CN106241522B - The earthquake controlled operation control system and its method of elevator - Google Patents
The earthquake controlled operation control system and its method of elevator Download PDFInfo
- Publication number
- CN106241522B CN106241522B CN201610344960.9A CN201610344960A CN106241522B CN 106241522 B CN106241522 B CN 106241522B CN 201610344960 A CN201610344960 A CN 201610344960A CN 106241522 B CN106241522 B CN 106241522B
- Authority
- CN
- China
- Prior art keywords
- earthquake
- elevator
- controlled operation
- earthquake controlled
- sensing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B1/00—Control systems of elevators in general
- B66B1/02—Control systems without regulation, i.e. without retroactive action
- B66B1/06—Control systems without regulation, i.e. without retroactive action electric
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B3/00—Applications of devices for indicating or signalling operating conditions of elevators
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B5/00—Applications of checking, fault-correcting, or safety devices in elevators
- B66B5/02—Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions
- B66B5/021—Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions the abnormal operating conditions being independent of the system
- B66B5/024—Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions the abnormal operating conditions being independent of the system where the abnormal operating condition is caused by an accident, e.g. fire
Abstract
The earthquake controlled operation control system of elevator of appropriate earthquake controlled operation and the earthquake controlled progress control method of elevator can also be carried out even if under the setting that will not become earthquake controlled operation in the operation of elevator when an earthquake occurs by providing.The earthquake controlled operation control system of elevator includes:Earthquake sensing device;Earthquake controlled operational mode switching part, with the operation of elevator is made as the earthquake controlled operation Licensing Model of earthquake controlled operation and while having sent earthquake sensing device actuating signal the operation of elevator not to be made to be switched to the earthquake controlled operation lockout mode of earthquake controlled operation when receiving earthquake sensing device actuating signal from earthquake sensing device, and earthquake controlled operation Licensing Model and earthquake controlled lockout mode of running are switched over according to request;Elevator long distance monitoring arrangement when receiving signal transmitted when an earthquake occurs, will make the signal that earthquake controlled operational mode switching part switches to earthquake controlled operation Licensing Model be sent to earthquake controlled operational mode switching part.
Description
Technical field
Earthquake controlled operation control system and earthquake controlled progress control method the present invention relates to elevator have from ground
Shake sensor makes the operation of elevator as the earthquake pipe of earthquake controlled operation in the case of receiving earthquake sensing device actuating signal
System operation Licensing Model.
Background technology
As the background technology of the art, there are Japanese Patent Laid-Open 2009-190822 publications (patent document 1).
It is recorded in the publication:" its structure includes:Check instruction input 6, the inspection instruction input 6 input is from maintenance tool 5
Control rolling inspection grant instruction or control rolling inspection mustn't can instruct P3;Control equipment input unit 8, the control equipment are defeated
Enter portion 8 and input the control device action signal P1 sent from control equipment 1;Control run action identifying unit 9, control operation
Act identifying unit 9 instructs storage single based on the control device action signal P1 from control equipment input unit 8 and come self-check
Member 7 control rolling inspection enabling signal or control rolling inspection mustn't signal P4, judge control operation it is whether actionable;With
And control running unit 11, the control running unit 11 is according to movable as control operation from control run action identifying unit 9
The control run action enabling signal P6 for making the control sent operation commencing signal P5 and being sent from maintenance tool 5 is carried out
Control is run." (with reference to summary).
Prior art literature
Patent document
Patent document 1:Japanese Patent Laid-Open 2009-190822 publications
The content of the invention
Problem to be solved by the invention
In general group management elevator, multiple elevator is connected with an earthquake sensing device in most cases, if to confirm
Acted the pressure of earthquake sensing device for the purpose of the earthquake controlled operation of elevator, then the operation of all elevators all becomes earthquake pipe
System operation, from the elevator that normal operation may be not present.
However, setting at the same time in the newly-built house property of multiple elevator, there is the elevator as construction usage machine, Huo Zhe
It delivers in house property, according to the situation of user, in most cases all elevators can not be made all to stop, therefore there are the following problems:Really
Recognizing the operation of the earthquake controlled operation of elevator can only implement in extremely limited environment time period as day off, the late into the night.
Therefore, in order to can also be carried out beyond extremely limited environment time period confirm the earthquake controlled operation of elevator work
Industry considers the mode using following earthquake controlled operation cutting function, i.e.,:Using control program will from earthquake sensing device to as
Carry out the input for the earthquake sensing device actuating signal that the elevator beyond the elevator for the object number machine that earthquake controlled operation confirms carries out
It disconnects.
Technology recorded in above patent document 1 uses such as lower structure:It mustn't from maintenance tool import control rolling inspection
Signal judges whether control operation is actionable using control run action identifying unit, is examined hence for control operation is carried out
Elevator beyond the elevator looked into is run without control.Particularly, control rolling inspection, which mustn't can instruct, maintains the effect time limit,
After certain time, control operation can not state become invalid.Therefore, even if not carrying out checking the situation of end operation
Under, also it can normally connect the control equipment of elevator after certain time.Therefore, even if terminating behaviour not carrying out checking
In the case of work, can also prevent control equipment because earthquake when due tos it is actual acted when elevator do not carry out control operation so as to
The situation that user makes troubles.
However, in technology recorded in above patent document 1, protected if mustn't can instruct by control rolling inspection
The effective time limit held, then control operation can not state will not become invalid.Therefore, do not carrying out checking the situation of end operation
Under, occur in the case of earthquake occurs before by as the certain time of effective time limit, during control rolling inspection
In the case of earthquake, situation about can be taken while in user is may result in, but elevator does not carry out control operation, i.e.,
The elevator in the case where rocking persistently is made also to run at high speed.
Therefore, even if present invention offer will not become the setting of earthquake controlled operation in the operation of elevator when an earthquake occurs
Under, it can also carry out the earthquake controlled operation of the earthquake controlled operation control system and elevator of the elevator of appropriate earthquake controlled operation
Control method.
Technical teaching for solving the problem was
To solve the above-mentioned problems, the earthquake controlled operation system of elevator of the invention includes:Earthquake sensing device;And ground
Shake control operational mode switching part, the earthquake controlled operational mode switching part have the earthquake sensing device acted and from
The earthquake sensing device makes the operation of elevator as earthquake controlled operation in the case of receiving earthquake sensing device actuating signal
Earthquake controlled operation Licensing Model and the fortune for not making the elevator in the case where having sent the earthquake sensing device actuating signal
Row is switched to the earthquake controlled operation lockout mode of the earthquake controlled operation, and the earthquake controlled operation is permitted according to request
Can pattern and the earthquake controlled operation lockout mode switch over, the earthquake controlled operation system of the elevator includes elevator prison
View apparatus, the elevator monitoring arrangement will make described earthquake controlled in the case where receiving signal transmitted when an earthquake occurs
The signal that operational mode switching part switches to the earthquake controlled operation Licensing Model is sent to the earthquake controlled operational mode
Switching part.
Invention effect
Even if the present invention can provide it will not become the setting of earthquake controlled operation in the operation of elevator when an earthquake occurs under,
Also the earthquake controlled operation control of the earthquake controlled operation control system and elevator of the elevator of appropriate earthquake controlled operation can be carried out
Method processed.Moreover, problem other than the above, structure and effect become clear and definite by the explanation of following embodiment.
Description of the drawings
Fig. 1 is the structure of an embodiment of the earthquake controlled operation control system for representing elevator according to the present invention
Figure.
Fig. 2 is the setting for representing the earthquake controlled operation lockout mode carried out using above-mentioned earthquake controlled operation control system
Action and the flow chart of releasing action.
Fig. 3 is the flow for the action for representing the earthquake controlled operation carried out using above-mentioned earthquake controlled operation control system
Figure.
Specific embodiment
In the following, based on attached drawing to an embodiment of the earthquake controlled operation control system of elevator according to the present invention
It illustrates.
Fig. 1 is the structure of an embodiment of the earthquake controlled operation control system for representing elevator according to the present invention
Figure.
In Fig. 1, the earthquake controlled operation control system of elevator according to the present invention mainly by Control Centre 1, base station 2,
Communicator 3, elevator long distance monitoring arrangement 4, elevator 5, elevator control gear 6, earthquake sensing device 7 and maintenance tool 8 are formed.
Control Centre 1 is connected with base station 2, the action that control is carried out by base station 2.Base station 2 includes:Urgent rapid earthquake information report receiving part 21,
The urgent rapid earthquake information report receiving part 21 is received via such as TV machine circuit, radio link, the Internet lines etc. by weather bureau
The urgent rapid earthquake information report of issue;Signal conversion part 22, the urgent rapid earthquake information report which receives this are converted into
Prespecified predetermined urgency signal;And urgent rapid earthquake information report distribution unit 23, which will be by believing
Number 22 transformed urgency signal of converter section is sent to elevator long distance monitoring arrangement 4 via communicator 3.Communicator 3 receives
The urgency signal issued by urgent rapid earthquake information report distribution unit 23, the urgency signal that this is received are sent to elevator long distance monitoring dress
Put 4.
Urgent rapid earthquake information report is following information:After earthquake just occurs, capture ground from the seismic detector for being arranged at various regions
Seismic wave, is calculated automatically using predetermined automaton (not shown) and it is expected that focus, scale, estimated intensity of rocking (are shaken
Grade), the arrival moment that rocks by force, notice is predicted with these as soon as possible focus, scale, earthquake magnitude, the arrival moment phases rocked by force
The information of pass, in the information of the strong forward direction various regions notice for rocking generation caused by earthquake.
Elevator long distance monitoring arrangement 4 is connected with elevator control gear 6, the operating status of remotely monitor elevator 5, in elevator
In the case that 5 run action is abnormal, it will represent that the abnormal abnormal signal occurs is sent to base station via communicator 3
2, it is notified from base station 2 to Control Centre 1.Elevator long distance monitoring arrangement 4 includes earthquake controlled operation lockout mode releasing portion
41, which is that not can perform the ground of earthquake controlled operation in the operational mode of elevator 5
In the case of shaking control operation lockout mode, release the earthquake controlled operation lockout mode and become common earthquake controlled
Run Licensing Model.Earthquake controlled operation lockout mode releasing portion 41 is in the urgent rapid earthquake information report via communicator 3 from base station 2
In the case that distribution unit 23 receives urgency signal, send for by set earthquake controlled operation lockout mode compulsory commutation
For the releasing request signal of earthquake controlled operation Licensing Model.
Elevator 5, which includes multiplying, takes out objective (people), the car 51 of cargo.Car 51 and one end of main rope 52 are connected.Main rope
Rope 52 hangs over the coaster i.e. upside of pulley 53, and is equipped in its other end to pouring weight 54.Car 51 suspends branch in midair by main rope 52
Hold, the drive control of the motor 55 by making 53 rotation driving of pulley, main rope 52 can move up and down, car 51 can on move down
It is dynamic.
Elevator control gear 6 controls the driving of the motor 55 of elevator 5, and operation control is carried out to car 51.Elevator controlling
Device 6 includes elevator control running gear 61, which is used to be made elevator 5 when an earthquake occurs
Car 51 peremptorily reaches nearest floor and the earthquake controlled operation stopped.Elevator control running gear 61 includes earthquake controlled fortune
Row pattern switching portion 62, which receives sends out from earthquake controlled operation lockout mode releasing portion 41
The releasing request signal sent.Earthquake controlled operation of the earthquake controlled operational mode switching part 62 to executable earthquake controlled operation
Licensing Model and earthquake controlled operation lockout mode switch over.
Earthquake controlled operation Licensing Model is that the situation of earthquake sensing device actuating signal is being had sent from earthquake sensing device 7
Under, make the operation of elevator 5 as usual as the operational mode of earthquake controlled operation.The operation of elevator 5 is usually by earthquake pipe
Operational mode switching part 62 processed is set as earthquake controlled operation Licensing Model.Even if earthquake controlled operation lockout mode is from ground
In the case that shake sensor 7 has sent earthquake sensing device actuating signal, also the operation of elevator 5 earthquake controlled operation is not switched into
And continue the operational mode of normal operation, such as having the request from maintenance tool 8, the feelings i.e. from external request
It is set under condition.
Whether elevator control gear 6 is included to the operation of elevator 5 being made to run the earthquake pipe judged as earthquake controlled
System runs determination unit 63 and the operation of elevator 5 is switched to normal operation and the earthquake controlled running earthquake of any one
Control runs switching part 64.Earthquake sensing device 7 is gone forward side by side in the case that action makees sensing earthquake, sends the action of earthquake sensing device
Signal.Earthquake controlled operation determination unit 63 is connected with earthquake sensing device 7, is receiving from the ground that earthquake sensing device 7 is sent
Shake sensor actuating signal in the case of, according to current operational mode, judgement be the operation of elevator 5 is switched to it is earthquake controlled
Operation, it is constant to be also to maintain normal operation.Earthquake controlled operation switching part 64 is based on obtained by earthquake controlled operation determination unit 64
Judgement as a result, switching elevator 5 operation.
Maintenance tool 8 is in the instrument for elevator 5 use during maintenance test, is by being tieed up to elevator 5
Shield is connected when checking with elevator control gear 6, so as to confirm the elevator maintenance inspection device of the state of elevator 5.Maintenance workers
Tool 8 has the earthquake controlled operation lockout mode configuration part 81 being connected with earthquake controlled operational mode switching part 62.Earthquake pipe
System operation lockout mode configuration part 81 will be for forcibly switching to ground by the operation of elevator 5 from earthquake controlled operation Licensing Model
The setting request signal and releasing request signal of shake control operation lockout mode are sent to earthquake controlled operational mode switching part 62.
Moreover, the earthquake controlled operational mode switching part 62 of elevator control gear 6 is in the earthquake controlled fortune from maintenance tool 8
In the case that row lockout mode configuration part 81 receives setting request signal, the operational mode of elevator 5 is switched to earthquake controlled
Run lockout mode.In addition, earthquake controlled operational mode switching part 62 is set to earthquake controlled fortune in the operational mode of elevator 5
In the state of row lockout mode, if being supervised from the earthquake controlled operation lockout mode configuration part 81 of maintenance tool 8 or elevator long distance
The earthquake controlled operation lockout mode releasing portion 41 of view apparatus 4 receives releasing request signal, then cuts the operational mode of elevator 5
Change earthquake controlled operation Licensing Model into.Earthquake controlled operational mode switching part 62 will set switch to it is earthquake controlled operation cut
In the case of have passed through the prespecified predetermined time after disconnected pattern, even if not receiving releasing request signal, also setting is cut
It changes and reverts to earthquake controlled operation Licensing Model.
Then, the earthquake controlled operation of the elevator involved by an embodiment of the invention is controlled with reference to Fig. 2 and Fig. 3
The action of system illustrates.
First, the set action of earthquake controlled operation lockout mode and releasing action are illustrated with reference to Fig. 2.Fig. 2 is to represent profit
The flow chart that the set action of the earthquake controlled operation lockout mode carried out with earthquake controlled operation control system and releasing act.
After maintenance tool 8 is connected with elevator control gear 6, earthquake controlled fortune is carried out using the maintenance tool 8
The setting operation (S201/ is) of row lockout mode, from the earthquake controlled operation lockout mode configuration part 81 of maintenance tool 8 to elevator
The earthquake controlled operational mode switching part 62 of control device 6 sends the setting request signal of earthquake controlled operation lockout mode.This
When, in the case where not carrying out the setting operation of earthquake controlled operation lockout mode using maintenance tool 8 (S201/ is no), repeat
The processing of this S201.
In the case where above-mentioned 201/ is, based on the reception of setting request signal, switched using earthquake controlled operational mode
The operation of elevator 5 is switched to earthquake controlled operation and cut by portion 62 from common operational mode, that is, earthquake controlled operation Licensing Model
Disconnected pattern (S202).
Hereafter, in above-mentioned S202, the operational mode of elevator 5 is set to pass through after earthquake controlled operation lockout mode
In the case of predetermined time (S203/ is), aftermentioned S207 is advanced to, by the operational mode of elevator 5 from earthquake controlled operation
Lockout mode switches to earthquake controlled operation Licensing Model.
On the other hand, the operational mode of elevator 5 is set to after earthquake controlled operation lockout mode in above-mentioned S202
In the case of without the predetermined time (S203/ is no), if earthquake occurs, urgent rapid earthquake information report is issued from weather bureau, by base station 2
Urgent rapid earthquake information report receiving part 21 receives urgent rapid earthquake information report, then is received this using the signal conversion part 22 of base station 2
Urgent rapid earthquake information report is converted into urgency signal, and the urgency signal is sent to communicator 3 from urgent rapid earthquake information report distribution unit 23
(S204/ is).
In the case where above-mentioned S204/ is, the urgency signal received is sent to elevator long distance monitoring from communicator 3
The earthquake controlled operation lockout mode releasing portion 41 (S205) of device 4.Hereafter, if being received tightly by elevator long distance monitoring arrangement 4
The releasing command signal for releasing earthquake controlled operation lockout mode is then run lockout mode releasing portion by anxious signal from earthquake controlled
41 are sent to the earthquake controlled operational mode switching part 62 (S206) of elevator control gear 6.Then, earthquake controlled operation mould is utilized
The operational mode of elevator 5 is switched to earthquake controlled operation Licensing Model by formula switching part 62 from earthquake controlled operation lockout mode
(S207)。
On the other hand, urgent rapid earthquake information report is not being issued, the urgent rapid earthquake information report receiving part 21 of base station 2 does not receive promptly
In the case of rapid earthquake information report (S204/ is no), if having carried out the setting of the earthquake controlled operation lockout mode of releasing using maintenance tool 8
Release operation (S208/ is), then using maintenance tool 8, the releasing that will release the setting of earthquake controlled operation lockout mode please
Signal is asked to be sent to the earthquake controlled operational mode switching part 62 (S209) of elevator control gear 6, advances to above-mentioned S207, is utilized
The operational mode of elevator 5 is switched to earthquake pipe by earthquake controlled operational mode switching part 62 from earthquake controlled operation lockout mode
System operation Licensing Model.
In addition, using maintenance tool 8 release the release operation of the earthquake controlled setting for running lockout mode
In the case of (S208/ is no), back to above-mentioned S203, whether judge from being set to after earthquake controlled operation lockout mode by pre-
It fixes time.
Then, said with reference to the action of earthquake controlled operations of the Fig. 3 to being carried out in earthquake controlled operation Licensing Model
It is bright.Fig. 3 is the flow chart for the action for representing the earthquake controlled operation carried out using earthquake controlled operation control system.
If generation earthquake, earthquake sensing device 7, which senses earthquake and goes forward side by side to take action, to be made, then from earthquake sensing device 7 to elevator controlling
The earthquake controlled operation determination unit 63 of device 6 sends earthquake sensing device actuating signal (S301/ is).At this point, in earthquake sensing device 7
In the case of without action (S301/ is no), the processing of this S301 is repeated.
After the situation for being in above-mentioned S301/, judge that the operational mode of elevator 5 is using earthquake controlled operation determination unit 63
It is no to run lockout mode (S302) to be earthquake controlled.At this point, the operational mode in elevator 5 is earthquake controlled operation lockout mode
In the case of (S302/ is), by it is earthquake controlled operation determination unit 63 be judged as continue elevator 5 normal operation, unfavorable earthquake pipe
System operation switching part 63 carries out the switching to earthquake controlled operation, continues the normal operation (S303) of elevator 5.
On the other hand, elevator 5 operational mode be not it is earthquake controlled operation lockout mode but it is earthquake controlled operation permitted
It can be judged as the operation of elevator 5 switching to earthquake pipe by earthquake controlled operation determination unit 63 in the case of pattern (S302/ is)
System operation carries out the switching to earthquake controlled operation using earthquake controlled operation switching part 63, and the operation of elevator 5 becomes earthquake pipe
System operation (S304).
As described above, the earthquake controlled operation control system of the elevator 5 according to involved by said one embodiment, right
Whens elevator 5 carries out maintenance test or confirming operation etc., even if corresponding earthquake controlled fortune occurs with earthquake being set to cut-out
Row Licensing Model, when an earthquake occurs without under the setting of earthquake controlled run action, becoming the operational mode of elevator 5
Under the situation of earthquake controlled operation lockout mode when an earthquake occurs, also based on the urgent rapid earthquake information report from weather bureau, from elevator
The releasing request signal for releasing earthquake controlled operation lockout mode is sent to the ground of elevator control gear 6 by Long-Range Surveillance Unit 4
Control operational mode switching part 62 is shaken, makes the operation of elevator 5 become earthquake controlled operation Licensing Model.
As a result, even if elevator 5 operational mode be set to it is earthquake controlled operation lockout mode in the case of,
Can the operation of elevator 5 be switched into earthquake controlled operation when an earthquake occurs.Thus, it is possible to more suitably carry out spot
The run action of elevator 5 during shake can further improve the user using elevator 5, maintenance test or dynamic is carried out to elevator 5
That makees the maintenance test person confirmed etc. etc. trusts degree.That is, even if earthquake will not be become in the operation of elevator 5 when an earthquake occurs
Under the setting of control operation, the security of user is also ensured that.
Moreover, the earthquake controlled operational mode switching part 62 of elevator control gear 6 is set to by the operational mode of elevator 5
In the case of have passed through the predetermined time after earthquake controlled operation lockout mode, even if not receiving from elevator long distance monitoring arrangement
The releasing request signal of 4 earthquake controlled operation lockout mode releasing portion 41, also switches to earthquake pipe by the operational mode of elevator 5
System operation Licensing Model.Thus, even if being set to ground being sent from the earthquake controlled operation lockout mode configuration part 81 of maintenance tool 8
The setting request signal of control operation lockout mode is shaken, after the operation of elevator 5 is made to become earthquake controlled operation lockout mode, is forgotten
Remember the releasing request signal for being sent from maintenance tool 8 and releasing earthquake controlled operation lockout mode, cut with carrying out earthquake controlled operation
In the case of the release operation of disconnected pattern, the operational mode of elevator 5 is also switched into earthquake pipe with the process of predetermined time
System operation Licensing Model.It, can be more suitable therefore, it is possible to which the operation of elevator 5 is switched to earthquake controlled operation when an earthquake occurs
The run action of the elevator 5 of locality control when an earthquake occurs.
In addition, the invention is not limited in above-mentioned embodiments, various modifications mode is included.For example, above-mentioned implementation
Mode is the explanation for for easy understanding illustrating the present invention and carrying out, and the present invention is not necessarily limited to include illustrated institute
There is structure.
Label declaration
4 elevator long distance monitoring arrangements (elevator monitoring arrangement)
5 elevators
62 earthquake controlled operational mode switching parts
7 earthquake sensing devices
Claims (3)
1. a kind of earthquake controlled operation control system of elevator, including:
Earthquake sensing device;And
Earthquake controlled operational mode switching part, the earthquake controlled operational mode switching part have in the earthquake sensing device into action
Make and the operation of elevator is made to become earthquake controlled in the case of receiving earthquake sensing device actuating signal from the earthquake sensing device
Operation earthquake controlled operation Licensing Model and do not make the electricity in the case where having sent the earthquake sensing device actuating signal
The operation of ladder is switched to the earthquake controlled operation lockout mode of the earthquake controlled operation, and according to request to described earthquake controlled
Operation Licensing Model and the earthquake controlled operation lockout mode switch over,
The earthquake controlled operation control system of the elevator is characterized in that,
Including elevator monitoring arrangement, which, will in the case where receiving signal transmitted when an earthquake occurs
The signal that the earthquake controlled operational mode switching part switches to the earthquake controlled operation Licensing Model is made to be sent to describedly
Shake control operational mode switching part.
2. the earthquake controlled operation control system of elevator as described in claim 1, which is characterized in that
The earthquake controlled operational mode switching part from switching to after the earthquake controlled operation lockout mode by predetermined
Earthquake controlled operation Licensing Model is switched to during the time.
3. a kind of earthquake controlled progress control method of elevator, having makes in the case where receiving earthquake sensing device actuating signal
The operation of elevator acts as the earthquake controlled operation Licensing Model of earthquake controlled operation and receiving the earthquake sensing device
The operation of the elevator is not made to be switched to the earthquake controlled operation lockout mode of the earthquake controlled operation in the case of signal, and
The earthquake controlled operation Licensing Model and the earthquake controlled operation lockout mode are switched over according to request, the elevator
Earthquake controlled progress control method be characterized in that,
The elevator operate to it is earthquake controlled operation lockout mode in the case of, if receiving transmitted when an earthquake occurs
Signal is then switched to the earthquake controlled operation Licensing Model.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015117638A JP6450265B2 (en) | 2015-06-10 | 2015-06-10 | Elevator seismic control operation control system and method |
JP2015-117638 | 2015-06-10 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106241522A CN106241522A (en) | 2016-12-21 |
CN106241522B true CN106241522B (en) | 2018-06-05 |
Family
ID=57626624
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610344960.9A Active CN106241522B (en) | 2015-06-10 | 2016-05-23 | The earthquake controlled operation control system and its method of elevator |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP6450265B2 (en) |
CN (1) | CN106241522B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110494383B (en) * | 2017-04-10 | 2020-09-25 | 三菱电机株式会社 | Control device and control method for elevator for goods |
US10882717B2 (en) | 2017-10-02 | 2021-01-05 | Otis Elevator Company | Elevator network for emergency operation |
WO2019167256A1 (en) * | 2018-03-02 | 2019-09-06 | 三菱電機ビルテクノサービス株式会社 | Elevator remote monitoring system |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201406233Y (en) * | 2009-05-22 | 2010-02-17 | 苏州新达电扶梯部件有限公司 | Elevator monitoring system based on seismic detection |
CN102596781A (en) * | 2009-10-30 | 2012-07-18 | 三菱电机株式会社 | Elevator control device and control method |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0622699Y2 (en) * | 1987-04-23 | 1994-06-15 | 株式会社日立ビルシステムサービス | Elevator control device inspection device |
JPH07232873A (en) * | 1994-02-22 | 1995-09-05 | Hitachi Building Syst Eng & Service Co Ltd | Earthquake controller for elevator |
JP2001261250A (en) * | 2000-03-17 | 2001-09-26 | Hitachi Building Systems Co Ltd | Inspection device for elevator emergency operation |
JP2007022679A (en) * | 2005-07-12 | 2007-02-01 | Hitachi Building Systems Co Ltd | Performance test system of earthquake control operation of elevator |
JP4994616B2 (en) * | 2005-08-09 | 2012-08-08 | 三菱電機株式会社 | Elevator control device and elevator control method |
JP2009190822A (en) * | 2008-02-13 | 2009-08-27 | Hitachi Building Systems Co Ltd | Control operation examination device of elevator |
JP2011026106A (en) * | 2009-07-29 | 2011-02-10 | Hitachi Building Systems Co Ltd | Driving apparatus for elevator at disaster |
-
2015
- 2015-06-10 JP JP2015117638A patent/JP6450265B2/en active Active
-
2016
- 2016-05-23 CN CN201610344960.9A patent/CN106241522B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201406233Y (en) * | 2009-05-22 | 2010-02-17 | 苏州新达电扶梯部件有限公司 | Elevator monitoring system based on seismic detection |
CN102596781A (en) * | 2009-10-30 | 2012-07-18 | 三菱电机株式会社 | Elevator control device and control method |
Also Published As
Publication number | Publication date |
---|---|
JP6450265B2 (en) | 2019-01-09 |
CN106241522A (en) | 2016-12-21 |
JP2017001830A (en) | 2017-01-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7926620B2 (en) | Elevator control apparatus and control method | |
CN106241522B (en) | The earthquake controlled operation control system and its method of elevator | |
US20080067006A1 (en) | Elevator System | |
JP5246636B2 (en) | Elevator seismic control system | |
JP2012201504A (en) | Simulative confirmation system for elevator function | |
CN110088022B (en) | Recovery support system | |
CN101939242B (en) | Elevator controller | |
CN102826456A (en) | Space positioning and intelligent anticollision system using encoders for large-scale construction equipment | |
JP6717390B2 (en) | Elevator automatic recovery system | |
JP5827113B2 (en) | Mechanical equipment management system | |
JP6737254B2 (en) | Information processing equipment | |
JP2010260666A (en) | Temporary recovering operation device of elevator in case of earthquake | |
CN109484936A (en) | Elevator maintenance job management system and elevator maintenance job management method | |
JP5041967B2 (en) | Elevator seismic control operation test equipment | |
JP5035773B2 (en) | Elevator control device | |
JP6469314B1 (en) | Elevator system | |
JP7185607B2 (en) | An operating state information providing device, an operating state information providing method, and a program. | |
KR102020652B1 (en) | Safety apprication program, train control network system and method using the same | |
CN110382389B (en) | Recovery support system | |
JP6469315B1 (en) | Elevator system | |
JP2008137800A (en) | Controller for elevator | |
JP2008105762A (en) | Long period vibration control operation system of elevator | |
JP7174729B2 (en) | Flood evacuation evacuation system for elevators | |
JP6521195B2 (en) | Seismic detector for elevators | |
JP2017019607A (en) | Remote monitoring system for elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |