CN106237708A - A kind of Coal Preparation Plant coal slime dewatering system and method - Google Patents

A kind of Coal Preparation Plant coal slime dewatering system and method Download PDF

Info

Publication number
CN106237708A
CN106237708A CN201610843713.3A CN201610843713A CN106237708A CN 106237708 A CN106237708 A CN 106237708A CN 201610843713 A CN201610843713 A CN 201610843713A CN 106237708 A CN106237708 A CN 106237708A
Authority
CN
China
Prior art keywords
coal slime
coal
thickener
export
bucket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610843713.3A
Other languages
Chinese (zh)
Inventor
孟培培
唐金闪
丁雨婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Three Body Intelligence Science And Technology Ltd
Original Assignee
Suzhou Three Body Intelligence Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Three Body Intelligence Science And Technology Ltd filed Critical Suzhou Three Body Intelligence Science And Technology Ltd
Priority to CN201610843713.3A priority Critical patent/CN106237708A/en
Publication of CN106237708A publication Critical patent/CN106237708A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D36/00Filter circuits or combinations of filters with other separating devices
    • B01D36/04Combinations of filters with settling tanks
    • B01D36/045Combination of filters with centrifugal separation devices
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10LFUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G, C10K; LIQUEFIED PETROLEUM GAS; ADDING MATERIALS TO FUELS OR FIRES TO REDUCE SMOKE OR UNDESIRABLE DEPOSITS OR TO FACILITATE SOOT REMOVAL; FIRELIGHTERS
    • C10L5/00Solid fuels
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10LFUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G, C10K; LIQUEFIED PETROLEUM GAS; ADDING MATERIALS TO FUELS OR FIRES TO REDUCE SMOKE OR UNDESIRABLE DEPOSITS OR TO FACILITATE SOOT REMOVAL; FIRELIGHTERS
    • C10L2290/00Fuel preparation or upgrading, processes or apparatus therefore, comprising specific process steps or apparatus units
    • C10L2290/08Drying or removing water

Landscapes

  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Treatment Of Sludge (AREA)

Abstract

The invention discloses a kind of Coal Preparation Plant coal slime dewatering system and method, this system includes: sieve bend, thickener, Pulp pump, coal slime bucket, screen bowl centrifuge and filter press;Sieve bend oversize collecting terminal and thickener underflow merging are connected to the first coal slime bucket, make one section of dehydration pan feeding through mixing bulk processing;Using Sedimentation centrifugel to complete one section of dehydration, its filtrate is from flowing to the second coal slime bucket, and the second coal slime bucket is connected to filter press to complete two-stage nitration dehydration through pump;Sieve bend backwater, Sedimentation centrifugel centrifugal liquid and filter press filtrate are back to thickener.This system and method gives full play to the advantageous feature of each dehydration equipment, improves dehydrating effect and the response rate of Sedimentation centrifugel, improves dewatering efficiency, and effectively reduces the moisture of coal slime product.

Description

A kind of Coal Preparation Plant coal slime dewatering system and method
Technical field
The present invention relates to a kind of coal preparation plant production system, particularly relate to a kind of Coal Preparation Plant coal slime combined dehydration system System.
Background technology
The high-efficiency dehydration of coal slime is the matter of utmost importance that must solve in slime water treatment.Existing Coal Preparation Plant coal slime one As do not carry out flotation, but directly carry out dehydration and reclaim, use typical one section and concentrate one section and reclaim slime water treatment work Skill, there is more shortcoming, mainly black water and reclaims the equipment either filter press in operation, pressure filtration All there is advantage or weak point in machine, Sedimentation centrifugel, vacuum filter.The major advantage of filter press is to adapt to energy Power is strong, and shortcoming is that treating capacity is little can not continuous pulp discharge and working continuously.Pressing filter, the major advantage of vacuum filter are can To work continuously, but pressing filter bad adaptability, and to fine slime poor processing effect, filter liquor concentration is high, and vacuum filters Machine is little so moisture of coal fines high because of pressure differential, and equally exists the situation that filter liquor concentration is high.Sedimentation centrifugel takes off in coal slime The most gradually receiving extensive concern in water, and be applied in two sections of process techniques concentrating two-stage recovery, two sections concentrate two sections During recovery Sedimentation centrifugel processing < during the higher material of 45 μm content, always there will be the problem that the response rate is low, Too much fine enters in the thickening of second segment, increases the process load of second segment, causes coal slime dewatering system System job insecurity, inefficient, cause recirculated water the purest, have influence on the stability of the whole production system of coal preparation plant.
Summary of the invention
Goal of the invention: in order to overcome the deficiencies in the prior art, the present invention provides a kind of Coal Preparation Plant coal slime Dewatering system, improves coal slime dewatering efficiency, energy efficient further, improves the disposal ability of slurry circulating system.
Technical scheme: for achieving the above object, technical scheme is as follows:
A kind of Coal Preparation Plant coal slime dewatering system, including sieve bend, thickener, the first Pulp pump, the first coal slime bucket, Sedimentation centrifugel, the second coal slime bucket, the second Pulp pump and plate and frame filter, described thickener includes two ports of export, its In a port of export be circulating water outlet end, another port of export and the first Pulp pump connect;Described sieve bend includes that two go out Mouth end, one of them port of export is connected with thickener, and another port of export and the first Pulp pump are flowed to the first coal slime bucket;Described First coal slime bucket is connected with Sedimentation centrifugel, and described Sedimentation centrifugel includes three ports of export, and wherein first goes out Mouth end is connected with thickener, and second port of export and the second coal slime bucket connect;Described second coal slime bucket and the second Pulp pump connect, Described second Pulp pump is connected with filter press;Described filter press includes two ports of export, one of them port of export with Thickener connects, and another port of export confluxes with the 3rd port of export of described Sedimentation centrifugel.
Further, the feeding end of described sieve bend connects the separation of coarse slime equipment of coal preparation plant's production system.
Further, the arc chord angle scope of described sieve bend regulates between 45 °~75 °.
Further, the feeding end of described thickener is connected with black water feed end.
Beneficial effect: the present invention uses Sedimentation centrifugel and filter press combined dehydration, the product in sieve bend The pan feeding of Sedimentation centrifugel is mixed slightly, it is possible to be effectively improved dewatering efficiency and the response rate of Sedimentation centrifugel, The filtrate of Sedimentation centrifugel is mainly fine granule material, uses filter press processed to have the strongest being suitable for Property.This system gives full play to the advantageous feature of each dehydration equipment, improves the disposal ability of slime water system, effectively reduces coal The moisture of mud product, and it is high to have efficiency, the advantage that energy consumption is low.
Accompanying drawing explanation
Accompanying drawing 1 is the structural representation of the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawings the present invention is further described.
As shown in Figure 1, a kind of Coal Preparation Plant coal slime dewatering system, including sieve bend 1, thickener the 2, first slurry Pump the 3, first coal slime bucket 4, Sedimentation centrifugel the 5, second coal slime bucket the 6, second Pulp pump 7 and plate and frame filter 8.Described arc The feeding end of shape sieve 1 connects the separation of coarse slime equipment of coal preparation plant's production system, and described sieve bend 1 takes off for the pre-of coarse slime Water.The feeding end of described thickener 2 is connected with black water feed end.Described thickener 2 includes two ports of export, and one of them goes out Mouth end is circulating water outlet end, and another port of export and the first Pulp pump 3 connect;Described sieve bend 1 includes two ports of export, its In a port of export be connected with thickener 2, another port of export and the first Pulp pump 3 are flowed to the first coal slime bucket 4;Described first Coal slime bucket 4 is connected with Sedimentation centrifugel 5, and described Sedimentation centrifugel 5 includes three ports of export, wherein primary outlets End is connected with thickener 2, and second port of export and the second coal slime bucket 6 connect;Described second coal slime bucket 6 and the second Pulp pump 7 are even Connecing, described second Pulp pump 7 is connected with filter press 8;Described filter press 8 includes two ports of export, and one of them goes out Mouth end is connected with thickener 2, and another port of export confluxes with the 3rd port of export of described Sedimentation centrifugel 5.
Sieve bend 1 oversize collecting terminal and thickener 2 underflow merge and are connected to the first coal slime bucket 4, make one section be dehydrated into Material is through mixing bulk processing;Using Sedimentation centrifugel 5 to complete one section of dehydration, its filtrate is from flowing to the second coal slime bucket 6, the second coal Mud bucket 6 is connected to filter press 8 to complete two-stage nitration dehydration through the second Pulp pump 7;Sieve bend 1 backwater, sedimentation filtration are centrifugal Machine 5 centrifugal liquid and filter press 8 filtrate are back to thickener.This system gives full play to the advantageous feature of each dehydration equipment, carries The dehydrating effect of high Sedimentation centrifugel and the response rate, improve dewatering efficiency, and effectively reduce the water of coal slime product Point.
The arc chord angle of described sieve bend (1) is adjustable, to adapt to the dehydration demand of whole dewatering system, and can be at model Enclose and regulate between 45 °~75 °, require to accept or reject the overall rate of water loss of regulation and dehydration rate, arc chord angle in systems according to dehydration Be 60 ° optimal.
During work, being passed through black water in the feeding end of thickener 2, black water splits into after thickener 2 concentrates and follows Black water after ring water and concentration, wherein, recirculated water is discharged through circulating water outlet end, the black water after concentration and sieve bend 1 In be sieving through coarse slime mixing after sequentially enter the first coal slime bucket 4 and Sedimentation centrifugel 5, from Sedimentation centrifugel 5 In be diverted filtrate, centrifugal liquid and dehydrating prods, respectively enter thickener the 2, second coal slime bucket 6 and filter press 8, wherein Enter into centrifugal liquid in the second coal slime bucket 6 to continue to be passed through the second Pulp pump 7 and filter press 8 successively, eventually pass sheet frame pressure In distributing in filter cake and Sedimentation centrifugel 5 that filter 8 filter pressing becomes, dehydrating prods out is merged into final cleaned coal and produces Product.Another port of export of filter press 8 filtrate out converges into thickener 2.
The above is only the preferred embodiment of the present invention, it should be pointed out that: for the ordinary skill people of the art For Yuan, under the premise without departing from the principles of the invention, it is also possible to make some improvements and modifications, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (5)

1. a Coal Preparation Plant coal slime dewatering system, it is characterised in that: include sieve bend (1), thickener (2), the first slag Stock pump (3), the first coal slime bucket (4), Sedimentation centrifugel (5), the second coal slime bucket (6), the second Pulp pump (7) and plate and frame filter Machine (8), described thickener (2) includes two ports of export, and one of them port of export is circulating water outlet end, another port of export with First Pulp pump (3) connects;Described sieve bend (1) includes that two ports of export, one of them port of export are connected with thickener (2), Another port of export and the first Pulp pump (3) are flowed to the first coal slime bucket (4);Described first coal slime bucket (4) and sedimentation filtration from Scheming (5) connects, and described Sedimentation centrifugel (5) includes three ports of export, and wherein primary outlet end is with thickener (2) even Connecing, second port of export and the second coal slime bucket (6) connect;Described second coal slime bucket (6) is connected with the second Pulp pump (7), described Second Pulp pump (7) is connected with filter press (8);Described filter press (8) includes two ports of export, one of them outlet End is connected with thickener (2), and another port of export confluxes with the 3rd port of export of described Sedimentation centrifugel (5).
A kind of Coal Preparation Plant coal slime dewatering system, it is characterised in that: described sieve bend (1) feeding end connects the separation of coarse slime equipment of coal preparation plant's production system.
A kind of Coal Preparation Plant coal slime dewatering system, it is characterised in that: described sieve bend (1) arc chord angle scope regulates between 45 °~75 °.
A kind of Coal Preparation Plant coal slime dewatering system, it is characterised in that: described thickener (2) Feeding end be connected with black water feed end.
5. the method for work of a Coal Preparation Plant coal slime dewatering system, it is characterised in that:
Being passed through black water in the feeding end of thickener (2), black water splits into recirculated water with dense after thickener (2) concentrates Black water after contracting;
Recirculated water is discharged through circulating water outlet end, and the black water after concentration mixes with the coarse slime being sieving through in sieve bend (1) After sequentially enter the first coal slime bucket (4) and Sedimentation centrifugel (5), be diverted from Sedimentation centrifugel (5) filtrate, Centrifugal liquid and dehydrating prods, respectively enter thickener (2), the second coal slime bucket (6) and filter press (8);
Enter into centrifugal liquid in the second coal slime bucket (6) to continue to be passed through the second Pulp pump (7) and filter press (8) successively, finally In distributing in filter cake and the Sedimentation centrifugel (5) that filter press (8) filter pressing becomes, dehydrating prods out closes And become final head coal product;
Filter press (8) another port of export filtrate out converges into thickener (2).
CN201610843713.3A 2016-09-23 2016-09-23 A kind of Coal Preparation Plant coal slime dewatering system and method Pending CN106237708A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610843713.3A CN106237708A (en) 2016-09-23 2016-09-23 A kind of Coal Preparation Plant coal slime dewatering system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610843713.3A CN106237708A (en) 2016-09-23 2016-09-23 A kind of Coal Preparation Plant coal slime dewatering system and method

Publications (1)

Publication Number Publication Date
CN106237708A true CN106237708A (en) 2016-12-21

Family

ID=57610815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610843713.3A Pending CN106237708A (en) 2016-09-23 2016-09-23 A kind of Coal Preparation Plant coal slime dewatering system and method

Country Status (1)

Country Link
CN (1) CN106237708A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109908653A (en) * 2017-12-12 2019-06-21 上海第二工业大学 A kind of mining area coal slime concentrates dehydration and impurity removed system
CN111298960A (en) * 2020-04-16 2020-06-19 平顶山天安煤业股份有限公司八矿选煤厂 Echelon reduction process for flotation tailing coal slime
CN113599867A (en) * 2021-08-25 2021-11-05 北京科技大学 Micro-fine particle viscous material filter-pressing dehydration process detection control device and method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3783227B2 (en) * 2000-02-02 2006-06-07 株式会社大林組 How to treat dredged mud
CN1792830A (en) * 2005-10-21 2006-06-28 赵树彦 Tech. for treating coal mud water by tow section concentration, tow section recovery
CN1948434A (en) * 2006-11-10 2007-04-18 张春林 Two stage dewatering technology of fine coal mud
CN104436854A (en) * 2014-12-12 2015-03-25 四川达竹煤电(集团)有限责任公司石板选煤发电厂 Slime water serial treatment system and slime water serial treatment process
CN104773872A (en) * 2015-04-03 2015-07-15 中国神华能源股份有限公司 Coal slime treatment system and process
CN105858964A (en) * 2016-05-17 2016-08-17 北京国华科技集团有限公司 Tailing mud water treatment method for wet coal preparation plant
CN206168075U (en) * 2016-09-23 2017-05-17 宁夏百辰工业产品设计有限公司 Thermal coal coal separating plant coal slime dewatering system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3783227B2 (en) * 2000-02-02 2006-06-07 株式会社大林組 How to treat dredged mud
CN1792830A (en) * 2005-10-21 2006-06-28 赵树彦 Tech. for treating coal mud water by tow section concentration, tow section recovery
CN1948434A (en) * 2006-11-10 2007-04-18 张春林 Two stage dewatering technology of fine coal mud
CN104436854A (en) * 2014-12-12 2015-03-25 四川达竹煤电(集团)有限责任公司石板选煤发电厂 Slime water serial treatment system and slime water serial treatment process
CN104773872A (en) * 2015-04-03 2015-07-15 中国神华能源股份有限公司 Coal slime treatment system and process
CN105858964A (en) * 2016-05-17 2016-08-17 北京国华科技集团有限公司 Tailing mud water treatment method for wet coal preparation plant
CN206168075U (en) * 2016-09-23 2017-05-17 宁夏百辰工业产品设计有限公司 Thermal coal coal separating plant coal slime dewatering system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄波: "《煤泥浮选技术》", 31 March 2012 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109908653A (en) * 2017-12-12 2019-06-21 上海第二工业大学 A kind of mining area coal slime concentrates dehydration and impurity removed system
CN111298960A (en) * 2020-04-16 2020-06-19 平顶山天安煤业股份有限公司八矿选煤厂 Echelon reduction process for flotation tailing coal slime
CN111298960B (en) * 2020-04-16 2022-01-28 平顶山天安煤业股份有限公司八矿选煤厂 Echelon reduction process for flotation tailing coal slime
CN113599867A (en) * 2021-08-25 2021-11-05 北京科技大学 Micro-fine particle viscous material filter-pressing dehydration process detection control device and method
CN113599867B (en) * 2021-08-25 2022-08-12 北京科技大学 Micro-fine particle viscous material filter-pressing dehydration process detection control device and method

Similar Documents

Publication Publication Date Title
CN105858964B (en) A kind of wet coal preparation factory tail coal Slurry treatment method
CN106179717A (en) A kind of full level of thermal coal is selected in simplified heavy medium sorting process
CN106237708A (en) A kind of Coal Preparation Plant coal slime dewatering system and method
RU2498860C1 (en) Plant for slurry coal concentration in helical separators (versions)
CN110899001B (en) Two-stage flotation process for difficult-to-float coal slime
CN104773872B (en) Coal slime processing system and coal slime treatment process
CN102500472A (en) Concentrating, filtering and dehydrating process for flotation clean coal
CN207271464U (en) A kind of tailing dry row&#39;s equipment that can be improved efficiency and reduce cost
CN112760478B (en) High-clay polymetallic ore pulp thickening method
CN108660832A (en) A kind of paper production line pulping system
CN206168075U (en) Thermal coal coal separating plant coal slime dewatering system
CN111035991A (en) Dry-discharging and dewatering system and process for iron tailings
CN110404665B (en) Treatment method for dewatering superfine coal slime
CN109847923B (en) Recovery process of extremely-poor weathered primary ilmenite
CN209307196U (en) Mud equipment for separating liquid from solid
CN211799351U (en) Dry-discharging and dewatering system for iron tailings
CN216947631U (en) Pulping, pulp distribution and flow conveying system for corrugated paper
CN202860275U (en) Solid-liquid separation system
CN201140000Y (en) Dish type vacuum filter distribution dish
CN208512058U (en) A kind of efficiency material dewatering system
CN102897950A (en) Method for treating coal slurry water at long-distance pipeline coal transporting terminal
CN210001883U (en) device for producing iron concentrate powder by using red mud
CN201596576U (en) High efficiency energy saving three-product heavy medium cyclone
CN209577010U (en) It is a kind of based on the tailing recycling system optimized product structure
CN113210133A (en) Three-time coal flotation process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161221