CN106217916A CN201610640441.7A CN201610640441A CN106217916A CN 106217916 A CN106217916 A CN 106217916A CN 201610640441 A CN201610640441 A CN 201610640441A CN 106217916 A CN106217916 A CN 106217916A
Authority
CN
China
Prior art keywords
tube
opening
steel pipe
conveyer chain
composite steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610640441.7A
Other languages
Chinese (zh)
Other versions
CN106217916B (en
Inventor
高世荣
甘伟家
徐彩霞
王琪
钟瑞文
戴杰文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Naisi Pipe Industry Co Ltd
Original Assignee
Sichuan Naisi Pipe Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Naisi Pipe Industry Co Ltd filed Critical Sichuan Naisi Pipe Industry Co Ltd
Priority to CN201610640441.7A priority Critical patent/CN106217916B/en
Publication of CN106217916A publication Critical patent/CN106217916A/en
Application granted granted Critical
Publication of CN106217916B publication Critical patent/CN106217916B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29DPRODUCING PARTICULAR ARTICLES FROM PLASTICS OR FROM SUBSTANCES IN A PLASTIC STATE
    • B29D23/00Producing tubular articles
    • B29D23/001Pipes; Pipe joints

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The manufacture system of a kind of composite steel tube and manufacture method thereof, belong to technique of pipe field.First conveyer chain two ends are stretched out the first opening of preheating furnace and the second opening respectively and transmit steel pipe for stating the first opening to the second opening direction.The 3rd opening of curing oven and the 4th opening are stretched out and respectively for transmitting steel pipe along the 3rd opening to the 4th opening direction in second conveyer chain two ends.Mobile clamping device is arranged at frame and for driving steel pipe to shift between the first conveyer chain, spray equipment and the second conveyer chain.Above-mentioned manufacture system is used to obtain composite steel tube by preheating, flange, spraying and curing schedule.This manufacture system can carry out post bake to steel pipe, the structure making steel pipe is more stable, this composite steel pipe liner plastic tube made by this manufacture method, outer painting coating, the when of being attached between two composite steel tubes, flange contacts, and its sealing is higher, when composite steel tube is as water pipe, base tube will not contact with water, prevents the secondary pollution of water.

Description

The manufacture system of a kind of composite steel tube and manufacture method thereof
Technical field
The present invention relates to technique of pipe field, in particular to manufacture system and the manufacturer thereof of a kind of composite steel tube Method.
Background technology
At society, the development in city is increasingly quicker, and population gets more and more, and urban life drinking water is totally to protect The key factor that card urban population is healthy, the safety of Drinking Water water quality, reliability, wholesomeness are required more by people Come the highest.So, the design of urban life drinking water pipeline is even more important.
The composite steel pipe manufacturing system of prior art can not disposably produce the composite steel tube of multiple structure, and it manufactures system More complicated, manufacture method step is various, manufactures its sealing of composite steel tube obtained and can not well be ensured, as drinking During waterpipe, easily water is caused secondary pollution, be unfavorable for the health of human body.
Summary of the invention
It is an object of the invention to provide the manufacture system of a kind of composite steel tube, its simple in construction, there is preheating furnace with solid Changing stove, steel pipe is carried out twice heating, the structure making composite steel tube is more stable, improves production efficiency.
Another object of the present invention is to provide the manufacture method of a kind of composite steel tube, the clad steel that this manufacture method prepares Pipe, inner lining plastic tube, trypsin method coating, the end face of base tube is respectively provided with flange, the when of being attached between two composite steel tubes, The flange of two composite steel tubes contacts, and flange is one-body molded with tube body, and it connects better tightness later, meanwhile, solidification Process too increases the adhesive strength of flange.
The present invention realizes by the following technical solutions:
A kind of manufacture system of composite steel tube, including frame, mobile clamping device, preheating furnace, the first transporter, second Transporter, spray equipment and curing oven.
Preheating furnace has the first relative opening and the second opening, and the first transporter includes the first conveyer chain, and first passes Chain two ends are sent to stretch out the first opening and the second opening respectively and for transmitting steel pipe along the first opening to the second opening direction.Solidification Stove has the 3rd relative opening and the 4th opening, and the second transporter includes the second conveyer chain, and the second conveyer chain two ends are respectively Stretch out the 3rd opening and the 4th opening and for transmitting steel pipe along the 3rd opening to the 4th opening direction.Mobile clamping device is arranged In frame and be used for driving steel pipe to shift between the first conveyer chain, spray equipment and the second conveyer chain.
A kind of manufacture method utilizing above-mentioned manufacture system to manufacture composite steel tube:
Obtain steel pipe in plastic pipe sleeve is located at base tube, and make the two ends of plastic tube stretch out base tube, be positioned over the first transmission The part stretching out the first opening of chain, sets preheating furnace temperature as 180 DEG C-200 DEG C, controls the first conveyer chain at 15min- Through preheating furnace in 30min, by the steel pipe flange through preheating furnace, control mobile clamping device and drive the steel pipe after flange from the One conveyer chain is transferred to spray equipment and sprays, and controls mobile clamping device and drives the steel pipe after spraying from spray equipment to the The part stretching out the 3rd opening of two conveyer chains, sets curing oven temperature as 180 DEG C-190 DEG C, controls the second conveyer chain and exist Composite steel tube is obtained through curing oven in 15min-30min.
Manufacture system and the manufacture method thereof of the composite steel tube that presently preferred embodiments of the present invention provides provide the benefit that:
The manufacture system of the composite steel tube that the present invention provides, steel pipe is passed by the first conveyer chain from the first opening part of preheating furnace Delivering to the second opening of preheating furnace and preheat, steel pipe is stretched out the of preheating furnace from the first conveyer chain by mobile clamping device It is transferred to spray equipment at the part of two openings spray, then by mobile clamping device, steel pipe is shifted at spray equipment To the part stretching out the 3rd opening of the second conveyer chain, steel pipe is sent to solid by the second conveyer chain from the 3rd opening part of curing oven Changing the 4th opening of stove and solidify, by preheating and twice heating of solidification, the structure making composite steel tube is more stable, and carries High efficiency.
Additionally, during preparation, obtain steel pipe in plastic pipe sleeve is located at base tube, and make the two ends of plastic tube stretch out base tube, put It is placed in the part stretching out the first opening of the first conveyer chain, sets preheating furnace temperature as 180 DEG C-200 DEG C, control the first conveyer chain Through preheating furnace in 15min-30min, plastic tube can be made to soften, plastic tube can be good at being adhered to the inwall of base tube, Meanwhile, by the steel pipe flange through preheating furnace, control the steel pipe after mobile clamping device drives flange and shift from the first conveyer chain Spraying to spray equipment, make steel pipe lining plastic pipe, outer painting coating, its performance is more stable, finally, controls mobile clamping Device drives the steel pipe after spraying from the part stretching out the 3rd opening of spray equipment to the second conveyer chain, sets curing oven temperature It is 180 DEG C-190 DEG C, controls the second conveyer chain and obtain composite steel tube through curing oven in 15min-30min, strengthen further Flange and the connection of base tube, the structure making composite steel tube is more stable, and the setting of this composite steel pipe liner plastic tube is more uniform, When composite steel tube is as water pipe, water can be avoided completely to contact with base tube, prevent base tube from getting rusty, also avoid water to pollute, two The when of being attached between root composite steel tube, the flange of two composite steel tubes contacts, and flange is one-body molded with tube body, its Better tightness after connecting, the end face of base tube also will not contact with water, can be prevented effectively from the secondary pollution of water, it is ensured that life drink By the health of water.
Accompanying drawing explanation
In order to be illustrated more clearly that the technical scheme of the embodiment of the present invention, below by embodiment required use attached Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, and it is right to be therefore not construed as The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to according to this A little accompanying drawings obtain other relevant accompanying drawings and fall within protection scope of the present invention.
The structural representation of the manufacture system of the composite steel tube that Fig. 1 provides for the embodiment of the present invention;
First transporter and the installation of preheating furnace in the manufacture system of the composite steel tube that Fig. 2 provides for the embodiment of the present invention Schematic diagram;
The manufacture system of the composite steel tube that Fig. 3 provides for the embodiment of the present invention clamps the sectional view of pipe;
The structural representation of spray equipment in the manufacture system of the composite steel tube that Fig. 4 provides for the embodiment of the present invention;
Without the structural representation of electrostatic spraying gun in the manufacture system of the composite steel tube that Fig. 5 provides for the embodiment of the present invention Figure;
Fig. 6 for the embodiment of the present invention provide without the structural representation of nozzle cap in electrostatic spraying gun;
Fig. 7 for the embodiment of the present invention provide without the structural representation of kuppe in electrostatic spraying gun;
Fig. 8 for the embodiment of the present invention provide without the structural representation of conducting element in electrostatic spraying gun;
Fig. 9 for the embodiment of the present invention provide without the structural representation of process sleeve in electrostatic spraying gun;
Second transporter and the peace of curing oven in the manufacture system of the composite steel tube that Figure 10 provides for the embodiment of the present invention Dress schematic diagram;
The structural representation of fixed cell 152 in the second transporter that Figure 11 provides for the embodiment of the present invention;
Figure 12 is the enlarged drawing in Figure 11 at Ⅻ;
The sectional view of the first fixture in the fixed cell that Figure 13 provides for the present embodiment.
Reference collects:
The manufacture system 100 of composite steel tube;Frame 110;Mobile clamping device 120;Preheating furnace 130;First transporter 140;Second transporter 150;Spray equipment 160;Curing oven 170;First opening 135;Second opening 136;First conveyer chain 141;First lowering or hoisting gear 142;Fixed part 143;First clamp 144;Second clamp 145;Clamping part 121;Mobile lifting device 122;Clamping pipe 123;Inner tube 124;Outer tube 125;Crossbeam 111;First column 112;Second column 113;Lower tank wall 161;First Side box wall 162;Second side box wall 163;Spraying box 164;Without electrostatic spraying gun 200;Nozzle cap 210;Lance tube 240;Charging Joint 260;First end 241;Second end 242;Kuppe 220;Conducting element 230;Process sleeve 237;Diversion division 221;Connecting portion 222;Supporting part 223;First connects end 224;Second connects end 225;Pod apertures 226;First through hole 227;Tapered portion 231;Even Fitting 232;Second through hole 238;Second conveyer chain 151;Fixed cell 152;Gripper shoe 153;First fixture 154;Second is solid Locking member 155;First fixed plate 156;First pressure-bearing surface 157;First compression end 158;Second compression end 159;4th opening 172; 3rd opening 173.
Detailed description of the invention
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is The a part of embodiment of the present invention rather than whole embodiments.Generally implement with the present invention illustrated described in accompanying drawing herein The assembly of example can be arranged with various different configurations and design.Therefore, reality to the present invention provided in the accompanying drawings below The detailed description executing example is not intended to limit the scope of claimed invention, but is merely representative of the selected enforcement of the present invention Example.Based on the embodiment in the present invention, those of ordinary skill in the art are obtained under not making creative work premise Every other embodiment, broadly falls into the scope of protection of the invention.
It should also be noted that similar label and letter represent similar terms, therefore, the most a certain Xiang Yi in following accompanying drawing Individual accompanying drawing is defined, then need not it be defined further and explains in accompanying drawing subsequently.
Embodiment
The structural representation of the manufacture system 100 of the composite steel tube that Fig. 1 provides for the present embodiment.Refer to Fig. 1, this enforcement In example, the manufacture system 100 of composite steel tube includes frame 110, mobile clamping device 120, preheating furnace the 130, first transporter 140, the second transporter 150, spray equipment 160 and curing oven 170.
Preheating furnace 130 is for preheating sheathed plastic tube in the base tube of steel pipe and base tube.Fig. 2 is that the present embodiment carries First transporter 140 of confession and the scheme of installation of preheating furnace 130.See also Fig. 1 and Fig. 2, in the present embodiment, first Transporter 140 includes first conveyer chain the 141, first lowering or hoisting gear 142 and multiple fixed part 143 for fixing steel pipe, in advance Hot stove 130 has the first opening 135 and the second opening 136, and the first opening 135 and is stretched out at the first conveyer chain 141 two ends respectively Two openings 136 also are used for transmitting steel pipe along the first opening 135 to the second opening 136 direction.Steel pipe enters at the first opening 135 Preheating furnace 130, preheats in preheating furnace 130, meanwhile, is sent at the second opening 136 by the first conveyer chain 141, from Go out preheating furnace 130 at second opening 136, and be positioned at above the first lowering or hoisting gear 142.In the present embodiment, the first opening 135 and Two openings 136 are provided with high temperature cloth, prevent scattering and disappearing of heat in preheating furnace 130.
Continuing with in the lump refering to Fig. 1 and Fig. 2, in the present embodiment, each fixed part 143 can fix the steel after a preheating Pipe, each fixed part 143 includes the first clamp 144 and the second clamp 145 relatively set, the first clamp 144 and the second clamp 145 Being provided with " V " font notch, the first clamp 144 and the second clamp 145 are oppositely arranged and are positioned at the two of the first conveyer chain 141 Side, and be connected with the first lowering or hoisting gear 142, the first lowering or hoisting gear 142 controls the first clamp 144 and the second clamp 145 is gone up simultaneously Rise or decline.Multiple fixed parts 143 can fix many steel pipes simultaneously, improves the production efficiency of composite steel tube.Steel pipe is fixed on The when of determining in portion 143, manually the two ends of plastic tube are carried out flange, and is fixed on the both ends of the surface of base tube.Mobile clamping device 120 include mobile lifting device 122 and multiple clamping part 121 coordinated with fixed part 143, for gripping in portion 143 Steel pipe, the first lowering or hoisting gear 142 rises, and mobile lifting device 122 declines, and the steel pipe on fixed part 143 is pushed to clamping part 121, make clamping part 121 be clamped by steel pipe.
The structural representation of the clamping pipe 123 that Fig. 3 provides for the present embodiment.See also Fig. 1 and Fig. 3, the present embodiment In, clamping part 121 includes two the clamping pipes 123 being oppositely arranged, and each clamping pipe 123 includes inner tube 124 and outer tube 125, outward Pipe 125 is arranged at mobile lifting device 122, outside inner tube 124 is located at along the first clamp 144 to the second clamp 145 direction slip cap In pipe 125, outer tube 125 is stretched out at the two ends of inner tube 124, when clamping part 121 clamps steel pipe, inner tube 124 stretch out outer tube 125 One end near another clamping pipe 123 of part be sheathed in steel pipe steel pipe is formed and support, it should be noted that in clamping When portion 121 clamps steel pipe, the first first lowering or hoisting gear 142 rises, and mobile lifting device 122 declines, and both positions are corresponding, now Mobile lifting device 122 controls in inner tube 124 is slided and stretched into steel pipe and forms clamping, and now the first lowering or hoisting gear 142 declines, Mobile lifting device 122 rises and moves steel pipe.
Please continue to refer to Fig. 1, in the present embodiment, frame 110 includes crossbeam 111 and the first column 112 being oppositely arranged With the second column 113, the two ends of crossbeam 111 are connected with the first column 112 and the second column 113 respectively, mobile clamping device 120 Mobile lifting device 122 be arranged at crossbeam 111, steel pipe is clamped by the clamping part 121 of mobile clamping device 120, and in crossbeam 111 slide drives steel pipe to shift between the first conveyer chain 141, spray equipment 160.
The structural representation of the spray equipment 160 that Fig. 4 provides for the present embodiment.See also Fig. 1 and Fig. 4, this enforcement In example, spray equipment 160 is arranged at the lower section of crossbeam 111 and between preheating furnace 130 and curing oven 170, mobile clamping dress Put 120 and first the steel pipe clamping outside preheating furnace 130 is moved to spray equipment 160 in clamping part 121, carry out the spray of the outer wall of base tube It is coated with.Spray equipment 160 include spraying box 164 and many without electrostatic spraying gun 200, spraying box 164 include lower tank wall 161, One side box wall 162 and the second side box wall 163, the first side box wall 162 and the second side box wall 163 are separately positioned on lower tank wall 161 Two ends, mobile clamping device 120 moves, make steel pipe between the first side box wall 162 and the second side box wall 163, and at nowel The top of wall 161, sprays, and the first side box wall 162 and the second side box wall 163 are respectively provided with many without electrostatic spraying gun 200.
The structural representation without electrostatic spraying gun 200 that Fig. 5 provides for the present embodiment.See also Fig. 3 and Fig. 5, In the present embodiment, without electrostatic spraying gun 200, every all includes that nozzle cap 210, the lance tube 240 and the charging that pass for coating connect 260.Inlet connector 260 is used for connecting feed pipe, feed pipe connection coating case, makes to connect coating without electrostatic spraying gun 200 Case, coating case is used for putting coating, and the bottom of coating case is provided with compressed air inlet, the top of coating case be provided with multiple every From cloth, when compressed air is after import department enters coating case, and the coating powder in coating case can constantly move, powder In floating state.Further, powder can pass isolation cloth, through the coating powder after isolation cloth in the shape that scatters, is uniformly distributed, and And, there is certain power.It can enter feed pipe, arrives without electrostatic spraying gun 200.
Please continue to refer to Fig. 5, in the present embodiment, lance tube 240 passes, including the first end 241 and the second end for coating 242, inlet connector 260 is connected with the second end 242 of lance tube 240, and feed pipe connects with lance tube 240, the painting in feed pipe Material powder can enter in lance tube 240 smoothly.In the present embodiment, coating powder is epoxy resin, and base tube is steel pipe, asphalt mixtures modified by epoxy resin Fat has the adhesive strength of excellence to the surface of tube material, is liable to stick to the surface of steel pipe, forms epoxy resin layer.Make steel The stability of pipe is more preferable, will not get rusty, it is to avoid it is corroded by acid, alkali, salt etc..Each nozzle cap 210 all with the of lance tube 240 One end 241 connects, and lance tube 240, through spraying box, makes nozzle cap 210 be positioned at spraying box, carries out the steel pipe in spraying box Spraying, each lance tube 240 is arranged at the first side box wall or the second side box wall.
Fig. 6 is the structural representation of nozzle cap 210 in the present embodiment.See also Fig. 5 and Fig. 6, in the present embodiment, spray Oral area 210 includes that kuppe 220, conducting element 230 and process sleeve 237, kuppe 220 connect with the first end 241 of lance tube 240 Connect, kuppe 220 is provided with multiple pod apertures 226 connected with lance tube 240.The kuppe that Fig. 7 provides for the present embodiment The structural representation of 220.Seeing also Fig. 6 and Fig. 7, in the present embodiment, kuppe 220 includes diversion division 221, connecting portion 222 and three supporting parts 223, the two ends of each supporting part 223 are connected with diversion division 221 and connecting portion 222 respectively, adjacent two Form pod apertures 226, the most adjacent two supporting parts 223 and water conservancy diversion with diversion division 221 and connecting portion 222 between supporting part 223 Portion 221 and connecting portion 222 enclose formation pod apertures 226, and diversion division 221 is connected with the first end 241 of lance tube 240.
Please continue to refer to Fig. 7, in the present embodiment, diversion division 221 is the column structure of hollow, and diversion division 221 has first Connecting end 224 and connect the second connection end 225 that end 224 is relative with first, first connects end 224 is provided with the first external screw thread, First connects end 224 threadeds with the first end 241 of lance tube 240.Jointing is provided with the first female thread, the first outer spiral shell Stricture of vagina and the first female thread coupling, first connects in end 224 is sheathed on jointing and the first connection end 224 and jointing screw thread Connect.Coating powder in hollow pipe passes jointing, enters the pod apertures 226 of kuppe 220, then from pod apertures 226 Pass.Coating powder in hollow pipe through kuppe 220 out when, coating powder can be carried out certain dispersion, Even if coating powder Range compress air intlet is relatively far away from, coating powder also will not conglomeration, steel pipe can be carried out well Spraying.
Please continue to refer to Fig. 7, in the present embodiment, three supporting parts 223 are uniformly distributed along the circumference of diversion division 221.Make three The setting between diversion division 221 and connecting portion 222 of the individual supporting part 223 is more uniform, and the structure of kuppe 220 is more stable, Increasing the intensity of kuppe 220, kuppe 220 is less likely to occur to damage, and increases the service life of kuppe 220.Similar reality Execute mode it may also is that kuppe 220 includes two, four, five or more supporting part 223, the two ends of each supporting part 223 It is connected with diversion division 221 and connecting portion 222 respectively, with diversion division 221 and connecting portion 222 between adjacent two supporting parts 223 Form pod apertures 226.
The structural representation of the conducting element 230 that Fig. 8 provides for the present embodiment.See also Fig. 6, Fig. 7 and Fig. 8, this reality Executing in example, conducting element 230 includes tapered portion 231 and connector 232, and tapered portion 231 has bigger one end and less one end, connects One end of part 232 is connected with less one end of tapered portion 231, one end away from tapered portion 231 of connector 232 and kuppe 220 connect.Being preferably provided with, connector 232 is coupling bar, and coupling bar is provided with the second external screw thread.The connecting portion of kuppe 220 222 are provided with the first through hole 227, and the first through hole 227 runs through the two ends of connecting portion 222, and the inwall of connecting portion 222 is provided with Two female threads, the second external screw thread and the second female thread coupling, one end of coupling bar enters the first through hole 227 of connecting portion 222 also Threaded with connecting portion 222, being connected with less one end of tapered portion 231 away from one end of connecting portion 222 of coupling bar.
In the present embodiment, the coating powder sprayed by the pod apertures 226 of kuppe 220 can act directly on tapered portion On 231, tapered portion 231 can produce counteracting force to coating powder, makes coating powder pass through the effect of tapered portion 231 to contrary Rebounding and be completely dispersed and come in direction, meanwhile, is set to tapered portion 231 and makes the active area of coating powder greatly, and coating powder divides Dissipating effective, due to the effect of gravity, coating powder moves downward, and directly falls on steel pipe, sprays steel pipe, makes steel pipe Spraying more uniform, effect is more preferable, it is easy to reach the coating thickness that steel pipe needs.
In the present embodiment, tapered portion 231 can be adjusted by regulation coupling bar with the area of threadeding of connecting portion 222 Distance with kuppe 220.If the connection area that coupling bar is connected with connecting portion 222 is relatively small, connecting portion 222 is relative Shorter, then tapered portion 231 is relatively large with the distance of kuppe 220, and coating powder sprays from the pod apertures 226 of kuppe 220 When, the power in tapered portion 231 of beating is relatively small, and coating powder is relatively concentrated after tapered portion 231 falls.As Really coupling bar is relatively large with the connection area that connecting portion 222 is connected, and connecting portion 222 is relatively long, then tapered portion 231 with lead The distance of stream cover 220 is relatively small, and coating powder, from the pod apertures 226 of kuppe 220 sprays when, is beaten in tapered portion 231 On power relatively large, coating powder relatively disperses after tapered portion 231 falls.Spraying need according to different steel pipes Want, the distance of tapered portion 231 and kuppe 220 can be adjusted by regulation coupling bar, in order to improve without electrostatic spraying gun The work efficiency of 200.
The structural representation of the process sleeve 237 that Fig. 9 provides for the present embodiment.See also Fig. 6 and Fig. 9, the present embodiment In, process sleeve 237 is round table-like structure, and process sleeve 237 is provided with the second through hole 238, and the second through hole 238 runs through process sleeve The two ends of 237.Assembling nozzle cap 210 when, coupling bar passes the second through hole 238 company with kuppe 220 Meeting portion 222 threaded, the external diameter of coupling bar, less than the diameter of the second through hole 238, makes to have between coupling bar and process sleeve 237 Space, coating powder can pass through from space.Process sleeve 237 is sheathed on outside the second connection end 225, the second of diversion division 221 Connecting end 225 is sliding surface, and process sleeve 237 is rubber sleeve, has certain elasticity, and process sleeve 237 is connected end 225 interference with second Coordinate, be sheathed on outside the second connection end 225.
Figure 10 is second transporter 150 scheme of installation with curing oven 170 of the present embodiment.See also Fig. 1 And Figure 10, in the present embodiment, without electrostatic gun, the outer wall of steel pipe is sprayed by above-mentioned, re-use mobile clamping device Steel pipe is moved to the second transporter 150 by 120 from spray equipment 160, and the second transporter 150 includes the second conveyer chain 151 With multiple fixed cells 152, the steel pipe on clamping part 121 is arranged on multiple fixed cell 152, on each fixed cell 152 A piece steel pipe is set.The structural representation of the fixed cell 152 that Figure 11 provides for the present embodiment.See also Figure 10 and Tu 11, in the present embodiment, each fixed cell 152 includes gripper shoe 153 and be symmetricly set in gripper shoe 153 two ends first is fixed Part 154 and the second fixture 155, each gripper shoe 153 is connected with the second conveyer chain 151.Figure 12 is the amplification in Figure 11 at Ⅻ Figure.Figure 13 is the sectional view of the first fixture 154 in the present embodiment.See also Figure 11, Figure 12 and Figure 13, the present embodiment In, the first fixture 154 includes multiple first fixed plate 156, and multiple first fixed plates 156 are arranged at intervals at gripper shoe 153, excellent Choosing is arranged: multiple first fixed plates 156 be arranged in parallel.The one side away from gripper shoe 153 of multiple first fixed plates 156 is first Pressure-bearing surface 157, the first pressure-bearing surface 157 of multiple first fixed plates 156 and the cross section of the length direction being perpendicular to gripper shoe 153 Intersection is positioned on same circumference, when steel pipe is arranged on the first pressure-bearing surface 157 when, and connecing of steel pipe and the first pressure-bearing surface 157 Touch and contact for camber line, it is to avoid the coating of steel tube surface is destroyed.First pressure-bearing surface 157 includes near the second fixture 155 First compression end 158 and second compression end 159 relative with the first compression end 158, between the second compression end 159 and gripper shoe 153 Distance more than the distance of the first compression end 158 with gripper shoe 153, the contact area of steel tube surface and the first pressure-bearing surface 157 is relatively Little, it is to avoid the coating of steel tube surface is destroyed.In the present embodiment, the first fixture 154 includes four the first fixed plates 156. Similar embodiment is it may also is that the first fixture 154 includes five the first fixed plates 156.
Please continue to refer to Figure 10, in the present embodiment, curing oven 170 includes that having the 3rd relative opening 173 and the 4th opens Mouth 172, the 3rd opening 173 and the 4th opening 172 are stretched out and respectively for along the 3rd opening 173 in the two ends of the second conveyer chain 151 Steel pipe is transmitted with the direction of the 4th opening 172.Stretch out when steel pipe is moved to the second conveyer chain 151 by mobile clamping device 120 Time on the fixed cell 152 of the part of the 3rd opening 173, open the 3rd opening 173, make the second conveyer chain 151 by steel pipe market Solidify to curing oven 170, steel pipe is carried out post bake, obtains composite steel tube.Produce after carrying out post bake answers Conjunction steel pipe makes the bonding strength increase of the plastic tube in base tube and base tube, and flange increases with the bonding strength of the end face of base tube, same Time, the coating on base tube surface is less likely to occur to come off, and the structure making composite steel tube is more stable, when it is as water pipe, and lining plastic The setting of material pipe is more uniform, water can be avoided completely to contact with steel pipe, prevent steel pipe from getting rusty, also avoid water to pollute, and two The when of being attached between root composite steel tube, the flange of two composite steel tubes contacts, and flange is one-body molded with tube body, its Better tightness after connecting, the end face of base tube also will not contact with water, can be prevented effectively from the secondary pollution of water, it is ensured that life drink By the health of water.
When the steel pipe heating of curing oven 170 reaches the required time, the 4th opening 172 is opened, by the second conveyer chain Composite steel tube is exported by 151, carries out natural cooling.
Utilizing the manufacture system 100 of above-mentioned composite steel tube, the present embodiment also provides for the manufacture method of a kind of composite steel tube, bag Include following steps:
First obtain steel pipe in plastic pipe sleeve is located at base tube, and make the two ends of plastic tube stretch out base tube, be positioned over first The part stretching out the first opening 135 of conveyer chain 141, sets preheating furnace 130 temperature as 180 DEG C-200 DEG C, controls the first transmission Chain 141 is through preheating furnace 130 in 15min-30min, and base tube and plastic tube preheat, and make plastic tube soften, convenient Follow-up flange step and the carrying out of curing schedule, be provided with plastic cement in plastic tube, after preheating, plastic cement fusing formation is moulded Material glue-line, plastic tube is adhered to the inwall of base tube by plastic layer.In the present embodiment, plastic tube is vinyl tube.
By the steel pipe flange through preheating furnace 130, flange is that the part stretching out base tube of plastic tube is outwards bent and glued It is connected to the end face of base tube.Steel pipe is positioned over fixed part 143, and plastic tube softens, manually by the two of plastic tube due to preheating End is outwards bent to form flange, facilitates the operation of staff, and flange is fixed on the end of plastic tube by the plastics glue-line on flange Face.
Control the steel pipe after mobile clamping device 120 drives flange to be transferred to spray equipment 160 from the first conveyer chain 141 and enter Row spraying, after preheating, coating is easily adhered the outer wall in steel pipe, makes to be improved without the spray efficiency of electrostatic gun 200.This In embodiment, coating is epoxy coating.
Control steel pipe the stretching out from spray equipment 160 to the second conveyer chain 151 after mobile clamping device 120 drives spraying The part of the 3rd opening 173, sets curing oven 170 temperature as 180 DEG C-190 DEG C, controls the second conveyer chain 151 at 15min- Composite steel tube is obtained through curing oven 170 in 30min.Steel pipe is carried out post bake solidification so as to get the knot of composite steel tube Structure is more stable, is coated with epoxy resin thermoset material, by solidification, makes composite steel tube outside composite steel pipe liner vinyl tube Structure is more stable, and performance more optimizes.
This composite steel tube prepared through above-mentioned manufacture system and manufacture method after testing, meets GB/T28897 2012 and marks Accurate.
These are only the preferred embodiments of the present invention, be not limited to the present invention, for those skilled in the art For Yuan, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, any amendment of being made, Equivalent, improvement etc., should be included within the scope of the present invention.

Claims (10)

1. the manufacture system of a composite steel tube, it is characterised in that include preheating furnace, the first transporter, frame, mobile clamping Device, spray equipment, the second transporter and curing oven;
Described preheating furnace has the first relative opening and the second opening, and described first transporter includes the first conveyer chain, institute State the first conveyer chain two ends and stretch out described first opening and described second opening respectively and for along described first opening to described Second opening direction transmits steel pipe, and described curing oven has the 3rd relative opening and the 4th opening, described second transporter Including the second conveyer chain, described 3rd opening and described 4th opening are stretched out and respectively for along institute in described second conveyer chain two ends Stating the 3rd opening and transmit steel pipe to described 4th opening direction, described mobile clamping device is arranged at described frame and for driving Described steel pipe shifts between described first conveyer chain, described spray equipment and described second conveyer chain.
The manufacture system of composite steel tube the most according to claim 1, it is characterised in that described first transporter also includes First lowering or hoisting gear and multiple fixed part for fixing described steel pipe, each described fixed part includes and described first lifting dress The first clamp putting connection and the second clamp being connected with described first lowering or hoisting gear, described first clamp and described second clamp Being oppositely arranged and be positioned at the both sides of described first conveyer chain, described mobile clamping device includes multiple for clamping described fixed part On the clamping part of described steel pipe.
The manufacture system of composite steel tube the most according to claim 2, it is characterised in that described mobile clamping device also includes Mobile lifting device, described clamping part includes two the clamping pipes being oppositely arranged, and each described clamping pipe includes inner and outer tubes, Described outer tube is arranged at described mobile lifting device, and said inner tube is along described first clamp to described second clamp direction slip cap It is located in described outer tube.
The manufacture system of composite steel tube the most according to claim 1, it is characterised in that described second transporter also includes Multiple fixed cells, each described fixed cell includes gripper shoe and is symmetricly set in first fixture at described gripper shoe two ends With the second fixture, each described gripper shoe is connected with described second conveyer chain.
The manufacture system of composite steel tube the most according to claim 4, it is characterised in that described first fixture includes multiple First fixed plate, the plurality of first fixed plate is arranged at intervals at described gripper shoe, the plurality of first fixed plate away from institute The one side stating gripper shoe is the first pressure-bearing surface, described first pressure-bearing surface of the plurality of first fixed plate be perpendicular to described support The intersection in the cross section of the length direction of plate is positioned on same circumference.
The manufacture system of composite steel tube the most according to claim 5, it is characterised in that described first pressure-bearing surface includes close The second compression end that first compression end of described second fixture is relative with described first compression end, described second compression end and institute State the distance between gripper shoe more than the distance between described first compression end and described gripper shoe.
7. according to the manufacture system of the composite steel tube described in any one of claim 1-6, it is characterised in that described spray equipment bag Including spraying box and many without electrostatic spraying gun, every all includes nozzle cap and the spray gun passed for coating without electrostatic spraying gun Pipe, each described lance tube includes the first end and the second end, each described nozzle cap all with described first end of described lance tube Connecting, each described lance tube both passes through described spraying box, and each described nozzle cap may be contained within described spraying box.
The manufacture system of composite steel tube the most according to claim 7, it is characterised in that described nozzle cap include kuppe, Conducting element and process sleeve, described conducting element includes the connector that tapered portion and one end less with described tapered portion are connected, described company One end away from described tapered portion of fitting is connected with described kuppe, described kuppe and described first end of described lance tube Connecting, described kuppe is provided with the pod apertures that multiple and described lance tube connects, described process sleeve is sheathed on described water conservancy diversion Outside cover.
9. utilizing the manufacture system described in any one of claim 1-8 to manufacture a manufacture method for composite steel tube, its feature exists In:
Obtain described steel pipe in plastic pipe sleeve is located at base tube, and make the two ends of described plastic tube stretch out described base tube, by described Steel pipe is placed in the part stretching out described first opening of described first conveyer chain, sets described preheating furnace temperature as 180 DEG C-200 DEG C, control described first conveyer chain in 15min-30min through described preheating furnace, by the described steel pipe through described preheating furnace Flange, controls the described steel pipe after described mobile clamping device drives flange and is transferred to described spraying dress from described first conveyer chain Put and spray, control the described steel pipe after described mobile clamping device drives spraying and pass to described second from described spray equipment Send the part stretching out described 3rd opening of chain, set described curing oven temperature as 180 DEG C-190 DEG C, control described second and transmit Chain obtains described composite steel tube through described curing oven in 15min-30min.
Manufacture method the most according to claim 9, it is characterised in that described flange is that described plastic tube is stretched out institute The part stating base tube outwards bends and is adhered to the end face of described base tube.
CN201610640441.7A 2016-08-05 2016-08-05 A kind of manufacture system and its manufacturing method of composite steel tube Active CN106217916B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610640441.7A CN106217916B (en) 2016-08-05 2016-08-05 A kind of manufacture system and its manufacturing method of composite steel tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610640441.7A CN106217916B (en) 2016-08-05 2016-08-05 A kind of manufacture system and its manufacturing method of composite steel tube

Publications (2)

Publication Number Publication Date
CN106217916A true CN106217916A (en) 2016-12-14
CN106217916B CN106217916B (en) 2018-08-24

Family

ID=57547116

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610640441.7A Active CN106217916B (en) 2016-08-05 2016-08-05 A kind of manufacture system and its manufacturing method of composite steel tube

Country Status (1)

Country Link
CN (1) CN106217916B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5775843A (en) * 1980-10-30 1982-05-12 Kuraray Plast Kk Continuous manufacturing method of flexible rubber hose
CN201304389Y (en) * 2008-11-24 2009-09-09 浙江华立涂装设备有限公司 Spraying equipment used for corrosion protection of inner wall of steel pipe
CN101695867A (en) * 2009-10-27 2010-04-21 新兴铸管股份有限公司 Method and device for sticking plastic film on internal and external surfaces and end surface of metal tube
CN202962794U (en) * 2012-06-20 2013-06-05 广东联塑科技实业有限公司 Automatic production device of coating plastic steel pipe
CN104550281A (en) * 2014-12-22 2015-04-29 常州市腾田液压机械有限公司 Composite pipe manufacturing process and compound forming production line
CN105170422A (en) * 2015-10-21 2015-12-23 青岛豪德博尔实业有限公司 Production method of plastic-coated pipe

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5775843A (en) * 1980-10-30 1982-05-12 Kuraray Plast Kk Continuous manufacturing method of flexible rubber hose
CN201304389Y (en) * 2008-11-24 2009-09-09 浙江华立涂装设备有限公司 Spraying equipment used for corrosion protection of inner wall of steel pipe
CN101695867A (en) * 2009-10-27 2010-04-21 新兴铸管股份有限公司 Method and device for sticking plastic film on internal and external surfaces and end surface of metal tube
CN202962794U (en) * 2012-06-20 2013-06-05 广东联塑科技实业有限公司 Automatic production device of coating plastic steel pipe
CN104550281A (en) * 2014-12-22 2015-04-29 常州市腾田液压机械有限公司 Composite pipe manufacturing process and compound forming production line
CN105170422A (en) * 2015-10-21 2015-12-23 青岛豪德博尔实业有限公司 Production method of plastic-coated pipe

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨智勇: "《汽车涂装技术》", 30 September 2005, 北京理工大学出版社 *

Also Published As

Publication number Publication date
CN106217916B (en) 2018-08-24

Similar Documents

Publication Publication Date Title
CN101254647A (en) Method of container inside lining anti-corrosive fluoroplastic plate
CN106217916A (en) The manufacture system of a kind of composite steel tube and manufacture method thereof
CN106678454B (en) A kind of internal-rib enhancing polyethylene helical bellows and its production technology
CN202791110U (en) Steel plastic transition pipe fitting used for gas distribution system
CN104896209B (en) Manufacturing method of polyethylene plastic pipe with electric hot melting zone embedded inside
CN208295357U (en) A kind of pipeline is to sealing joint anti-sink structure
CN107269958B (en) A kind of flange form steam is with row pipe and its installation method
CN207599166U (en) A kind of reinforcement grade 3PE anti-corrosions polyethylene steel-plastic conversion pipe fitting
CN205690673U (en) A kind of end of plastic tube softens heat gun
CN104761790A (en) Reinforcement-modified polyethylene corrugated pipe
CN203404540U (en) Spherical four-way pipe fitting
CN101526164B (en) Multilayer heat insulation pipe and manufacturing method thereof
CN107745531A (en) A kind of bridging method of carbon fiber pipe
CN207584208U (en) A kind of construction pressure-resistant pipeline
CN201926176U (en) Water tank for water heater
CN110370662A (en) Sweating soldering device for plastic tube and plastics orifice plate
CN109080095A (en) A kind of PE pipe cooling device
CN207093966U (en) A kind of external fiber tube straight coupling
CN206175921U (en) Quick hot melt connector of piece formula ne -leakage
CN206159721U (en) Fall trapezoidal inserts and connection pipe fitting of making thereof
CN205938285U (en) Quick pipe fitting of formula of cuting straightly
CN206264377U (en) A kind of bull polyurethane round belt splicer
CN212028790U (en) HDPE high-strength winding reinforced pipe
CN211682771U (en) Concrete distributing device is used in production of coincide cavity shear force wall
CN204962118U (en) Pipeline connection device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant