CN106224642B - A kind of prefabricated assembled upper pipe working well of steel construction - Google Patents

A kind of prefabricated assembled upper pipe working well of steel construction Download PDF

Info

Publication number
CN106224642B
CN106224642B CN201610823262.7A CN201610823262A CN106224642B CN 106224642 B CN106224642 B CN 106224642B CN 201610823262 A CN201610823262 A CN 201610823262A CN 106224642 B CN106224642 B CN 106224642B
Authority
CN
China
Prior art keywords
support
prefabricated
leading screw
films
active well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610823262.7A
Other languages
Chinese (zh)
Other versions
CN106224642A (en
Inventor
冯涛
高树娟
王�锋
李腾
孟洋
司新伟
张军见
丁铖
孙靖涛
秦伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Oilfield Service Corp
Sinopec Shengli Oilfield Construction Engineering Co Ltd
Original Assignee
Sinopec Oilfield Service Corp
Sinopec Shengli Oilfield Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Oilfield Service Corp, Sinopec Shengli Oilfield Construction Engineering Co Ltd filed Critical Sinopec Oilfield Service Corp
Priority to CN201610823262.7A priority Critical patent/CN106224642B/en
Publication of CN106224642A publication Critical patent/CN106224642A/en
Application granted granted Critical
Publication of CN106224642B publication Critical patent/CN106224642B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground

Abstract

Include prefabricated film, support leading screw, support beam, support post, connecting elements and connection bolt the present invention relates to a kind of steel construction prefabrication and assembly construction upper pipe working well device, it is characterised in that the prefabricated film is rectangular member of different sizes;Prefabricated film is bolted by connecting elements and connection, and the both sides support leading screw of active well, support beam, support post support, support leading screw, support beam, support post are by buckling and being bolted;The active well is safe and reliable, can shorten construction period, improves construction efficiency, meets the construction concept of " low-carbon economy, civilized construction ".

Description

A kind of prefabricated assembled upper pipe working well of steel construction
Technical field
The present invention relates to one kind being applied to jacking construction field, and in particular to a kind of prefabricated assembled push pipe work of steel construction Well.
Background technology
Active well is jacking construction the key link, and active well can be divided into jacking active well and received well again.Wherein reinforcing bar Concrete work well is relatively conventional, which generally uses live assembling reinforcement, branch masterplate casting concrete, construction period It is longer, construction section traffic is affected greatly, and pollute surrounding enviroment, seriously affects the normal life of neighbouring resident.
Invention content
Insufficient to solve the prior art, the present invention provides a kind of prefabricated assembled upper pipe working wells of steel construction.
The technical scheme is that:A kind of prefabricated assembled upper pipe working well device of steel construction includes prefabricated film, support Leading screw, support beam, support post, connecting elements and connection bolt, it is characterised in that the prefabricated film is length of different sizes Square member;Prefabricated film is bolted by connecting elements and connection, the both sides support leading screw of active well, support beam, branch Upright supports are supportted, support leading screw, support beam, support post are by buckling and being bolted.
The prefabricated film has tetra- kinds of sizes of 3.3m*2.32m, 3.3m*2.36m, 6.33m*2.32m, 6.33*2.36m, by H profile steel and steel plate are welded.
Described device layering installation.
Poured in place concrete ground and hole after the completion of described device supporting.
The prefabricated film carries active well cutting shoe, is assemblied in active well both sides.
The beneficial effects of the invention are as follows:The active well is safe and reliable, can shorten construction period, improves construction efficiency, meets The construction concept of " low-carbon economy, civilized construction ".
Description of the drawings
Fig. 1 is the prefabricated assembled active well 2 d plane picture of steel construction of the present invention.
Fig. 2 is the A-A sectional views of Fig. 1 of the present invention.
Fig. 3 is the B-B sectional views of Fig. 2 of the present invention.
Fig. 4 is the C-C sectional views of Fig. 2 of the present invention.
Fig. 5 is the D-D sectional views of Fig. 2 of the present invention.
Fig. 6 is Fig. 2 mounting structures detail drawing of the present invention.
Fig. 7 is Fig. 4 active wells cutting shoe detail drawing of the present invention.
Wherein:1 it is A prefabricated films, 2 be B prefabricated films, 4 be D prefabricated films, 5 be mounting structure, 6 be support leading screw, 7 is support Crossbeam, 8 be support post, 9 be hole, 10 be mixed mud ground, 11 be active well cutting shoe, 12 be connecting elements, 13 be connection Bolt.
Specific implementation mode
A kind of prefabricated assembled upper pipe working well device of steel construction includes prefabricated film, support leading screw 6, support beam 7, support Column 8, connecting elements 12 and connection bolt 13, the prefabricated film are rectangular member of different sizes;Prefabricated film passes through connection Component 12 and connection bolt 13 connect, and both sides support leading screw 6, support beam 7, the support post 8 of active well support, supporting wire Thick stick 6, support beam 7, support post 8 are connected by buckle and bolt 13.
The prefabricated film has tetra- kinds of sizes of 3.3m*2.32m, 3.3m*2.36m, 6.33m*2.32m, 6.33*2.36m, by H profile steel and steel plate are welded.
Described device layering installation.
Poured in place concrete ground and hole after the completion of described device supporting.
The prefabricated film carries active well cutting shoe, is assemblied in active well both sides.
In the prefabricated two panels A prefabricated films 1 of steel construction precast plant, a piece of B prefabricated films 2(With active well cutting shoe), six C are prefabricated Piece 3, six D prefabricated films 4(With active well cutting shoe).Digging in-situ work foundation pit, carries out supporting by the way of splicing layer by layer. First layer supporting is carried out when working pit is excavated to -2.5m, 1, six 3 fragment of the C prefabricated films connection of two panels A prefabricated films, both sides It is supported with support leading screw 6, support beam 7, support post 8.Continue to excavate after the complete first layer of supporting, when work excavation of foundation pit To the supporting for carrying out the second layer when -5m, 2, six 4 fragments of D prefabricated films of a piece of B prefabricated films are assembled, both sides support leading screw 6, Support beam 7, support post 8 are supported, in order to ensure that poling space, centre do not set stull.Cast in situs after the completion of supporting Mattess 10 and hole 9.
Above-mentioned active well, 1 size of A prefabricated films are 3.3m × 2.32m, and 2 size of B prefabricated films is 3.3m × 2.36m, and C is prefabricated 3 size of piece is 6.33m × 2.32m, and 4 size of D prefabricated films is 6.33m × 2.36m, is welded by H profile steel and steel plate.Active well Overall dimension is 18.96m × 6.6m × 4.68m.
Above-mentioned active well, supporting member are made of support leading screw 6, support beam 7, support post 8, are connected with.Work The soil pressure for making foundation pit walls passes to steel construction prefabricated film, tightens support leading screw 6 and generates prestressing force, reaches stress balance, ensure The safety of active well.
Above-mentioned active well, mounting structure 5 are made of connecting elements 12 and connection bolt 13.Nut-welding in connecting elements, Prefabricated film is directly connect with nut with connecting elements 12.

Claims (2)

1. a kind of steel construction prefabrication and assembly construction upper pipe working well device, including prefabricated film, support leading screw(6), support beam(7), branch Support column(8), connecting elements(12)And connection bolt(13), it is characterised in that:The prefabricated film is rectangle of different sizes Component;Prefabricated film passes through connecting elements(12)And connection bolt(13)Connection, the both sides support leading screw of active well(6), support Crossbeam(7), support post(8)Support supports leading screw(6), support beam(7), support post(8)By buckle and bolt(13)Even It connects;Described device layering installation;Poured in place concrete ground after the completion of described device supporting(10)And hole(9);It is described pre- Film-making carries active well cutting shoe, is assemblied in active well both sides;Supporting member is by support leading screw(6), support beam(7), support it is vertical Column(8)Composition, is connected with;The soil pressure of work foundation pit walls passes to steel construction prefabricated film, tightens support leading screw(6)It generates Prestressing force reaches stress balance, ensures the safety of active well;
In the prefabricated two panels A prefabricated films (1) of steel construction precast plant, a piece of B prefabricated films (2), B prefabricated films (2) carry active well sword Foot, six C prefabricated films (3), six D prefabricated films (4), D prefabricated films (4) carry active well cutting shoe;Digging in-situ work foundation pit, Supporting is carried out by the way of splicing layer by layer;First layer supporting is carried out when working pit is excavated to -2.5m, two panels A prefabricated films (1), six pieces C prefabricated films(3)Fragment connects, both sides support leading screw(6), support beam(7), support post(8)It is supported; Continue to excavate after the complete first layer of supporting, the supporting of the second layer is carried out when the excavation of foundation pit that works is to -5m, a piece of B prefabricated films (2), six pieces D prefabricated films(4)Fragment assembles, both sides support leading screw(6), support beam(7), support post(8)It is supported, In order to ensure that poling space, centre do not set stull, poured in place concrete ground after the completion of supporting(10)And hole(9).
2. a kind of steel construction prefabrication and assembly construction upper pipe working well according to claim 1, it is characterised in that:The A is prefabricated Piece(1)Size is 3.3m × 2.32m, B prefabricated films(2)Size is 3.3m × 2.36m, C prefabricated films(3)Size be 6.33m × 2.32m, D prefabricated film(4)Size is 6.33m × 2.36m, is welded by H profile steel and steel plate;Active well overall dimension is 18.96m×6.6m×4.68m。
CN201610823262.7A 2016-09-14 2016-09-14 A kind of prefabricated assembled upper pipe working well of steel construction Active CN106224642B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610823262.7A CN106224642B (en) 2016-09-14 2016-09-14 A kind of prefabricated assembled upper pipe working well of steel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610823262.7A CN106224642B (en) 2016-09-14 2016-09-14 A kind of prefabricated assembled upper pipe working well of steel construction

Publications (2)

Publication Number Publication Date
CN106224642A CN106224642A (en) 2016-12-14
CN106224642B true CN106224642B (en) 2018-09-14

Family

ID=58074562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610823262.7A Active CN106224642B (en) 2016-09-14 2016-09-14 A kind of prefabricated assembled upper pipe working well of steel construction

Country Status (1)

Country Link
CN (1) CN106224642B (en)

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3653000B2 (en) * 2001-04-10 2005-05-25 日本電信電話株式会社 Manhole structure
CN102155025B (en) * 2011-03-23 2012-05-23 东南大学 Late poured band type assembled pipe jacking working open caisson
CN102644296A (en) * 2012-05-09 2012-08-22 东南大学 Prefabricate assembly type pipe jacking working well
CN103967050B (en) * 2014-01-29 2015-05-20 广州机施建设集团有限公司 Construction system of subway station
CN204851265U (en) * 2015-07-26 2015-12-09 中铁十八局集团有限公司 Bearing structure in work well under high water pressure condition
CN205276324U (en) * 2015-12-31 2016-06-01 中国水电建设集团十五工程局有限公司 Push pipe work well
CN206159648U (en) * 2016-09-14 2017-05-10 中石化石油工程技术服务有限公司 Prefabricated assembled push pipe work well of steel construction

Also Published As

Publication number Publication date
CN106224642A (en) 2016-12-14

Similar Documents

Publication Publication Date Title
CN106284655B (en) Precast concrete beam stud connects connecting node and connection method
KR100969586B1 (en) Rhamen bridge and construction method there of
KR101780370B1 (en) Composite structure using shear connector made of anchor and socket shoe
KR20020011706A (en) Fabricated pier and Fabricated pier construction method
CN101939492A (en) Precast temporary facility structure and a construction method for the same
CN111663681A (en) Assembled wall body connecting structure and construction method thereof
KR20080100740A (en) Strut system of temporary plate with opening supporting temporary retaining wall and subgrade external wall construction method utilizing the same
CN208105477U (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam L shape connecting node
CN108104310B (en) Assembled frame shear structure column staggered connection structure and assembling method
CN108265823A (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam L-shaped connecting node
CN106224642B (en) A kind of prefabricated assembled upper pipe working well of steel construction
CN206159648U (en) Prefabricated assembled push pipe work well of steel construction
CN211949204U (en) Pre-buried structure of strength nature column base
KR101072958B1 (en) Foundation structure using the micropile and truss, and construction method thereof in a surrounding structure and the places that it is adjacent to
CN111663682A (en) Assembly type wall body connecting structure based on ribbed box and construction method thereof
KR101013627B1 (en) Roof of underground structure and method for constructing the same
CN208023735U (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam T shape connecting nodes
CN212452765U (en) Two-in-one underground pipe gallery structure
CN108301562A (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam cross connecting node
CN211523761U (en) Ribbed light steel beam with novel connection mode
JP3789444B2 (en) Segment and segment manufacturing method
CN113356405A (en) Prefabricated composite wall structure based on embedded profile steel and construction method thereof
CN208023734U (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam linear type connecting node
CN108589930A (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam T shape connecting nodes
CN110700274A (en) Mechanically-connected assembled stand column and stand column pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Feng Tao

Inventor after: Qin Wei

Inventor after: Gao Shujuan

Inventor after: Wang Feng

Inventor after: Li Teng

Inventor after: Meng Yang

Inventor after: Si Xinwei

Inventor after: Zhang Junjian

Inventor after: Ding Cheng

Inventor after: Sun Jingtao

Inventor before: Feng Tao

Inventor before: Wang Feng

Inventor before: Li Teng

Inventor before: Meng Yang

Inventor before: Zhang Junjian

Inventor before: Ding Cheng

Inventor before: Sun Jingtao

Inventor before: Qin Wei

GR01 Patent grant
GR01 Patent grant