CN106223184A - A kind of method improving xoncrete structure crack resistance - Google Patents

A kind of method improving xoncrete structure crack resistance Download PDF

Info

Publication number
CN106223184A
CN106223184A CN201610530890.6A CN201610530890A CN106223184A CN 106223184 A CN106223184 A CN 106223184A CN 201610530890 A CN201610530890 A CN 201610530890A CN 106223184 A CN106223184 A CN 106223184A
Authority
CN
China
Prior art keywords
separation net
based material
xoncrete structure
toughness cement
crack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610530890.6A
Other languages
Chinese (zh)
Inventor
朱尔玉
何春晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jiaotong University
Original Assignee
Beijing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jiaotong University filed Critical Beijing Jiaotong University
Priority to CN201610530890.6A priority Critical patent/CN106223184A/en
Publication of CN106223184A publication Critical patent/CN106223184A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F5/00Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
    • E01F5/005Culverts ; Head-structures for culverts, or for drainage-conduit outlets in slopes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses a kind of toughness cement-based material and wrap up the normal concrete method with raising xoncrete structure crack resistance, can be used for the concrete workses such as bridge, high ferro, building, pond, tank, culvert, belong to concrete engineering construction technical field.The method of this raising xoncrete structure crack resistance, by laying separation net inside steel reinforcement cage, pours toughness cement-based material at xoncrete structure tension position easy to crack, pours normal concrete at other positions of xoncrete structure, and separates with separation net.The superpower stretching strain ability utilizing toughness cement-based material improves the crack resistance of xoncrete structure;Utilize separation net to separate bi-material, both ensure that infiltration good between bi-material and caking property, greatly reduce again the consumption of the toughness cement-based material of costliness, thus significantly reduce engineering cost.

Description

A kind of method improving xoncrete structure crack resistance
Technical field
This patent relates to a kind of method improving xoncrete structure crack resistance, is applied to bridge, high ferro, building, pond, water The concrete works such as groove, culvert, specifically, it is simply that wrap up normal concrete with toughness cement-based material, utilize toughness cement The superpower stretching strain ability of sill improves the crack resistance of xoncrete structure, belongs to concrete works technical field.
Background technology
Due to concrete tension poor performance, crack is common asking in concrete works especially large-scale concrete engineering Topic, is also one of problem that engineering staff is the most worried.In the concrete works having a large capacity and a wide range is built, engineering staff is according to reality Trample experience and theoretical direction the most correspondingly proposes some solutions, such as, xoncrete structure increases amount of reinforcement, Structure arranges three dimension prestressing muscle, improves the strength grade of concrete;Use the stronger material of other toughness instead and all replace general Logical concrete material etc..
Toughness cement-based material refers to add appropriate toughness material in cement, rear by stirring and processing molding, makes A kind of bigger than normal concrete toughness, intensity is high, have the composite of notable strain hardening characteristic after hardening.Its interface roughness Degree can ensure the adhesion strength between toughness cement-based material and normal concrete, and at interface, roughness is the highest, bi-material Between contact area the biggest, the gmatjpdumamics on interface is the biggest, thus both adhesion strengths are the highest;And along with general The increase of logical strength grade of concrete, the roughness at interface improves the most accordingly, and adhesion strength is higher, and both bondings are tighter Gu.
" a kind of anticracking mixes for patent of invention " a kind of anti-crack concrete application publication number CN 104496303 A ", patent of invention Solidifying soil application publication number CN 103755237 A ", patent of invention " a kind of anti-crack concrete application publication number CN 103755233 A ", patent of invention " a kind of anti-crack concrete application publication number CN 103739245 A ", utility model patent " a kind of anticracking coagulation Soil application publication number CN 203947683 A " all disclose that a kind of different materials proportioning makes slightly higher compared with normal concrete toughness Anti-crack concrete.
Patent of invention " a kind of cracking protection method for concrete dams application publication number CN 103195025 A " discloses one Plant and insulation material is set at dam body stream side surface, after some strength to be achieved, fill out in insulation material upstream side certain limit The method building sand, reaches to reduce the temperature difference, the purpose of dam body anticracking protection with this.
Patent of invention " a kind of concrete waterproofing and anti-leakage agent application publication number CN 104140217 A ", patent of invention " Kind of concrete waterproofing and anti-leakage agent application publication number CN 104140218 A ", patent of invention " a kind of concrete waterproofing and anti-leakage agent Application publication number CN 104140219 A " disclose use waterproofing and anti-leakage agent reduction hydration heat of concrete, with compensating concrete Shrink, thus prevent concrete cracking and seepage.
Knowing from above existing patent and open source literature, current existing agent on crack resistance of concrete cracking method is the most all from concrete material Material aspect is improved, but these improve or cost increases a lot, or effect of prestressed is inconspicuous.In view of this, inventor's root According to theory analysis and practical experience, study, develop and experiment proves that, from stress performance and economy, finally produce this Patent.
Summary of the invention
This patent to solve the technical problem that: proposes a kind of method improving xoncrete structure crack resistance, utilizes toughness Cement-based material is wrapped in the outside of normal concrete structure, resists coagulation by the superpower tensile property of toughness cement-based material The peripheral tension of soil structure, prevents xoncrete structure from crack occur or reducing fracture width.And with toughness cement-based material bag It is rolled in the mode that normal concrete is peripheral, replaces whole concrete works to use toughness cement-based material, greatly reduce more high The consumption of expensive toughness cement-based material, considerably reduces the cost of engineering construction.
This patent solves technical problem and be the technical scheme is that
A kind of method improving xoncrete structure crack resistance, including toughness cement-based material 1-1-1, toughness cement-based material 1-1-2, toughness cement-based material 1-2-1, toughness cement-based material 1-2-2, toughness cement-based material 1-3-1, normal concrete 2-1-1, normal concrete 2-1-2, normal concrete 2-2-1, normal concrete 2-2-2, normal concrete 2-3-1, separation net 3-1-1, separation net 3-1-2, separation net 3-1-3, separation net 3-2-1, separation net 3-2-2, steel reinforcement cage 4-1-1, steel reinforcement cage 4-1- 2, steel reinforcement cage 4-2-1, steel reinforcement cage 4-2-2, steel reinforcement cage 4-3-1;It is characterized in that: water at xoncrete structure tension position easy to crack Build toughness cement-based material 1-1-1, pour normal concrete 2-1-1 at other positions of xoncrete structure, between bi-material with Separation net 3-1-1 separates;Or pour toughness cement-based material 1-1-2 at xoncrete structure tension position easy to crack, at concrete Other positions of structure pour normal concrete 2-1-2, separate with separation net 3-2-1 between bi-material;Or at xoncrete structure Tension position easy to crack pours toughness cement-based material 1-2-1, pours normal concrete 2-2-at other positions of xoncrete structure 1, separate with separation net 3-1-2 between bi-material;Or pour toughness cement matrix at xoncrete structure tension position easy to crack Material 1-2-2, pour normal concrete 2-2-2 at other positions of xoncrete structure, between bi-material with separation net 3-1-3 every Open;Or pour toughness cement-based material 1-3-1 at xoncrete structure tension position easy to crack, water at other positions of xoncrete structure Build normal concrete 2-3-1, separate with separation net 3-2-2 between bi-material;Reach to save costly by above measure Toughness cement-based material, reduction engineering cost, improve the purpose of xoncrete structure crack resistance.
A kind of method improving xoncrete structure crack resistance, it is characterised in that: for solid section xoncrete structure, mixed Xtah Crude Clay structure tension position easy to crack is laid separation net 3-1-1 and is separated toughness cement-based material 1-1-1 and normal concrete 2- 1-1, separation net 3-1-1 are layed in the inner side of steel reinforcement cage 4-1-1;Or separation net is laid at xoncrete structure tension position easy to crack 3-2-1 separates toughness cement-based material 1-1-2 and normal concrete 2-1-2, and separation net 3-2-1 is layed in steel reinforcement cage 4-1-2 Inner side;Toughness cement-based material the thickest 50~500mm, separation net sizing grid 2 × 2~80 × 80mm2
A kind of method improving xoncrete structure crack resistance, it is characterised in that: open-type or type semienclosed cross section are tied Structure, lays separation net 3-1-2 and separates toughness cement-based material 1-2-1 and commonly mix at xoncrete structure tension position easy to crack Solidifying soil 2-2-1, separation net 3-1-2 are layed in the inner side of steel reinforcement cage 4-2-1;Or lay at xoncrete structure tension position easy to crack Separation net 3-1-3 separates toughness cement-based material 1-2-2 and normal concrete 2-2-2, and separation net 3-1-3 is layed in steel reinforcement cage The inner side of 4-2-2;Toughness cement-based material the thickest 50~500mm;Separation net sizing grid 2 × 2~80 × 80mm2
A kind of method improving xoncrete structure crack resistance, it is characterised in that: for hollow type cross section structure, at concrete Structure tension position easy to crack is laid separation net 3-2-2 and is separated toughness cement-based material 1-3-1 and normal concrete 2-3-1, Separation net 3-2-2 is layed in the inner side of steel reinforcement cage 4-3-1;Toughness cement-based material the thickest 50~500mm;Separation net grid is big Little 2 × 2~80 × 80mm2
A kind of method improving xoncrete structure crack resistance, it is characterised in that: separation net 3-1-1, separation net 3-1-2, every Off-network 3-1-3, separation net 3-2-1, separation net 3-2-2 are geonet or GSZ or steel wire or stainless steel cloth or iron wire Net or nylon wire or wire netting.
This patent is reasonable in design, and the suitability is strong, and good reliability has wide practical use.
Accompanying drawing explanation
Fig. 1 Filled Rectangle concrete component sectional drawing
Fig. 2 solid circles concrete component sectional drawing
Fig. 3 Rectangular Water Trough sectional drawing
Fig. 4 U-tube concrete component sectional drawing
Fig. 5 hollow circular-tube concrete component sectional drawing
In figure: 1-1-1 toughness cement-based material;1-1-2 toughness cement-based material;1-2-1 toughness cement matrix Material;1-2-2 toughness cement-based material;1-3-1 toughness cement-based material;2-1-1 normal concrete;2-1-2 is common Concrete;2-2-1 normal concrete;2-2-2 normal concrete;2-3-1 normal concrete;3-1-1 separation net;3- 1-2 separation net;3-1-3 separation net;3-2-1 separation net;3-2-2 separation net;4-1-1 steel reinforcement cage;4-1-2 steel Muscle cage;4-2-1 steel reinforcement cage;4-2-2 steel reinforcement cage;4-3-1 steel reinforcement cage.
Detailed description of the invention
In conjunction with specific embodiments this patent is described further:
Embodiment one:
Wet joint concrete, because of end face and bottom surface all tensions, easily ftractures, and is that the stress of rigid frame bridge is weak after first freely-supported Position, the useful life longevity of serious threat bridge.Utilize the superpower tensile property of toughness cement-based material, wet seam can be improved Crack resistance, prevents the internal reinforcing bar of its crack corrosion;And the method utilizing toughness cement-based material parcel normal concrete, decrease The consumption of expensive toughness cement-based material, significantly reduces engineering cost.
Apply a kind of method improving xoncrete structure crack resistance, rigid frame bridge concrete after the first freely-supported of construction one Wet seam, the long 2m of wet seam, wide 1m, high 1.5m.The wet seam of this solid rectangular cross-section includes toughness cement-based material 1-1-1, general Logical concrete 2-1-1, separation net 3-1-1, steel reinforcement cage 4-1-1.It is embodied as step as follows:
1, assembling reinforcement cage and laying separation net
According to structure stress characteristic, calculate wet seam crossing amount of reinforcement, and be properly positioned assembling reinforcement cage 4-1-1, such as Fig. 1. Along with building of reinforcement cage skeleton, lay thickness inside steel reinforcement cage is 30 × 30mm for 2mm, size of mesh opening simultaneously2Separation net, And take to lay the mode of separation net 3-1-1 at xoncrete structure tension position easy to crack.
2, toughness cement-based material and normal concrete are poured
(1) bottom wet seam, the thick toughness cement-based material 1-1-1 of 150mm is first poured, such as Fig. 1.
(2) the most parallel wet seam sidepiece toughness cement-based material 1-1-1 and normal concrete 2-1-1, toughness water are poured The thickness of cement-based material 1-1-1 is 200mm, it is ensured that the mobility of bi-material and caking property, makes toughness cement-based material 1-1-1 Good with normal concrete 2-1-1 bonding, until toughness cement-based material 1-1-1 and the fully wrapped around steel of normal concrete 2-1-1 Muscle cage 4-1-1, such as Fig. 1.
(3) the last toughness cement-based material 1-1-1 pouring 150mm thickness at wet seam top, such as Fig. 1.Maintenance reaches to set Meter intensity, ultimately forms crack resistance strong, and tensile property is good, the wet seam that structural safety is durable.
Embodiment two:
The bridge of just structure system after first freely-supported, its abutment pier is relatively big by pulling force, easily ftractures, have a strong impact on bridge safety and Normal use, therefore after first freely-supported, just the abutment pier tension of structure system is problem demanding prompt solution.
Apply a kind of method improving xoncrete structure crack resistance, a diameter of 1m of construction one, the cylindrical bridge of high 6m Pier.This bridge pier includes toughness cement-based material 1-1-2, normal concrete 2-1-2, separation net 3-2-1, steel reinforcement cage 4-1-2.Specifically Implement step as follows:
1, assembling reinforcement cage and laying separation net
According to structure stress characteristic, calculate amount of reinforcement needed for bridge pier, and be properly positioned assembling reinforcement cage 4-1-2, such as Fig. 2. Along with building of reinforcement cage skeleton, lay thickness inside steel reinforcement cage is 25 × 25mm for 2mm, size of mesh opening simultaneously2Separation net, And take to lay the mode of separation net 3-2-1 at xoncrete structure tension position easy to crack, such as Fig. 2.
2, toughness cement-based material and normal concrete are poured
Parallel pour bridge pier toughness cement-based material 1-1-2 and normal concrete 2-1-2, toughness cement-based material 1-1-2 Thickness be 150mm, it is ensured that the mobility of bi-material and caking property, make toughness cement-based material 1-1-2 and normal concrete 2-1-2 bonding is good, until toughness cement-based material 1-1-2 and normal concrete 2-1-2 fully wrapped around steel reinforcement cage 4-1-2, as Fig. 2.Maintenance reaches design strength, strengthens the crack resistance of bridge pier, makes structural safety durable.
Embodiment three:
Rectangular Water Trough, because being moistened by water enchroachment (invasion) throughout the year, itself not only to be born excessive structure tension, also want antiseep, anti- Sealing stream invades cell body because of crack, the internal reinforcing bar of corrosion, thus anticracking, the leakproof to Rectangular Water Trough engineering proposes the strictest Requirement.
Apply a kind of method improving xoncrete structure crack resistance, the Rectangular Water Trough of construction width 20m × high 2m.This square Shape tank includes toughness cement-based material 1-2-1, normal concrete 2-2-1, separation net 3-1-2, steel reinforcement cage 4-2-1.Concrete real Execute step as follows:
1, assembling reinforcement cage and laying separation net
According to structure stress characteristic, calculate amount of reinforcement needed for Rectangular Water Trough, and be properly positioned assembling reinforcement cage 4-2-1, as Fig. 3.Along with building of reinforcement cage skeleton, lay thickness inside steel reinforcement cage is 20 × 20mm for 2mm, size of mesh opening simultaneously2Every Off-network, and take to lay the mode of separation net 3-1-2 at xoncrete structure tension position easy to crack, such as Fig. 3.
2, toughness cement-based material and normal concrete are poured
(1) bottom Rectangular Water Trough, the thick toughness cement-based material 1-2-1 of 100mm is first poured, such as Fig. 3;
(2) the most parallel Rectangular Water Trough pool wall toughness cement-based material 1-2-1 and normal concrete 2-2-1, toughness are poured The thickness of cement-based material 1-2-1 is 100mm, it is ensured that the mobility of bi-material and caking property, makes toughness cement-based material 1- 2-1 and normal concrete 2-2-1 bonding is good, until toughness cement-based material 1-2-1 is fully wrapped around with normal concrete 2-2-1 Steel reinforcement cage 4-2-1, such as Fig. 3;
(3) the last toughness cement-based material 1-2-1 pouring 100mm thickness at cell wall top, such as Fig. 3.Maintenance reaches design Intensity, ultimately forms crack resistance strong, and barrier performance is good, the Rectangular Water Trough of safety durable.
Embodiment four:
Certain precast concrete U-lag, outer wall tension stress is relatively big, easy to crack.
Applying a kind of method improving xoncrete structure crack resistance, a prefabricated long 8m, internal diameter are 0.8m, external diameter is 1.2m's Concrete U-type groove.This concrete U-type groove include toughness cement-based material 1-2-2, normal concrete 2-2-2, separation net 3-1-3, Steel reinforcement cage 4-2-2.It is embodied as step as follows:
1, assembling reinforcement cage and laying separation net
According to structure stress characteristic, calculate amount of reinforcement needed for concrete U-type groove, and be properly positioned assembling reinforcement cage 4-2-2, Such as Fig. 4.Along with building of reinforcement cage skeleton, lay thickness inside steel reinforcement cage is 15 × 15mm for 1.5mm, size of mesh opening simultaneously2 Separation net, and take xoncrete structure tension position easy to crack lay separation net 3-1-3 mode, such as Fig. 4.
2, toughness cement-based material and normal concrete are poured
(1) bottom U-type groove, the thick toughness cement-based material 1-2-2 of 100mm is first poured, such as Fig. 4.
(2) the most parallel U-type groove toughness cement-based material 1-2-2 and normal concrete 2-2-2, toughness cement matrix are poured The thickness of material 1-2-2 is 100mm, it is ensured that the mobility of bi-material and caking property, makes toughness cement-based material 1-2-2 with common Concrete 2-2-2 bonding is good, until toughness cement-based material 1-2-2 and normal concrete 2-2-2 fully wrapped around steel reinforcement cage 4- 2-2, such as Fig. 4.
(3) finally 100mm thickness toughness cement-based material 1-2-2 is poured at U-type groove top, such as Fig. 4.It is strong that maintenance reaches design Degree, ultimately forms crack resistance strong, the concrete U-type groove that tensile property is good.
Embodiment five:
Pipe culvert concrete works, internal is washed away by water, and when especially water speed is very fast, tube wall is hit greatly, outside pipe Side is relatively big by pulling force, therefore requires that the cracking resistance of pipe, tensile property are good.
Applying a kind of method improving xoncrete structure crack resistance, a prefabricated long 10m, internal diameter are 0.6m, external diameter is 0.8m Concrete pipe.This pipe includes toughness cement-based material 1-3-1, normal concrete 2-3-1, separation net 3-2-2, steel reinforcement cage 4-3-1.It is embodied as step as follows:
1, assembling reinforcement cage and laying separation net
According to structure stress characteristic, calculate amount of reinforcement needed for pipe, and be properly positioned assembling reinforcement cage 4-3-1, such as Fig. 5. Along with building of reinforcement cage skeleton, lay thickness inside steel reinforcement cage 4-3-1 is 1.5mm simultaneously, and size of mesh opening is 15 × 15mm2's Separation net, and take to lay the mode of separation net 3-2-2 at xoncrete structure tension position easy to crack, such as Fig. 5.
2, toughness cement-based material and normal concrete are poured
Parallel pour tube wall toughness cement-based material 1-3-1 and normal concrete 2-3-1, toughness cement-based material 1-3-1 Thickness be 50mm, it is ensured that the mobility of bi-material and caking property, make toughness cement-based material 1-3-1 and normal concrete 2- 3-1 bonding is good, until toughness cement-based material 1-3-1 and normal concrete 2-3-1 fully wrapped around steel reinforcement cage 4-3-1, such as figure 5.Maintenance reaches design strength, ultimately forms crack resistance strong, and barrier performance is good, the pipe that tension is durable.
Above-described specific implementation method, is illustrated purpose, technical scheme and the beneficial effect of this patent.Institute It is emphasized that the foregoing is only specific implementation of the patent example, can not be used for limiting the scope of this patent.All Within the spirit of this patent and principle, any amendment, equivalent or the improvement etc. made, should be included in the protection of this patent Within the scope of.
In sum, this patent provides a kind of method improving xoncrete structure crack resistance, it is achieved that solve concrete The difficult problem that engineering is easy to crack, improves safety and the practicality of engineering, the durability of engineering construction.This patent has novelty Property, practicality, meet patent requirements, therefore propose patent application in accordance with the law.

Claims (5)

1. the method improving xoncrete structure crack resistance, including toughness cement-based material (1-1-1), toughness cement-based material (1-1-2), toughness cement-based material (1-2-1), toughness cement-based material (1-2-2), toughness cement-based material (1-3-1), general Lead to concrete (2-1-1), normal concrete (2-1-2), normal concrete (2-2-1), normal concrete (2-2-2), commonly mix Solidifying soil (2-3-1), separation net (3-1-1), separation net (3-1-2), separation net (3-1-3), separation net (3-2-1), separation net (3- 2-2), steel reinforcement cage (4-1-1), steel reinforcement cage (4-1-2), steel reinforcement cage (4-2-1), steel reinforcement cage (4-2-2), steel reinforcement cage (4-3-1);Its Be characterised by: pour toughness cement-based material (1-1-1) at xoncrete structure tension position easy to crack, xoncrete structure other Position pours normal concrete (2-1-1), separates with separation net (3-1-1) between bi-material;Or in xoncrete structure tension Position easy to crack pours toughness cement-based material (1-1-2), pours normal concrete (2-1-at other positions of xoncrete structure 2), separate with separation net (3-2-1) between bi-material;Or pour toughness cement based at xoncrete structure tension position easy to crack Material (1-2-1), pours normal concrete (2-2-1) at other positions of xoncrete structure, with separation net (3-between bi-material 1-2) separate;Or pour toughness cement-based material (1-2-2) at xoncrete structure tension position easy to crack, xoncrete structure its His position pours normal concrete (2-2-2), separates with separation net (3-1-3) between bi-material;Or be subject at xoncrete structure Draw position easy to crack to pour toughness cement-based material (1-3-1), pour normal concrete (2-3-at other positions of xoncrete structure 1), separate with separation net (3-2-2) between bi-material;The toughness cement matrix saved costly is reached by above measure Material, reduction engineering cost, improve the purpose of xoncrete structure crack resistance.
A kind of method improving xoncrete structure crack resistance the most according to claim 1, it is characterised in that: for solid section Surface concrete structure, lays separation net (3-1-1) and separates toughness cement-based material at xoncrete structure tension position easy to crack (1-1-1) with normal concrete (2-1-1), separation net (3-1-1) is layed in the inner side of steel reinforcement cage (4-1-1);Or at concrete Structure tension position easy to crack is laid separation net (3-2-1) and is separated toughness cement-based material (1-1-2) and normal concrete (2- 1-2), separation net (3-2-1) is layed in the inner side of steel reinforcement cage (4-1-2);Toughness cement-based material the thickest 50~500mm, every Off-network sizing grid 2 × 2~80 × 80mm2
A kind of method improving xoncrete structure crack resistance the most according to claim 1, it is characterised in that: for open-type Or type semienclosed cross section structure, lay separation net (3-1-2) at xoncrete structure tension position easy to crack and separate toughness cement Sill (1-2-1) and normal concrete (2-2-1), separation net (3-1-2) is layed in the inner side of steel reinforcement cage (4-2-1);Or Xoncrete structure tension position easy to crack is laid separation net (3-1-3) and is separated toughness cement-based material (1-2-2) and commonly mix Solidifying soil (2-2-2), separation net (3-1-3) is layed in the inner side of steel reinforcement cage (4-2-2);Toughness cement-based material respectively thick 50~ 500mm;Separation net sizing grid 2 × 2~80 × 80mm2
A kind of method improving xoncrete structure crack resistance the most according to claim 1, it is characterised in that: for hollow type Cross section structure, lays separation net (3-2-2) and separates toughness cement-based material (1-3-at xoncrete structure tension position easy to crack 1) and normal concrete (2-3-1), separation net (3-2-2) is layed in the inner side of steel reinforcement cage (4-3-1);Toughness cement-based material divides Not thick 50~500mm;Separation net sizing grid 2 × 2~80 × 80mm2
A kind of method improving xoncrete structure crack resistance the most according to claim 1, it is characterised in that: separation net (3- 1-1), separation net (3-1-2), separation net (3-1-3), separation net (3-2-1), separation net (3-2-2) are geonet or geotechnique's lattice Grid or steel wire or stainless steel cloth or wire gauze or nylon wire or wire netting.
CN201610530890.6A 2016-07-07 2016-07-07 A kind of method improving xoncrete structure crack resistance Pending CN106223184A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610530890.6A CN106223184A (en) 2016-07-07 2016-07-07 A kind of method improving xoncrete structure crack resistance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610530890.6A CN106223184A (en) 2016-07-07 2016-07-07 A kind of method improving xoncrete structure crack resistance

Publications (1)

Publication Number Publication Date
CN106223184A true CN106223184A (en) 2016-12-14

Family

ID=57520064

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610530890.6A Pending CN106223184A (en) 2016-07-07 2016-07-07 A kind of method improving xoncrete structure crack resistance

Country Status (1)

Country Link
CN (1) CN106223184A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109795020A (en) * 2019-03-21 2019-05-24 徐州工程学院 A kind of preparation method of highly resistance carbonizing reinforced concrete
CN109824312A (en) * 2019-03-21 2019-05-31 徐州工程学院 A kind of preparation method improving Marine Reinforced Concrete Structures corrosion resistance of chloride ion ability
RU2731759C1 (en) * 2019-12-25 2020-09-08 Общество с ограниченной ответственностью "Центр технических разработок" Reinforced concrete gutter and channel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103496865A (en) * 2013-09-16 2014-01-08 北京工业大学 Hybrid FRP (Fiber Reinforced Plastic) grid enhancedreinforced ECC (Engineered Cementitious Composite) and application thereof tostructure for reinforcing concrete structure
CN103938803A (en) * 2014-04-04 2014-07-23 浙江大学 High toughness cement-based material-nonmetal fiber rib composite structure as well as application and application method thereof
CN104563389A (en) * 2014-12-22 2015-04-29 扬州大学 High-strength reinforced and functionally-graded concrete beam
CN104775565A (en) * 2015-03-30 2015-07-15 东南大学 Steel bar reinforced ECC-steel pipe concrete composite column
CN105464288A (en) * 2016-01-18 2016-04-06 东南大学 Composite bar-reinforced ECC and concrete composite beam and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103496865A (en) * 2013-09-16 2014-01-08 北京工业大学 Hybrid FRP (Fiber Reinforced Plastic) grid enhancedreinforced ECC (Engineered Cementitious Composite) and application thereof tostructure for reinforcing concrete structure
CN103938803A (en) * 2014-04-04 2014-07-23 浙江大学 High toughness cement-based material-nonmetal fiber rib composite structure as well as application and application method thereof
CN104563389A (en) * 2014-12-22 2015-04-29 扬州大学 High-strength reinforced and functionally-graded concrete beam
CN104775565A (en) * 2015-03-30 2015-07-15 东南大学 Steel bar reinforced ECC-steel pipe concrete composite column
CN105464288A (en) * 2016-01-18 2016-04-06 东南大学 Composite bar-reinforced ECC and concrete composite beam and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109795020A (en) * 2019-03-21 2019-05-24 徐州工程学院 A kind of preparation method of highly resistance carbonizing reinforced concrete
CN109824312A (en) * 2019-03-21 2019-05-31 徐州工程学院 A kind of preparation method improving Marine Reinforced Concrete Structures corrosion resistance of chloride ion ability
CN109795020B (en) * 2019-03-21 2021-04-23 徐州工程学院 Preparation method of high-carbonization-resistance reinforced concrete
CN109824312B (en) * 2019-03-21 2021-07-27 徐州工程学院 Preparation method for improving chlorine ion erosion resistance of marine reinforced concrete
RU2731759C1 (en) * 2019-12-25 2020-09-08 Общество с ограниченной ответственностью "Центр технических разработок" Reinforced concrete gutter and channel

Similar Documents

Publication Publication Date Title
CN106869017B (en) A kind of the precast assembly bridge pier-cushion cap node connection type and its practice of pier bottom setting flexible layer
CN201598776U (en) FRP pipe sea sand concrete column
CN206581145U (en) A kind of concrete-bridge end deck installation structure for exempting from expansion joint
CN106869315A (en) Concrete-filled steel tubular frame and its construction method with presstressed reinforcing steel
CN107447646B (en) Preparation method of steel-continuous fiber composite bar ECC-concrete composite column/pier
CN106223184A (en) A kind of method improving xoncrete structure crack resistance
CN101701485A (en) Hollow steel pipe-reinforced concrete superimposed member
CN102817375A (en) Assembly type precast reinforced concrete inspection well system
CN201627136U (en) Superposed member of PVC pipe reinforced concrete and steel pipe concrete
CN106917470A (en) The steel tube confinement concrete-filled rectangular steel tube component and its processing method of a kind of sandwich
CN206800795U (en) A kind of hollow multi-cavity steel tube concrete post
CN106638486B (en) High-tech zones cut-pff wall and gallery stage construction method
CN204370573U (en) Matrix pattern Rebar anchor
CN204691782U (en) A kind of Tunnel Second Lining surface Defects Treatment structure
CN108396783A (en) A kind of pre- closure grouting devices and methods therefor of basement roof pouring after settlement
CN206467899U (en) A kind of ripple multiple tube seawater sea-sand concrete member
CN204238264U (en) A kind of sole plate post-poured strip structure
CN203007936U (en) Prestressed concrete solid square pile
CN106337443A (en) Jointless construction structure combining SCC (self-compacting concrete) and common concrete
CN206844149U (en) A kind of connecting node of prefabricated assembled pipe gallery
CN106827207A (en) A kind of simple concrete column curing means
CN106381956A (en) Concrete prefabricated shell-regenerated mixed concrete combination column and preparation method thereof
CN103590538A (en) Non-circular rib for concrete
CN105971196A (en) Method for constructing masonry structure embedded square concrete filled steel tube ring beam-constructional column
CN207032010U (en) A kind of assembled solid steel tube constrains armored concrete pillar height pier

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination