CN106223178A - 一种传力杆定位结构 - Google Patents
一种传力杆定位结构 Download PDFInfo
- Publication number
- CN106223178A CN106223178A CN201610844655.6A CN201610844655A CN106223178A CN 106223178 A CN106223178 A CN 106223178A CN 201610844655 A CN201610844655 A CN 201610844655A CN 106223178 A CN106223178 A CN 106223178A
- Authority
- CN
- China
- Prior art keywords
- punching block
- sizing
- steel
- dowel steel
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C23/00—Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
- E01C23/04—Devices for laying inserting or positioning reinforcing elements or dowel bars with or without joint bodies; Removable supports for reinforcing or load transfer elements; Devices, e.g. removable forms, for making essentially horizontal ducts in paving, e.g. for prestressed reinforcements
- E01C23/045—Removable, e.g. reusable supports for positioning reinforcing or load transfer elements, adapted or not to also hold joint bodies
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明公开了一种传力杆定位结构,该结构包括第一定型钢模以及第二定型钢模,所述第一定型钢模与所述第二定型钢模对称设置;其中,所述第一定型钢模与所述第二定型钢模各自主体上分别开设有对称的多个通孔,所述多个通孔上远离所述第一定型钢模与所述第二定型钢模对应一侧分别连接有钢管;所述钢管内径大于所述传力杆外径;所述通孔以及所述钢管用于放置所述传力杆并限定所述传力杆的位置。该结构简单合理,制作成本低廉,通过在定位模板上设置的通孔以及钢管,可以在确保传力杆平行间的距离精度,同时该结构不会影响正常的浇筑施工,脱膜方便快捷。值得大面积推广使用。
Description
技术领域
本发明涉及定位结构技术领域,特别是涉及一种用于路基基床混凝土施工中传力杆的定位结构。
背景技术
传力杆指的是沿水泥混凝土路面板横缝,每隔一定距离在板厚中央布置的圆钢筋。其一端固定在一侧板内,另一端可以在邻侧板内滑动,其作用是在两块路面板之间传递行车荷载和防止错台,增加相邻混凝土块之间的应力传递以防止混凝土路面局部受力较大造成混凝土路面不均匀沉降,传递应力使相邻混凝土块共同受力。传力杆加固工装用于路基基床混凝土施工,基床混凝土内传力杆采用直径40mm的HPB300钢筋,横向间距0.3m,设置两排(距离混凝土底部20mm和顶部20mm分别设置一排)。传力杆在现场安装时很难保证其平行间距精度要求。
发明内容
本发明提供了一种传力杆定位结构。
本发明提供了如下方案:
一种传力杆定位结构,该结构包括第一定型钢模以及第二定型钢模,所述第一定型钢模与所述第二定型钢模对称设置;
其中,所述第一定型钢模与所述第二定型钢模各自主体上分别开设有对称的多个通孔,所述多个通孔上远离所述第一定型钢模与所述第二定型钢模对应一侧分别连接有钢管;所述钢管内径大于所述传力杆外径;所述通孔以及所述钢管用于放置所述传力杆并限定所述传力杆的位置。
优选的:所述钢管采用焊接工艺与所述通孔相连。
优选的:所述钢管长度为10厘米。
优选的:所述钢管内径为40毫米。
根据本发明提供的具体实施例,本发明公开了以下技术效果:
通过本发明,可以实现一种传力杆定位结构,在一种实现方式下,该结构包括第一定型钢模以及第二定型钢模,所述第一定型钢模与所述第二定型钢模对称设置;其中,所述第一定型钢模与所述第二定型钢模各自主体上分别开设有对称的多个通孔,所述多个通孔上远离所述第一定型钢模与所述第二定型钢模对应一侧分别连接有钢管;所述钢管内径大于所述传力杆外径;所述通孔以及所述钢管用于放置所述传力杆并限定所述传力杆的位置。该结构简单合理,制作成本低廉,通过在定位模板上设置的通孔以及钢管,可以在确保传力杆平行间的距离精度,同时该结构不会影响正常的浇筑施工,脱膜方便快捷。值得大面积推广使用。
当然,实施本发明的任一产品并不一定需要同时达到以上所述的所有优点。
附图说明
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1是本发明实施例提供的一种传力杆定位结构的结构示意图;
图2是本发明实施例提供的第一定型钢模的结构示意图。
图中:第一定型钢模1、第二定型钢模2、通孔3、钢管4、传力杆5。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员所获得的所有其他实施例,都属于本发明保护的范围。
实施例
参见图1、图2,为本发明实施例提供的一种传力杆定位结构,如图1、图2所示,该结构包括第一定型钢模1以及第二定型钢模2,所述第一定型钢模1与所述第二定型钢模2对称设置;
其中,所述第一定型钢模1与所述第二定型钢模2各自主体上分别开设有对称的多个通孔3,所述多个通孔3上远离所述第一定型钢模1与所述第二定型钢模2对应一侧分别连接有钢管4;所述钢管4内径大于所述传力杆5外径;所述通孔以及所述钢管4用于放置所述传力杆5并限定所述传力杆的位置。在实际应用中,所述钢管4采用焊接工艺与所述通孔相连。具体的,所述钢管4长度为10厘米。所述钢管内径为40毫米。
该结构在使用时,首先将第一定型钢模1与所述第二定型钢模2按照施工埋设位置进行安装,安装时确保第一定型钢模1与所述第二定型钢模2位置对应,然后将传力杆5穿过第一定型钢模1上的钢管4以及第二定型钢模2对应的钢管4,这样可以保证传力杆在整个浇筑过程中均能够保证平行间距离不变,从而达到设计要求的精度。同时该结构脱膜不受影响,浇筑完成后,可以直接将该第一定型钢模与第二定型钢模取下。
总之,该结构简单合理,制作成本低廉,通过在定位模板上设置的通孔以及钢管,可以在确保传力杆平行间的距离精度,同时该结构不会影响正常的浇筑施工,脱膜方便快捷。值得大面积推广使用。
需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。
以上所述仅为本发明的较佳实施例而已,并非用于限定本发明的保护范围。凡在本发明的精神和原则之内所作的任何修改、等同替换、改进等,均包含在本发明的保护范围内。
Claims (4)
1.一种传力杆定位结构,其特征在于,所述结构包括第一定型钢模以及第二定型钢模,所述第一定型钢模与所述第二定型钢模对称设置;
其中,所述第一定型钢模与所述第二定型钢模各自主体上分别开设有对称的多个通孔,所述多个通孔上远离所述第一定型钢模与所述第二定型钢模对应一侧分别连接有钢管;所述钢管内径大于所述传力杆外径;所述通孔以及所述钢管用于放置所述传力杆并限定所述传力杆的位置。
2.根据权利要求1所述的结构,其特征在于,所述钢管采用焊接工艺与所述通孔相连。
3.根据权利要求1所述的结构,其特征在于,所述钢管长度为10厘米。
4.根据权利要求1所述的结构,其特征在于,所述钢管内径为40毫米。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610844655.6A CN106223178A (zh) | 2016-09-23 | 2016-09-23 | 一种传力杆定位结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610844655.6A CN106223178A (zh) | 2016-09-23 | 2016-09-23 | 一种传力杆定位结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106223178A true CN106223178A (zh) | 2016-12-14 |
Family
ID=58076688
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610844655.6A Pending CN106223178A (zh) | 2016-09-23 | 2016-09-23 | 一种传力杆定位结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106223178A (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2205810A (en) * | 1937-09-22 | 1940-06-25 | John E Carter | Construction joint |
DE8016039U1 (de) * | 1980-06-18 | 1980-09-25 | Michel, Reinhold, 7123 Sachsenheim | Abstandshalter fuer aus rundmaterial bestehende duebel |
DE8909099U1 (zh) * | 1989-07-27 | 1989-12-14 | Meyers, Claude, Bruessel/Bruxelles, Be | |
CN1178276A (zh) * | 1996-06-19 | 1998-04-08 | 培康有限公司 | 侧向力量杆轴承 |
CN103452033A (zh) * | 2013-09-09 | 2013-12-18 | 青岛林川工程技术咨询有限公司 | 一种混凝土路面传力杆临时固定装置及其使用方法 |
CN206204751U (zh) * | 2016-09-23 | 2017-05-31 | 中国水利水电第四工程局有限公司 | 一种传力杆定位结构 |
-
2016
- 2016-09-23 CN CN201610844655.6A patent/CN106223178A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2205810A (en) * | 1937-09-22 | 1940-06-25 | John E Carter | Construction joint |
DE8016039U1 (de) * | 1980-06-18 | 1980-09-25 | Michel, Reinhold, 7123 Sachsenheim | Abstandshalter fuer aus rundmaterial bestehende duebel |
DE8909099U1 (zh) * | 1989-07-27 | 1989-12-14 | Meyers, Claude, Bruessel/Bruxelles, Be | |
CN1178276A (zh) * | 1996-06-19 | 1998-04-08 | 培康有限公司 | 侧向力量杆轴承 |
CN103452033A (zh) * | 2013-09-09 | 2013-12-18 | 青岛林川工程技术咨询有限公司 | 一种混凝土路面传力杆临时固定装置及其使用方法 |
CN206204751U (zh) * | 2016-09-23 | 2017-05-31 | 中国水利水电第四工程局有限公司 | 一种传力杆定位结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202509687U (zh) | 高层住宅楼剪力墙竖向钢筋定位装置 | |
CN206204751U (zh) | 一种传力杆定位结构 | |
CN106223178A (zh) | 一种传力杆定位结构 | |
CN104534188B (zh) | 大口径缠绕管及其缠绕方法 | |
CN205839505U (zh) | 一种耐用联锁砖 | |
CN206548945U (zh) | 一种应用于输液加热器中的输液管固定板 | |
CN202559750U (zh) | 高层住宅楼剪力墙墙体钢筋笼定位装置用制作模具 | |
CN208884848U (zh) | 一种可拼接式钢筋保护层垫板 | |
CN104480959A (zh) | 通用型塔吊支撑座 | |
CN102808816A (zh) | 机械安装座 | |
CN106192664A (zh) | 一种机场道面传力杆安装施工工艺 | |
CN106223975A (zh) | 一种隧道接触网槽道加工定位装置 | |
CN103675265B (zh) | 适用于酶标仪的酶标板搁架 | |
CN209274465U (zh) | 一种房车抽拉床排骨条卡套 | |
CN204571123U (zh) | 一种楼梯及其楼梯用连接件 | |
CN103572684B (zh) | 一种保证混凝土路面传力杆水平的装置及其使用方法 | |
CN202248547U (zh) | U型竖筋定位钉 | |
CN102413137A (zh) | 数据访问方法及装置 | |
CN206208167U (zh) | 一种用于梁、柱、墙的混凝土钢筋保护层预检测工具 | |
CN105509679A (zh) | 一种具有通信功能的新型裂缝计 | |
CN106320375B (zh) | 预制装配式地下管廊及其安装方法 | |
CN205654084U (zh) | 一种石膏墙体模具 | |
CN209324005U (zh) | 一种卫生间地漏开洞、封堵定位器 | |
CN203498733U (zh) | 一种保证混凝土路面传力杆水平的装置 | |
CN211228150U (zh) | 平面控制网的预埋件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161214 |