CN106223339A - Ultra-deep foundation pit concrete pump down support system - Google Patents

Ultra-deep foundation pit concrete pump down support system Download PDF

Info

Publication number
CN106223339A
CN106223339A CN201610554634.0A CN201610554634A CN106223339A CN 106223339 A CN106223339 A CN 106223339A CN 201610554634 A CN201610554634 A CN 201610554634A CN 106223339 A CN106223339 A CN 106223339A
Authority
CN
China
Prior art keywords
pump line
pump
foundation ditch
ultra
support unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610554634.0A
Other languages
Chinese (zh)
Other versions
CN106223339B (en
Inventor
郑志辉
何涛
刘应洪
杨宏
石立国
李冉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201610554634.0A priority Critical patent/CN106223339B/en
Publication of CN106223339A publication Critical patent/CN106223339A/en
Application granted granted Critical
Publication of CN106223339B publication Critical patent/CN106223339B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

nullA kind of ultra-deep foundation pit concrete pump down support system that the present invention provides,Including multiple standard section of tower cranes、Multiple pump line well word fixed mounts、Passage、Pump machine、Pump line and tower crane base,Tower crane base is arranged on the bottom of foundation ditch,Multiple standard section of tower cranes are fixedly installed in tower crane base composition support unit successively,The height of support unit is not less than the degree of depth of foundation ditch,Support unit is connected with the edge of foundation ditch by passage,Pump machine is arranged on the edge of foundation ditch,Pump line is connected with pump machine and passes sequentially through passage and support unit and is connected with the bottom of foundation ditch,Pump line is fixedly installed with support unit by multiple pump line well word fixed mounts respectively,Its form supported by using standard section of tower crane to make,Instead of the scheme using the steel pipe scaffold that difficulty is higher to support when running into deep foundation ditch concrete pumping in work progress,Efficiently solve the problems referred to above,Guarantee is provided for concreting.

Description

Ultra-deep foundation pit concrete pump down support system
Technical field
The present invention relates to technical field of building construction, particularly a kind of ultra-deep foundation pit concrete pump down support system.
Background technology
Pour concrete difficulty of construction under ultra-deep foundation pit relatively big, relate to many factors, select a kind of safe and reliable to pour mode Method is relatively difficult, and conventional steel pipe scaffold support system quantities is big, and difficulty of construction is big, and danger coefficient is high, attachment complexity.
Summary of the invention
In order to solve above-mentioned technical problem, and providing a kind of ultra-deep foundation pit concrete pump down support system, it passes through Use standard section of tower crane to make the form supported, instead of and use difficulty higher when work progress runs into deep foundation ditch concrete pumping Steel pipe scaffold support scheme, efficiently solve the problems referred to above, provide guarantee for concreting.
A kind of ultra-deep foundation pit concrete pump down support system that the present invention provides, including multiple standard section of tower cranes, many Individual pump line well word fixed mount, passage, pump machine, pump line and tower crane base, described tower crane base is arranged on the bottom of described foundation ditch, institute Stating multiple standard section of tower crane and be fixedly installed in described tower crane base composition support unit successively, the height of described support unit is not Less than the degree of depth of described foundation ditch, described support unit is connected with the edge of described foundation ditch by described passage, and described pump machine is arranged At the edge of described foundation ditch, described pump line is connected with described pump machine and passes sequentially through described passage and described support unit and institute The bottom stating foundation ditch is connected, and described pump line sets by multiple described pump line well word fixed mounts and described support unit are fixing respectively Put.
Further, also including adhering to frame and anchor support, described attachment frame is nested with at described support unit logical with described The lower section of junction, road, described attachment frame is connected by described anchor support is fixing with the sidewall of described foundation ditch.
Further, multiple described pump line well word fixed mounts are fixing with described support unit employing fastener to be connected, and connects Place uses flexible material parcel.
Further, described pump line well word fixed mount includes multiple steel pipe, multiple described steel pipes two-by-two one group be arranged in parallel Composition groined type shape also fixing with described support unit is connected, and junction uses flexible material to wrap up.
Further, described pump line forms return bend in the bottom of described foundation ditch.
Further, described return bend includes the first pump line, the second pump line, the 3rd pump line, the 4th pump line, the 5th pump line With the 6th pump line, described first pump line is arranged straight down, and described first pump line extends to the right the second pump line forming semicircle shape, Described second pump line extends formation the 3rd pump line, described 3rd pump line the most horizontal-extending formation the 4th pump line, institute straight up State the 4th pump line straight down extend formation the 5th pump line, described 5th pump line the most horizontal-extending formation the 6th pump line, described The low spot of the second pump line is higher than described 6th pump line.
Further, described second pump line and described 6th pump line bottom are provided with cushion pad.
Further, described passage includes steel pipe skeleton, support beam and safety net, the two ends of described support beam respectively with institute Stating the fixing connection in edge of support unit and described foundation ditch, described steel pipe skeleton is arranged in described support beam, described safety net Length direction along described support beam is fixedly installed on described steel pipe skeleton.
Further, the fixed connection place, edge of described support beam and described foundation ditch is provided with anchor, described anchoring Device includes that multiple spiral, multiple described spirals become matrix arrangement.
Further, multiple described spirals all embed concrete cushion at least 500 millimeters.
In sum, a kind of ultra-deep foundation pit concrete pump down support system that the present invention provides is compared with prior art It has the advantage that into, it, by using standard section of tower crane to make the form that supports, instead of and run into deep base in work progress The scheme using the steel pipe scaffold that difficulty is higher to support during the concrete pumping of hole, efficiently solves the problems referred to above, for concrete Pour and provide guarantee;The sidewall of whole support unit with foundation ditch is fixedly connected, strengthens the peace of support unit further Quan Xing;Use the structure of return bend, allow for high drop concrete to the impulsive force of bend pipe bottom pump line, therefore at the bottom of pump line Portion arranges return bend, plays protection pump line, reduces concrete impulsive force, prevents the effect of plugging.
Accompanying drawing explanation
The overall structure schematic diagram of a kind of ultra-deep foundation pit concrete pump down support system that Fig. 1 provides for the present invention;
The pump line well word fixed mount peace of a kind of ultra-deep foundation pit concrete pump down support system that Fig. 2 provides for the present invention Assembling structure schematic diagram;
In figure:
1, standard section of tower crane;2, pump line well word fixed mount;3, passage;4, pump machine;
5, pump line;6, tower crane base;7, support unit;8, attachment frame;
9, anchor support;10, return bend;11, anchor;21, fastener;
22, steel pipe;31, steel pipe skeleton;32, support beam;33, safety net;
101, the first pump line;102, the second pump line;103, the 3rd pump line;
104, the 4th pump line;105, the 5th pump line;106, the 6th pump line;
107, cushion pad;111, spiral.
Detailed description of the invention
With specific embodiment, the present invention is described in further details below in conjunction with the accompanying drawings:
As shown in Fig. 1 and Tu, a kind of ultra-deep foundation pit concrete pump down support system that the present invention provides, including multiple Standard section of tower crane 1, multiple pump line 5 well word fixed mount 2, passage 3, pump machine 4, pump line 5 and tower crane base 6, tower crane base 6 is arranged on The bottom of foundation ditch, multiple standard section of tower cranes 1 are fixedly installed in tower crane base 6 composition support unit 7 successively, support unit 7 Highly not less than the degree of depth of foundation ditch, support unit 7 is connected with the edge of foundation ditch by passage 3, and pump machine 4 is arranged on the limit of foundation ditch Edge, pump line 5 is connected with pump machine 4 and passes sequentially through passage 3 and support unit 7 is connected with the bottom of foundation ditch, and pump line 5 leads to respectively Cross multiple pump line 5 well word fixed mount 2 to be fixedly installed with support unit 7, its form supported by using standard section of tower crane 1 to make, Instead of the scheme of steel pipe 22 scaffold support that employing difficulty is higher when running into deep foundation ditch concrete pumping in work progress, have Effect solves the problems referred to above, provides guarantee for concreting.
In a preferred embodiment, also including adhering to frame 8 and anchor support 9, attachment frame 8 is nested with at support unit 7 With the lower section of passage 3 junction, attachment frame 8 is connected, by whole support unit 7 by anchor support 9 is fixing with the sidewall of foundation ditch It is fixedly connected with the sidewall of foundation ditch, strengthens the safety of support unit 7 further.
In a preferred embodiment, multiple pump line 5 well word fixed mounts 2 and support unit 7 use fastener 21 fixing even Connect, and junction uses flexible material parcel, it is ensured that be on the premise of being connected firmly, it is ensured that the connection reliability of connecting portion, logical Spending the use time that flexible material parcel can ensure to connect, pump line 5 well word fixed mount 2 includes multiple steel pipe 22, multiple steel pipes 22 One group of composition groined type shape fixing with support unit 7 being connected, lower cost for material of be arrangeding in parallel two-by-two, and it is applicable to various executing Work is on-the-spot.
In a preferred embodiment, pump line 5 forms return bend 10 in the bottom of foundation ditch, and return bend 10 includes the One pump line the 101, second pump line the 102, the 3rd pump line the 103, the 4th pump line the 104, the 5th pump line 105 and the 6th pump line 106, the first pump Pipe 101 is arranged straight down, and the first pump line 101 extends to the right the second pump line 102 forming semicircle shape, and the second pump line 102 is vertical Upwardly extending formation the 3rd pump line 103, the 3rd pump line 103 the most horizontal-extending formation the 4th pump line 104, the 4th pump line 104 erects Directly it is downwardly extending the 5th pump line 105, the 5th pump line 105 the most horizontal-extending formation the 6th pump line 106, the second pump line 102 Low spot higher than the 6th pump line 106, the second pump line 102 and the 6th pump line 106 bottom are provided with cushion pad 107, use this Kind of structure, allows for high drop concrete to the impulsive force of bend pipe bottom pump line 5, therefore arranges return bend bottom pump line 5 10, play protection pump line 5, reduce concrete impulsive force, prevent the effect of plugging.
In a preferred embodiment, passage 3 includes steel pipe 22 skeleton 31, support beam 32 and safety net 33, support beam The two ends of 32 are fixing with the edge of support unit 7 and foundation ditch respectively to be connected, and steel pipe 22 skeleton 31 is arranged in support beam 32, safety Net 33 is fixedly installed on steel pipe 22 skeleton 31 along the length direction of support beam 32, and the edge of support beam 32 and foundation ditch is fixing to be connected Place is provided with anchor 11, and anchor 11 includes multiple spiral 111, and multiple spirals 111 become matrix arrangement, many Individual spiral 111 all embeds concrete cushion at least 500 millimeters, it is ensured that installation strength is enough, it is ensured that safety.
The tower crane base of Construction in Preparatory Stage and standard section of tower crane need to judge whether to strengthen tower crane standard according to field condition Joint, the foundation platform of tower crane base should ensure that enough service times after concreting, and general more than 7 days, its intensity should reach To cap design of pile intensity more than 80% can implement the installation of standard section of tower crane, and standard section of tower crane uses tower crane with tower crane base Lifting, on-the-spot standard section of tower crane must reach enough height, install tower crane base and standard section of tower crane, tower crane according to field condition Attachment making and passage set up the anchoring that according to field condition, attachment point need to be carried out.Concrete condition according to job site Choice arrangement pump machine and pump line, arrange security protection, standby enough pump line elbows with prevent pump line construction plugging time pour between The cold seam of break time oversize formation, revolution setting bottom pump line is arranged by last emphasis, it is contemplated that high drop concrete is to pump The impulsive force of bend pipe bottom pipe, therefore return bend is set bottom pump line, play protection pump line, reduce concrete impulsive force, anti- Only the effect of plugging, ultimately forms the system supported with standard section of tower crane for pump line.
Situation below for two kinds of easy pluggings enumerates two kinds of solutions: one, prevent coagulation by adjustment match ratio Soil plugging in pumping determines the suitable ratio of mud and water consumption, and the cement consumption of pump concrete typically cannot be less than 300 kilograms often Cubic meter, and indices should meet " portland cement, Portland cement " (GBJI75 1992) and " slag portland Cement, Portland pozzolana cement, Portland fly ash cement " (GBJl344 1992) standard, the maximum ratio of mud is 0.6, Typically preferably controlling in 0.4~0.6 relatively good, the water consumption of concrete according to slump requirement, and should be come really with reference to aggregate grading Fixed, if meeting that the slump requires and water consumption is excessive, it is easy to during pump concrete, produce bleeding isolation and block up Pipe, now should adjust the slump by improving aggregate grading, increasing additive and admixture.The minimum cement of pump concrete Consumption one-level should meet the requirements, to ensure the pumpability of concrete.Two, grading of aggregates and sand coarse aggregate ratio is unreasonable causes this feelings of plugging Condition solves using the following method, 1. improves the grating of sandstone and adjusts sand coarse aggregate ratio, and coarse aggregate preferably selects ganoid circle or approximation Circular aggregate, cobble is better than rubble, and in rubble, faller gill shape stone contents should be less than 5%;The grating of coarse aggregate directly affects Voidage and sand coarse aggregate ratio, thus affect the pumpability of concrete, general conventional 5~25mm and the continuous grading of 5~40mm;2. to carefully The requirement of aggregate, preferably with the medium sand that modulus of fineness is 2.5~3.2;15% is should be greater than, if can reach by the sand of the sieve aperture of 0.315 15%~30% is optimal;Having good grating, voidage is little, and coarse sand voidage is big, and pumpability is poor;Sand grains is meticulous, bleeding Increasing, concrete produces drying shrinkage, and pumping resistance is big.As there is plugging because fine aggregate can not meet pumping requirements;Can pass through The method such as adjustment cement consumption, sand coarse aggregate ratio, gradation of coarse aggregate of improving, interpolation additive is solved;3. the sand coarse aggregate ratio of pump concrete Requirement, the sand coarse aggregate ratio of pump concrete is the most relevant with stone kind, maximum particle diameter, the grating of sand and cement consumption.Pumped concrete The sand coarse aggregate ratio of soil typically should control 40%~50%, and sand coarse aggregate ratio specifically can adjust according to practical situation, uses coarse aggregate suitably to increase Big sand coarse aggregate ratio, uses fine sand then to reduce sand coarse aggregate ratio.Rule of thumb, the sand coarse aggregate ratio general control of medium sand is 38%~45%, and fine sand or spy are thin The sand coarse aggregate ratio of sand is the most suitable with 32%~38%.
Revolution setting bottom pump line is arranged by last emphasis, it is contemplated that high drop concrete is to bend pipe bottom pump line Impulsive force, therefore return bend is set bottom pump line, play protection pump line, reduce concrete impulsive force, prevent the effect of plugging.
The above, only presently preferred embodiments of the present invention, not in order to limit the present invention, every skill according to the present invention Any trickle amendment, equivalent and the improvement that above example is made by art essence, should be included in technical solution of the present invention Protection domain within.

Claims (10)

1. a ultra-deep foundation pit concrete pump down support system, it is characterised in that include multiple standard section of tower crane (1), many Individual pump line well word fixed mount (2), passage (3), pump machine (4), pump line (5) and tower crane base (6), described tower crane base (6) is arranged In the bottom of described foundation ditch, multiple described standard section of tower cranes (1) are fixedly installed on successively in described tower crane base (6) and form support Unit (7), the height of described support unit (7) passes through described passage not less than the degree of depth of described foundation ditch, described support unit (7) (3) edge with described foundation ditch is connected, and described pump machine (4) is arranged on the edge of described foundation ditch, described pump line (5) and described pump machine (4) it is connected and passes sequentially through described passage (3) and be connected with the bottom of described foundation ditch with described support unit 7, described pump line (5) it is fixedly installed with described support unit (7) by multiple described pump lines well word fixed mount (2) respectively.
A kind of ultra-deep foundation pit concrete pump down support system the most according to claim 1, it is characterised in that also include Attachment frame (8) and anchor support (9), described attachment frame (8) is nested with in described support unit (7) and described passage (3) junction Lower section, described attachment frame (8) is fixed by the sidewall of described anchor support (9) and described foundation ditch and is connected.
A kind of ultra-deep foundation pit concrete pump down support system the most according to claim 1 and 2, it is characterised in that many Individual described pump line well word fixed mount (2) is fixing with described support unit (7) employing fastener (21) to be connected, and junction uses flexibility Material wraps up.
A kind of ultra-deep foundation pit concrete pump down support system the most according to claim 3, it is characterised in that described pump Pipe well word fixed mount (2) includes multiple steel pipe (22), multiple described steel pipes (22) one group of composition groined type shape that be arranged in parallel two-by-two And fixing with described support unit (7) is connected, junction uses flexible material to wrap up.
A kind of ultra-deep foundation pit concrete pump down support system the most according to claim 1 and 2, it is characterised in that institute State pump line (5) and form return bend (10) in the bottom of described foundation ditch.
A kind of ultra-deep foundation pit concrete pump down support system the most according to claim 5, it is characterised in that described time Turning head (10) includes the first pump line (101), the second pump line (102), the 3rd pump line (103), the 4th pump line (104), the 5th pump Pipe (105) and the 6th pump line (106), described first pump line (101) is arranged straight down, and described first pump line (101) is prolonged to the right Stretching the second pump line (102) forming semicircle shape, described second pump line (102) extends formation the 3rd pump line (103), institute straight up Stating the 3rd pump line (103) the most horizontal-extending formation the 4th pump line (104), described 4th pump line (104) extends shape straight down Become the 5th pump line (105), described 5th pump line (105) the most horizontal-extending formation the 6th pump line (106), described second pump line (102) low spot is higher than described 6th pump line (106).
A kind of ultra-deep foundation pit concrete pump down support system the most according to claim 6, it is characterised in that described the Two pump lines (102) and described 6th pump line (106) bottom are provided with cushion pad (107).
A kind of ultra-deep foundation pit concrete pump down support system the most according to claim 1 and 2, it is characterised in that institute State passage (3) and include steel pipe skeleton (31), support beam (32) and safety net (33), the two ends of described support beam (32) respectively with institute Stating the fixing connection in edge of support unit (7) and described foundation ditch, described steel pipe skeleton (31) is arranged in described support beam (32), Described safety net (33) is fixedly installed on described steel pipe skeleton (31) along the length direction of described support beam (32).
A kind of ultra-deep foundation pit concrete pump down support system the most according to claim 8, it is characterised in that described The fixed connection place, edge of support beam (32) and described foundation ditch is provided with anchor (11), and described anchor (11) includes multiple Spiral (111), multiple described spirals (111) become matrix arrangement.
A kind of ultra-deep foundation pit concrete pump down support system the most according to claim 9, it is characterised in that multiple Described spiral (111) all embeds concrete cushion at least 500 millimeters.
CN201610554634.0A 2016-07-14 2016-07-14 Ultra-deep foundation pit concrete pumps downwards support system Expired - Fee Related CN106223339B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610554634.0A CN106223339B (en) 2016-07-14 2016-07-14 Ultra-deep foundation pit concrete pumps downwards support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610554634.0A CN106223339B (en) 2016-07-14 2016-07-14 Ultra-deep foundation pit concrete pumps downwards support system

Publications (2)

Publication Number Publication Date
CN106223339A true CN106223339A (en) 2016-12-14
CN106223339B CN106223339B (en) 2018-08-17

Family

ID=57520398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610554634.0A Expired - Fee Related CN106223339B (en) 2016-07-14 2016-07-14 Ultra-deep foundation pit concrete pumps downwards support system

Country Status (1)

Country Link
CN (1) CN106223339B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108560556A (en) * 2018-05-22 2018-09-21 北京六建集团有限责任公司 A kind of deep foundation ditch concrete pumping system and its construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6290414A (en) * 1985-10-15 1987-04-24 Kokudo Kaihatsu Gijutsu Kenkyu Center Method and apparatus for concreting work
JP2008267051A (en) * 2007-04-24 2008-11-06 Kajima Corp Method and facility for placing concrete
CN102493457A (en) * 2011-12-07 2012-06-13 中国建筑第八工程局有限公司 Extra-deep downward concrete pumping system
CN104863158A (en) * 2015-05-25 2015-08-26 中国建筑第八工程局有限公司 Super-deep and downward concrete conveying system along vertical structure
CN104895331A (en) * 2015-05-26 2015-09-09 中国建筑第八工程局有限公司 Concrete downward ultra-deep combined pumping method and device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6290414A (en) * 1985-10-15 1987-04-24 Kokudo Kaihatsu Gijutsu Kenkyu Center Method and apparatus for concreting work
JP2008267051A (en) * 2007-04-24 2008-11-06 Kajima Corp Method and facility for placing concrete
CN102493457A (en) * 2011-12-07 2012-06-13 中国建筑第八工程局有限公司 Extra-deep downward concrete pumping system
CN104863158A (en) * 2015-05-25 2015-08-26 中国建筑第八工程局有限公司 Super-deep and downward concrete conveying system along vertical structure
CN104895331A (en) * 2015-05-26 2015-09-09 中国建筑第八工程局有限公司 Concrete downward ultra-deep combined pumping method and device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
钱海波等: "上海世茂深坑酒店混凝土超深一溜到底施工技术", 《施工技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108560556A (en) * 2018-05-22 2018-09-21 北京六建集团有限责任公司 A kind of deep foundation ditch concrete pumping system and its construction method

Also Published As

Publication number Publication date
CN106223339B (en) 2018-08-17

Similar Documents

Publication Publication Date Title
Li Large volume, high‐performance applications of fibers in civil engineering
CN110158484A (en) A kind of high-speed railway packaged type bridges precast assembly structure and construction method
CN206396816U (en) A kind of blower foundation various dimensions ruggedized construction
CN205206033U (en) Frame post connected node suitable for prefabricated assembly building
CN103964795A (en) Reinforced cement based composite material with fiber woven mesh and preparation method of reinforced cement based composite material
CN109057170A (en) A kind of fibre reinforced composites linked system and implementation method based on cement base cementing medium
CN109338874B (en) Bridge composite pier column structure based on directional ECC and construction process
CN110485276A (en) A kind of combined anti-seismic pier stud and its without templating construction method
CN101761073A (en) Improved construction technology of CFG (cement fIying-ash gravel) pile
CN108316466A (en) A kind of prefabricated window member that floats, assembled float window joint structure and its construction method
CN107140922A (en) Road quick patching mortar and its production method
CN209025322U (en) A kind of fibre reinforced composites linked system based on cement base cementing medium
CN106223339A (en) Ultra-deep foundation pit concrete pump down support system
CN106968455A (en) The ruggedized construction and reinforcement means of sea sand reinforced beam
CN106542788A (en) A kind of Machine-made Sand C120 steel fibre pump concretes and preparation method thereof
CN108590035A (en) High-strength recycled concrete superposed column and preparation method thereof
CN109180044A (en) A kind of polystyrene microcapsules self-repair concrete structure and preparation method thereof
CN111502721A (en) Joint roadway concrete joint supporting structure and construction method thereof
CN217378870U (en) Major diameter prestressed steel pipe concrete friction pile
CN105803942A (en) Concrete roughening method
CN105906258B (en) A kind of concrete for reinforced concrete composite structure C240 strength grades
CN107859017A (en) A kind of fabricated ocean engineering concrete architectural structure system
CN101165291A (en) Vertical prestressing force opening mud jacking construction method and construction device
CN208586640U (en) A kind of large form support construction for constructing no holdfast concrete barricade
Fouad et al. High-strength materials for spun concrete poles.

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180817

Termination date: 20190714

CF01 Termination of patent right due to non-payment of annual fee