CN106223469A - Tube structure roof boarding construction method and hang modular system - Google Patents

Tube structure roof boarding construction method and hang modular system Download PDF

Info

Publication number
CN106223469A
CN106223469A CN201610584572.8A CN201610584572A CN106223469A CN 106223469 A CN106223469 A CN 106223469A CN 201610584572 A CN201610584572 A CN 201610584572A CN 106223469 A CN106223469 A CN 106223469A
Authority
CN
China
Prior art keywords
sliding formwork
internal frame
roof boarding
construction
formwork internal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610584572.8A
Other languages
Chinese (zh)
Inventor
孙宏福
尹友非
向庭江
陈亚东
崔海堂
赵建刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201610584572.8A priority Critical patent/CN106223469A/en
Publication of CN106223469A publication Critical patent/CN106223469A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables

Abstract

The invention discloses the roof boarding construction method of a kind of tube structure, comprise the following steps, 1) by slding form operation method component tube structure and pre-buried ring is set on barrel top, 2), after barrel slding form operation, sliding formwork internal frame is split with sliding formwork outrigger and sliding formwork internal frame is dropped to below roof boarding absolute altitude;4) with steel wire rope, synovial membrane internal frame is connected fixing for pre-buried ring drawknot, then sliding formwork internal frame is fixed relative to cylinder inboard wall;5) on sliding formwork internal frame, lay plank and channel-section steel and carry out supporting frame and set up and roofing construction.Also disclose construction system simultaneously.Modular system is hung in roof boarding of the present invention construction, mould bases use is hung by being changed by sliding formwork internal frame, make the support platform of roof boarding supporting frame, thus carry out roof boarding construction, hang mould bases and use the reinforcing mode of pull-up, top steel wire rope carries out drawknot by hanging the mould bases pre-buried ring with barrel top, hang between mould bases and barrel real with U-shaped jacking, effectively prevent support body from rocking, expand range and the use time hanging modular system, reduced difficulty of construction, reduction of erection time, reduce danger coefficient, saved construction cost.

Description

Tube structure roof boarding construction method and hang modular system
Technical field
The present invention relates to technical field of building construction, particularly relate to a kind of tube structure roof boarding construction method and hang mould System.
Background technology
Tube structure is strong due to good rigidity, shock resistance, is widely used, especially in industrial building in building trade Chimney, coal bunker, silo are widely applied, tube structure simple structure, mostly use sliding formwork form to carry out Wall Construction.In cylinder Top, portion arranges roof boarding, and roof boarding conventional construction method is to set up full hall supporting frame, owing in tube structure, floor is higher, Then in tube structure, roof boarding occurs that difficulty of construction is big, workload big, danger coefficient high.
Summary of the invention
It is an object of the invention to for technological deficiency present in prior art, and provide a kind of tube structure roof boarding to execute Work hangs modular system.
Be the technical scheme is that by realizing the purpose of the present invention
The roof boarding construction method of a kind of tube structure, comprises the following steps,
1) by slding form operation method component tube structure and pre-buried ring is set on barrel top,
2), after barrel slding form operation, sliding formwork internal frame is split with sliding formwork outrigger and sliding formwork internal frame is dropped to roof boarding Below absolute altitude;
4) with steel wire rope, synovial membrane internal frame is connected fixing for pre-buried ring drawknot, then that sliding formwork internal frame is solid relative to cylinder inboard wall Fixed;
5) on sliding formwork internal frame, lay plank and channel-section steel and carry out supporting frame and set up and roofing construction.
In step 2) in also include utilizing sliding formwork internal frame with pre-buried ring that jack is corresponding fixing connects, the most again by sliding formwork Frame and sliding formwork outrigger split and utilize jack that sliding formwork internal frame is dropped to below roof boarding absolute altitude, and described jack is at sliding formwork internal frame Remove after Gu Ding.
Modular system is hung in a kind of tube structure roof boarding construction, including the pre-buried ring on the barrel top being formed at cylinder, is positioned at Fix, below roof boarding absolute altitude and with described pre-buried ring, the sliding formwork internal frame being connected, be arranged on the bracing frame on sliding formwork internal frame Body, and it is arranged on the support agency between sliding formwork internal frame and cylinder inboard wall.
Described sliding formwork internal frame includes top boom and lower boom, and the top boom described in connecting and the web member of lower boom.
It is equipped with plank at described sliding formwork internal frame upper surface, described plank is provided with and described supporting frame Corresponding channel-section steel.
Described support agency includes the U-shaped torr that afterbody is connected with sliding formwork internal frame, and is clamped in the supporting plate of U-shaped torr and interior Flitch between wall.
Described sliding formwork internal frame and pre-buried ring connect by multiple steel wire ropes are fixing.
Compared with prior art, the invention has the beneficial effects as follows:
Modular system is hung in roof boarding of the present invention construction, hangs mould bases use by being changed by sliding formwork internal frame, makes roof boarding The support platform of supporting frame, thus carry out roof boarding construction, to hang mould bases and use the reinforcing mode of pull-up, top will with steel wire rope The pre-buried ring hanging mould bases and barrel top carries out drawknot, hangs between mould bases and barrel real with U-shaped jacking, effectively prevents support body from shaking Dynamic, expanded range and the use time hanging modular system, reduce difficulty of construction, reduction of erection time, reduce danger coefficient, Save construction cost.
Accompanying drawing explanation
Fig. 1 show the tube structure roof boarding construction of the present invention and hangs the structural representation of modular system;
Fig. 2 show plan structure schematic diagram;
Fig. 3 show close-up schematic view.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.Should be appreciated that described herein Specific embodiment only in order to explain the present invention, be not intended to limit the present invention.
As Figure 1-3, the roof boarding construction method of the tube structure of the present invention, comprise the following steps,
1) by slding form operation method component tube structure and arrange pre-buried ring 1 on barrel top,
2), after barrel slding form operation, sliding formwork internal frame is split with sliding formwork outrigger and sliding formwork internal frame is dropped to roof boarding Below absolute altitude;
4) with steel wire rope 2, synovial membrane internal frame is connected fixing for pre-buried ring drawknot, then by sliding formwork internal frame relative to cylinder inboard wall Fixing;
5) on sliding formwork internal frame, lay plank and channel-section steel and carry out supporting frame and set up and roofing construction, wherein, at roofing Sheathed sleeve pipe on steel wire rope it is additionally included in, such as pvc pipe so that finally by the step of steel wire rope extraction, finally by sleeve pipe during construction Block, and sliding formwork internal frame may utilize hoisting mechanism etc. and it unloaded.
Specifically, in step 2) in also include utilizing sliding formwork internal frame with pre-buried ring that jack is corresponding fixing connects, then Split and utilize jack that sliding formwork internal frame drops to below roof boarding absolute altitude, described jack sliding formwork internal frame and sliding formwork outrigger again Remove after sliding formwork internal frame is fixing.
The construction method of the present invention, uses the pre-buried ring on barrel top to achieve the mode hanging mould, has expanded sliding formwork internal frame Use function and use occasion, reduce construction cost, shorten construction period, and the component decreasing supporting frame is high Degree, and the duration is short, workload is little, safe and reliable, it is to avoid bring the danger of fall injury when setting up too high support body, save Duration, reduce cost, decrease labour force simultaneously and put into, achieve preferable economic and social benefit.
As Figure 1-3, the tube structure roof boarding construction of the present invention hangs modular system, including the barrel top being formed at cylinder The pre-buried ring 1 of end, is positioned at below roof boarding absolute altitude and with described pre-buried ring by the fixing sliding formwork internal frame being connected of steel wire rope 2, It is arranged on the supporting frame on sliding formwork internal frame, and the support agency being arranged between sliding formwork internal frame and cylinder inboard wall is to reduce And the gap between barrel, increases friction and stability.
Wherein, described sliding formwork internal frame includes top boom 3 and lower boom 4, and the top boom described in connecting and lower boom Web member 5, be equipped with plank 6 at described sliding formwork internal frame upper surface, described plank be provided with and described bracing frame The channel-section steel 7 that body is corresponding.
Specifically, described support agency includes the U-shaped torr that afterbody is connected with sliding formwork internal frame, and is clamped in U-shaped torr Flitch 9 between supporting plate 8 and inwall.Using U-shaped torr to draw materials convenient and bearing capacity strong, flitch increases contact area simultaneously, carries The stability in the large of mould bases in high.
Modular system is hung in roof boarding of the present invention construction, hangs mould bases use by being changed by sliding formwork internal frame, makes roof boarding The support platform of supporting frame, thus carry out roof boarding construction, to hang mould bases and use the reinforcing mode of pull-up, top will with steel wire rope The pre-buried ring hanging mould bases and barrel top carries out drawknot, hangs between mould bases and barrel real with U-shaped jacking, effectively prevents support body from shaking Dynamic, expanded range and the use time hanging modular system, reduce difficulty of construction, reduction of erection time, reduce danger coefficient, Save construction cost.
The above is only the preferred embodiment of the present invention, it is noted that for the common skill of the art For art personnel, under the premise without departing from the principles of the invention, it is also possible to make some improvements and modifications, these improvements and modifications Also should be regarded as protection scope of the present invention.

Claims (7)

1. the roof boarding construction method of a tube structure, it is characterised in that comprise the following steps,
1) by slding form operation method component tube structure and pre-buried ring is set on barrel top,
2), after barrel slding form operation, sliding formwork internal frame is split with sliding formwork outrigger and sliding formwork internal frame is dropped to roof boarding absolute altitude Below;
4) with steel wire rope, synovial membrane internal frame is connected fixing for pre-buried ring drawknot, then sliding formwork internal frame is fixed relative to cylinder inboard wall;
5) on sliding formwork internal frame, lay plank and channel-section steel and carry out supporting frame and set up and roofing construction.
2. roof boarding construction method as claimed in claim 1, it is characterised in that in step 2) in also include by sliding formwork internal frame with Pre-buried ring utilizes the fixing connection of jack correspondence, splits and utilize jack by sliding formwork internal frame sliding formwork internal frame and sliding formwork outrigger the most again Dropping to below roof boarding absolute altitude, described jack is removed after sliding formwork internal frame is fixing.
3. modular system is hung in tube structure roof boarding construction, it is characterised in that include being formed at barrel top pre-of cylinder Bury ring, be positioned at below roof boarding absolute altitude and fix, with described pre-buried ring, the sliding formwork internal frame being connected, being arranged on sliding formwork internal frame Supporting frame, and be arranged on the support agency between sliding formwork internal frame and cylinder inboard wall.
4. modular system is hung in tube structure roof boarding construction as claimed in claim 3, it is characterised in that described sliding formwork internal frame bag Include top boom and lower boom, and the top boom described in connecting and the web member of lower boom.
5. modular system is hung in tube structure roof boarding construction as claimed in claim 3, it is characterised in that at described sliding formwork internal frame Upper surface is equipped with plank, is provided with the channel-section steel corresponding with described supporting frame on described plank.
6. modular system is hung in tube structure roof boarding construction as claimed in claim 3, it is characterised in that described support agency bag Include the U-shaped torr that afterbody is connected with sliding formwork internal frame, and be clamped in the flitch between the supporting plate of U-shaped torr and inwall.
7. modular system is hung in tube structure roof boarding construction as claimed in claim 3, it is characterised in that described sliding formwork internal frame and Pre-buried ring connects by multiple steel wire ropes are fixing.
CN201610584572.8A 2016-07-20 2016-07-20 Tube structure roof boarding construction method and hang modular system Pending CN106223469A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610584572.8A CN106223469A (en) 2016-07-20 2016-07-20 Tube structure roof boarding construction method and hang modular system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610584572.8A CN106223469A (en) 2016-07-20 2016-07-20 Tube structure roof boarding construction method and hang modular system

Publications (1)

Publication Number Publication Date
CN106223469A true CN106223469A (en) 2016-12-14

Family

ID=57532503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610584572.8A Pending CN106223469A (en) 2016-07-20 2016-07-20 Tube structure roof boarding construction method and hang modular system

Country Status (1)

Country Link
CN (1) CN106223469A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165397A (en) * 2017-06-29 2017-09-15 中国五冶集团有限公司 A kind of painting workshop exhaust chimney slding form operation safeguard structure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08218628A (en) * 1995-02-14 1996-08-27 Ohbayashi Corp Construction of roof for cylindrical structure
CN101781930A (en) * 2009-01-16 2010-07-21 沈阳市山立机械厂 Template system
CN102733608A (en) * 2012-08-03 2012-10-17 贵州开磷建设有限责任公司 Construction method for spray head layer of granulation tower
CN202882507U (en) * 2012-10-18 2013-04-17 中煤建筑安装工程集团有限公司 Hauling tool for silo construction platform
CN103556823A (en) * 2013-10-28 2014-02-05 山西省第二建筑工程公司 Construction method with silo sliding formwork operating platform as top cover plate formwork supporting system
CN105155840A (en) * 2015-07-03 2015-12-16 山西宏厦建筑工程有限公司 Flexible slip-form lifting measure beam construction method for granulation tower
CN105507476A (en) * 2015-12-16 2016-04-20 中国建筑第二工程局有限公司 Multi-arch roof and construction method thereof
CN205875410U (en) * 2016-07-20 2017-01-11 中冶天工集团有限公司 A hang module system all for tube structure room panel construction

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08218628A (en) * 1995-02-14 1996-08-27 Ohbayashi Corp Construction of roof for cylindrical structure
CN101781930A (en) * 2009-01-16 2010-07-21 沈阳市山立机械厂 Template system
CN102733608A (en) * 2012-08-03 2012-10-17 贵州开磷建设有限责任公司 Construction method for spray head layer of granulation tower
CN202882507U (en) * 2012-10-18 2013-04-17 中煤建筑安装工程集团有限公司 Hauling tool for silo construction platform
CN103556823A (en) * 2013-10-28 2014-02-05 山西省第二建筑工程公司 Construction method with silo sliding formwork operating platform as top cover plate formwork supporting system
CN105155840A (en) * 2015-07-03 2015-12-16 山西宏厦建筑工程有限公司 Flexible slip-form lifting measure beam construction method for granulation tower
CN105507476A (en) * 2015-12-16 2016-04-20 中国建筑第二工程局有限公司 Multi-arch roof and construction method thereof
CN205875410U (en) * 2016-07-20 2017-01-11 中冶天工集团有限公司 A hang module system all for tube structure room panel construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165397A (en) * 2017-06-29 2017-09-15 中国五冶集团有限公司 A kind of painting workshop exhaust chimney slding form operation safeguard structure

Similar Documents

Publication Publication Date Title
CN101177959A (en) Curtain wall unit hanging equipment and construction method thereof
CN201598820U (en) Single point suspension external hanging bracket
CN103643800A (en) Lifting installation system for buckling restrained supporting member and construction method thereof
CN202483154U (en) High bearing capacity suspending scaffold
CN204401999U (en) With the climbing type scaffold of discharging platform
CN213774554U (en) Assembled self-control sliding lifting construction unloading platform
CN106223469A (en) Tube structure roof boarding construction method and hang modular system
CN205875410U (en) A hang module system all for tube structure room panel construction
CN111422758A (en) Conical steel truss hoisting fixture and hoisting process
CN210976552U (en) Foldable operation platform device in elevator shaft
CN105952129B (en) A kind of elevator combined type entirety lifting operation platform and its construction method
CN203654754U (en) Double-layered overhanging type discharging platform
CN202000647U (en) Base device for lifting scaffold in elevator shaft
CN204850396U (en) Foldable elevartor shaft construction support
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN210620081U (en) Cantilever crane device suitable for dismantling external scaffold of assembled high-rise residence
CN209855192U (en) Automatic lifting frame for shaped elevator shaft way
CN104609316B (en) Longitudinal simple ground jack of tripartite confrontation
KR200288007Y1 (en) Rail railing (scaffolding) clamping device in the construction site.
CN201818034U (en) Movable operation platform
CN206591803U (en) A kind of overhanging scaffold supporting construction
CN204661109U (en) Two-layer single-column lifting working platform
CN206397107U (en) Armored concrete construction of lift well operating platform bracket
CN204661108U (en) Two-layer twin columns lifting working platform
CN213981021U (en) Novel support device for tail water

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination