CN106225359A - 多组机组错开进行除霜的控制方法 - Google Patents

多组机组错开进行除霜的控制方法 Download PDF

Info

Publication number
CN106225359A
CN106225359A CN201610615751.3A CN201610615751A CN106225359A CN 106225359 A CN106225359 A CN 106225359A CN 201610615751 A CN201610615751 A CN 201610615751A CN 106225359 A CN106225359 A CN 106225359A
Authority
CN
China
Prior art keywords
unit
defrosting
cycle
preset
group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610615751.3A
Other languages
English (en)
Other versions
CN106225359B (zh
Inventor
艾志永
方源徽
刘远辉
高翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong PHNIX Eco Energy Solution Ltd
Original Assignee
Guangdong PHNIX Eco Energy Solution Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong PHNIX Eco Energy Solution Ltd filed Critical Guangdong PHNIX Eco Energy Solution Ltd
Priority to CN201610615751.3A priority Critical patent/CN106225359B/zh
Publication of CN106225359A publication Critical patent/CN106225359A/zh
Application granted granted Critical
Publication of CN106225359B publication Critical patent/CN106225359B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B47/00Arrangements for preventing or removing deposits or corrosion, not provided for in another subclass
    • F25B47/02Defrosting cycles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/41Defrosting; Preventing freezing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/61Control or safety arrangements characterised by user interfaces or communication using timers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/65Electronic processing for selecting an operating mode
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2347/00Details for preventing or removing deposits or corrosion
    • F25B2347/02Details of defrosting cycles
    • F25B2347/021Alternate defrosting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/01Timing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/21Temperatures

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Signal Processing (AREA)
  • Defrosting Systems (AREA)

Abstract

本发明涉及一种多组机组错开进行除霜的控制方法,多组机组错开进行除霜的控制方法,包括如下步骤:预设N组机组的除霜周期,分别为T+(1‑1)a、T+(2‑1)a……T+(N‑1)a;N组机组通电运行、一组机组对应预设一个上述除霜周期、并分别根据各自的除霜周期进行除霜;每当机组按预设的除霜周期运行的时长到达轮值周期K时,根据所述N组除霜周期重新预设N组机组所对应的除霜周期,且至少有两组机组的上一次预设的除霜周期不等于其对应的此次重设的除霜周期。该多组机组错开进行除霜的控制方法,在满足用户供热需求情况下,能均衡调整机组的累计除霜时长,同时能均衡调整各机组的运行时长。

Description

多组机组错开进行除霜的控制方法
技术领域
本发明涉及机组运行控制技术领域,特别是涉及一种多组机组错开进行除霜的控制方法。
背景技术
大型暖通工程采用N组热泵机组共同制热来满足需求,而通常同类型的机组出厂配置总体相同,因此同时采用N组热泵机组共同制热时将出现以下问题:
1.机组设定的N组机组同时进入除霜状态,导致N组机组同时停止制热而无法满足用户供热需求;
2.N组机组设定的目标温度相同,当用户侧温度达到目标温度时,N组机组会同时停机或开机,造成不必要的资源浪费;
3.若对每台机组设置不同的除霜周期,在此除霜周期下长时间运行,可能导致除霜周期长的机组除霜不干净,影响机组换热效率;除霜周期短的机组除霜过于频繁,降低机组的制热能力;若对机组设置不同的目标温度,各机组制热量不同,长时间运行后,机组的压缩机工作累计时间不均等,长时间运行将导致机组的寿命长短不一。
发明内容
基于此,有必要提供一种多组机组错开进行除霜的控制方法,在满足用户供热需求情况下,均衡调整机组的累计除霜时长,尽可能均衡各机组之间热交换效率;同时均衡调整各机组的运行时长,减去少资源浪费,尽可能使所有机组的使用寿命均衡。
其技术方案如下:
一种多组机组错开进行除霜的控制方法,包括如下步骤:
预设N组机组的除霜周期,分别为T+(1-1)a、T+(2-1)a……T+(N-1)a;
N组机组通电运行、一组机组对应预设一个上述除霜周期、并分别根据各自的除霜周期进行除霜;
每当机组按预设的除霜周期运行的时长到达轮值周期K时,根据所述N组除霜周期重新预设N组机组所对应的除霜周期,且至少有两组机组的上一次预设的除霜周期不等于其对应的此次重设的除霜周期;
其中,一组机组包括至少一台机组,N≥2,T为预设除霜周期,a为预设时间差值、且a≠0,K>0。
下面进一步对技术方案进行说明:
在其中一个实施例中,如其中a>0时,最短除霜周期为T+(1-1)a,最长除霜周期为T+(N-1)a;
每当机组按预设的除霜周期运行的时长到达轮值周期K时,按最短除霜周期运行的机组重设的除霜周期预设为T+(N-1)a,其余机组重设的除霜周期分别等于其各自对应的上一次预设的除霜周期减去a;或每当机组按预设的除霜周期运行的时长到达轮值周期K时,按最长除霜周期运行的机组重设的除霜周期预设为T+(1-1)a,其余组机组重设的除霜周期分别等于其各自对应的上一次预设的除霜周期加上a。
在其中一个实施例中,如其中a<0时,最短除霜周期为T+(N-1)a,最长除霜周期为T+(1-1)a;
每当机组按预设的除霜周期运行的时长到达轮值周期K时,按最短除霜周期运行的机组重设的除霜周期预设为T+(1-1)a,其余组机组重设的除霜周期分别等于其各自对应的上一次预设的除霜周期加上a;或每当机组按预设的除霜周期运行的时长到达轮值周期K时,按最长除霜周期运行的机组重设的除霜周期为T+(N-1)a,其余机组重设的除霜周期分别等于其各自对应的上一次预设的除霜周期减去a。
在其中一个实施例中,如N为偶数时,N组机组的平均除霜周期为T△1,每当机组按预设的除霜周期运行的时长到达轮值周期K时,每组机组上一次预设的除霜周期与此次重设后的除霜周期相加上等于2T△1
如N为奇数时,N组机组的平均除霜周期为T△2,每当机组按预设的除霜周期运行的时长到达轮值周期K时,除霜周期等于T△2的机组重设的除霜周期仍为T△2,其余组机组上一次预设的除霜周期与此次重设后的除霜周期相加上等于2T△2
在其中一个实施例中,当机组进行除霜时,还包括到达预设累计除霜时间t,机组退出除霜运行,进入正常工作状态。
在其中一个实施例中,所述预设时间差值a大于或等于预设累计除霜时间t。
在其中一个实施例中,当机组进行除霜时,还包括到达预设退出除霜温度,机组退出除霜运行,进入正常工作状态。
在其中一个实施例中,N组机组的除霜周期相加上的总和T,所述轮值周期K≥T
在其中一个实施例中,当N组机组运行到达预设时长后,任意两台机组之间的最大除霜累计用时之差小于或等于所有机组的平均除霜累计用时的5%。
在其中一个实施例中,当N组机组运行到达预设时长后,每台机组的除霜累计用时均相等。
在其中一个实施例中,所述多组机组错开进行除霜的控制方法还包括如下步骤:
预设M组机组的目标温度,分别为C+(1-1)b、C+(2-1)b……C+(M-1)b;
M组机组运行过程中,一组机组对应预设一个目标温度、并分别根据各自的目标温度进入预设运行状态;
每当机组按预设的目标温度运行的时长到达轮值周期P时,根据所述M组目标温度重新预设M组机组所对应的目标温度,且至少有两组机组的上一次预设的触发温度不等于其对应的此次重设的触发温度;
其中,一组机组包括至少一台机组,M≥2,C为预设目标温度,b为预设差值温度、且b≠0,P>0。
在其中一个实施例中,如只有一组机组处于正常工作状态时,当该机组到达目标温度时,不进入待机状态,仍继续正常工作。
在其中一个实施例中,如只有一组机组处于正常工作状态时,当该机组包括至少两台机组时,当该机组达到目标温度时,预设的一台或两台以上的机组不进入待机状态、仍继续正常工作,其余台机组进入待机状态。
在其中一个实施例中,如其中b>0时,最低目标温度为C+(1-1)b,最高目标温度为C+(M-1)b;
每当机组按预设的目标温度运行的时长到达轮值周期P时,按最低目标温度运行的机组重设的目标温度预设为C+(M-1)b,其余机组重设的目标温度分别等于其各自对应的上一次预设的目标温度减去b;或每当机组按预设的目标温度运行的时长到达轮值周期P时,按最高目标温度运行的机组重设的目标温度为C+(1-1)b,其余组机组重设的目标温度分别等于其各自对应的上一次预设的目标温度加上b。
在其中一个实施例中,如其中b>0时,最低目标温度为C+(M-1)b,最高目标温度为C+(1-1)b;
每当机组按预设的目标温度运行的时长到达轮值周期P时,按最低目标温度运行的机组重设的目标温度预设为C+(1-1)b,其余机组重设的目标温度分别等于其各自对应的上一次预设的目标温度加上b;或每当机组按预设的目标温度运行的时长到达轮值周期P时,按最高目标温度运行的机组重设的目标温度为C+(M-1)b,其余组机组重设的目标温度分别等于其各自对应的上一次预设的目标温度减去b。
在其中一个实施例中,如M为偶数时,M组机组的平均目标温度为C△1,每当机组按预设的目标温度运行的时长到达轮值周期P时,每组机组上一次预设的目标温度与此次重设后的目标温度相加上等于2C△1
如M为奇数时,M组机组的平均目标温度为C△2,每当机组按预设的目标温度运行的时长到达轮值周期P时,目标温度为C△2的机组重设的目标温度仍为C△2,其余组机组上一次预设的目标温度与此次重设后的目标温度相加上等于2C△2
在其中一个实施例中,所述机组设有进入待机状态的第一触发温度,所述机组的目标温度减去其对应的所述第一触发温度的差值为c1,c1≤0。
在其中一个实施例中,或/和所述机组还设进入正常工作状态的第二触发温度,所述机组的目标温度减去其对应的所述第二触发温度的差值为c2,c2≥0。
在其中一个实施例中,所述预设差值温度b≥c1或/和b≥c2
在其中一个实施例中,当M组机组中,只有一台机组处于正常工作状态,其余机组处于待机状态,当该机组到达第一触发温度时,该处于正常工作状态的机组不进入待机状态,仍维持正常工作状态。
在其中一个实施例中,当M组机组运行到达预设时长后,任意任意两台机组之间的最大机组压缩机工作累计用时之差小于或等于所有机组的机组压缩机工作累计时间的5%。
在其中一个实施例中,当M组机组运行到达预设时长后,每台机组最大机组压缩机工作累计用时均相等。
上述本发明中所述“第一”、“第二”不代表具体的数量及顺序,仅仅是用于名称的区分。
上述本发明的有益效果:
上述多组机组错开进行除霜的控制方法,根据N组机组预设N组除霜周期,一组机组对应预设一个除霜周期,并分别根据各自的除霜周期错开进行除霜,当机组按预设的除霜周期运行的时长到达轮值周期K时,根据所述N组除霜周期重新预设N组机组所对应的除霜周期,且至少有两组机组的上一次预设的除霜周期不等于其对应的此次重设的除霜周期。该多组机组错开进行除霜的控制方法能在满足用户供热需求情况下,均衡调整机组的累计除霜时长,尽可能均衡各机组之间热交换效率。
上述多组机组错开进行除霜的控制方法,在错开机组进行除霜的情况下,进一步预设M组机组的目标温度,各机组分别根据各自的目标温度进入预设运行状态,当机组按预设的目标温度运行的时长到达轮值周期P时,根据所述M组目标温度重新预设M组机组所对应的目标温度,且至少有两组机组的上一次预设的触发温度不等于其对应的此次重设的触发温度。该机组运行的控制方法在满足用户供热需求情况下,尽可能均衡各机组之间热交换效率;同时均衡调整各机组的运行时长,减去少资源浪费,尽可能使所有机组的使用寿命均衡。
附图说明
图1为本发明所述的多组机组错开进行除霜的控制方法的实施例一的流程示意图;
图2为本发明所述的多组机组错开进行除霜的控制方法的实施例二的流程示意图。
具体实施方式
为使本发明的目的、技术方案及优点更加上清楚明白,以下结合附图及具体实施方式,对本发明进行进一步的详细说明。应当理解的是,此处所描述的具体实施方式仅用以解释本发明,并不限定本发明的保护范围。
如图1所示,本发明所述的一种多组机组错开进行除霜的控制方法,包括如下步骤:
预设N组机组的除霜周期,分别为T+(1-1)a、T+(2-1)a……T+(N-1)a;
N组机组通电运行、一组机组对应预设一个上述除霜周期、并分别根据各自的除霜周期进行除霜;
每当机组按预设的除霜周期运行的时长到达轮值周期K时,根据所述N组除霜周期重新预设N组机组所对应的除霜周期,且至少有两组机组的上一次预设的除霜周期不等于其对应的此次重设的除霜周期;
其中,一组机组包括至少一台机组,N≥2,T为预设除霜周期,a为预设时间差值、且a≠0。
上述多组机组错开进行除霜的控制方法,根据N组机组预设N组除霜周期,一组机组对应预设一个除霜周期,并分别根据各自的除霜周期错开进行除霜,当机组按预设的除霜周期运行的时长到达轮值周期K时,根据所述N组除霜周期重新预设N组机组所对应的除霜周期,且至少有两组机组的上一次预设的除霜周期不等于其对应的此次重设的除霜周期。该多组机组错开进行除霜的控制方法能在满足用户供热需求情况下,均衡调整机组的累计除霜时长,尽可能均衡各机组之间热交换效率。
进一步的,如其中a<0时,最短除霜周期为T+(N-1)a,最长除霜周期为T+(1-1)a;每当机组按预设的除霜周期运行的时长到达轮值周期K时,按最短除霜周期运行的机组重设的除霜周期预设为T+(1-1)a,其余组机组重设的除霜周期分别等于其各自对应的上一次预设的除霜周期加上a;或每当机组按预设的除霜周期运行的时长到达轮值周期K时,按最长除霜周期运行的机组重设的除霜周期为T+(N-1)a,其余机组重设的除霜周期分别等于其各自对应的上一次预设的除霜周期减去a;例如,a=-5min,N=4,T=45min,除霜周期为30min、35min、40min、45min,每当机组按预设的除霜周期运行的时长到达轮值周期K时,按30min除霜周期运行的机组重设后除霜周期为45min,按35min除霜周期运行的机组重设后除霜周期为30min,按40min除霜周期运行的机组重设后除霜周期为35min,按45min除霜周期运行的机组重设后除霜周期为40min。或如其中a<0时,最短除霜周期为T+(N-1)a,最长除霜周期为T+(1-1)a;每当机组按预设的除霜周期运行的时长到达轮值周期K时,按最短除霜周期运行的机组重设的除霜周期预设为T+(1-1)a,其余组机组重设的除霜周期分别等于其各自对应的上一次预设的除霜周期加上a;或每当机组按预设的除霜周期运行的时长到达轮值周期K时,按最长除霜周期运行的机组重设的除霜周期为T+(N-1)a,其余机组重设的除霜周期分别等于其各自对应的上一次预设的除霜周期减去a;例如a=5min,N=4,T=30min,除霜周期为30min、35min、40min、45min,每当机组按预设的除霜周期运行的时长到达轮值周期K时,按45min除霜周期运行的机组重设后除霜周期为30min,按30min除霜周期运行的机组重设后除霜周期为35min,按35min除霜周期运行的机组重设后除霜周期为30min,按40min除霜周期运行的机组重设后除霜周期为45min,该轮值周期K可根据用户需求进行设置,优选的,所述轮值周期K≥T,其中,N组机组的除霜周期相加上的总和T。利用上述两种轮换方法便于机组自行调整除霜周期,长期运行后,机组的除霜累计时长相差不大,避免除霜周期长的机组除霜不干净,影响机组换热效率,除霜周期短的机组除霜过于频繁,降低机组的制热能力。再进一步的,当N组机组运行到达预设时长后,任意两台机组之间的最大除霜累计用时之差小于或等于所有机组的平均除霜累计用时的5%;优选的,当N组机组运行到达预设时长后,每台机组的除霜累计用时均相等,该预设时长可为轮值周期K乘以N组的倍数。
进一步的,如N为偶数时,N组机组的平均除霜周期为T△1,每当机组按预设的除霜周期运行的时长到达轮值周期K时,每组机组上一次预设的除霜周期与此次重设后的除霜周期相加上等于2T△1;或如N为奇数时,N组机组的平均除霜周期为T△2,每当机组按预设的除霜周期运行的时长到达轮值周期K时,除霜周期等于T△2的机组重设的除霜周期仍为T△2,其余组机组上一次预设的除霜周期与此次重设后的除霜周期相加上等于2T△2。例如,a=5min,N=4,T=30min,除霜周期为30min、35min、40min、45min,平均除霜周期为37.5min,每当机组按预设的除霜周期运行的时长到达轮值周期K时,按45min除霜周期运行的机组重设后除霜周期为30min,按30min除霜周期运行的机组重设后除霜周期为45min,按35min除霜周期运行的机组重设后除霜周期为40min,按40min除霜周期运行的机组重设后除霜周期为35min;同理,a=5min,N=3,T=30min,除霜周期为30min、35min、40min,平均除霜周期为35min,每当机组按预设的除霜周期运行的时长到达轮值周期K时,按30min除霜周期运行的机组重设后除霜周期为40min,按35min除霜周期运行的机组重设后除霜周期为35min,按40min除霜周期运行的机组重设后除霜周期为30min,进而只需调整两次,就可均衡各机组除霜的累计时长,提高机组热交换效率,同时该轮值周期K可根据用户需求进行设置,优选的,所述轮值周期K≥T,其中,N组机组的除霜周期相加上的总和T。当N组机组运行到达预设时长后,任意两台机组之间的最大除霜累计用时之差小于或等于所有机组的平均除霜累计用时的5%;优选的,当N组机组运行到达预设时长后,每台机组的除霜累计用时均相等,该预设时长可为轮值周期K乘以N组的倍数。
进一步的,还包括到达预设累计除霜时间t,机组退出除霜运行,进入正常工作状态;同时还可以设置N组累计除霜时间t+(1-1)d、t+(2-1)d……t+(N-1)d,根据机组的除霜周期预设对应的累计除霜时间,除霜周期越长对应的累计除霜时间越长,其中d为预设累计时长;再进一步的,所述预设时间差值a大于或等于预设累计除霜时间t,避免两组机组同时进入除霜,影响制热能力,导致用户体验不佳;再进一步的,当机组进行除霜时,还包括到达预设退出除霜温度,机组退出除霜运行,进入正常工作状态,通过该设置可根据机组的自身状况调整除霜时间,使机组及时投入正常工作状态,提高机组共同制热能力。需要说明的是,当同时设置预设累计除霜时间t及预设除霜温度时,如机组先触发预设累计除霜时间t则进入正常工作状态,如机组先触发预设除霜温度,则进入正常工作状态。
如图2所示,本发明所述的多组机组错开进行除霜的控制方法,还包括如下步骤:
预设M组机组的目标温度,分别为C+(1-1)b、C+(2-1)b……C+(M-1)b;
M组机组运行过程中,一组机组对应预设一个目标温度、并分别根据各自的目标温度进入预设运行状态;
每当机组按预设的目标温度运行的时长到达轮值周期P时,根据所述M组目标温度重新预设M组机组所对应的目标温度,且至少有两组机组的上一次预设的触发温度不等于其对应的此次重设的触发温度;
其中,一组机组包括至少一台机组,M≥2,C为预设目标温度,b为预设差值温度、且b≠0。
该多组机组错开进行除霜的控制方法,在错开机组进行除霜的情况下,进一步预设M组机组的目标温度,各机组分别根据各自的目标温度进入预设运行状态(预设运行状态包括进入待机状态及进入正常工作状态),当机组按预设的目标温度运行的时长到达轮值周期P时,根据所述M组目标温度重新预设M组机组所对应的目标温度,且至少有两组机组的上一次预设的触发温度不等于其对应的此次重设的触发温度。该机组运行的控制方法在满足用户供热需求情况下,尽可能均衡各机组之间热交换效率;同时均衡调整各机组的运行时长,减去少资源浪费,尽可能使所有机组的使用寿命均衡。
进一步的,如只有一组机组处于正常工作状态时,当该机组到达目标温度时,不进入待机状态,仍继续正常工作,以满足用户供热需求;再进一步的,如只有一组机组处于正常工作状态时,当该机组包括至少两台机组时,当该机组达到目标温度时,预设的一台或两台以上的机组不进入待机状态、仍继续正常工作,其余台机组进入待机状态,在满足用户供热需求的前提下,尽可能节约电量,使本暖通工程更加上环保节能。
进一步的,如其中b>0时,最低目标温度为C+(1-1)b,最高目标温度为C+(M-1)b;每当机组按预设的目标温度运行的时长到达轮值周期P时,按最低目标温度运行的机组重设的目标温度预设为C+(M-1)b,其余机组重设的目标温度分别等于其各自对应的上一次预设的目标温度减去b;或每当机组按预设的目标温度运行的时长到达轮值周期P时,按最高目标温度运行的机组重设的目标温度为C+(1-1)b,其余组机组重设的目标温度分别等于其各自对应的上一次预设的目标温度加上b;例如b=-5℃,M=4,C=45℃,除霜周期为30℃、35℃、40℃、45℃,每当机组按预设的除霜周期运行的时长到达轮值周期P时,按30℃除霜周期运行的机组重设后除霜周期为45℃,按35℃除霜周期运行的机组重设后除霜周期为30℃,按40℃除霜周期运行的机组重设后除霜周期为35℃,按45℃除霜周期运行的机组重设后除霜周期为40℃。或如其中b>0时,最低目标温度为C+(M-1)b,最高目标温度为C+(1-1)b;每当机组按预设的目标温度运行的时长到达轮值周期P时,按最低目标温度运行的机组重设的目标温度预设为C+(1-1)b,其余机组重设的目标温度分别等于其各自对应的上一次预设的目标温度加上b;或每当机组按预设的目标温度运行的时长到达轮值周期P时,按最高目标温度运行的机组重设的目标温度为C+(M-1)b,其余组机组重设的目标温度分别等于其各自对应的上一次预设的目标温度减去b;例如b=5℃,M=4,C=30℃,除霜周期为30℃、35℃、40℃、45℃,每当机组按预设的除霜周期运行的时长到达轮值周期P时,按45℃除霜周期运行的机组重设后除霜周期为30℃,按30℃除霜周期运行的机组重设后除霜周期为35℃,按35℃除霜周期运行的机组重设后除霜周期为30℃,按40℃除霜周期运行的机组重设后除霜周期为45℃,该轮值周期P可根据用户需求进行设置。利用上述两种轮换方法便于机组自行调整机组的正常工作时长,避免长时间运行后,机组的压缩机工作累计时长不相等,其中运行时间长的机组的故障率会增加上,导致整个暖通工程频繁维修,影响用户供热需求。再进一步的,当M组机组运行到达预设时长后,任意两台机组之间的最大机组压缩机工作累计用时之差小于或等于所有机组的机组压缩机工作累计时间的5%,优选的,当M组机组运行到达预设时长后,每台机组最大机组压缩机工作累计用时均相等,该预设时长可为轮值周期P乘以M组的倍数。
进一步的,如M为偶数时,M组机组的平均目标温度为C△1,每当机组按预设的目标温度运行的时长到达轮值周期P时,每组机组上一次预设的目标温度与此次重设后的目标温度相加上等于2C△1;如M为奇数时,M组机组的平均目标温度为C△2,每当机组按预设的目标温度运行的时长到达轮值周期P时,目标温度为C△2的机组重设的目标温度仍为C△2,其余组机组上一次预设的目标温度与此次重设后的目标温度相加上等于2C△2;例如,b=5℃,M=4,C=30℃,目标温度为30℃、35℃、40℃、45℃,平均目标温度为37.5℃,每当机组按预设的目标温度运行的时长到达轮值周期P时,按45℃目标温度运行的机组重设后目标温度为30℃,按30℃目标温度运行的机组重设后目标温度为45℃,按35℃目标温度运行的机组重设后目标温度为40℃,按40℃目标温度运行的机组重设后目标温度为35℃;同理,b=5℃,M=4,C=30℃,目标温度为30℃、35℃、40℃,平均目标温度为35℃,每当机组按预设的目标温度运行的时长到达轮值周期P时,按30℃目标温度运行的机组重设后目标温度为40℃,按35℃目标温度运行的机组重设后目标温度为35℃,按40℃目标温度运行的机组重设后目标温度为30℃,该轮值周期P可根据用户需求进行设置。利用上述两种轮换方法只需调整两次,就可均衡调整机组的正常工作时长,避免长时间运行后,机组的压缩机工作累计时长不相等,其中运行时间长的机组的故障率会增加上,导致整个暖通工程频繁维修,影响用户供热需求。再进一步的,当M组机组运行到达预设时长后,任意两台机组之间的最大机组压缩机工作累计用时之差小于或等于所有机组的机组压缩机工作累计时间的5%,优选的,当M组机组运行到达预设时长后,每台机组最大机组压缩机工作累计用时均相等,该预设时长可为轮值周期P乘以M组的倍数。
进一步的,所述机组设有进入待机状态的第一触发温度,所述机组的目标温度减去其对应的所述第一触发温度的差值为c1,c1≤0,;或/和所述机组还设进入正常工作状态的第二触发温度,所述机组的目标温度减去其对应的所述第二触发温度的差值为c2,c2≥0,通过设置第一触发温度及第二触发温度,提前获得判断机组的运行状况,与用户所需的目标温度进行对比,及时调整机组的运行状况,减去少机组运行过程中的温差变化,提高用户体验;该第一触发温度、第二触发温度可根据检测机组的预设位置的稳定获得,如进水温度、出水温度等;优选的,所述预设差值温度b≥c1或/和b≥c2,避免各机组的温差差异化调整失效;再进一步的,当M组机组中,如只有一台机组处于正常工作状态,其余机组处于待机状态,当处于正常工作状态机组到达第一触发温度时,该机组不进入待机状态,仍维持正常工作状态,以满足用户供热需求;再进一步的,当M组机组中,如只有一组机组处于正常工作状态时,当该机组包括至少两台机组时,当该机组达到目标温度时,预设的一台或两台以上的机组不进入待机状态、仍继续正常工作,其余台机组进入待机状态,在满足用户供热需求的前提下,尽可能节约电量,使本暖通工程更加环保节能。
本发明的具体实施例中,N=5,M=3,各机组可分别根据除霜周期及目标温度进行运行,并可根据用户要求进行修改,另可设定除霜周期或目标温度为优选级别进行运行。
如,预设除霜周期T设为40min,预设时间差值设为5min,那么各机组的除霜周期将会如下设定:
轮值周期K设为10,那么机组运行10天后的除霜周期变为:
如,预设目标温度C设为20℃,预设差值温度b为1℃,那么各机组的目标温度将会如下设定:
轮值周期P设为10,那么机组运行10天后的目标温度变为:
本发明的有益效果:
1、机组参数设置方便,只需分别设置2个参数便可确定多台机组的除霜周期、目标温度,而不需要在每台机组上一一进行设置;
2、避免了较多机组同时进入除霜,能有效保证用户持续供热的需求;
3、避免了较多机组同时进入恒温停机,有效减去少了不必要的能源浪费;
4、除霜周期/目标制热温度轮流分配,保证了长时间使用的各台机组的工作时间及工作负荷相差不大,使各台机组寿命长短尽量均衡。
以上所述实施例的各技术特征可以进行任意的组合,为使描述简洁,未对上述实施例中的各个技术特征所有可能的组合都进行描述,然而,只要这些技术特征的组合不存在矛盾,都应当认为是本说明书记载的范围。
以上所述实施例仅表达了本发明的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进,这些都属于本发明的保护范围。因此,本发明专利的保护范围应以所附权利要求为准。

Claims (9)

1.一种多组机组错开进行除霜的控制方法,其特征在于,包括如下步骤:
预设N组机组的除霜周期,分别为T+(1-1)a、T+(2-1)a……T+(N-1)a;
N组机组通电运行、一组机组对应预设一个上述除霜周期、并分别根据各自的除霜周期进行除霜;
每当机组按预设的除霜周期运行的时长到达轮值周期K时,根据所述N组除霜周期重新预设N组机组所对应的除霜周期,且至少有两组机组的上一次预设的除霜周期不等于其对应的此次重设的除霜周期;
其中,一组机组包括至少一台机组,N≥2,T为预设除霜周期,a为预设时间差值、且a≠0,K>0。
2.根据权利要求1所述的多组机组错开进行除霜的控制方法,其特征在于,如其中a>0时,最短除霜周期为T+(1-1)a,最长除霜周期为T+(N-1)a;
每当机组按预设的除霜周期运行的时长到达轮值周期K时,按最短除霜周期运行的机组重设的除霜周期预设为T+(N-1)a,其余机组重设的除霜周期分别等于其各自对应的上一次预设的除霜周期减去a;或每当机组按预设的除霜周期运行的时长到达轮值周期K时,按最长除霜周期运行的机组重设的除霜周期预设为T+(1-1)a,其余组机组重设的除霜周期分别等于其各自对应的上一次预设的除霜周期加上a。
3.根据权利要求1所述的多组机组错开进行除霜的控制方法,其特征在于,如其中a<0时,最短除霜周期为T+(N-1)a,最长除霜周期为T+(1-1)a;
每当机组按预设的除霜周期运行的时长到达轮值周期K时,按最短除霜周期运行的机组重设的除霜周期预设为T+(1-1)a,其余组机组重设的除霜周期分别等于其各自对应的上一次预设的除霜周期加上a;或每当机组按预设的除霜周期运行的时长到达轮值周期K时,按最长除霜周期运行的机组重设的除霜周期为T+(N-1)a,其余机组重设的除霜周期分别等于其各自对应的上一次预设的除霜周期减去a。
4.根据权利要求1所述的多组机组错开进行除霜的控制方法,其特征在于,如N为偶数时,N组机组的平均除霜周期为T△1,每当机组按预设的除霜周期运行的时长到达轮值周期K时,每组机组上一次预设的除霜周期与此次重设后的除霜周期相加上等于2T△1
如N为奇数时,N组机组的平均除霜周期为T△2,每当机组按预设的除霜周期运行的时长到达轮值周期K时,除霜周期等于T△2的机组重设的除霜周期仍为T△2,其余组机组上一次预设的除霜周期与此次重设后的除霜周期相加上等于2T△2
5.根据权利要求1所述的多组机组错开进行除霜的控制方法,其特征在于,当机组进行除霜时,还包括到达预设累计除霜时间t,机组退出除霜运行,进入正常工作状态。
6.根据权利要求5所述的多组机组错开进行除霜的控制方法,其特征在于,所述预设时间差值a大于或等于预设累计除霜时间t。
7.根据权利要求1所述的多组机组错开进行除霜的控制方法,其特征在于,当机组进行除霜时,还包括到达预设退出除霜温度,机组退出除霜运行,进入正常工作状态。
8.根据权利要求1至7任一项所述的多组机组错开进行除霜的控制方法,其特征在于,N组机组的除霜周期相加上的总和T,所述轮值周期K≥T
9.根据权利要求1至7任一项所述的多组机组错开进行除霜的控制方法,还包括如下步骤:
预设M组机组的目标温度,分别为C+(1-1)b、C+(2-1)b……C+(M-1)b;
M组机组运行过程中,一组机组对应预设一个目标温度、并分别根据各自的目标温度进入预设运行状态;
每当机组按预设的目标温度运行的时长到达轮值周期P时,根据所述M组目标温度重新预设M组机组所对应的目标温度,且至少有两组机组的上一次预设的触发温度不等于其对应的此次重设的触发温度;
其中,一组机组包括至少一台机组,M≥2,C为预设目标温度,b为预设差值温度、且b≠0,P>0。
CN201610615751.3A 2016-07-28 2016-07-28 多组机组错开进行除霜的控制方法 Active CN106225359B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610615751.3A CN106225359B (zh) 2016-07-28 2016-07-28 多组机组错开进行除霜的控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610615751.3A CN106225359B (zh) 2016-07-28 2016-07-28 多组机组错开进行除霜的控制方法

Publications (2)

Publication Number Publication Date
CN106225359A true CN106225359A (zh) 2016-12-14
CN106225359B CN106225359B (zh) 2018-12-11

Family

ID=57535605

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610615751.3A Active CN106225359B (zh) 2016-07-28 2016-07-28 多组机组错开进行除霜的控制方法

Country Status (1)

Country Link
CN (1) CN106225359B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106642586A (zh) * 2016-12-29 2017-05-10 广东美的暖通设备有限公司 一种用于风冷热泵并联机组的分级化霜方法及装置
CN109654678A (zh) * 2018-11-13 2019-04-19 青岛海尔空调器有限总公司 空调器除霜控制方法
CN109668356A (zh) * 2018-12-18 2019-04-23 广东芬尼克兹节能设备有限公司 一种热泵机组的除霜控制方法及系统
CN114777357A (zh) * 2022-02-11 2022-07-22 广东芬尼克兹节能设备有限公司 一种协调除霜控制方法、装置、计算机设备及存储介质

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013077167A1 (ja) * 2011-11-24 2013-05-30 三菱重工業株式会社 ヒートポンプシステムの除霜運転方法及びヒートポンプシステム
CN103307705A (zh) * 2013-06-27 2013-09-18 Tcl空调器(中山)有限公司 控制空调器化霜的方法和装置
CN103486781A (zh) * 2012-06-13 2014-01-01 珠海格力电器股份有限公司 空调化霜方法及装置
CN105135629A (zh) * 2015-09-30 2015-12-09 海信(山东)空调有限公司 空调器除霜控制方法和空调器

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013077167A1 (ja) * 2011-11-24 2013-05-30 三菱重工業株式会社 ヒートポンプシステムの除霜運転方法及びヒートポンプシステム
JP2013108732A (ja) * 2011-11-24 2013-06-06 Mitsubishi Heavy Ind Ltd ヒートポンプシステムの除霜運転方法及びヒートポンプシステム
CN103486781A (zh) * 2012-06-13 2014-01-01 珠海格力电器股份有限公司 空调化霜方法及装置
CN103307705A (zh) * 2013-06-27 2013-09-18 Tcl空调器(中山)有限公司 控制空调器化霜的方法和装置
CN105135629A (zh) * 2015-09-30 2015-12-09 海信(山东)空调有限公司 空调器除霜控制方法和空调器

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106642586A (zh) * 2016-12-29 2017-05-10 广东美的暖通设备有限公司 一种用于风冷热泵并联机组的分级化霜方法及装置
CN106642586B (zh) * 2016-12-29 2019-09-17 广东美的暖通设备有限公司 一种用于风冷热泵并联机组的分级化霜方法及装置
CN109654678A (zh) * 2018-11-13 2019-04-19 青岛海尔空调器有限总公司 空调器除霜控制方法
CN109668356A (zh) * 2018-12-18 2019-04-23 广东芬尼克兹节能设备有限公司 一种热泵机组的除霜控制方法及系统
CN109668356B (zh) * 2018-12-18 2021-01-19 广东芬尼克兹节能设备有限公司 一种热泵机组的除霜控制方法及系统
CN114777357A (zh) * 2022-02-11 2022-07-22 广东芬尼克兹节能设备有限公司 一种协调除霜控制方法、装置、计算机设备及存储介质
CN114777357B (zh) * 2022-02-11 2023-07-21 广东芬尼克兹节能设备有限公司 一种协调除霜控制方法、装置、计算机设备及存储介质

Also Published As

Publication number Publication date
CN106225359B (zh) 2018-12-11

Similar Documents

Publication Publication Date Title
CN106225359A (zh) 多组机组错开进行除霜的控制方法
US8996140B2 (en) Multichannel power controller
CN102353122B (zh) 一种模块式多联机控制方法及系统
JP6260789B2 (ja) 応答負荷を制御する方法およびソフトウェアプログラム
US9513018B2 (en) Method for controlling a parallel operation of a multi-water heater
CN106196724A (zh) 多组机组错开进入预设状态的控制方法
RU2007133792A (ru) Способ оптимизации эксплуатации множества компрессорных агрегатов и устройство для этого
EP3663670A1 (en) Hot water supply system
US9651955B2 (en) Controllers and methods of control of water heaters
CN104165443B (zh) 空调机组模式转换控制方法、装置及空调系统
CN102261691A (zh) 多热源环状管网动力输送系统、系统配置方法及运行方式
CN104863833B (zh) 用于控制流体循环系统内的泵站的增强方法和实现所述方法的相关循环系统和泵站
JP6327226B2 (ja) 電力使用量の予測方法および予測システム
JP2012032117A (ja) 貯湯式給湯システム
JP4408285B2 (ja) 補助冷却装置
WO2015129390A1 (ja) 熱源機の出口設定温度の設定方法及び熱源システム
US9109835B2 (en) Method and control system for controlling supply of heat energy from a furnace to mulitple dryers
JP5734882B2 (ja) 貯湯式給湯装置
JP6221337B2 (ja) デマンド制御装置およびデマンド制御システム
JP6922449B2 (ja) 電源システムおよび電源装置
JP2000283051A (ja) 複数台の機器の運転制御方法
CA2876363C (en) Tool management system
JP6513498B2 (ja) 給湯システム
KR101195816B1 (ko) 스마트 절전 기능을 갖는 정수기 및 이의 제어방법
EP2789717B1 (en) Method for spinning-in on a spinning machine, particularly on an air-jet spinning machine or an open-end spinning machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant