CN106217916B - A kind of manufacture system and its manufacturing method of composite steel tube - Google Patents
A kind of manufacture system and its manufacturing method of composite steel tube Download PDFInfo
- Publication number
- CN106217916B CN106217916B CN201610640441.7A CN201610640441A CN106217916B CN 106217916 B CN106217916 B CN 106217916B CN 201610640441 A CN201610640441 A CN 201610640441A CN 106217916 B CN106217916 B CN 106217916B
- Authority
- CN
- China
- Prior art keywords
- tube
- steel pipe
- opening
- conveyer chain
- conveyer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29D—PRODUCING PARTICULAR ARTICLES FROM PLASTICS OR FROM SUBSTANCES IN A PLASTIC STATE
- B29D23/00—Producing tubular articles
- B29D23/001—Pipes; Pipe joints
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Application Of Or Painting With Fluid Materials (AREA)
Abstract
A kind of manufacture system and its manufacturing method of composite steel tube, belong to steel pipe technical field.First conveyer chain both ends stretch out the first opening of preheating furnace and second and are open and for stating the first opening to the second opening direction transmission steel pipe respectively.Second conveyer chain both ends stretch out the third opening of curing oven and the 4th and are open and transmit steel pipe to the 4th opening direction for being open along third respectively.Mobile clamping device is set to rack and for driving steel pipe to be shifted between the first conveyer chain, spray equipment and the second conveyer chain.Composite steel tube is obtained by preheating, flange, spraying and curing schedule using above-mentioned manufacture system.This manufacture system can carry out reheating to steel pipe, the structure of steel pipe is set more to stablize, this composite steel pipe liner plastic tube made of this manufacturing method, outer painting coating, when being attached between two composite steel tubes, flange is in contact, and leakproofness is stronger, when composite steel tube is as water pipe, base tube will not be contacted with water, prevent the secondary pollution of water.
Description
Technical field
The present invention relates to steel pipe technical field, the manufacture system in particular to a kind of composite steel tube and its manufacturer
Method.
Background technology
More and more quicker in the development of today's society, city, population is more and more, and urban life drinking water is totally to protect
A key factor of urban population health is demonstrate,proved, people require to get over to the safety of Drinking Water water quality, reliability, wholesomeness
Come higher.So the design of urban life drinking water pipeline is even more important.
The composite steel tube manufacture system of the prior art cannot disposably produce the composite steel tube of multilayered structure, manufacture system
More complex, manufacturing method step is various, its leakproofness of the composite steel tube manufactured cannot be ensured well, as drinking
When waterpipe, it is easy to cause secondary pollution to water, is unfavorable for the health of human body.
Invention content
It is simple in structure the purpose of the present invention is to provide a kind of manufacture system of composite steel tube, with preheating furnace and admittedly
Change stove, steel pipe is heated twice, so that the structure of composite steel tube is more stablized, improve production efficiency.
Another object of the present invention is to provide a kind of manufacturing method of composite steel tube, clad steel made from this manufacturing method
Pipe, the end face of inner lining plastic tube, trypsin method coating, base tube is respectively provided with flange, when being attached between two composite steel tubes,
The flange of two composite steel tubes is in contact, and flange is integrally formed with tube body, better tightness after connecting, meanwhile, solidification
Process also increases the adhesive strength of flange.
Realization that the present invention adopts the following technical solutions:
A kind of manufacture system of composite steel tube, including rack, mobile clamping device, preheating furnace, second conveyer, second
Transmission device, spray equipment and curing oven.
Preheating furnace has opposite the first opening and the second opening, and second conveyer includes the first conveyer chain, and first passes
It send chain both ends to stretch out the first opening and second respectively to be open and for transmitting steel pipe along the first opening to the second opening direction.Solidification
It includes the second conveyer chain, the second conveyer chain both ends difference that stove, which has opposite third opening and the 4th opening, second conveyer,
Third opening and the 4th is stretched out to be open and transmit steel pipe to the 4th opening direction for being open along third.Mobile clamping device setting
In rack and for driving steel pipe to be shifted between the first conveyer chain, spray equipment and the second conveyer chain.
A kind of manufacturing method manufacturing composite steel tube using above-mentioned manufacture system:
Plastic pipe sleeve is set in base tube and obtains steel pipe, and the both ends of plastic tube is made to stretch out base tube, is positioned over the first transmission
The part that the stretching first of chain is open sets preheating furnace temperature as 180 DEG C -200 DEG C, and the first conveyer chain of control is in 15min-
Preheating furnace is passed through in 30min, will be controlled mobile clamping device across the steel pipe flange of preheating furnace and drive the steel pipe after flange from the
One conveyer chain is transferred to spray equipment and is sprayed, and controls mobile clamping device and drives the steel pipe after spraying from spray equipment to the
The part of the stretching third opening of two conveyer chains sets solidification furnace temperature as 180 DEG C -190 DEG C, and the second conveyer chain of control exists
In 15min-30min composite steel tube is obtained across curing oven.
Presently preferred embodiments of the present invention provide the manufacture system of composite steel tube and its advantageous effect of manufacturing method be:
The manufacture system of composite steel tube provided by the invention, the first conveyer chain pass steel pipe from the first opening of preheating furnace
It send to the second of preheating furnace and is open and is preheated, mobile clamping device is by steel pipe from the of the stretching preheating furnace of the first conveyer chain
It is transferred to spray equipment at the parts of two openings and is sprayed, then shifted from spray equipment steel pipe by mobile clamping device
Steel pipe is sent to solid by the part being open to the stretching third of the second conveyer chain, the second conveyer chain from the third opening of curing oven
Change stove the 4th is open and is cured, and is heated twice by preheating and curing, and so that the structure of composite steel tube is more stablized, and carry
High efficiency.
In addition, when preparing, plastic pipe sleeve is set in base tube and obtains steel pipe, and the both ends of plastic tube is made to stretch out base tube, put
It is placed in the part that the stretching first of the first conveyer chain is open, preheating furnace temperature is set as 180 DEG C -200 DEG C, controls the first conveyer chain
Preheating furnace is passed through in 15min-30min, plastic tube can be made to soften, plastic tube can be good at the inner wall for being adhered to base tube,
Meanwhile it by across the steel pipe flange of preheating furnace, controlling mobile clamping device and the steel pipe after flange is driven to transmit chain tra nsfer from first
It is sprayed to spray equipment, steel pipe lining plastic pipe, outer painting coating, performance is made more to stablize, finally, control mobile clamping
Device drives the part of stretching third opening of the steel pipe after spraying from spray equipment to the second conveyer chain, setting solidification furnace temperature
It it is 180 DEG C -190 DEG C, the second conveyer chain of control obtains composite steel tube in 15min-30min across curing oven, further strengthens
The connection of flange and base tube makes the structure of composite steel tube more stablize, and the setting of this composite steel pipe liner plastic tube is more uniform,
When composite steel tube is as water pipe, it can completely avoid water and contacted with base tube, prevent base tube from getting rusty, also water is avoided to pollute, two
When being attached between root composite steel tube, the flange of two composite steel tubes is in contact, and flange is integrally formed with tube body,
Better tightness after connection, the end face of base tube will not be contacted with water, can effectively avoid the secondary pollution of water, ensure life drink
With the health of water.
Description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached
Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair
The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this
A little attached drawings obtain other relevant attached drawings and also belong to protection scope of the present invention.
Fig. 1 is the structural schematic diagram of the manufacture system of composite steel tube provided in an embodiment of the present invention;
Fig. 2 be composite steel tube provided in an embodiment of the present invention manufacture system in second conveyer and preheating furnace installation
Schematic diagram;
Fig. 3 be composite steel tube provided in an embodiment of the present invention manufacture system in be clamped pipe sectional view;
Fig. 4 be composite steel tube provided in an embodiment of the present invention manufacture system in spray equipment structural schematic diagram;
Fig. 5 is the structural representation without electrostatic spraying gun in the manufacture system of composite steel tube provided in an embodiment of the present invention
Figure;
Fig. 6 is the structural schematic diagram of nozzle cap in no electrostatic spraying gun provided in an embodiment of the present invention;
Fig. 7 is the structural schematic diagram of kuppe in no electrostatic spraying gun provided in an embodiment of the present invention;
Fig. 8 is the structural schematic diagram of conducting element in no electrostatic spraying gun provided in an embodiment of the present invention;
Fig. 9 is the structural schematic diagram of process sleeve in no electrostatic spraying gun provided in an embodiment of the present invention;
Figure 10 be composite steel tube provided in an embodiment of the present invention manufacture system in second conveyer and curing oven peace
Fill schematic diagram;
Figure 11 is the structural schematic diagram of fixed cell 152 in second conveyer provided in an embodiment of the present invention;
Figure 12 is the enlarged drawing at Ⅻ in Figure 11;
Figure 13 is the sectional view of the first fixing piece in fixed cell provided in this embodiment.
Reference numeral summarizes:
The manufacture system 100 of composite steel tube;Rack 110;Mobile clamping device 120;Preheating furnace 130;Second conveyer
140;Second conveyer 150;Spray equipment 160;Curing oven 170;First opening 135;Second opening 136;First conveyer chain
141;First lifting gear 142;Fixed part 143;First snap-gauge 144;Second snap-gauge 145;Clamping part 121;Mobile lifting device
122;Pipe 123 is clamped;Inner tube 124;Outer tube 125;Crossbeam 111;First column 112;Second column 113;Lower tank wall 161;First
Side box wall 162;Second side box wall 163;Spraying box 164;Without electrostatic spraying gun 200;Nozzle cap 210;Lance tube 240;Charging
Connector 260;First end 241;Second end 242;Kuppe 220;Conducting element 230;Process sleeve 237;Diversion division 221;Interconnecting piece
222;Support portion 223;First connecting pin 224;Second connection end 225;Deflector hole 226;First through hole 227;Tapered portion 231;Even
Fitting 232;Second through-hole 238;Second conveyer chain 151;Fixed cell 152;Support plate 153;First fixing piece 154;Second is solid
Determine part 155;First fixed plate 156;First pressure-bearing surface 157;First compression end 158;Second compression end 159;4th opening 172;
Third opening 173.
Specific implementation mode
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented
The component of example can be arranged and be designed with a variety of different configurations.Therefore, below to the reality of the present invention provided in the accompanying drawings
The detailed description for applying example is not intended to limit the range of claimed invention, but is merely representative of the selected implementation of the present invention
Example.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without creative efforts
Every other embodiment, shall fall within the protection scope of the present invention.
It should be noted that:Similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined, then it further need not be defined and explained in subsequent attached drawing in a attached drawing.
Embodiment
Fig. 1 is the structural schematic diagram of the manufacture system 100 of composite steel tube provided in this embodiment.Referring to Fig. 1, this implementation
In example, the manufacture system 100 of composite steel tube includes rack 110, mobile clamping device 120, preheating furnace 130, second conveyer
140, second conveyer 150, spray equipment 160 and curing oven 170.
Preheating furnace 130 is for preheating the plastic tube being arranged in the base tube and base tube of steel pipe.Fig. 2 carries for the present embodiment
The scheme of installation of the second conveyer 140 and preheating furnace 130 of confession.Also referring to Fig. 1 and Fig. 2, in the present embodiment, first
Transmission device 140 includes the first conveyer chain 141, the first lifting gear 142 and multiple fixed parts 143 for fixing steel pipe, in advance
There is hot stove 130 first opening 135 and the second opening 136,141 both ends of the first conveyer chain to stretch out the first opening 135 and the respectively
Two openings 136 simultaneously are used to transmit steel pipes along 135 to the second 136 directions of opening of the first opening.Steel pipe enters from the first opening 135
Preheating furnace 130 is preheated in preheating furnace 130, meanwhile, it is sent at the second opening 136 by the first conveyer chain 141, from
Go out preheating furnace 130 at second opening 136, and positioned at 142 top of the first lifting gear.In the present embodiment, the first opening 135 and the
Two openings 136 are both provided with high temperature cloth, prevent scattering and disappearing for heat in preheating furnace 130.
Continuing with refering to fig. 1 and Fig. 2, in the present embodiment, each fixed part 143 can fix the steel after a preheating together
Pipe, each fixed part 143 include opposite the first snap-gauge 144 and the second snap-gauge 145 set, the first snap-gauge 144 and the second snap-gauge 145
It is both provided with "V" shaped slot mouth, the first snap-gauge 144 and the second snap-gauge 145 are oppositely arranged and positioned at the two of the first conveyer chain 141
Side, and being connect with the first lifting gear 142, the first lifting gear 142 control the first snap-gauge 144 and the second snap-gauge 145 simultaneously on
It rises or declines.Multiple fixed parts 143 can fix more steel pipes simultaneously, improve the production efficiency of composite steel tube.Steel pipe is fixed on
When determining in portion 143, the both ends of plastic tube are manually subjected to flange, and be fixed on the both ends of the surface of base tube.Mobile clamping device
120 include mobile lifting device 122 and multiple clamping parts 121 coordinated with fixed part 143, for gripping in portion 143
Steel pipe, the first lifting gear 142 rise, and mobile lifting device 122 declines, and the steel pipe on fixed part 143 is pushed to clamping part
121, so that clamping part 121 is clamped steel pipe.
Fig. 3 is the structural schematic diagram of clamping pipe 123 provided in this embodiment.Also referring to Fig. 1 and Fig. 3, the present embodiment
In, clamping part 121 includes two clamping pipes 123 being oppositely arranged, and each pipe 123 that is clamped includes inner tube 124 and outer tube 125, outside
Pipe 125 is set to mobile lifting device 122, and inner tube 124 is set to outer along 144 to the second snap-gauge of the first snap-gauge, 145 direction sliding sleeve
In pipe 125, outer tube 125, when clamping part 121 clamps steel pipe, the stretching outer tube 125 of inner tube 124 are stretched out in the both ends of inner tube 124
Part be sheathed in steel pipe to form steel pipe close to one end of another clamping pipe 123 and support, it should be noted that be clamped
When steel pipe is clamped in portion 121, the first lifting gear 142 first rises, and mobile lifting device 122 declines, and the two position corresponds to, at this time
Mobile lifting device 122 controls inner tube 124 and slides and stretch into steel pipe and form clamping, and the first lifting gear 142 declines at this time,
Mobile lifting device 122 rises and mobile steel pipe.
Please continue to refer to Fig. 1, in the present embodiment, rack 110 includes crossbeam 111 and the first column 112 for being oppositely arranged
It is connect respectively with the first column 112 and the second column 113 with the both ends of the second column 113, crossbeam 111, mobile clamping device 120
Mobile lifting device 122 be set to crossbeam 111, the clamping part 121 of mobile clamping device 120 clamps steel pipe, and in crossbeam
111 slidings drive steel pipe to be shifted between the first conveyer chain 141, spray equipment 160.
Fig. 4 is the structural schematic diagram of spray equipment 160 provided in this embodiment.Also referring to Fig. 1 and Fig. 4, this implementation
In example, spray equipment 160 is set to the lower section of crossbeam 111 and between preheating furnace 130 and curing oven 170, mobile clamping dress
It sets 120 and the steel pipe clamping outside preheating furnace 130 is first moved to spray equipment 160 in clamping part 121, carry out the spray of the outer wall of base tube
It applies.Spray equipment 160 includes spraying box 164 and more handles without electrostatic spraying gun 200, and spraying box 164 includes lower tank wall 161, the
One side box wall 162 and the second side box wall 163, the first side box wall 162 and the second side box wall 163 are separately positioned on lower tank wall 161
Both ends, mobile clamping device 120 move, and make steel pipe between the first side box wall 162 and the second side box wall 163, and in nowel
The top of wall 161, is sprayed, and the first side box wall 162 and the second side box wall 163 are respectively provided with more handles without electrostatic spraying gun 200.
Fig. 5 is the structural schematic diagram of no electrostatic spraying gun 200 provided in this embodiment.Also referring to Fig. 3 and Fig. 5,
In the present embodiment, every no electrostatic spraying gun 200 includes nozzle cap 210, the lance tube 240 that passes through for coating and charging connect
First 260.Inlet connector 260 is connected to coating case for connecting feed pipe, feed pipe, and no electrostatic spraying gun 200 is made to be connected to coating
Case, for coating case for putting coating, the bottom of coating case is provided with compressed air inlet, the top of coating case be provided with it is multiple every
From cloth, when compressed air is after entrance enters coating case, the coating powder in coating case can be moved constantly, powder
In floating state.Also, powder can pass through isolation cloth, and the coating powder after isolation cloth is uniformly distributed in the shape that scatters, and
And there is certain power.It can enter feed pipe, reach without electrostatic spraying gun 200.
Please continue to refer to Fig. 5, in the present embodiment, lance tube 240 is passed through for coating, including first end 241 and second end
242, inlet connector 260 is connect with the second end 242 of lance tube 240, and feed pipe is connected to lance tube 240, the painting in feed pipe
Feed powder end can smoothly enter into lance tube 240.In the present embodiment, coating powder is epoxy resin, and base tube is steel pipe, asphalt mixtures modified by epoxy resin
Fat has excellent adhesive strength to the surface of tube material, is liable to stick to the surface of steel pipe, forms epoxy resin layer.Make steel
The stability of pipe is more preferable, will not get rusty, and avoids it by corrosion such as acid, alkali, salt.Each nozzle cap 210 with lance tube 240 the
One end 241 connects, and lance tube 240 passes through spraying box, and nozzle cap 210 is made to be located in spraying box, is carried out to the steel pipe in spraying box
Spraying, each lance tube 240 are set to the first side box wall or the second side box wall.
Fig. 6 is the structural schematic diagram of nozzle cap 210 in the present embodiment.Also referring to Fig. 5 and Fig. 6, in the present embodiment, spray
Oral area 210 includes kuppe 220, conducting element 230 and process sleeve 237, and kuppe 220 and the first end 241 of lance tube 240 connect
It connects, multiple deflector holes 226 being connected to lance tube 240 is provided on kuppe 220.Fig. 7 is kuppe provided in this embodiment
220 structural schematic diagram.Also referring to Fig. 6 and Fig. 7, in the present embodiment, kuppe 220 includes diversion division 221, interconnecting piece
222 and three support portions 223, the both ends of each support portion 223 are connect with diversion division 221 and interconnecting piece 222 respectively, two neighboring
Between support portion 223 deflector hole 226, i.e., two neighboring support portion 223 and water conservancy diversion are formed with diversion division 221 and interconnecting piece 222
Portion 221 and interconnecting piece 222 are enclosed deflector hole 226, and diversion division 221 is connect with the first end 241 of lance tube 240.
Please continue to refer to Fig. 7, in the present embodiment, diversion division 221 is hollow column structure, and diversion division 221 has first
Connecting pin 224 and the second connection end 225 opposite with the first connecting pin 224, the first connecting pin 224 are provided with the first external screw thread,
First connecting pin 224 is threadedly coupled with the first end 241 of lance tube 240.Jointing is provided with the first internal thread, the first outer spiral shell
Line is matched with the first internal thread, and the first connecting pin 224 is sheathed in jointing and the first connecting pin 224 and jointing screw thread
Connection.Coating powder in hollow tube passes through jointing, into the deflector hole 226 of kuppe 220, then from deflector hole 226
It is pierced by.When coating powder in hollow tube comes out by kuppe 220, certain dispersion can be carried out to coating powder,
Even if coating powder Range compress air intlet is relatively far away from, coating powder will not conglomeration, steel pipe can be carried out good
Spraying.
Please continue to refer to Fig. 7, in the present embodiment, three support portions 223 are uniformly distributed along the circumferential direction of diversion division 221.Make three
Setting of a support portion 223 between diversion division 221 and interconnecting piece 222 is more uniform, and the structure of kuppe 220 is more stablized,
Increase the intensity of kuppe 220, kuppe 220 is less likely to occur to damage, and increases the service life of kuppe 220.Similar reality
The mode of applying can also be:Kuppe 220 includes two, four, five or more support portions 223, the both ends of each support portion 223
Connect respectively with diversion division 221 and interconnecting piece 222, between two neighboring support portion 223 with diversion division 221 and interconnecting piece 222
Form deflector hole 226.
Fig. 8 is the structural schematic diagram of conducting element 230 provided in this embodiment.Also referring to Fig. 6, Fig. 7 and Fig. 8, this reality
It applies in example, conducting element 230 includes tapered portion 231 and connector 232, and tapered portion 231 has larger one end and smaller one end, connection
One end of part 232 is connect with smaller one end of tapered portion 231, one end of the separate tapered portion 231 of connector 232 and kuppe
220 connections.It is preferably provided with, connector 232 is coupling bar, and the second external screw thread is provided on coupling bar.The interconnecting piece of kuppe 220
222 are provided with first through hole 227, and first through hole 227 runs through the both ends of interconnecting piece 222, and the is provided on the inner wall of interconnecting piece 222
Two internal threads, the second external screw thread are matched with the second internal thread, and one end of coupling bar enters the first through hole 227 of interconnecting piece 222 simultaneously
It is threadedly coupled with interconnecting piece 222, one end of the separate interconnecting piece 222 of coupling bar is connect with smaller one end of tapered portion 231.
In the present embodiment, the coating powder sprayed by the deflector hole 226 of kuppe 220 can act directly on tapered portion
On 231, tapered portion 231 can generate reaction force to coating powder, and coating powder is made to pass through the effect of tapered portion 231 to opposite
Direction is rebounded and is completely dispersed and comes, meanwhile, being set as tapered portion 231 keeps the active area of coating powder big, coating powder point
Scattered effect is good, and due to the effect of gravity, coating powder moves downward, and directly falls on steel pipe, is sprayed to steel pipe, makes steel pipe
Spraying it is more uniform, effect is more preferable, it is easy to reach steel pipe needs coating thickness.
In the present embodiment, tapered portion 231 can be adjusted by adjusting the threaded connection area of coupling bar and interconnecting piece 222
At a distance from kuppe 220.If the connection area that coupling bar is connect with interconnecting piece 222 is relatively small, interconnecting piece 222 is opposite
Shorter, then tapered portion 231 is relatively large at a distance from kuppe 220, and coating powder is sprayed from the deflector hole 226 of kuppe 220
When, the power beaten in tapered portion 231 is relatively small, and coating powder is relatively concentrated after being fallen from tapered portion 231.Such as
The connection area that fruit coupling bar is connect with interconnecting piece 222 is relatively large, and interconnecting piece 222 is relatively long, then tapered portion 231 with lead
The distance of stream cover 220 is relatively small, when coating powder is sprayed from the deflector hole 226 of kuppe 220, beats in tapered portion 231
On power it is relatively large, coating powder relatively disperses after being fallen from tapered portion 231.According to the spraying need of different steel pipes
It wants, tapered portion 231 can be adjusted at a distance from kuppe 220 by adjusting coupling bar, to improve no electrostatic spraying gun
200 working efficiency.
Fig. 9 is the structural schematic diagram of process sleeve 237 provided in this embodiment.Also referring to Fig. 6 and Fig. 9, the present embodiment
In, process sleeve 237 is round-like structure, and the second through-hole 238 is provided on process sleeve 237, and the second through-hole 238 runs through process sleeve
237 both ends.When being assembled to nozzle cap 210, coupling bar pass through the second through-hole 238 and with the company of kuppe 220
Socket part 222 is threadedly coupled, and the outer diameter of coupling bar is less than the diameter of the second through-hole 238, makes to have between coupling bar and process sleeve 237
Gap, coating powder can pass through from gap.Process sleeve 237 is sheathed on outside second connection end 225, and the second of diversion division 221
Connecting pin 225 is sliding surface, and process sleeve 237 is rubber sleeve, has certain elasticity, process sleeve 237 and 225 interference of second connection end
Cooperation, is sheathed on outside second connection end 225.
Figure 10 is the scheme of installation of the second conveyer 150 and curing oven 170 of the present embodiment.Also referring to Fig. 1
And Figure 10, in the present embodiment, the outer wall of steel pipe is sprayed by above-mentioned no electrostatic gun, reuses mobile clamping device
Steel pipe is moved to second conveyer 150 by 120 from spray equipment 160, and second conveyer 150 includes the second conveyer chain 151
With multiple fixed cells 152, the steel pipe on clamping part 121 is set on multiple fixed cells 152, on each fixed cell 152
A piece steel pipe is set.Figure 11 is the structural schematic diagram of fixed cell 152 provided in this embodiment.Also referring to Figure 10 and figure
11, in the present embodiment, each fixed cell 152 includes support plate 153 and is symmetrically disposed on the first of 153 both ends of support plate and fixes
Part 154 and the second fixing piece 155, each support plate 153 are connect with the second conveyer chain 151.Figure 12 is the amplification at Ⅻ in Figure 11
Figure.Figure 13 is the sectional view of the first fixing piece 154 in the present embodiment.Also referring to Figure 11, Figure 12 and Figure 13, the present embodiment
In, the first fixing piece 154 includes multiple first fixed plates 156, and multiple first fixed plates 156 are arranged at intervals at support plate 153, excellent
Choosing setting:Multiple first fixed plates 156 are arranged in parallel.The one side of the separate support plate 153 of multiple first fixed plates 156 is first
Pressure-bearing surface 157, the first pressure-bearing surface 157 and the section of the length direction perpendicular to support plate 153 of multiple first fixed plates 156
Intersection is located on same circumference, and when steel pipe is set on the first pressure-bearing surface 157, steel pipe connects with the first pressure-bearing surface 157
It touches and is contacted for camber line, the coating of steel tube surface is avoided to be destroyed.First pressure-bearing surface 157 includes close to the second fixing piece 155
First compression end 158 and second compression end 159 opposite with the first compression end 158, between the second compression end 159 and support plate 153
Distance be more than the first compression end 158 with support plate 153 at a distance from, the contact area of steel tube surface and the first pressure-bearing surface 157 compared with
It is small, avoid the coating of steel tube surface from being destroyed.In the present embodiment, the first fixing piece 154 includes four the first fixed plates 156.
Similar embodiment can also be:First fixing piece 154 includes five the first fixed plates 156.
Please continue to refer to Figure 10, in the present embodiment, curing oven 170 includes that there is opposite third opening 173 and the 4th to open
Third opening 173 and the 4th opening 172 are stretched out and for along third opening 173 in the both ends of mouth 172, the second conveyer chain 151 respectively
Steel pipe is transmitted with the direction of the 4th opening 172.It is stretched out when steel pipe is moved to the second conveyer chain 151 by mobile clamping device 120
When on the fixed cell 152 of the part of third opening 173, third opening 173 is opened, makes the second conveyer chain 151 by steel pipe market
To being cured in curing oven 170, reheating is carried out to steel pipe, obtains composite steel tube.What is produced after progress reheating answers
Closing steel pipe makes the bonding strength of plastic tube and base tube in base tube increase, and the bonding strength of the end face of flange and base tube increases, together
When, the coating on base tube surface is less likely to occur to fall off, and the structure of composite steel tube is made more to stablize, when being used as water pipe, lining plastic
The setting of expects pipe is more uniform, can completely avoid water and is contacted with steel pipe, prevent steel pipe from getting rusty, also water is avoided to pollute, and two
When being attached between root composite steel tube, the flange of two composite steel tubes is in contact, and flange is integrally formed with tube body,
Better tightness after connection, the end face of base tube will not be contacted with water, can effectively avoid the secondary pollution of water, ensure life drink
With the health of water.
When the steel pipe heating of curing oven 170 reaches the required time, the 4th opening 172 is opened, the second conveyer chain is passed through
151 export composite steel tube, carry out natural cooling.
Using the manufacture system 100 of above-mentioned composite steel tube, the present embodiment also provides a kind of manufacturing method of composite steel tube, packet
Include following steps:
Plastic pipe sleeve is set in base tube first and obtains steel pipe, and the both ends of plastic tube is made to stretch out base tube, is positioned over first
The part of the opening of stretching first 135 of conveyer chain 141, sets 130 temperature of preheating furnace as 180 DEG C -200 DEG C, control first transmits
Chain 141 passes through preheating furnace 130, base tube and plastic tube to be preheated in 15min-30min, and plastic tube is made to soften, convenient
The progress of subsequent flange step and curing schedule is provided with plastic cement in plastic tube, and after preheating, plastic cement melts to form modeling
Expect that glue-line, plastic tube are adhered to the inner wall of base tube by plastic layer.In the present embodiment, plastic tube is vinyl tube.
By across the steel pipe flange of preheating furnace 130, flange is by the part outward bending of the stretching base tube of plastic tube and to glue
It is connected to the end face of base tube.Steel pipe is positioned over fixed part 143, plastic tube is since preheating softens, manually by the two of plastic tube
It holds outward bending to form flange, facilitates the operation of staff, flange is fixed on the end of plastic tube by the plastics glue-line on flange
Face.
The mobile clamping device 120 of control drive the steel pipe after flange from the first conveyer chain 141 be transferred to spray equipment 160 into
Row spraying, after preheating, coating is easily adhered the outer wall in steel pipe, and the spray efficiency of no electrostatic gun 200 is made to be improved.This
In embodiment, coating is epoxy coating.
The mobile clamping device 120 of control drives stretching of the steel pipe after spraying from 160 to the second conveyer chain 151 of spray equipment
The part of third opening 173 sets 170 temperature of curing oven as 180 DEG C -190 DEG C, and the second conveyer chain 151 of control is in 15min-
In 30min composite steel tube is obtained across curing oven 170.By steel pipe carry out reheating solidification, so as to get composite steel tube knot
Structure is more stablized, and composite steel pipe liner vinyl tube applies epoxy resin thermoset material outside, by solidification, makes composite steel tube
Structure is more stablized, and performance more optimizes.
This after testing, meets the marks of GB/T28897-2012 through composite steel tube made from above-mentioned manufacture system and manufacturing method
It is accurate.
It these are only the preferred embodiment of the present invention, be not intended to restrict the invention, for those skilled in the art
For member, the invention may be variously modified and varied.Any modification made by all within the spirits and principles of the present invention,
Equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (7)
1. a kind of manufacture system of composite steel tube, which is characterized in that including preheating furnace, second conveyer, rack, mobile clamping
Device, spray equipment, second conveyer and curing oven;
The preheating furnace has opposite the first opening and the second opening, and the second conveyer includes the first conveyer chain, institute
It states the first conveyer chain both ends and stretches out first opening and second opening respectively and for being open to described along described first
Second opening direction transmits steel pipe, and the curing oven has opposite third opening and the 4th opening, the second conveyer
Including the second conveyer chain, second conveyer chain both ends stretch out the third opening and the described 4th and are open and for along institute respectively
It states third to be open to the 4th opening direction transmission steel pipe, the mobile clamping device is set to the rack and for driving
The steel pipe shifts between first conveyer chain, the spray equipment and second conveyer chain;
The second conveyer further includes multiple fixed cells, and each fixed cell includes support plate and is symmetrically disposed on
First fixing piece and the second fixing piece at the support plate both ends, each support plate transmit chain link with described second;
First fixing piece includes multiple first fixed plates, and the multiple first fixed plate is arranged at intervals at the support plate,
The multiple first fixed plate far from the support plate one side be the first pressure-bearing surface, the multiple first fixed plate it is described
First pressure-bearing surface and the intersection in the section of the length direction perpendicular to the support plate are located on same circumference;
First pressure-bearing surface includes close to the first compression end of second fixing piece and opposite with first compression end
Second compression end, second compression end between the support plate at a distance from be more than between first compression end and the support plate
Distance.
2. the manufacture system of composite steel tube according to claim 1, which is characterized in that the second conveyer further includes
First lifting gear and multiple fixed parts for fixing the steel pipe, each fixed part include being filled with first lifting
The second snap-gauge set the first snap-gauge of connection and connect with first lifting gear, first snap-gauge and second snap-gauge
The both sides of first conveyer chain are oppositely arranged and are located at, the mobile clamping device includes multiple for the fixed part to be clamped
On the steel pipe clamping part.
3. the manufacture system of composite steel tube according to claim 2, which is characterized in that the mobile clamping device further includes
Mobile lifting device, the clamping part include two clamping pipes being oppositely arranged, and each clamping pipe includes inner and outer tubes,
The outer tube is set to the mobile lifting device, and said inner tube is along first snap-gauge to second snap-gauge direction sliding sleeve
In the outer tube.
4. according to the manufacture system of claim 1-3 any one of them composite steel tubes, which is characterized in that the spray equipment packet
Spraying box and more handles are included without electrostatic spraying gun, every spray gun that no electrostatic spraying gun is included nozzle cap and passed through for coating
Pipe, each lance tube includes first end and second end, each nozzle cap with the first end of the lance tube
Connection, each lance tube both pass through the spraying box, and each nozzle cap may be contained in the spraying box.
5. the manufacture system of composite steel tube according to claim 4, which is characterized in that the nozzle cap include kuppe,
Conducting element and process sleeve, the conducting element include tapered portion and the connector that is connect with the smaller one end of the tapered portion, the company
One end far from the tapered portion of fitting is connect with the kuppe, the first end of the kuppe and the lance tube
It connects, is provided with multiple deflector holes being connected to the lance tube on the kuppe, the process sleeve is sheathed on the water conservancy diversion
Cover is outer.
6. a kind of manufacturing method being manufactured composite steel tube using claim 1-5 any one of them manufacture systems, feature are existed
In:
Plastic pipe sleeve is set in base tube and obtains the steel pipe, and the both ends of the plastic tube is made to stretch out the base tube, it will be described
Steel pipe is placed in the part of stretching first opening of first conveyer chain, sets the preheating furnace temperature as 180 DEG C -200
DEG C, it controls first conveyer chain and passes through the preheating furnace in 15min-30min, it will be across the steel pipe of the preheating furnace
Flange, the control mobile clamping device drive the steel pipe after flange to be transferred to the spraying dress from first conveyer chain
It sets and is sprayed, the control mobile clamping device drives the steel pipe after spraying to be passed from the spray equipment to described second
The part for sending the stretching of the chain third opening sets the solidification furnace temperature as 180 DEG C -190 DEG C, and control described second transmits
Chain obtains the composite steel tube in 15min-30min across the curing oven.
7. manufacturing method according to claim 6, which is characterized in that the flange is will be described in the stretching of the plastic tube
The part outward bending of base tube and the end face for being adhered to the base tube.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610640441.7A CN106217916B (en) | 2016-08-05 | 2016-08-05 | A kind of manufacture system and its manufacturing method of composite steel tube |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610640441.7A CN106217916B (en) | 2016-08-05 | 2016-08-05 | A kind of manufacture system and its manufacturing method of composite steel tube |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106217916A CN106217916A (en) | 2016-12-14 |
CN106217916B true CN106217916B (en) | 2018-08-24 |
Family
ID=57547116
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610640441.7A Active CN106217916B (en) | 2016-08-05 | 2016-08-05 | A kind of manufacture system and its manufacturing method of composite steel tube |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106217916B (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101695867A (en) * | 2009-10-27 | 2010-04-21 | 新兴铸管股份有限公司 | Method and device for sticking plastic film on internal and external surfaces and end surface of metal tube |
CN202962794U (en) * | 2012-06-20 | 2013-06-05 | 广东联塑科技实业有限公司 | Automatic production device of coating plastic steel pipe |
CN104550281A (en) * | 2014-12-22 | 2015-04-29 | 常州市腾田液压机械有限公司 | Composite pipe manufacturing process and compound forming production line |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5775843A (en) * | 1980-10-30 | 1982-05-12 | Kuraray Plast Kk | Continuous manufacturing method of flexible rubber hose |
CN201304389Y (en) * | 2008-11-24 | 2009-09-09 | 浙江华立涂装设备有限公司 | Spraying equipment used for corrosion protection of inner wall of steel pipe |
CN105170422B (en) * | 2015-10-21 | 2017-07-21 | 青岛豪德博尔实业有限公司 | A kind of production method of plastics coated tube |
-
2016
- 2016-08-05 CN CN201610640441.7A patent/CN106217916B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101695867A (en) * | 2009-10-27 | 2010-04-21 | 新兴铸管股份有限公司 | Method and device for sticking plastic film on internal and external surfaces and end surface of metal tube |
CN202962794U (en) * | 2012-06-20 | 2013-06-05 | 广东联塑科技实业有限公司 | Automatic production device of coating plastic steel pipe |
CN104550281A (en) * | 2014-12-22 | 2015-04-29 | 常州市腾田液压机械有限公司 | Composite pipe manufacturing process and compound forming production line |
Also Published As
Publication number | Publication date |
---|---|
CN106217916A (en) | 2016-12-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102889446A (en) | Environment-friendly plastic pipe fusion bonding method | |
CN106217916B (en) | A kind of manufacture system and its manufacturing method of composite steel tube | |
CN101254647A (en) | Method of container inside lining anti-corrosive fluoroplastic plate | |
KR101366801B1 (en) | Metal panel manufacturing apparatus | |
CN207514474U (en) | A kind of joint for plastic pipe | |
CN208089711U (en) | A kind of plastic-coated steel | |
CN209240500U (en) | It is a kind of to cross water assembly | |
CN201926176U (en) | Water tank for water heater | |
CN208123643U (en) | Assembly type plastic pressure pipe, production mould and plastic plate, piping lane | |
CN209686963U (en) | Heat accumulation pond | |
CN203404540U (en) | Spherical four-way pipe fitting | |
CN202972287U (en) | Pipe fitting connector favorable for pipe material assembly | |
CN207094022U (en) | A kind of interpolation type double-walled electric smelting bend pipe tools | |
CN211463721U (en) | Steel edge lighting tile gluing device | |
CN206011754U (en) | A kind of side fills PE fuel gas ball valve welding equipments | |
CN110370662A (en) | Sweating soldering device for plastic tube and plastics orifice plate | |
CN100578049C (en) | Explosion-proof, anti-vacuum self-relieving safety valve | |
CN211682771U (en) | Concrete distributing device is used in production of coincide cavity shear force wall | |
CN109367042A (en) | Plastic part and the connection structure of metalwork and preparation method thereof | |
CN209054233U (en) | Cross water assembly | |
CN209020243U (en) | A kind of new cartilage production equipment | |
CN203477737U (en) | Universal movable PE (polyethylene) combined electric smelting pipe fitting | |
CN218992787U (en) | Alloy piece with flame retardant function | |
CN209516512U (en) | Cable tube plugging device for cable tunnel | |
CN211492872U (en) | Hot-melting socket connection welding head device for PE thin-walled pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |