CN102897950A - Method for treating coal slurry water at long-distance pipeline coal transporting terminal - Google Patents

Method for treating coal slurry water at long-distance pipeline coal transporting terminal Download PDF

Info

Publication number
CN102897950A
CN102897950A CN2012103962625A CN201210396262A CN102897950A CN 102897950 A CN102897950 A CN 102897950A CN 2012103962625 A CN2012103962625 A CN 2012103962625A CN 201210396262 A CN201210396262 A CN 201210396262A CN 102897950 A CN102897950 A CN 102897950A
Authority
CN
China
Prior art keywords
thickner
pipeline
water
another
power house
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103962625A
Other languages
Chinese (zh)
Inventor
孟凡贞
伍宏为
李晓英
胡言凤
杨洪环
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Design and Research Institute of China Coal Technology and Engineering Group
Original Assignee
Wuhan Design and Research Institute of China Coal Technology and Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Design and Research Institute of China Coal Technology and Engineering Group filed Critical Wuhan Design and Research Institute of China Coal Technology and Engineering Group
Priority to CN2012103962625A priority Critical patent/CN102897950A/en
Publication of CN102897950A publication Critical patent/CN102897950A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Separation Of Suspended Particles By Flocculating Agents (AREA)

Abstract

The invention discloses a device and a method for treating coal slurry water at a long-distance pipeline coal transporting terminal. The device for treating the coal slurry water at the terminal comprises an agent adding device, a concentrator 1, a concentrator 2, an accident concentrator, a circulating water tank, a sewage treatment plant, and a main power house press filter; the coal slurry water comprises the coal slurry water from a main power house and the coal slurry water from bottom current of a sewage treatment station, wherein the coal slurry water from the main power house comprises sedimentation and centrifugation filtrate and filtrate from the press filter; and a two-stage concentration mechanism is adopted, centrifugate and filtrate from a centrifugal machine are settled and filtered by the main power house, the bottom current of the sewage treatment station enters the concentrator 1 through a pipeline, the filtrate from the main power plant press filter and overflow water from the concentrator 1 enter the concentrator 2 through a pipeline, overflow water from the concentrator 2 enters a circulating water tank through a pipeline and is conveyed to the sewage treatment station by a circulating water pump through a pipeline, and bottom current from the concentrators 1 and 2 and the accident concentrator enters the press filter through a pipeline for dehydration.

Description

The defeated coal terminal black water treatment unit of a kind of long-distance pipe and method
Technical field
The present invention relates to the black water treatment unit, be specifically related to the defeated coal terminal black water treatment unit of a kind of long-distance pipe and method.
Background technology
Along with improving constantly of mining mechanization degree, in China coal separating plant feed coal<also increasing year by year of the fine grain content of 0.5mm level, process and coal slime dewatering reclaims and increased difficulty to black water.Present black water dewatering process both domestic and external can better reclaim large coal particles, but relatively poor to the organic efficiency of fine particulate coal, causes the loss of a large amount of fine particulate coal, causes coal recovery rate to reduce the wasting of resources.
Summary of the invention
The objective of the invention is to improve to a great extent the rate of recovery of coal for pipe water delivery coal slurry terminal provides a kind of high-level efficiency, high-quality black water treatment process, increase the defeated coal terminal black water treatment unit of long-distance pipe of coal production.
Another object of the present invention is treatment process.
In order to overcome the deficiencies in the prior art, technical scheme of the present invention is to solve like this: a kind of long-distance pipe is failed coal terminal black water treatment unit, this terminal black water treatment unit comprises medicament adding device, one thickner, another thickner, the accident thickner, circulating water pool, sewage works, the power house pressure filter, special character of the present invention is that two sections of design employings are concentrated, described medicament addition device is to add flocculation agent and coagulant aids in black water, the centrifugate of described power house Sedimentation centrifugel, the sewage works underflow advances a thickner through pipeline, described power house pressure filter filtrate and a thickner overflow water advance another thickner through pipeline, and described another thickner overflow water flows into circulating water pool and is delivered to the described thickner of sewage works by water circulating pump through pipeline through pipeline, another thickner and accident thickener underflow carry out processed through pipeline entrance pressure filter.
Described medicament adding device is quadruplet, and dual-purpose two is standby.
Add medicament and comprise flocculation agent: polyacrylamide (PAM), coagulant aids: polymerize aluminum chloride (PAC); The flocculation agent consumption is 2g/m 3Black water, coagulant aids consumption are 50g/m 3Black water; Flocculation agent is added on the pressure filter filtrate pipe and the Sedimentation centrifugel filtrate pipe is said the power house place, and flocculation agent is added on thickner pan feeding buffer barrel place.It is in good time in the variation that comes coal character that dosing is wanted, and adds test according to the black water medicament, finely tunes on above-mentioned dosing basis.
A kind of long-distance pipe of described device is failed coal terminal black water treatment process, carries out in the steps below successively:
1), centrifugate and pressure filter filtrate, the drainage of sewage works underflow with the power house Sedimentation centrifugel enters a thickner;
2), power house pressure filter filtrate and a thickner overflow water drainage are entered another thickner;
3), another thickner overflow water is delivered to circulating water pool, be delivered to sewage works by water circulating pump;
4), a thickner, another thickner and accident thickener underflow are sent into pressure filter and carry out processed.
Long-distance pipe is failed coal uninterrupted duty in 24 hours, requires the non-stop run of black water treatment unit energy, and the accident thickner of setting can fully guarantee the uninterrupted processing of black water.The thickner accident is divided into simultaneously three kinds of situations of accident of a thickner accident, another thickner accident and another thickner.
1., a thickner accident: when a thickner broke down, the black water that enters a thickner transfers to the accident thickner to be processed, and several times the black water in the thickner is delivered to the accident thickner with underflow pump simultaneously, emptying rear maintenance.
2., another thickner accident: when another thickner has an accident, the coal slime that enters another thickner is transferred to the accident thickner and is processed, utilize simultaneously closed tube and underflow pump between the thickner several times the black water in another thickner to be delivered to the accident thickner, emptying rear maintenance.
3., another thickner while accident: when another thickner has an accident simultaneously, the moisture of coal fines that enters another thickner repeatedly all transfers to the accident thickner and processes, utilize underflow pump that the moisture of coal fines in another thickner repeatedly is delivered to the accident thickner, emptying rear maintenance.
The work of recovery thickner after above-mentioned break down maintenance is finished is delivered to a thickner with the whole moisture of coal fines Multiple through then out underflow pumps in the accident thickner and processes, and it is for subsequent use simultaneously the accident thickner to be overhauled, maintain rear continuation.
Pressure filter pan feeding concentration is 350~500g/L, and the moisture of product is 20%~24% after processing, and dehydration rate reaches 58%~71%.
In the ore pulp of 4,500,000 tons of coals was processed, by 1,170,000 tons of 1 year recyclable delivering dry coal slurries of this kind technique, consequent direct economic benefit was at least more than hundred million yuan; Reduced in addition the overflow water concentration after processing, reduced follow-up cost of sewage disposal, consequent indirect economic effect is also very considerable.
The present invention compared with prior art provides a kind of high-level efficiency, high-quality black water treatment process for managing defeated coal slurry terminal.The defeated coal slurry terminal black water treatment process of this pipe can be widely used in the further processing of instructing slurries in the paste materials filtered liquid.Adopt this method can improve to a great extent the rate of recovery of coal, increase coal production.
Description of drawings
Fig. 1 is terminal black water treatment process structural representation of the present invention;
Among the figure: 1-power house whizzer filtrate centrifugate, 2-power house pressure filter filtrate, 3-sewage works underflow, 4-adds medicament, 5-one thickner, another thickner of 6-, 7-accident thickner, 8-circulating water pool, 9-sewage work, 10-power house pressure filter
Specific embodiment
Accompanying drawing is embodiments of the invention.
Below in conjunction with accompanying drawing content of the present invention is further described:
With reference to Fig. 1: long-distance pipe is failed coal terminal black water treatment unit, this terminal black water treatment unit comprises medicament adding device, one thickner, another thickner, the accident thickner, circulating water pool, sewage works, the power house pressure filter, design adopts two sections to concentrate, described medicament addition device 4 is to add flocculation agent and coagulant aids in black water, the centrifugate 1 of described power house Sedimentation centrifugel, sewage works underflow 3 advances a thickner 5 through pipeline, described power house pressure filter filtrate 2 and a thickner overflow water advance another thickner 6 through pipeline, and described another thickner overflow water flows into circulating water pool 8 and is delivered to sewage works 9 through pipeline, a described thickner 5 by water circulating pump through pipeline, another thickner 6 and accident thickner 7 underflows carry out processed through pipeline entrance pressure filter 10.
Described medicament adding device is quadruplet, and dual-purpose two is standby.
A kind of long-distance pipe of described device is failed coal terminal black water treatment process, carries out in the steps below successively:
1), centrifugate and pressure filter filtrate, the drainage of sewage works underflow with the power house Sedimentation centrifugel enters a thickner;
2), power house pressure filter filtrate and a thickner overflow water drainage are entered another thickner;
3), another thickner overflow water is delivered to circulating water pool, be delivered to sewage works by water circulating pump;
4), a thickner, another thickner and accident thickener underflow are sent into pressure filter and carry out processed.
In sum, the source of black water described in the present invention comprises two parts, the one, from the black water of power house, the one, from the black water of sewage works underflow, wherein the black water from power house comprises again sedimentation centrifugal filtrate and pressure filter filtrate two portions, the secondary concentrating mechanism is adopted in design, the defeated coal terminal black water treatment unit of long-distance pipe described in the present invention is reliable, it is good that inter process is connected, compare domestic and international existing black water treatment process, this black water treatment unit and method can improve coal recovery rate to a great extent aspect the recovery fine particle its unique advantage being arranged, and increase coal production.
The above has carried out exemplary description to the present invention by reference to the accompanying drawings; obvious realization of the present invention is not subjected to the restriction of aforesaid way; as long as the various improvement of having adopted device design of the present invention and technical scheme to carry out; or without improving design of the present invention and technical scheme are directly applied to other occasion, all in protection scope of the present invention.

Claims (3)

1. a long-distance pipe is failed coal terminal black water treatment unit, this terminal black water treatment unit comprises medicament adding device, one thickner, another thickner, the accident thickner, circulating water pool, sewage works, the power house pressure filter, it is characterized in that two sections of design employings are concentrated, described medicament addition device (4) is to add flocculation agent and coagulant aids in black water, the centrifugate of described power house Sedimentation centrifugel (1), sewage works underflow (3) advances a thickner (5) through pipeline, described power house pressure filter filtrate (2) and a thickner overflow water advance another thickner (6) through pipeline, described another thickner overflow water flows into circulating water pool (8) and is delivered to sewage works (9) by water circulating pump through pipeline, a described thickner (5) through pipeline, another thickner (6) and accident thickner (7) underflow carry out processed through pipeline entrance pressure filter (10).
2. the defeated coal terminal black water treatment unit of a kind of long-distance pipe according to claim 1 and method is characterized in that described medicament adding device is quadruplet, and dual-purpose two is standby.
3. a long-distance pipe that installs is as claimed in claim 1 failed coal terminal black water treatment process, carries out in the steps below successively:
1), centrifugate (1) and pressure filter filtrate (2), sewage works underflow (3) drainage with the power house Sedimentation centrifugel enters a thickner (5);
2), power house pressure filter filtrate (2) and a thickner overflow water drainage are entered another thickner (6);
3), another thickner (5) overflow water is delivered to circulating water pool (8), be delivered to sewage works (9) by water circulating pump;
4), a thickner (5), another thickner (6) and accident thickner (7) underflow are sent into pressure filter (10) and carry out processed.
CN2012103962625A 2012-10-18 2012-10-18 Method for treating coal slurry water at long-distance pipeline coal transporting terminal Pending CN102897950A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103962625A CN102897950A (en) 2012-10-18 2012-10-18 Method for treating coal slurry water at long-distance pipeline coal transporting terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103962625A CN102897950A (en) 2012-10-18 2012-10-18 Method for treating coal slurry water at long-distance pipeline coal transporting terminal

Publications (1)

Publication Number Publication Date
CN102897950A true CN102897950A (en) 2013-01-30

Family

ID=47570486

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103962625A Pending CN102897950A (en) 2012-10-18 2012-10-18 Method for treating coal slurry water at long-distance pipeline coal transporting terminal

Country Status (1)

Country Link
CN (1) CN102897950A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103289776A (en) * 2013-06-18 2013-09-11 兖州煤业股份有限公司 Device and process for producing power plant fuel by utilizing coal preparation plant coal slime seriflux
CN106933099A (en) * 2017-03-06 2017-07-07 太原理工大学 A kind of coal preparation plant's thickener and filter press medicament addition cooperative control system
CN107213982A (en) * 2017-07-27 2017-09-29 中国神华能源股份有限公司 Duff mud treatment system and fine coal slurry processing method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1792830A (en) * 2005-10-21 2006-06-28 赵树彦 Tech. for treating coal mud water by tow section concentration, tow section recovery
CN101024211A (en) * 2007-03-26 2007-08-29 开滦(集团)有限责任公司煤业分公司 Floating tail-coal graded recovering process
CN102399028A (en) * 2010-09-16 2012-04-04 永城煤电控股集团有限公司 Technology for treating coal slime water through secondary flow and settlement filtering centrifuge
CN202246205U (en) * 2011-09-05 2012-05-30 河南利源煤焦集团有限公司 Heavy-medium coal slurry recycling system
CN102626571A (en) * 2012-04-17 2012-08-08 中国矿业大学 Slime water treatment process for separately clarifying filtrate

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1792830A (en) * 2005-10-21 2006-06-28 赵树彦 Tech. for treating coal mud water by tow section concentration, tow section recovery
CN101024211A (en) * 2007-03-26 2007-08-29 开滦(集团)有限责任公司煤业分公司 Floating tail-coal graded recovering process
CN102399028A (en) * 2010-09-16 2012-04-04 永城煤电控股集团有限公司 Technology for treating coal slime water through secondary flow and settlement filtering centrifuge
CN202246205U (en) * 2011-09-05 2012-05-30 河南利源煤焦集团有限公司 Heavy-medium coal slurry recycling system
CN102626571A (en) * 2012-04-17 2012-08-08 中国矿业大学 Slime water treatment process for separately clarifying filtrate

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103289776A (en) * 2013-06-18 2013-09-11 兖州煤业股份有限公司 Device and process for producing power plant fuel by utilizing coal preparation plant coal slime seriflux
CN106933099A (en) * 2017-03-06 2017-07-07 太原理工大学 A kind of coal preparation plant's thickener and filter press medicament addition cooperative control system
CN106933099B (en) * 2017-03-06 2019-12-10 太原理工大学 Coal preparation plant thickener and filter press medicament adding cooperative control system
CN107213982A (en) * 2017-07-27 2017-09-29 中国神华能源股份有限公司 Duff mud treatment system and fine coal slurry processing method

Similar Documents

Publication Publication Date Title
CN101559295B (en) Tailing dry heaping method
CN102228762B (en) Dehydration method and device of tailings
CN202876534U (en) Tailing dry emission system
CN103357212B (en) A kind of mine tailing solid-liquid separating equipment and method
CN103657840A (en) Dry type discharge method of phosphorus ore tailings
CN106045107A (en) Heavy-metal-containing flotation wastewater treatment and recycling technique
CN103521357A (en) Method for utilizing return water of separation flotation for copper and molybdenum bulk concentrates
CN204079743U (en) A kind of Technique of Coal Mine Drainage sludge treatment equipment
CN101905099B (en) Tailing treatment method and system
CN207271464U (en) A kind of tailing dry row's equipment that can be improved efficiency and reduce cost
CN102897950A (en) Method for treating coal slurry water at long-distance pipeline coal transporting terminal
CN101711929A (en) Process for fully dehydrating coal under hydraulic coal mining well
CN102500472A (en) Concentrating, filtering and dehydrating process for flotation clean coal
CN102872645A (en) Long-distance pipeline coal conveying terminal dehydration system device and dehydration method
CN202865036U (en) Coal slurry water treatment device of long-distance pipeline coal transporting terminal
CN202860267U (en) Terminal dewatering system device for long-distance pipeline coal conveying
CN205773736U (en) A kind of magnesite tailings flotation waste water recycling device
CN105152195A (en) Treatment method and apparatus for controlled filter cakes in Bayer process for alumina production
CN202315548U (en) Dry-discharge system for tailings
CN201962159U (en) Novel coal water comprehensive treatment device
CN103506226B (en) High-sulfur bauxite reverse flotation product High-efficiency dehydration technology
CN203370386U (en) Solid-liquid separation equipment for tailings
CN202143801U (en) Tailing dehydrating device
CN207957997U (en) A kind of mine tailing wastewater cyclic utilization system
CN110066041B (en) Mine type coal preparation plant and mine water combined water treatment system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 430064 Hubei Province, Wuhan city Wuchang District Wuluo Road No. 442

Applicant after: Wuhan Design and Research Institute Co., Ltd. pf China Coal Technology & Engineering Group

Address before: 430064 Hubei Province, Wuhan city Wuchang District Wuluo Road No. 442

Applicant before: Wuhan Design and Research Institute of China Coal Technology & Engineering Group

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: WUHAN DESIGN AND RESEARCH INSTITUTE OF CHINA COAL TECHNOLOGY + ENGINEERING GROUP TO: WUHAN DESIGN AND RESEARCH INSTITUTE CO., LTD. PF CHINA COAL TECHNOLOGY + ENGINEERING GROUP

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130130