CN206175921U - Quick hot melt connector of piece formula ne -leakage - Google Patents

Quick hot melt connector of piece formula ne -leakage Download PDF

Info

Publication number
CN206175921U
CN206175921U CN201621234835.4U CN201621234835U CN206175921U CN 206175921 U CN206175921 U CN 206175921U CN 201621234835 U CN201621234835 U CN 201621234835U CN 206175921 U CN206175921 U CN 206175921U
Authority
CN
China
Prior art keywords
union joint
chip
piece formula
leakage
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621234835.4U
Other languages
Chinese (zh)
Inventor
郭宗余
秦舒浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui shengchenyuan Material Technology Industrial Development Co., Ltd
Original Assignee
Mingyuan Kang (anhui) Plastic Technology Development Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mingyuan Kang (anhui) Plastic Technology Development Ltd By Share Ltd filed Critical Mingyuan Kang (anhui) Plastic Technology Development Ltd By Share Ltd
Priority to CN201621234835.4U priority Critical patent/CN206175921U/en
Application granted granted Critical
Publication of CN206175921U publication Critical patent/CN206175921U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Branch Pipes, Bends, And The Like (AREA)

Abstract

The utility model discloses a quick hot melt connector of piece formula ne -leakage. Including piece formula connector (1), be equipped with heating wire (2) along length direction on the internal surface of piece formula connector (1), the both ends of heating wire (2) are connected on power connection (3) of locating piece formula connector (1) the outside, and piece formula connector (1) is equipped with along the surface at length direction's both ends on and draws in nail (4) in, draws in in and is connected with tightening thread (5) on nail (4). The utility model has the characteristics of good, the sealed degree of wireless connection is high, the nothing is leaked, simple installation, quick, labour saving and time saving, and the transportation is with low costs with the storage.

Description

A kind of chip ne-leakage Rapid hot-melting union joint
Technical field
This utility model is related to a kind of plastic pipeline joint, particularly a kind of chip ne-leakage Rapid hot-melting union joint.
Background technology
For the ease of the production of plastic conduit, transport, sale and storage, in pipeline production process, its length has one The fixed upper limit, will not be oversize.But, in use, need to be spliced in the shorter pipeline of length, reach to use and wanted Ask, therefore, Petrochemical Pipe Joints have become part common and important during pipeline connection construction.Existing Petrochemical Pipe Joints Annular union joint is used, by the way that the plastic tube for needing connection is inserted in annular union joint from two ends, then heating makes ring Shape union joint shrinks, and to the pipeline of its inside banding connection is carried out, but, there is many defects in this union joint:1st, annular connects After joint thermal contraction can only banding plastic conduit, there is small thin seam, easily cause seepage in its contact surface;2nd, annular connection Head when mounted, need that the connecting pipe of both sides is sling, then after para-position insert union joint in, due to large-scale drainage pipeline it is straight Footpath is big, weight is big, needs professional crane to coordinate and is constructed, while also need to substantial amounts of human assistance operation just can complete, takes When it is laborious, and there is certain potential safety hazard;3rd, annular union joint is interior because its shape is limited in transport and storing process There are larger clearance spaces in portion, the freight volume of single transport is less, increases transport and the cost for storing.
The content of the invention
The purpose of this utility model is, there is provided a kind of chip ne-leakage Rapid hot-melting union joint.This utility model has Good connecting effect, tightness are high, No leakage, simple installation, quick, time saving and energy saving, the characteristics of transport and low storage cost.
The technical solution of the utility model:A kind of chip ne-leakage Rapid hot-melting union joint, includes chip union joint, piece It is provided with heating wire on the inner surface of formula union joint along its length, the two ends of heating wire are connected on the outside of chip union joint On power connection, the outer surface at chip union joint two ends along its length is provided with gathering nail, and gathering nails on to be connected with tightens up Line.
Aforesaid chip ne-leakage Rapid hot-melting union joint, the chip union joint is from consistent with the pipeline for being connected Material makes.
When the chip union joint surrounds annular, hot melt rod is provided with the gap at juxtaposition.
The beneficial effects of the utility model:
1st, union joint is melted and is combined together with the pipeline being connected by this utility model by way of using resistance heating, Compared with traditional thermal contraction connects, its joint face is more tight, and sealing effectiveness is more preferable.
, this utility model by the way that union joint is arranged to into chip, and by being received using tightening up line and hold in connection procedure Hold together nail, side electrified regulation melts union joint, and side makes union joint continuous by drawing nail in and tightening up the two ends for pullling union joint of line Tighten up, the bubble formed in joint face after union joint is melted and hole extrusion, it is to avoid form gap in joint face, enter one Step improves connection effect, enhances sealing property, prevents joint face seepage.
, this utility model is when installing, only pipeline para-position need to be spliced, then directly by chip union joint around link position one Electrified regulation after circle, compared with annular union joint, its installation process is easier, quick, meanwhile, when greatly having saved Between(More than 10 times in conventional coupling arrangement of speed), reduce the input of manpower(As a example by pipeline connection by 3 meters of bores, with Toward needing more than 20 people can just complete connection, 4 people or so are only needed to complete the splicing operation of one group of large-scale pipeline now), carry Degree of safety in high installation process.
, this utility model using chip design, transport and storing process in chip union joint can be carried out overlap placement, Compared with annular union joint, the redundant space in its transport and storing process is less, and the transport two of disposable transport is more, identical The quantity that space interior energy places storage is bigger, greatly reduces transport and the cost for storing.
, the material that adopts of this utility model it is consistent with the material of pipeline, the degrees of fusion of union joint after thawing and pipeline is more It is high, tightr, further increase connection effect and tightness.
, this utility model by the gap at the juxtaposition of chip union joint two ends arrange hot melt rod, hot melt rod melt It is after change that the gap filling of infall is complete, further ensure the tightness of connection.
Description of the drawings
Accompanying drawing 1 is structural representation of the present utility model;
Structural representation when accompanying drawing 2 is used for this utility model.
Description of reference numerals:1- chip union joints, 2- heating wire, 3- power connections, 4- draws nail in, and 5- tightens up line, and 6- is warm Molten rod.
Specific embodiment
This utility model is further described with reference to the accompanying drawings and examples, but is not intended as to this utility model The foundation of restriction.
Embodiment of the present utility model:A kind of chip ne-leakage Rapid hot-melting union joint, as shown in accompanying drawing 1-2, includes Chip union joint 1, on the inner surface of chip union joint 1 along its length(Chip connection is during connection along pipe circumference direction The length direction of plate 1)Heating wire 2 is provided with, heating wire 2 arranges that the two ends of heating wire 2 are connected to and set using serpentine rings by the way of On the power connection 3 in the outside of chip union joint 1, the outer surface at the two ends along its length of chip union joint 1 is provided with gathering Nail 4, draws in be connected with nail 4 and tightens up line 5.
The chip union joint 1 is made from the material consistent with the pipeline for being connected.
When the chip union joint 1 surrounds annular, hot melt rod 6 is provided with the gap at juxtaposition.
Operation principle:First, according to the size and material of the pipeline of required connection, corresponding chip union joint 1 is selected, so The port alignment of two pipelines of connection will be needed afterwards, by one end of chip union joint 1 around pipeline one week after alignment, form ring-type Union joint, will then tighten up line 5 and be fixed on the gathering at two ends nail 4, can be by plant-grid connection power supply after the completion of preparation On joint 3, electric current flows into heating wire 2 and makes the intensification heating of heating wire 2, when temperature reaches the fusion temperature of chip union joint 1, piece The inner surface of formula union joint 1 and the outer surface of pipeline start to melt, and mutually blend together, in fusion process, constantly Contraction tighten up line 5,4 the two ends of chip union joint 1 are drawn over to one's side by nail is drawn in, shrink its formation annular union joint it is straight Footpath, the joint face endogenous cause of ill of chip union joint 1 and pipeline is melted the bubble to be formed extrusion, it is to avoid produce gap, and face to be connected is melted When the two ends of change certain thickness and chip union joint 1 have been drawn close, deenergization can complete to connect work by its natural cooling.

Claims (3)

1. a kind of chip ne-leakage Rapid hot-melting union joint, it is characterised in that:Include chip union joint(1), chip union joint (1)Inner surface on be provided with heating wire along its length(2), heating wire(2)Two ends be connected to located at chip union joint(1)Outward The power connection of side(3)On, chip union joint(1)The outer surface at two ends along its length is provided with gathering nail(4), draw nail in (4)On be connected with and tighten up line(5).
2. chip ne-leakage Rapid hot-melting union joint according to claim 1, it is characterised in that:The chip union joint (1)Made from the material consistent with the pipeline for being connected.
3. chip ne-leakage Rapid hot-melting union joint according to claim 1, it is characterised in that:The chip union joint (1)When surrounding annular, hot melt rod is provided with the gap at juxtaposition(6).
CN201621234835.4U 2016-11-17 2016-11-17 Quick hot melt connector of piece formula ne -leakage Active CN206175921U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621234835.4U CN206175921U (en) 2016-11-17 2016-11-17 Quick hot melt connector of piece formula ne -leakage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621234835.4U CN206175921U (en) 2016-11-17 2016-11-17 Quick hot melt connector of piece formula ne -leakage

Publications (1)

Publication Number Publication Date
CN206175921U true CN206175921U (en) 2017-05-17

Family

ID=58686142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621234835.4U Active CN206175921U (en) 2016-11-17 2016-11-17 Quick hot melt connector of piece formula ne -leakage

Country Status (1)

Country Link
CN (1) CN206175921U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106678473A (en) * 2016-11-17 2017-05-17 康命源(安徽)塑料科技发展股份有限公司 Sheet type non-leakage rapid hot melting connecting method and connector

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106678473A (en) * 2016-11-17 2017-05-17 康命源(安徽)塑料科技发展股份有限公司 Sheet type non-leakage rapid hot melting connecting method and connector

Similar Documents

Publication Publication Date Title
CN107606356A (en) It is a kind of can Fast Installation or dismounting metal hose joint
CN106321990A (en) Socket and spigot type structural wall winding pipe and connecting method thereof
CN206175921U (en) Quick hot melt connector of piece formula ne -leakage
CN206904446U (en) A kind of prefabricated direct-buried thermal insulation pipe repaired mouth electric heating melting cage plate
CN205207932U (en) Inner groove electrothermal welding socket joint formula steel band bellows of heavy -calibre
CN106678473A (en) Sheet type non-leakage rapid hot melting connecting method and connector
CN205829075U (en) Glass fiber reinforced plastic optical cable protection sleeve
CN205606065U (en) A complete anticorrosive connection structure for serving as a contrast mould compound steel pipes
CN209084265U (en) It is a kind of for connecting the electric melting pipe fittings of unlike material tubing
CN105257915A (en) Large-diameter and inner groove electric heat melting socket and spigot joint type steel belt corrugated pipe and application thereof
CN103090146A (en) Poly ethylene (PE) pipeline cold joint sleeve
CN206093285U (en) A attach fitting for steel band reinforcing PE helical bellows
CN205078934U (en) Interior ladder way electrothermal welding socket joint formula steel band bellows of heavy -calibre
CN208855089U (en) A kind of injection molding socket joint flexible connection steel-belt-pipe
CN2475915Y (en) Electric welded belt type winding pipe connector
CN204062203U (en) Spigot and socket type steel band reinforced polyethylene spiral ripple pipe material
CN208900945U (en) A kind of novel pipeline repaired mouth device
CN203686450U (en) Socket and spigot connector used for steel strip reinforced polyethylene spiral corrugated pipe
CN205446999U (en) Plastic steel wound pipe connection structure
CN208690875U (en) A kind of power cable protection easily welding polyvinyl chloride conduit
CN207094022U (en) A kind of interpolation type double-walled electric smelting bend pipe tools
CN205618889U (en) Oversleeve electric smelting connecting device of winding arrangement wall pipe
CN206130403U (en) Hot melt formula RTP high -pressure pipe joint
CN201651627U (en) Joint used for steel strip reinforced polyethylene spiral corrugated pipes
CN214743897U (en) Hot melting sleeve suitable for different pipe diameters

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 236500 Anhui Jieshou City in Fuyang Province Jieshou jingyilu Development Zone Industrial Park Pansum Guangwu West No. 4

Patentee after: Anhui shengchenyuan Material Technology Industrial Development Co., Ltd

Address before: 236500 No.4, West 1st Road, Fanxing Road, Guangwu Industrial Park, Jieshou Economic Development Zone, Jieshou City, Anhui Province, Fuyang City, Anhui Province

Patentee before: KANGMINGYUAN (ANHUI) PLASTIC TECHNOLOGY DEVELOPMENT Co.,Ltd.

CP03 Change of name, title or address