CN106219354A - A kind of reinforced guide rail bracket of elevator and manufacture method thereof and manufacture equipment - Google Patents

A kind of reinforced guide rail bracket of elevator and manufacture method thereof and manufacture equipment Download PDF

Info

Publication number
CN106219354A
CN106219354A CN201610580277.5A CN201610580277A CN106219354A CN 106219354 A CN106219354 A CN 106219354A CN 201610580277 A CN201610580277 A CN 201610580277A CN 106219354 A CN106219354 A CN 106219354A
Authority
CN
China
Prior art keywords
steel plate
elevator
guide rail
rail bracket
impression
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610580277.5A
Other languages
Chinese (zh)
Inventor
于洁
严国锋
沈方忠
孙珠平
杨晓兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YIDA EXPRESS ELEVATOR CO Ltd
Original Assignee
YIDA EXPRESS ELEVATOR CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YIDA EXPRESS ELEVATOR CO Ltd filed Critical YIDA EXPRESS ELEVATOR CO Ltd
Priority to CN201610580277.5A priority Critical patent/CN106219354A/en
Publication of CN106219354A publication Critical patent/CN106219354A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides
    • B66B7/022Guideways; Guides with a special shape

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention discloses a kind of reinforced guide rail bracket of elevator and manufacture method thereof and manufacture equipment, reinforced guide rail bracket of elevator includes the steel plate (1) being bent into right angle, one or more pairs of bar shaped installing hole (2) being distributed in mirror image it is respectively equipped with on two orthogonal plate bodys of steel plate (1), the center of each plate body is provided with the impression (3) of the bending angle inner bulge to steel plate (1), and two impressions (3) on two plate bodys are interconnected.Present configuration intensity is higher, can improve the lifting capacity of elevator.

Description

A kind of reinforced guide rail bracket of elevator and manufacture method thereof and manufacture equipment
Technical field
The present invention relates to a kind of reinforced guide rail bracket of elevator and manufacture method thereof and manufacture equipment, belong to elevator and manufacture skill Art field.
Background technology
Guide rail bracket of elevator is used as supporting and the component of fixing guide rail, is installed on well enclosure or crossbeam.It is solid Determine the locus of guide rail, and bear the various actions from guide rail.At present, in most cases, cage guide is all logical Cross in hoistway, fix one block of angle steel, then the angle steel that another block is fixing with guide rail is installed on angle steel, i.e. uses two blocks of angle steel As guide rail bracket of elevator.Owing to cage guide needs to bear bigger load, simple steel angle structure cannot bear enough Load, this badly influences the lifting capacity of elevator.
Summary of the invention
It is an object of the invention to, it is provided that a kind of reinforced guide rail bracket of elevator and manufacture method thereof and manufacture equipment, it Structural strength is higher, can improve the lifting capacity of elevator, manufacture method and manufacture equipment and be possible not only to integrally manufactured molding, and And manufacture in hgher efficiency.
Technical scheme: a kind of reinforced guide rail bracket of elevator, is characterized in: include being bent into the steel at right angle Plate, two orthogonal plate bodys of steel plate are respectively equipped with one or more pairs of bar shaped installing hole being distributed in mirror image, each plate The center of body is provided with the impression of the bending angle inner bulge to steel plate, and two impressions on two plate bodys are interconnected.
In above-mentioned reinforced guide rail bracket of elevator, every pair of bar shaped installing hole is all with impression as axis of symmetry.
In aforesaid reinforced guide rail bracket of elevator, all turn on one's side in the bending angle of steel plate in the edge of each plate body both sides Folding, and it is formed with flanging.
In aforesaid reinforced guide rail bracket of elevator, between two bar shaped installing holes of every pair of bar shaped installing hole in 100 °~ 120°。
The manufacture method of aforesaid reinforced guide rail bracket of elevator, is characterized in: be continuously introduced into continuously by the steel plate of straightening Diel, continuous stamping die tentatively presses rib, fixed length cutting, pressure rib to become successively on steel plate along steel plate direction of advance Type, punching, two side flangings and 90 degree of bending formings;During steel plate advances, steel plate is pressed the impression that rib obtains at continuous punching The lower mold of compression mould plays guide-localization effect;The each action of continuous stamping die realize tentatively pressing simultaneously rib, fixed length cutting, Pressure rib molding, punching, two side flangings and 90 degree of bending forming operations.
In the manufacture method of aforesaid reinforced guide rail bracket of elevator, described preliminary pressure rib is to extrude one at steel plate centre punch The impression that bar is shallower, pressure rib molding be on the basis of the shallower impression that preliminary pressure rib obtains, be stamped into finished product further needed for Size.
In the manufacture method of aforesaid reinforced guide rail bracket of elevator, described fixed length cutting is that steel plate partition becomes fixing long The segment of degree, and not exclusively cut off between every section, leave the wide linkage section of 10mm, it is ensured that steel plate can continuously enter follow-up Operation, when steel plate carries out 90 degree of bending forming operations, linkage section cuts off the most in the lump.
Realize the manufacture equipment of preceding method, be characterized in: include steel plate hoist engine, on rear side of steel plate hoist engine, be provided with straightening Machine, is provided with continuous punching device on rear side of straightener, continuous punching device is provided with plate feeding device.
In aforesaid manufacture equipment, on front side of described straightener, it is provided with the arc pressure arm of drive mechanism, arc pressure arm one end Being connected with straightener by rotating shaft, the other end is provided with roll
In aforesaid manufacture equipment, described continuous punching device includes that lower mold holder, lower mold holder are provided with lower mold, and lower mold sets Having the upper mold being fixed on below top mold frame, top mold frame is provided with hydraulic power mechanism, described upper mold and lower mold shape complementarity;Described Lower mold is sequentially provided with the shallow indent in center, transection slot, center indent, slotted hole from front to back, flange subsides groove and V-type bends groove.
Compared with prior art, the present invention, by arranging the impression of projection on the steel plate be bent into right angle, can play The effect of similar reinforcement, such that it is able to improve integrally-built intensity.The present invention, can be in use etc. relative to conventional angle steel Elevator can be made to have higher lifting capacity in the case of amount material.And it is mutual at the guide rail bracket of elevator of two present invention Time fixing, between two impressions, just can form a closed conduct, can reinforcement structure intensity further.
And, the manufacture method of the present invention and manufacture equipment can realize the continuous punch forming of rail brackets, before it The impression that procedure extrudes, can be with stability contorting steel plate position in a mold for guiding, thus the accuracy of manufacture is higher, Er Qielian Continuous mould punching can improve production efficiency.
Accompanying drawing explanation
Fig. 1 is the reinforced guide rail bracket of elevator structural representation of the present invention;
Fig. 2 is that the reinforced guide rail bracket of elevator of the present invention uses status architecture schematic diagram;
Fig. 3 is the structural representation manufacturing equipment of the present invention;
Fig. 4 is the lower die structure schematic diagram of the continuous punching device of the present invention.
Being labeled as in accompanying drawing: 1-steel plate, 2-bar shaped installing hole, 3-impression, 4-flanging, 5-steel plate hoist engine, 6-adjusts Straight machine, 7-continuous punching device, 8-plate feeding device, 601-arc pressure arm, 602-roll, 701-lower mold holder, 702-lower mold, 703- Top mold frame, 704-upper mold, the shallow indent in 705-center, 706-transection slot, 707-center indent, 708-slotted hole, 709-flange falls into Low water, 710-V type bending groove.
Detailed description of the invention
The present invention is further illustrated with embodiment below in conjunction with the accompanying drawings, but is not intended as depending on restriction of the present invention According to.
Embodiment.Reinforced guide rail bracket of elevator, as shown in Figure 1: include the steel plate 1 being bent into right angle, two of steel plate 1 One or more pairs of bar shaped installing hole 2 (being in Fig. 1 a pair) being distributed in mirror image it is respectively equipped with on orthogonal plate body, each The center of plate body is provided with the impression 3 of the bending angle inner bulge to steel plate 1, two impression 3 phase interconnection on two plate bodys Logical.Every pair of bar shaped installing hole 2 is all with impression 3 as axis of symmetry.All turn on one's side in the bending angle of steel plate 1 in the edge of each plate body both sides Folding, and it is formed with flanging 4.In 100 °~120 ° between two bar shaped installing holes 2 of every pair of bar shaped installing hole 2.
During installation, first the reinforced guide rail bracket of elevator of a present invention is fixed in hoistway (one of them plate body lead to Cross bolt to fix), on another plate body, then it is bolted the reinforced guide rail bracket of elevator of another present invention, After guide rail is fixed on the reinforced guide rail bracket of elevator of later, the installation site of two reinforced guide rail bracket of elevator as figure Shown in 2, two interconnective plate bodys of reinforced guide rail bracket of elevator in Fig. 2 are equipped with two pairs of bar shaped installing holes, so The adjustable distance of guide rail can be increased.
The manufacture method of reinforced guide rail bracket of elevator: the steel plate of straightening is continuously introduced into continuous stamping die, continuous punching Compression mould tentatively presses rib, fixed length cutting, pressure rib molding, punching, two rollovers successively on steel plate along steel plate direction of advance Limit and 90 degree of bending formings;During steel plate advances, steel plate is pressed the impression that rib obtains in the lower mold of continuous stamping die Play guide-localization effect;The each action of continuous stamping die realize tentatively pressing simultaneously rib, fixed length cutting, pressure rib molding, punching, Two side flangings and 90 degree of bending forming operations.
Described preliminary pressure rib is to extrude a shallower impression at steel plate centre punch, and pressure rib molding is to obtain at preliminary pressure rib Shallower impression on the basis of be stamped into the size needed for finished product further.
Described fixed length cutting is that steel plate partition becomes the segment of regular length, and not exclusively cuts off between every section, leaves The linkage section that 10mm is wide, it is ensured that steel plate can continuously enter follow-up operation, carries out 90 degree of bending forming operations at steel plate Time, linkage section cuts off the most in the lump.
The manufacture equipment of reinforced guide rail bracket of elevator, as shown in Figure 3: include steel plate hoist engine 5, after steel plate hoist engine 5 Side is provided with straightener 6, is provided with continuous punching device 7 on rear side of straightener 6, and continuous punching device 7 is provided with plate feeding device 8.Described Being provided with the arc pressure arm 601 of drive mechanism on front side of straightener 6, arc pressure arm 601 one end is connected with straightener 6 by rotating shaft, The other end is provided with roll 602
As shown in Figure 4, including lower mold holder 701, lower mold holder 701 is provided with lower mold 702, lower mold to described continuous punching device 7 702 are provided with the upper mold 704 being fixed on below top mold frame 703, and top mold frame 703 is provided with hydraulic power mechanism, described upper mold 704 With lower mold 702 shape complementarity;Described lower mold 702 is sequentially provided with the shallow indent in center 705, transection slot 706, center indent from front to back 707, slotted hole 708, flange subside groove 709 and V-type bending groove 710.
During the work for the first time of the manufacture equipment of the present invention, first steel plate termination is drawn out to straightener from steel plate hoist engine, so With the roll of straightener, steel plate is pressed into straightener and carries out straightening, after steel plate passes straightener, enter continuous punching from sending trigger Device, then presses under upper mold, extrudes shallower impression at steel plate center, and then upper mold is mentioned, and steel plate marches forward lattice;Under upper mold Pressure, the position (the i.e. first lattice) being pressed with shallower impression extrudes the impression consistent with finished size, lattice (second after steel plate Lattice) extrude and cut off (only retain a bit of be connected) between shallower impression, and the first lattice and the second lattice, steel plate marches forward one Lattice;Pressing under upper mold, the first lattice go out slotted hole, and the second lattice impression is to finished size, and the 3rd lattice extrude shallow trace, the second lattice and the 3rd Cutting off between lattice, steel plate marches forward lattice;Pressing under upper mold, the first lattice two side flanging, the second lattice go out slotted hole, the 3rd lattice impression To finished size, the 4th lattice extrude shallow trace, cut off between the 3rd lattice and the 4th lattice, and steel plate marches forward lattice;Press under upper mold, first Lattice bend 90 degree, the second lattice two side flanging, and the 3rd lattice go out slotted hole, and the 4th lattice impression is to finished size, and the 5th lattice extrude shallow Trace, cuts off between the 5th lattice and the 6th lattice, thoroughly cuts off between the first lattice and the second lattice, and advance lattice, and the first lattice are with finished product shape State is sent.Then can the reinforced guide rail bracket of elevator of the output present invention continuously according to this order.

Claims (10)

1. a reinforced guide rail bracket of elevator, it is characterised in that: include the steel plate (1) being bent into right angle, two of steel plate (1) One or more pairs of bar shaped installing hole (2) being distributed in mirror image, the centre bit of each plate body it is respectively equipped with on orthogonal plate body Installing the impression (3) of the bending angle inner bulge of oriented steel plate (1), two impressions (3) on two plate bodys are interconnected.
Reinforced guide rail bracket of elevator the most according to claim 1, it is characterised in that: the every pair of bar shaped installing hole (2) all with Impression (3) is axis of symmetry.
Reinforced guide rail bracket of elevator the most according to claim 1, it is characterised in that: the edge of each plate body both sides all to Turn down inside the bending angle of steel plate (1), and be formed with flanging (4).
Reinforced guide rail bracket of elevator the most according to claim 1 and 2, it is characterised in that: every pair of bar shaped installing hole (2) In 100 °~120 ° between two bar shaped installing holes (2).
5., according to the manufacture method of the reinforced guide rail bracket of elevator described in Claims 1-4 any claim, its feature exists In: the steel plate of straightening is continuously introduced into continuous stamping die, continuous stamping die along steel plate direction of advance successively on steel plate Tentatively press rib, fixed length cutting, pressure rib molding, punching, two side flangings and 90 degree of bending formings;During steel plate advances, The impression pressing rib to obtain on steel plate plays guide-localization effect in the lower mold of continuous stamping die;Continuous stamping die moves every time Realize tentatively pressing rib, fixed length cutting, pressure rib molding, punching, two side flangings and 90 degree of bending forming operations simultaneously.
The manufacture method of reinforced guide rail bracket of elevator the most according to claim 5, it is characterised in that: described preliminary pressure rib Being to extrude a shallower impression at steel plate centre punch, pressure rib molding is that the shallower impression basis obtained at preliminary pressure rib is enterprising One step is stamped into the size needed for finished product.
The manufacture method of reinforced guide rail bracket of elevator the most according to claim 5, it is characterised in that: described fixed length is cut Cut the segment being steel plate partition is become regular length, and not exclusively cut off between every section, leave the wide linkage section of 10mm, Ke Yibao Card steel plate can continuously enter follow-up operation, and when steel plate carries out 90 degree of bending forming operations, linkage section cuts off the most in the lump.
8. realize the manufacture equipment of method described in claim 5 to 7 any claim, it is characterised in that: include steel plate elevator Machine (5), steel plate hoist engine (5) rear side is provided with straightener (6), and straightener (6) rear side is provided with continuous punching device (7), continuous punching Pressure device (7) is provided with plate feeding device (8).
Manufacture equipment the most according to claim 8, it is characterised in that: described straightener (6) front side is provided with drive mechanism Arc pressure arm (601), arc pressure arm (601) one end is connected with straightener (6) by rotating shaft, and the other end is provided with roll (602).
Manufacture equipment the most according to claim 8, it is characterised in that: described continuous punching device (7) includes lower mold holder (701), lower mold holder (701) is provided with lower mold (702), and lower mold (702) is provided with the upper mold being fixed on top mold frame (703) lower section (704), top mold frame (703) is provided with hydraulic power mechanism, described upper mold (704) and lower mold (702) shape complementarity;Described lower mold (702) it is sequentially provided with the shallow indent in center (705), transection slot (706), center indent (707), slotted hole (708) from front to back, turns over While subside groove (709) and V-type bending groove (710).
CN201610580277.5A 2016-07-19 2016-07-19 A kind of reinforced guide rail bracket of elevator and manufacture method thereof and manufacture equipment Pending CN106219354A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610580277.5A CN106219354A (en) 2016-07-19 2016-07-19 A kind of reinforced guide rail bracket of elevator and manufacture method thereof and manufacture equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610580277.5A CN106219354A (en) 2016-07-19 2016-07-19 A kind of reinforced guide rail bracket of elevator and manufacture method thereof and manufacture equipment

Publications (1)

Publication Number Publication Date
CN106219354A true CN106219354A (en) 2016-12-14

Family

ID=57531304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610580277.5A Pending CN106219354A (en) 2016-07-19 2016-07-19 A kind of reinforced guide rail bracket of elevator and manufacture method thereof and manufacture equipment

Country Status (1)

Country Link
CN (1) CN106219354A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107350345A (en) * 2017-05-31 2017-11-17 苏州天吴电梯装璜有限公司 Hoistway support bending part manufacturing process
CN108443280A (en) * 2017-12-20 2018-08-24 东莞市鑫峰建筑机械有限公司 Plate is telescopically connected structure and elevator extension car
CN108758317A (en) * 2018-04-02 2018-11-06 友达光电股份有限公司 Plate member
CN109915416A (en) * 2019-04-28 2019-06-21 江苏大学镇江流体工程装备技术研究院 A kind of punching is welded into type centrifugal pump body export structure and centrifugal pump
CN114346071A (en) * 2021-12-31 2022-04-15 宁波鸿腾精密制造股份有限公司 Automatic manufacturing equipment and method for guide rail bracket for elevator

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202687695U (en) * 2012-08-23 2013-01-23 安川双菱电梯有限公司 Adjustable guide rail support
CN202880612U (en) * 2012-09-12 2013-04-17 富士通电梯(深圳)有限公司 Elevator guide rail bracket reinforced structure
CN203079471U (en) * 2013-01-16 2013-07-24 西子奥的斯电梯有限公司 Guide rail support
CN203715022U (en) * 2014-01-26 2014-07-16 广东亚太西奥电梯有限公司 Conveniently adjusted combined guide rail bracket
US20140326545A1 (en) * 2012-01-27 2014-11-06 Kone Corporation Arrangement for fixing the compensating weight guide rails of an elevator, and guide rail bracket used in the arrangement
CN204096830U (en) * 2014-09-25 2015-01-14 希姆斯电梯(中国)有限公司 Adjustable guide rail support
CN105666140A (en) * 2016-03-11 2016-06-15 安徽正民车业有限公司 Stamping and cutoff integrated machine
CN205739910U (en) * 2016-07-19 2016-11-30 怡达快速电梯有限公司 Reinforced guide rail bracket of elevator

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140326545A1 (en) * 2012-01-27 2014-11-06 Kone Corporation Arrangement for fixing the compensating weight guide rails of an elevator, and guide rail bracket used in the arrangement
CN202687695U (en) * 2012-08-23 2013-01-23 安川双菱电梯有限公司 Adjustable guide rail support
CN202880612U (en) * 2012-09-12 2013-04-17 富士通电梯(深圳)有限公司 Elevator guide rail bracket reinforced structure
CN203079471U (en) * 2013-01-16 2013-07-24 西子奥的斯电梯有限公司 Guide rail support
CN203715022U (en) * 2014-01-26 2014-07-16 广东亚太西奥电梯有限公司 Conveniently adjusted combined guide rail bracket
CN204096830U (en) * 2014-09-25 2015-01-14 希姆斯电梯(中国)有限公司 Adjustable guide rail support
CN105666140A (en) * 2016-03-11 2016-06-15 安徽正民车业有限公司 Stamping and cutoff integrated machine
CN205739910U (en) * 2016-07-19 2016-11-30 怡达快速电梯有限公司 Reinforced guide rail bracket of elevator

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107350345A (en) * 2017-05-31 2017-11-17 苏州天吴电梯装璜有限公司 Hoistway support bending part manufacturing process
CN108443280A (en) * 2017-12-20 2018-08-24 东莞市鑫峰建筑机械有限公司 Plate is telescopically connected structure and elevator extension car
CN115013390A (en) * 2017-12-20 2022-09-06 东莞市鑫峰建筑机械有限公司 Telescopic lift car
CN108758317A (en) * 2018-04-02 2018-11-06 友达光电股份有限公司 Plate member
CN109915416A (en) * 2019-04-28 2019-06-21 江苏大学镇江流体工程装备技术研究院 A kind of punching is welded into type centrifugal pump body export structure and centrifugal pump
CN114346071A (en) * 2021-12-31 2022-04-15 宁波鸿腾精密制造股份有限公司 Automatic manufacturing equipment and method for guide rail bracket for elevator

Similar Documents

Publication Publication Date Title
CN106219354A (en) A kind of reinforced guide rail bracket of elevator and manufacture method thereof and manufacture equipment
CN100478123C (en) Stainless-steel band special apparatus for steel-aluminum composite contact rail
CN100478119C (en) Making process of stainless steel belt for composite aluminium-steel contact rail
KR101431977B1 (en) Press shaping apparatus for shaping metal plate
CN102610978B (en) Method and device for machining motor carbon brush carrier
CN101386045A (en) Method and device for manufacturing stamping parts with a larger functional area
CN106180376A (en) A kind of process equipment of elevator door pocket
CN103612119A (en) Stainless steel strip forming equipment for steel-aluminum composite contact rail
RU2655511C2 (en) Method and device for forming steel by three-point press bending
CN102335806A (en) Mobile phone shield plate forming method and process equipment
CN103128207B (en) The processing technology of circlip and shape device
CN106964691A (en) A kind of band grid ribs Cylinder shape constructional element flexible compound manufacturing process
CN201009078Y (en) Device special for stainless steel band molding for steel-aluminum complex contract rail
CN112008419A (en) C-shaped steel forming machine
CN204770000U (en) Double arc face bumper side pushes away plastic mechanism
CN207494323U (en) Thicken the manufacturing equipment of tooth shape chain board
CN104325058A (en) Forging mould and forming die of forging mould
CN205800284U (en) The manufacture equipment of guide rail bracket of elevator
CN105834258B (en) A kind of device and technique for being used to manufacture pumping unit horsehead arc plate
CN203245263U (en) High-precision bending forming mould for elastic piece
CN106694750B (en) A kind of stirrup cavity plate for reinforcing steel bar hoop bending shaping equipment
CN205496320U (en) Automobile -used start -up motor shell reelpipe make -up machine
CN203184553U (en) Full-automatic processing forming device of elastic check ring
CN204975020U (en) Four sides shaping hem blanking mould
KR101715482B1 (en) manufacture method of rectangular tube

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161214

RJ01 Rejection of invention patent application after publication