ensured that rhythm of production in turn ensures the longevity for being conducive to carbonization chamber wall.
Description
Technical field
The present invention relates to coking technology field, in particular to a kind of carbonization furnace wall mending device and method.
Background technique
Top dress coking by coke oven is the major way of China's production blast furnace ironmaking coke.In the actual production process of coke oven,
With the growth and coke pushing in furnace life, coaling, pluck etc. operate caused by temperature stress, mechanical pressure and chemical attack effect,
Furnace body various pieces are made gradually to change, furnace wall surface different degrees of crack occurs, degrades, pitted skin, arrisdefect, deformation, mistake
Phenomena such as platform, fusion hole are even turned round.This will will cause two Room and gang up, i.e., indoor coke, coal charge, famine are carbonized when coke pushing is coaling
Coal gas enters adjacent combustion chamber or flue, influences normal coke oven heating and production, while the further expansion in crack, hole
The damage that will aggravate carbonization chamber wall influences the service life of coke oven.Therefore, it is necessary to the carbonization chamber carry out office for cracking or turning round
Portion's repairing.
Conventional repair carbonization chamber technological means is that carbonization chamber wall temperature is dropped to 400 DEG C or so from 1200 DEG C;And it will be to
The carbonization chamber of repairing push away it is empty do not coaling, not upper furnace door, service personnel wears thermal protective clothing and enters carbonization chamber to carry out on inspection platform
It lays bricks, the operations such as spray repair.There are the problem of: 1, the shortcomings that manual repair carbonization chamber technology be even cooling after be also not suitable for people
Work operates, and coal gas and toxic gas content severely exceed in carbonization chamber, is unfavorable for constructing.2, carbonization chamber generally uses silica brick material system
To make, at 400 DEG C or so, lattice conversion has occurred repairing temperature of furnace wall for silica brick, it may cause the contraction sedimentation at wall holes position,
And then causes wall to burst and expand digging range.
Summary of the invention
The present invention provides a kind of carbonization furnace wall mending device and method, solves or part solves and repairs in the prior art
Carbonization chamber, which carries out manual repair, leads to the excessively high suitable manual operation of temperature, and coal gas and toxic gas content seriously surpass in carbonization chamber
Mark, is unfavorable for constructing, and when temperature is too low, lattice conversion has occurred the silica brick material that carbonization chamber uses for silica brick, may cause wall
The contraction at body holes position settles, so lead to that wall is burst and the technical issues of expand digging range.
In order to solve the above technical problems, being arranged on flat coal car the present invention provides a kind of carbonization furnace wall mending device
On leveling bar, sliding slot is offered on the leveling bar;The mending device includes: positioning mechanism, and one end is movably arranged on described
On sliding slot;The other end of the positioning mechanism is arranged in high temperature imager;The other end of the positioning mechanism is arranged in sealing plate;
Blowing mechanism, one end are arranged on the flat coal car, and the side of the sealing plate is arranged in the other end;Refractory wass conveying mechanism,
One end is arranged on the flat coal car, and the other end is connected to the sealing plate, the refractory wass conveying mechanism and the purging machine
The connection of structure one end;Programmable logic controller (PLC), with the positioning mechanism, high temperature imager, blowing mechanism, refractory wass conveyer
Structure and the connection of flat coal car;Wherein, the leveling bar and positioning mechanism movement, when the high temperature imager detects damaged position
When, Xiang Suoshu programmable logic controller (PLC) sends breakage signal, and the programmable logic controller (PLC) is to the leveling bar and described
Positioning mechanism sending action signal, the positioning mechanism acts in the sliding slot drives the sealing plate, blowing mechanism and fire resisting
Slurry transportation mechanism reaches damaged position, and the programmable logic controller (PLC) sends purging signal to the blowing mechanism, described to blow
After the completion of sweeping mechanism purging, the programmable logic controller (PLC) sends rotating signal, the positioning mechanism to the positioning mechanism
Make sealing plate and the damaged bit parallel, the programmable logic controller (PLC) sends extension signal, the envelope to the positioning mechanism
Plate is pressed in the damaged position, and the programmable logic controller (PLC) sends conveying signal to the refractory wass conveying mechanism, described
Refractory wass in the refractory wass conveying mechanism is delivered to damaged position by blowing mechanism.
Further, present invention carbonization furnace wall mending device further include: pressure sensor is arranged in described sealing plate one end,
The pressure sensor is connect with the programmable logic controller (PLC).
Further, the positioning mechanism includes: motor, and one end is arranged on the leveling bar;First scalable transverse direction
Cantilever, one end are movably arranged in the sliding slot, and the first scalable horizontal cantilever and the programmable logic controller (PLC) connect
It connects, the first scalable horizontal cantilever is connect with the motor other end;Scalable vertical cantilever, one end and described first can
Flexible horizontal cantilever other end connection, the scalable vertical cantilever are connect with the programmable logic controller (PLC);Second can stretch
Contracting horizontal cantilever, one end are connect with the scalable vertical cantilever other end, the second scalable horizontal cantilever and it is described can
Programmed logic controller connection;Rotating electric machine, one end are connect with the described second scalable horizontal cantilever, the other end and the sealing plate
Connection, the rotating electric machine are connect with the programmable logic controller (PLC).
Further, the blowing mechanism includes: air compressor machine, be arranged on the flat coal car, the air compressor machine with it is described
Programmable logic controller (PLC) connection;Scavenging conduit, one end are connected to the air compressor machine, and the side of the sealing plate is arranged in the other end.
Further, the refractory wass conveying mechanism includes: rotary feeder, is arranged on the flat coal car, described
Rotary feeder is connect with the programmable logic controller (PLC);Compressed air pipe, one end are connected to the rotary feeder, separately
One end is connected to the blowing mechanism;It is blown mud hose, one end is connected to the rotary feeder;Mud valve, setting exist
On the blowing mud hose;Spray head, one end are connected to the sealing plate, and one end is connected to the blowing mud hose other end.
Based on identical inventive concept, the present invention also provides a kind of carbonization furnace wall spray repair method the following steps are included: repairing
Before coking chamber wall damaged part, pusher machine is moved to and needs to repair by carbonizing chamber, pushes away sky carbonization chamber, oven door opening;Starting
Leveling bar and positioning mechanism, the positioning mechanism act in the carbonizing chamber, and high temperature imager scans the coking chamber wall
Damaged position, when the high temperature imager detects damaged position to programmable logic controller (PLC) send breakage signal;According to institute
The information for stating high temperature imager feedback, determines damage location and size, the programmable logic controller (PLC) to the leveling bar and
The positioning mechanism sending action signal, the mobile leveling bar and positioning mechanism are accurately positioned at damaged position, described programmable
For logic controller to the positioning mechanism sending action signal, the positioning mechanism acts in the sliding slot drives the envelope
Plate, blowing mechanism and refractory wass conveying mechanism reach damaged position;The programmable logic controller (PLC) is sent out to the blowing mechanism
Send purging signal, the blowing mechanism is purged by blasting cold air, and after the completion of purging, the programmable logic controller (PLC) is to institute
It states positioning mechanism and sends rotating signal, the positioning mechanism makes sealing plate and the damaged bit parallel, the Programmable logical controller
Device sends extension signal to the positioning mechanism, and the sealing plate is pressed in the damaged position;The programmable logic controller (PLC) is to institute
It states refractory wass conveying mechanism and sends conveying signal, the blowing mechanism is by the refractory wass in the refractory wass conveying mechanism
It is delivered to damaged position.
Further, carbonization furnace wall spray repair method further includes pressure sensor, is arranged in described sealing plate one end, the pressure
Sensor is connect with the programmable logic controller (PLC).
Further, the positioning mechanism includes: the first scalable horizontal cantilever, and one end and the leveling bar activity connect
It connects, the first scalable horizontal cantilever is connect with the programmable logic controller (PLC);Scalable vertical cantilever, one end with it is described
First scalable horizontal cantilever other end connection, the scalable vertical cantilever are connect with the programmable logic controller (PLC);The
Two scalable horizontal cantilevers, one end are connect with the scalable vertical cantilever other end, the second scalable horizontal cantilever with
The programmable logic controller (PLC) connection;Rotating electric machine, one end are connect with the described second scalable horizontal cantilever, the other end and institute
Sealing plate connection is stated, the rotating electric machine is connect with the programmable logic controller (PLC).
Further, the blowing mechanism includes: air compressor machine, be arranged on the flat coal car, the air compressor machine with it is described
Programmable logic controller (PLC) connection;Scavenging conduit, one end are connected to the air compressor machine, and the side of the sealing plate is arranged in the other end.
Further, the refractory wass conveying mechanism includes: rotary feeder, is arranged on the flat coal car, described
Rotary feeder is connect with the programmable logic controller (PLC);Compressed air pipe, one end are connected to the rotary feeder, separately
One end is connected to the blowing mechanism;It is blown mud hose, one end is connected to the rotary feeder;Mud valve, setting exist
On the blowing mud hose;Spray head, one end are connected to the sealing plate, and one end is connected to the blowing mud hose other end.
Carbonization furnace wall mending device provided by the invention and method are by will push away before repairing coking chamber wall damaged part
Burnt vehicle, which moves to, to be needed to repair by carbonizing chamber, pushes away sky carbonization chamber, not upper furnace door, starts leveling bar and positioning mechanism, positioning mechanism exist
Movement in carbonizing chamber, high temperature imager scans the damaged position of coking chamber wall, when high temperature imager detects damaged position Shi Xiangke
Programmed logic controller sends breakage signal, according to the information that high temperature imager is fed back, determines damage location and size, may be programmed
Logic controller is accurately positioned at breakage to leveling bar and positioning mechanism sending action signal, mobile leveling bar and positioning mechanism
Position, for programmable logic controller (PLC) to positioning mechanism sending action signal, positioning mechanism acts in sliding slot drives sealing plate, purging machine
Structure and refractory wass conveying mechanism reach damaged position, and programmable logic controller (PLC) sends purging signal, purging machine to blowing mechanism
Structure is purged by blasting cold air, and after the completion of purging, programmable logic controller (PLC) sends rotating signal, localization machine to positioning mechanism
Structure makes sealing plate and damaged bit parallel, and programmable logic controller (PLC) sends extension signal to positioning mechanism, and sealing plate is pressed in damaged position, can
Programmed logic controller sends conveying signal to refractory wass conveying mechanism, and blowing mechanism will be resistance in refractory wass conveying mechanism
Chamotte slurry is delivered to damaged position, can replace being manually entered carbonization chamber high-temperature reparation operation, effectively alleviate labor intensity, guarantee
Production safety is handled without cooling, both shortens the repairing time, it is ensured that rhythm of production in turn ensures and be conducive to carbonization chamber
The longevity of wall.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of carbonization furnace wall mending device provided in an embodiment of the present invention;
Fig. 2 is the structural schematic diagram of the positioning mechanism of carbonization furnace wall mending device in Fig. 1;
Fig. 3 is the structural schematic diagram of the blowing mechanism of carbonization furnace wall mending device in Fig. 1;
Fig. 4 is the structural schematic diagram of the sealing plate of carbonization furnace wall mending device in Fig. 1.
Specific embodiment
Referring to Fig. 1-4, the embodiment of the invention provides a kind of carbonization furnace wall mending device, it is arranged in flat on flat coal car 1
On coal bar 2, sliding slot 2-1 is offered on the leveling bar 2;The mending device includes: positioning mechanism 3, high temperature imager 4, envelope
Plate 5, blowing mechanism 6, refractory wass conveying mechanism 7 and programmable logic controller (PLC) 8.
Described 3 one end of positioning mechanism is movably arranged in the sliding slot 2-1.
The other end of the positioning mechanism 3 is arranged in the high temperature imager 4.
The other end of the positioning mechanism 3 is arranged in the sealing plate 5.
Described 6 one end of blowing mechanism is arranged on the flat coal car 1, and the side of the sealing plate 5 is arranged in the other end.
Described 7 one end of refractory wass conveying mechanism is arranged on the flat coal car 1, and the other end is connected to the sealing plate 5, institute
Refractory wass conveying mechanism 7 is stated to be connected to described 6 one end of blowing mechanism.
The programmable logic controller (PLC) 8, with the positioning mechanism 3, high temperature imager 4, blowing mechanism 6, refractory wass
Conveying mechanism 7 and flat coal car 1 connect.
Wherein, the leveling bar 2 and the positioning mechanism 3 act, when the high temperature imager 4 detects damaged position 12
When, Xiang Suoshu programmable logic controller (PLC) 8 sends breakage signal, and the programmable logic controller (PLC) 8 is to the leveling bar 2 and institute
3 sending action signal of positioning mechanism is stated, the positioning mechanism 3 acts in the sliding slot 2-1 drives the sealing plate 5, purging machine
Structure 6 and refractory wass conveying mechanism 7 reach damaged position 12, and the programmable logic controller (PLC) 8 is blown to the blowing mechanism 6 transmission
Signal is swept, after the completion of the blowing mechanism 6 purges, the programmable logic controller (PLC) 8 sends rotation letter to the positioning mechanism 3
Number, the positioning mechanism 3 keeps the sealing plate 5 parallel with the damaged position 12, and the programmable logic controller (PLC) 8 is to the positioning
Mechanism 3 sends extension signal, and the sealing plate 5 is pressed in the damaged position 12, and the programmable logic controller (PLC) 8 is to the fire clay
It starches conveying mechanism 7 and sends conveying signal, the blowing mechanism 6 conveys the refractory wass in the refractory wass conveying mechanism 7
To damaged position 12.
Before technical solution of the present invention is by repairing coking chamber wall damaged part, pusher machine is moved into needs and repairs carbonization
By room, sky carbonization chamber is pushed away, not upper furnace door, starts leveling bar and positioning mechanism, positioning mechanism act in carbonizing chamber, high temperature imaging
Instrument scans the damaged position of coking chamber wall, sends breakage to programmable logic controller (PLC) when high temperature imager detects damaged position
Signal determines damage location and size, programmable logic controller (PLC) is to leveling bar and determines according to the information that high temperature imager is fed back
Position mechanism sending action signal, moves leveling bar and positioning mechanism is accurately positioned at damaged position, and programmable logic controller (PLC) is to calmly
Position mechanism sending action signal, positioning mechanism acts in sliding slot drives sealing plate, blowing mechanism and refractory wass conveying mechanism to arrive
Up to damaged position, programmable logic controller (PLC) sends purging signal to blowing mechanism, and blowing mechanism is purged by blasting cold air, blown
After the completion of sweeping, programmable logic controller (PLC) sends rotating signal to positioning mechanism, and positioning mechanism makes sealing plate and damaged bit parallel, can
Programmed logic controller sends extension signal to positioning mechanism, and sealing plate is pressed in damaged position, and programmable logic controller (PLC) is to fire clay
It starches conveying mechanism and sends conveying signal, the refractory wass in refractory wass conveying mechanism is delivered to damaged position by blowing mechanism, can
Instead of being manually entered carbonization chamber high-temperature reparation operation, labor intensity is effectively alleviated, ensure that production safety, at cooling
Reason both shortens the repairing time, it is ensured that rhythm of production in turn ensures the longevity for being conducive to carbonization chamber wall.
Present invention carbonization furnace wall mending device further include: pressure sensor.
The pressure sensor is fixed at described 5 one end of sealing plate.Specifically, in the present embodiment, the pressure
Sensor, which is bolted, to be arranged in described 5 one end of sealing plate, and in other embodiments, the pressure sensor can pass through it
Its mode such as pivot pin etc. is fixed at described 5 one end of sealing plate.The pressure sensor and the programmable logic controller (PLC) 8 connect
It connects, Xiang Suoshu programmable logic controller (PLC) 8 sends pressure signal, when the sealing plate 5 is reached setting value by mud pressure, institute
It states programmable logic controller (PLC) and sends stop signal to the refractory wass conveying mechanism 7.
The structure of positioning mechanism is discussed in detail.
The positioning mechanism include: motor, the first scalable horizontal cantilever 3-1, scalable vertical cantilever 3-2, second can
Flexible horizontal cantilever 3-3 and rotating electric machine.
Described motor one end is arranged on the leveling bar 2.
The one end the first scalable horizontal cantilever 3-1 is movably arranged in the sliding slot 2-1, the first scalable cross
It is connect to cantilever 3-1 with the programmable logic controller (PLC) 8, first is flexible lateral described in the PLC controls
Cantilever 3-1's is flexible, and the first scalable horizontal cantilever 3-1 is connect with the motor other end, described in the motor drive
First scalable horizontal cantilever 3-1 is slided in the sliding slot 2-1.
Described scalable one end vertical cantilever 3-2 is fixedly connected with the described first scalable horizontal cantilever 3-1 other end.Tool
Body, in the present embodiment, described scalable one end vertical cantilever 3-2 passes through bolt and the described first scalable horizontal cantilever
The 3-1 other end is fixedly connected, and in other embodiments, described scalable one end vertical cantilever 3-2 can otherwise such as
Pivot pin etc. is fixedly connected with the described first scalable horizontal cantilever 3-1 other end.The scalable vertical cantilever 3-2 and it is described can
Programmed logic controller 8 connects, and scalable vertical cantilever 3-2's described in the PLC controls is flexible.
Described second one end scalable horizontal cantilever 3-3 is fixedly connected with the scalable vertical cantilever 3-2 other end.Tool
Body, in the present embodiment, described second one end scalable horizontal cantilever 3-3 passes through bolt and the scalable vertical cantilever
The 3-2 other end is fixedly connected, and in other embodiments, the one end the second scalable horizontal cantilever 3-3 can pass through other sides
Formula such as pivot pin etc. is fixedly connected with the scalable vertical cantilever 3-2 other end.The second scalable horizontal cantilever 3-3 and institute
The connection of programmable logic controller (PLC) 8 is stated, the second scalable horizontal cantilever 3-3's described in the PLC controls stretches
Contracting.
Described rotating electric machine one end is fixedly connected with the described second scalable horizontal cantilever 3-3.Specifically, in this embodiment party
In formula, described rotating electric machine one end is fixedly connected by bolt with the described second scalable horizontal cantilever 3-3, in other embodiment party
In formula, described rotating electric machine one end such as pivot pin and the described second scalable horizontal cantilever 3-3 can be fixed and connect otherwise
It connects.The rotating electric machine other end is fixedly connected by bolt with the sealing plate 5.Specifically, in the present embodiment, the rotation
The rotating motor other end can such as pivot pin be fixedly connected with the sealing plate 5 otherwise, in other embodiments, the rotation
The rotating motor other end is fixedly connected with the sealing plate 5.The rotating electric machine is connect with the programmable logic controller (PLC) 8, described
Programmable logic controller (PLC) 8 controls the rotating electric machine and the sealing plate 5 is driven to rotate.
The structure of blowing mechanism is discussed in detail.
The blowing mechanism includes: air compressor machine and scavenging conduit 6-1.
The air compressor machine is fixed on the flat coal car 1.Specifically, in the present embodiment, the air compressor machine is logical
It crosses bolt to be fixed on the flat coal car 1, in other embodiments, the air compressor machine can be otherwise such as pivot pin
Etc. being fixed on the flat coal car 1.The air compressor machine is connect with the programmable logic controller (PLC) 8, and described may be programmed is patrolled
It collects controller 8 and controls the air compressor machine gas supply.
The one end the scavenging conduit 6-1 is connected to the air compressor machine, and the scavenging conduit 6-1 other end is arranged in the sealing plate 5
Side.
The structure of refractory wass conveying mechanism is discussed in detail.
The refractory wass conveying mechanism includes: rotary feeder 7-1, compressed air pipe 7-2, blowing mud hose 7-
3, mud valve 7-4 and spray head.
The rotary feeder 7-1 is fixed on the flat coal car 1.Specifically, in the present embodiment, the rotation
It is given to glassware 7-1 and is bolted and be arranged on the flat coal car 1, in other embodiments, the rotary feeder 7-1
It can be otherwise as described in being fixed at pivot pin on flat coal car 1.The rotary feeder 7-1 is patrolled with described may be programmed
It collects controller 8 to connect, the programmable logic controller (PLC) 8 controls the rotary feeder 7-1 movement.
The one end the compressed air pipe 7-2 is connected to the rotary feeder 7-1, the other end and the blowing mechanism 6
The cold air of blowing mechanism 6 is transported in rotary feeder 7-1 by connection, the compressed air pipe 7-2, and it is dynamic to blow mud
Make.
Described blowing one end mud hose 7-3 is connected to the rotary feeder 7-1, and the blowing mud hose 7-3 is defeated
Send refractory wass.The blowing mud hose 7-3 be double-layer hose, outer flow cooling water, internal layer convey refractory wass, avoid
Refractory wass is caused to solidify since conveying distance is too long.
The mud valve 7-4 is arranged on the blowing mud hose 7-3, for adjusting the flow of refractory wass.
Described spray head one end is connected to the sealing plate 5, and one end is connected to the blowing mud hose 7-3 other end, to broken
Damage position 12 is filled up.
Based on identical inventive concept, the present invention also provides a kind of carbonization furnace wall spray repair method the following steps are included:
Step 1, before repairing 11 damaged part of coking chamber wall, pusher machine is moved to and needs to repair by carbonizing chamber, pushes away sky
Carbonization chamber, fire door 9 are opened.
Step 2, start leveling bar 2 and positioning mechanism 3, the positioning mechanism 3 act in the carbonizing chamber, high temperature imaging
Instrument 4 scans the damaged position 12 of the coking chamber wall 11, patrols when the high temperature imager 4 detects damaged position 12 to programmable
It collects controller 8 and sends breakage signal.
Step 3, the information fed back according to the high temperature imager 4, determines damage location and size, the PLC technology
For device 8 to 3 sending action signal of the leveling bar 2 and the positioning mechanism, the mobile leveling bar 2 and positioning mechanism 3 are accurately fixed
Positioned at damaged position 12, the programmable logic controller (PLC) 8 exists to the 3 sending action signal of positioning mechanism, the positioning mechanism 3
Movement drives the sealing plate 5, blowing mechanism 6 and refractory wass conveying mechanism 7 to reach damaged position 12 in the sliding slot 2-1.
Step 4, the programmable logic controller (PLC) 8 sends purging signal, the blowing mechanism 6 to the blowing mechanism 6
It is purged by blasting cold air, after the completion of purging, the programmable logic controller (PLC) 8 sends rotation letter to the positioning mechanism 3
Number, the positioning mechanism 3 keeps sealing plate 5 parallel with the damaged position 12, and the programmable controller 8 is sent out to the positioning mechanism 3
Extension signal is sent, the sealing plate 5 is pressed in the damaged position 12.
Step 5, the programmable logic controller (PLC) 8 sends conveying signal to the refractory wass conveying mechanism 7, described to blow
It sweeps mechanism 6 and the refractory wass in the refractory wass conveying mechanism 7 is delivered to damaged position 12.
Present invention carbonization furnace wall spray repair method further include: pressure sensor.
The pressure sensor is fixed at described 5 one end of sealing plate.Specifically, in the present embodiment, the pressure
Sensor, which is bolted, to be arranged in described 5 one end of sealing plate, and in other embodiments, the pressure sensor can pass through it
Its mode such as pivot pin etc. is fixed at described 5 one end of sealing plate.The pressure sensor and the programmable logic controller (PLC) 8 connect
It connects, Xiang Suoshu programmable logic controller (PLC) 8 sends pressure signal, when the sealing plate 5 is reached setting value by mud pressure, institute
It states programmable logic controller (PLC) and sends stop signal to the refractory wass conveying mechanism 7.
The structure of positioning mechanism is discussed in detail.
The positioning mechanism include: motor, the first scalable horizontal cantilever 3-1, scalable vertical cantilever 3-2, second can
Flexible horizontal cantilever 3-3 and rotating electric machine.
Described motor one end is arranged on the leveling bar 2.
The one end the first scalable horizontal cantilever 3-1 is movably arranged in the sliding slot 2-1, the first scalable cross
It is connect to cantilever 3-1 with the programmable logic controller (PLC) 8, first is flexible lateral described in the PLC controls
Cantilever 3-1's is flexible, and the first scalable horizontal cantilever 3-1 is connect with the motor other end, described in the motor drive
First scalable horizontal cantilever 3-1 is slided in the sliding slot 2-1.
Described scalable one end vertical cantilever 3-2 is fixedly connected with the described first scalable horizontal cantilever 3-1 other end.Tool
Body, in the present embodiment, described scalable one end vertical cantilever 3-2 passes through bolt and the described first scalable horizontal cantilever
The 3-1 other end is fixedly connected, and in other embodiments, described scalable one end vertical cantilever 3-2 can otherwise such as
Pivot pin etc. is fixedly connected with the described first scalable horizontal cantilever 3-1 other end.The scalable vertical cantilever 3-2 and it is described can
Programmed logic controller 8 connects, and scalable vertical cantilever 3-2's described in the PLC controls is flexible.
Described second one end scalable horizontal cantilever 3-3 is fixedly connected with the scalable vertical cantilever 3-2 other end.Tool
Body, in the present embodiment, described second one end scalable horizontal cantilever 3-3 passes through bolt and the scalable vertical cantilever
The 3-2 other end is fixedly connected, and in other embodiments, the one end the second scalable horizontal cantilever 3-3 can pass through other sides
Formula such as pivot pin etc. is fixedly connected with the scalable vertical cantilever 3-2 other end.The second scalable horizontal cantilever 3-3 and institute
The connection of programmable logic controller (PLC) 8 is stated, the second scalable horizontal cantilever 3-3's described in the PLC controls stretches
Contracting.
Described rotating electric machine one end is fixedly connected with the described second scalable horizontal cantilever 3-3.Specifically, in this embodiment party
In formula, described rotating electric machine one end is fixedly connected by bolt with the described second scalable horizontal cantilever 3-3, in other embodiment party
In formula, described rotating electric machine one end such as pivot pin and the described second scalable horizontal cantilever 3-3 can be fixed and connect otherwise
It connects.The rotating electric machine other end is fixedly connected by bolt with the sealing plate 5.Specifically, in the present embodiment, the rotation
The rotating motor other end can such as pivot pin be fixedly connected with the sealing plate 5 otherwise, in other embodiments, the rotation
The rotating motor other end is fixedly connected with the sealing plate 5.The rotating electric machine is connect with the programmable logic controller (PLC) 8, described
Programmable logic controller (PLC) 8 controls the rotating electric machine and the sealing plate 5 is driven to rotate.
The structure of blowing mechanism is discussed in detail.
The blowing mechanism includes: air compressor machine and scavenging conduit 6-1.
The air compressor machine is fixed on the flat coal car 1.Specifically, in the present embodiment, the air compressor machine is logical
It crosses bolt to be fixed on the flat coal car 1, in other embodiments, the air compressor machine can be otherwise such as pivot pin
Etc. being fixed on the flat coal car 1.The air compressor machine is connect with the programmable logic controller (PLC) 8, and described may be programmed is patrolled
It collects controller 8 and controls the air compressor machine gas supply.
The one end the scavenging conduit 6-1 is connected to the air compressor machine, and the scavenging conduit 6-1 other end is arranged in the sealing plate 5
Side.
The structure of refractory wass conveying mechanism is discussed in detail.
The refractory wass conveying mechanism includes: rotary feeder 7-1, compressed air pipe 7-2, blowing mud hose 7-
3, mud valve 7-4 and spray head.
The rotary feeder 7-1 is fixed on the flat coal car 1.Specifically, in the present embodiment, the rotation
It is given to glassware 7-1 and is bolted and be arranged on the flat coal car 1, in other embodiments, the rotary feeder 7-1
It can be otherwise as described in being fixed at pivot pin on flat coal car 1.The rotary feeder 7-1 is patrolled with described may be programmed
It collects controller 8 to connect, the programmable logic controller (PLC) 8 controls the rotary feeder 7-1 movement.
The one end the compressed air pipe 7-2 is connected to the rotary feeder 7-1, the other end and the blowing mechanism 6
The cold air of blowing mechanism 6 is transported in rotary feeder 7-1 by connection, the compressed air pipe 7-2, and it is dynamic to blow mud
Make.
Described blowing one end mud hose 7-3 is connected to the rotary feeder 7-1, and the blowing mud hose 7-3 is defeated
Send refractory wass.The blowing mud hose 7-3 be double-layer hose, outer flow cooling water, internal layer convey refractory wass, avoid
Refractory wass is caused to solidify since conveying distance is too long.
The mud valve 7-4 is arranged on the blowing mud hose 7-3, for adjusting the flow of refractory wass.
Described spray head one end is connected to the sealing plate 5, and one end is connected to the blowing mud hose 7-3 other end, to broken
Damage position 12 is filled up.
The embodiment of the present invention is introduced in order to clearer, is introduced from the application method of the embodiment of the present invention below.
Before repairing 11 damaged part of coking chamber wall, pusher machine is moved to and needs to repair by carbonizing chamber, pushes away sky carbonization chamber,
Not upper furnace door 9.Solid-state high temperature resistant amorphous refractory is prepared and stirred evenly in proportion with liquid adhesive, its stream is made
The indices such as dynamic property, dilatancy, the bridging time of high temperature gunning refractory, high volume stability and mobility, which meet spray repair, to be wanted
It asks.Control curing time of the high temperature gunning refractory under 1000 DEG C of -1200 DEG C of high temperature, it is ensured that the uniformity of stream.Start leveling bar 2
And motor, motor drive the first scalable horizontal cantilever 3-1 to act in sliding slot 2-1, scan carbonization chamber using high temperature imager 4
The damaged position 12 of furnace wall 11.According to the information that high temperature imager 4 is fed back, determine damage location and size, programmable controller 8 to
Leveling bar 2, the first scalable horizontal cantilever 3-1, the scalable vertical scalable horizontal cantilever 3-3 of cantilever 3-2 and second send dynamic
Make signal, mobile leveling bar 2, the first scalable horizontal cantilever 3-1, the scalable vertical scalable transverse direction of cantilever 3-2 and second are outstanding
Arm 3-3 makes the second scalable horizontal cantilever 3-3 be accurately positioned at damaged position 12.Programmable logic controller (PLC) 8 is sent to air compressor machine
Signal is purged, air compressor machine is started, air compressor machine conveys cold air by scavenging conduit 6-1, purges damaged position 12 by blasting cold air.
After purging, programmable logic controller (PLC) 8 sends rotating signal to rotating electric machine, and rotating electric machine rotates sealing plate 5, makes its abutting
Carbonizing chamber furnace wall 11, it is ensured that do not spilt over when spray repair mud.Sealing plate 5, which is one piece, can cover furnace wall and turn round the rectangle iron plate at position, peace
Front end loaded on the second lateral telescopic boom 3-3, and 90 ° of rotations can be done.Spray head front end, the front end scavenging conduit 6-1 and sealing plate are solid
It is scheduled on together, the front end and jet pipe front end of scavenging conduit 6-1 is at an angle of 90.Three, which synchronizes to do, to rotate, i.e., when 4 operation of high temperature imager
When, sealing plate 5 is in level, and the front end of scavenging conduit 6-1 is in level, and when needing spray repair operation, sealing plate 5 is rotated by 90 °, and is close to furnace wall
11, scavenging conduit 6-1, which are rotated to top, to be stopped purging, and interference is avoided to spray.Refractory wass stirs in rotary feeder 7-1
Even, under 1000 DEG C of -1200 DEG C of high temperature, the cold air of air compressor machine enters rotary feeder 7-1 by compressed air pipe 7-3
It is interior, high temperature resistant mud is delivered to spray head by being blown mud hose 7-3, blowing mud hose 7-3 is double-layer hose, outer laminar flow
Dynamic cooling water, internal layer convey refractory wass, avoid causing refractory wass to solidify since conveying distance is too long, and spray head is by refractory wass
Wall damaged part is sprayed into send out pressure signal after the pressure sensor on sealing plate 5 is reached certain numerical value by mud pressure
Programmable logic controller (PLC) 8 is given, programmable logic controller (PLC) 8 sends stop signal to rotary feeder 7-1, stop spray repair,
Mud valve 7-4 setting is on blowing mud hose 7-3, for adjusting the flow of refractory wass.Continue to seal after the completion of spray repair
Plate 5 is held against furnace wall 11, removes after mud molding.Sealing plate 5 is rotated, not interfere high temperature imager 4 to scan.Utilize high temperature
Imager 4 check spray repair effect, it is necessary to when can carry out it is secondary fill spray, can replace be manually entered carbonization chamber high-temperature reparation operation,
Labor intensity effectively is alleviated, ensure that production safety, is handled without cooling, the repairing time is both shortened, it is ensured that production
Rhythm in turn ensures the longevity for being conducive to carbonization chamber wall.Meanwhile arc guide barrel can be set on leveling bar 5, by arc guide barrel
10 are installed on 2 front end of leveling bar, which can make the first scalable horizontal cantilever 3-1 rotate horizontally 180 °, and covering is left
Right all positions of two sides carbonizing chamber furnace wall can do spray repair to all damaged parts, so that carbonizing chamber two sides furnace wall is able to achieve
Line spray repair is saved the time, is improved efficiency.
It should be noted last that the above specific embodiment is only used to illustrate the technical scheme of the present invention and not to limit it,
Although being described the invention in detail referring to example, those skilled in the art should understand that, it can be to the present invention
Technical solution be modified or replaced equivalently, without departing from the spirit and scope of the technical solution of the present invention, should all cover
In the scope of the claims of the present invention.
Claims (10)
1. a kind of carbonization furnace wall mending device, which is characterized in that be arranged on the leveling bar (2) on flat coal car (1), the flat coal
Sliding slot (2-1) is offered on bar (2);The mending device includes:
Positioning mechanism (3), one end are movably arranged in the sliding slot (2-1);
The other end in the positioning mechanism (3) is arranged in high temperature imager (4);
The other end in the positioning mechanism (3) is arranged in sealing plate (5);
Blowing mechanism (6), one end are arranged on the flat coal car (1), and the other end is arranged in the side of the sealing plate (5);
Refractory wass conveying mechanism (7), one end are arranged on the flat coal car (1), and the other end is connected to the sealing plate (5), institute
Refractory wass conveying mechanism (7) is stated to be connected to the blowing mechanism (6) one end;
Programmable logic controller (PLC) (8), with the positioning mechanism (3), high temperature imager (4), blowing mechanism (6), refractory wass
Conveying mechanism (7) and flat coal car (1) connection;
Wherein, the leveling bar (2) and the positioning mechanism (3) movement, when the high temperature imager (4) detects damaged position
(12) when, Xiang Suoshu programmable logic controller (PLC) (8) sends breakage signal, programmable controller (8) the Xiang Suoshu leveling bar
(2) and the positioning mechanism (3) sending action signal, the positioning mechanism (3) act described in drive in the sliding slot (2-1)
Sealing plate (5), blowing mechanism (6) and refractory wass conveying mechanism (7) reach damaged position (12), the programmable logic controller (PLC)
(8) Xiang Suoshu blowing mechanism (6) sends purging signal, after the completion of the blowing mechanism (6) purges, the Programmable logical controller
Device (8) Xiang Suoshu positioning mechanism (3) sends rotating signal, and the positioning mechanism (3) makes the sealing plate (5) and the damaged position
(12) in parallel, programmable logic controller (PLC) (8) the Xiang Suoshu positioning mechanism (3) sends extension signal, and the sealing plate (5) is pressed in
The breakage position (12), programmable logic controller (PLC) (8) the Xiang Suoshu refractory wass conveying mechanism (7) send conveying signal,
Refractory wass in the refractory wass conveying mechanism (7) is delivered to damaged position (12) by the blowing mechanism (6).
2. mending device according to claim 1, which is characterized in that further include:
Pressure sensor is arranged in the sealing plate (5) one end, the pressure sensor and the programmable logic controller (PLC) (8)
Connection.
3. mending device according to claim 1, which is characterized in that the positioning mechanism includes:
Motor, one end are arranged on the leveling bar (2);
First scalable horizontal cantilever (3-1), one end are movably arranged in the sliding slot (2-1), the first scalable transverse direction
Cantilever (3-1) is connect with the programmable logic controller (PLC) (8), the first scalable horizontal cantilever (3-1) and the motor
Other end connection;
Scalable vertical cantilever (3-2), one end is connect with described first scalable horizontal cantilever (3-1) other end, described to stretch
The vertical cantilever (3-2) that contracts is connect with the programmable logic controller (PLC) (8);
Second scalable horizontal cantilever (3-3), one end are connect with scalable vertical cantilever (3-2) other end, and described second
Scalable horizontal cantilever (3-3) connect with the programmable logic controller (PLC) (8);
Rotating electric machine, one end are connect with the described second scalable horizontal cantilever (3-3), and the other end is connect with the sealing plate (5), institute
Rotating electric machine is stated to connect with the programmable logic controller (PLC) (8).
4. mending device according to claim 1, which is characterized in that the blowing mechanism includes:
Air compressor machine is arranged on the flat coal car (1), and the air compressor machine is connect with the programmable logic controller (PLC) (8);
Scavenging conduit (6-1), one end are connected to the air compressor machine, and the other end is arranged in the side of the sealing plate (5).
5. mending device according to claim 1, which is characterized in that the refractory wass conveying mechanism includes:
Rotary feeder (7-1) is arranged on the flat coal car (1), the rotary feeder (7-1) and the programmable logic
Controller (8) connection;
Compressed air pipe (7-2), one end are connected to the rotary feeder (7-1), and the other end and the blowing mechanism (6) are even
It is logical;
It is blown mud hose (7-3), one end is connected to the rotary feeder (7-1);
Mud valve (7-4) is arranged on the blowing mud hose (7-3);
Spray head, one end are connected to the sealing plate (5), and one end is connected to blowing mud hose (7-3) other end.
6. a kind of carbonization furnace wall spray repair method, special based on carbonization furnace wall mending device described in claim 1-5 any one
Sign is, the spray repair method the following steps are included:
Before repairing coking chamber wall (11) damaged part, pusher machine is moved to and needs to repair by carbonizing chamber, pushes away sky carbonization chamber, furnace
Door (9) is opened;
Starting leveling bar (2) and positioning mechanism (3), the positioning mechanism (3) act in the carbonizing chamber, high temperature imager
(4) the damaged position (12) for scanning the coking chamber wall (11), when the high temperature imager (4) detects damaged position (12) to
Programmable logic controller (PLC) (8) sends breakage signal;
According to the information that the high temperature imager (4) is fed back, damage location and size, the programmable logic controller (PLC) are determined
(8) Xiang Suoshu leveling bar (2) and the positioning mechanism (3) sending action signal, the mobile leveling bar (2) and positioning mechanism
(3) it is accurately positioned at damaged position (12), programmable controller (8) Xiang Suoshu positioning mechanism (3) the sending action signal is described
Positioning mechanism (3) movement in the sliding slot (2-1) drives the sealing plate (5), blowing mechanism (6) and refractory wass conveying mechanism
(7) damaged position (12) is reached;
Programmable logic controller (PLC) (8) the Xiang Suoshu blowing mechanism (6) sends purging signal, and the blowing mechanism (6) passes through
It blasts cold air to purge, after the completion of purging, programmable logic controller (PLC) (8) the Xiang Suoshu positioning mechanism (3) sends rotation letter
Number, the positioning mechanism (3) keeps sealing plate (5) parallel with damaged position (12), programmable logic controller (PLC) (8) Xiang Suoshu
Positioning mechanism (3) sends extension signal, and the sealing plate (5) is pressed in the damaged position (12);
Programmable logic controller (PLC) (8) the Xiang Suoshu refractory wass conveying mechanism (7) sends conveying signal, the blowing mechanism
(6) refractory wass in the refractory wass conveying mechanism (7) is delivered to damaged position (12).
7. spray repair method according to claim 6, which is characterized in that further include:
Pressure sensor is arranged in the sealing plate (5) one end, the pressure sensor and the programmable logic controller (PLC) (8)
Connection.
8. spray repair method according to claim 6, which is characterized in that the positioning mechanism includes:
Motor, one end are arranged on the leveling bar (2);
First scalable horizontal cantilever (3-1), one end are movably arranged in the sliding slot (2-1), the first scalable transverse direction
Cantilever (3-1) is connect with the programmable logic controller (PLC) (8), the first scalable horizontal cantilever (3-1) and the motor
Other end connection;
Scalable vertical cantilever (3-2), one end is connect with described first scalable horizontal cantilever (3-1) other end, described to stretch
The vertical cantilever (3-2) that contracts is connect with the programmable logic controller (PLC) (8);
Second scalable horizontal cantilever (3-3), one end are connect with scalable vertical cantilever (3-2) other end, and described second
Scalable horizontal cantilever (3-3) connect with the programmable logic controller (PLC) (8);
Rotating electric machine, one end are connect with the described second scalable horizontal cantilever (3-3), and the other end is connect with the sealing plate (5), institute
Rotating electric machine is stated to connect with the programmable logic controller (PLC) (8).
9. spray repair method according to claim 6, which is characterized in that the blowing mechanism includes:
Air compressor machine is arranged on the flat coal car (1), and the air compressor machine is connect with the programmable logic controller (PLC) (8);
Scavenging conduit (6-1), one end are connected to the air compressor machine, and the other end is arranged in the side of the sealing plate (5).
10. spray repair method according to claim 6, which is characterized in that the refractory wass conveying mechanism includes:
Rotary feeder (7-1) is arranged on the flat coal car (1), the rotary feeder (7-1) and the programmable logic
Controller (8) connection;
Compressed air pipe (7-2), one end are connected to the rotary feeder (7-1), and the other end and the blowing mechanism (6) are even
It is logical;
It is blown mud hose (7-3), one end is connected to the rotary feeder (7-1);
Mud valve (7-4) is arranged on the blowing mud hose (7-3);
Spray head, one end are connected to the sealing plate (5), and one end is connected to blowing mud hose (7-3) other end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610859599.3A CN106244174B (en) | 2016-09-27 | 2016-09-27 | A kind of carbonization furnace wall mending device and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610859599.3A CN106244174B (en) | 2016-09-27 | 2016-09-27 | A kind of carbonization furnace wall mending device and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106244174A CN106244174A (en) | 2016-12-21 |
CN106244174B true CN106244174B (en) | 2019-04-02 |
Family
ID=57611743
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610859599.3A Active CN106244174B (en) | 2016-09-27 | 2016-09-27 | A kind of carbonization furnace wall mending device and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106244174B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109370619A (en) * | 2018-11-14 | 2019-02-22 | 五冶集团上海有限公司 | Application of the 3D stereocamera in the detection of coke dry quenching furnace liner |
CN113372931B (en) * | 2021-06-29 | 2022-09-16 | 河北华丰能源科技发展有限公司 | Remote coke oven wall supplementing device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102171311A (en) * | 2008-10-06 | 2011-08-31 | 新日本制铁株式会社 | Repair method and repair device for wall surface of coke oven chamber at bottom edge thereof |
CN102851040A (en) * | 2012-08-14 | 2013-01-02 | 宣化钢铁集团有限责任公司 | Method for repairing fusion holes in wall of carbonization chamber without cooling |
CN102925167A (en) * | 2012-11-05 | 2013-02-13 | 中国一冶集团有限公司 | Coking furnace hot repair carbonization chamber bottom brick masonry device |
CN202865172U (en) * | 2012-09-12 | 2013-04-10 | 中国一冶集团有限公司 | Elevation locator of bottom of coke oven carbonization chamber while maintaining in thermal state |
CN204892198U (en) * | 2015-08-06 | 2015-12-23 | 山东慧敏科技开发有限公司 | Coat on line energy -conserving coating and/or repair paint gun of material of coke oven |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100925630B1 (en) * | 2002-12-10 | 2009-11-06 | 주식회사 포스코 | An apparatus for drawing out the brick of heat accumulator in coke oven |
JP2009120795A (en) * | 2007-10-23 | 2009-06-04 | Mitsubishi Chemicals Corp | Method for repairing coke oven |
-
2016
- 2016-09-27 CN CN201610859599.3A patent/CN106244174B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102171311A (en) * | 2008-10-06 | 2011-08-31 | 新日本制铁株式会社 | Repair method and repair device for wall surface of coke oven chamber at bottom edge thereof |
CN102851040A (en) * | 2012-08-14 | 2013-01-02 | 宣化钢铁集团有限责任公司 | Method for repairing fusion holes in wall of carbonization chamber without cooling |
CN202865172U (en) * | 2012-09-12 | 2013-04-10 | 中国一冶集团有限公司 | Elevation locator of bottom of coke oven carbonization chamber while maintaining in thermal state |
CN102925167A (en) * | 2012-11-05 | 2013-02-13 | 中国一冶集团有限公司 | Coking furnace hot repair carbonization chamber bottom brick masonry device |
CN204892198U (en) * | 2015-08-06 | 2015-12-23 | 山东慧敏科技开发有限公司 | Coat on line energy -conserving coating and/or repair paint gun of material of coke oven |
Also Published As
Publication number | Publication date |
---|---|
CN106244174A (en) | 2016-12-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106244174B (en) | A kind of carbonization furnace wall mending device and method | |
CN113604619A (en) | Remote control thermal state wet method jetting lining manufacturing method | |
CN213835082U (en) | Sealing device for preventing cracking of welding point of conical hopper of Maerz kiln | |
CN101921887A (en) | Maintenance method of blast furnace liner | |
CN102559212A (en) | Hot repair method for castables on inner wall of ascending tube of 7.63m coke oven | |
CN101805622A (en) | Hot patching process for bottom brick of carbonization chamber of coke oven | |
CN217093984U (en) | Refractory material spraying device of gasification furnace of pyrometallurgical furnace | |
CN107446595A (en) | A kind of method of full stove integral replacing coke oven coke oven uprising tube | |
CN105694920A (en) | Method for repairing inter-leakage of silicon carbide brick walls of coke oven regenerative chamber in production | |
CN102390916B (en) | Method for replacing gun sleeve bricks of breast wall at melting part of tank furnace in heat state | |
CN105062510A (en) | Coke oven observation hole hot repairing method and hot repairing tool thereof | |
JP3601567B2 (en) | Repair equipment for coke oven carbonization chamber furnace walls | |
CN104342175A (en) | Method for hot repairing of local damage of coking chamber wall of coke oven | |
CN2848853Y (en) | Fire brick building device of coke oven carbonation chamber bottom | |
KR100504396B1 (en) | apparatus for repairing brick of coke chamber | |
KR101481612B1 (en) | Apparatus for repairing of chamber | |
CN210127214U (en) | Portable coke oven body plugging equipment | |
CN114685067B (en) | Rapid and stable cooling and emptying method for double-hearth kiln | |
CN110779336A (en) | Hot-state repairing device and method for burn-through molten hole of carbon pot type calcining furnace | |
CN105605924A (en) | Repair method of fixed anode copper metallurgical furnace bottom bricks | |
CN217043148U (en) | Spraying furnace repairing device | |
KR100931354B1 (en) | Blast Furnace Exit Grinding Device | |
JP4066651B2 (en) | Method for repairing refractory inside vertical pipe and jig and device for repair | |
CN103866062A (en) | Method for automatic wet injection lining making of blast furnace | |
CN218753657U (en) | Air-compression sealing feeding equipment for coke oven carbonization chamber |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20170713 Address after: 430080 Qingshan District stock company of Hubei, Wuhan Province Applicant after: Wuhan iron and Steel Company Limited Address before: 430083 Qingshan District, Hubei, Wuhan factory before the door No. 2 Applicant before: WUHAN IRON AND STEEL CORPORATION |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |