CN106216950A - Gas-fired kitchen pipeline manufacturing process - Google Patents

Gas-fired kitchen pipeline manufacturing process Download PDF

Info

Publication number
CN106216950A
CN106216950A CN201610613265.8A CN201610613265A CN106216950A CN 106216950 A CN106216950 A CN 106216950A CN 201610613265 A CN201610613265 A CN 201610613265A CN 106216950 A CN106216950 A CN 106216950A
Authority
CN
China
Prior art keywords
steel pipe
pipe
cutting
inspection
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610613265.8A
Other languages
Chinese (zh)
Other versions
CN106216950B (en
Inventor
杨国海
周军
杨钘超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINCHANG GREAT WALL AIR CONDITION PARTS CO Ltd
Original Assignee
XINCHANG GREAT WALL AIR CONDITION PARTS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINCHANG GREAT WALL AIR CONDITION PARTS CO Ltd filed Critical XINCHANG GREAT WALL AIR CONDITION PARTS CO Ltd
Priority to CN201610613265.8A priority Critical patent/CN106216950B/en
Publication of CN106216950A publication Critical patent/CN106216950A/en
Application granted granted Critical
Publication of CN106216950B publication Critical patent/CN106216950B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The invention discloses gas-fired kitchen pipeline manufacturing process, including: (a) pipe prepares and checks;The pickling of (b) pipe;(c) heating of pipe blank;(d) perforation molding;The inspection for the first time of (e) steel pipe;F () steel pipe reheats;(g) plug;H () Steel pipe fixed length cuts;The edge reconditioning of (i) steel pipe cutting part;The second time inspection of (j) steel pipe;K () packs.Cutting seam and cutter sweep that the present invention is arranged in steel tube surface mutually adjust alignment, fixed length cutting is conducted batch-wise, carry out the edge reconditioning of steel pipe cutting part, obtain the steel pipe finished product of different size length, it is applicable to various forms of gas-fired kitchen pipe laying, applied widely, improve efficiency of construction, reduce construction cost, and in the mill, carry out checking, then the steel pipe after fixed length cutting is carried out second time to check for the first time to the steel pipe after perforation molding, improve steel pipe end product quality, improve the safety of gas-fired kitchen pipe laying.

Description

Gas-fired kitchen pipeline manufacturing process
Technical field
The present invention relates to gas-fired kitchen pipeline manufacturing process.
Background technology
Along with the construction of various residential buildings, commercial and residential building and apartment, the positive swift and violent paces of pipe gas enter common hundred Surname man, becomes the preferred fuels of urbanite.In these need the building of use pipe gas, civilian dark kitchen, open type The gas safe in kitchen is especially prominent, and the appropriate design of the water pipe clean of this kind of building is seemed the most urgent and necessary.
Civilian dark kitchen, open type kitchen pipeline gas supply are complicated system engineerings, need gas company from The many-sides such as design, construction, management, operation, service are strict with, and combine the ventilating system in kitchen, warning system The many-sides such as system, required pipe part, the acceptance of work take appropriate measures, and I is implemented civilian dark kitchen, open type kitchen The gas networks design in room is arranged particularly important, on the premise of guaranteeing design specification, and the workmanship of gas-fired kitchen pipeline The most particularly significant.
Gas-fired kitchen pipeline uses steel pipe at present, and uses screwed connection, and general gas-fired kitchen pipeline is to secretly set, its May be provided in the tube seat on wall or piping shaft, it is possible in being arranged on the couter-ceiling that non-combustible material is constituted or in pipe trench, the pipe secretly set The tube seat on road should arrange dodge gate and vent, it is ensured that the safety of use.
For the gas-fired kitchen pipeline that each family is different designed by other, it needs to select various length steel pipe, but existing When having technology to manufacture gas-fired kitchen pipeline, there is certain error in obtained fished pipe in length, causes and is arranging During gas-fired kitchen pipeline, need pipe cutting again, reduce efficiency of construction, improve construction cost, also destroy steel pipe simultaneously Original structure.
Summary of the invention
Present invention aim at solving above-mentioned technical problem present in prior art, it is provided that gas-fired kitchen pipeline manufactures Technique, molding of being bored a hole by pipe obtains steel pipe, and cutting seam and cutter sweep that steel tube surface is arranged mutually adjust alignment, enter in batches Row fixed length cutting, carries out the edge reconditioning of steel pipe cutting part, obtains the steel pipe finished product of different size length, it is adaptable to various forms Gas-fired kitchen pipe laying, applied widely, improve efficiency of construction, reduce construction cost, and in the mill, to perforation Steel pipe after molding carries out checking, then carry out the steel pipe after fixed length cutting second time to check for the first time, improves steel pipe and becomes quality Amount, improves the safety of gas-fired kitchen pipe laying.
In order to solve above-mentioned technical problem, the present invention adopts the following technical scheme that
Gas-fired kitchen pipeline manufacturing process, it is characterised in that comprise the steps:
A () pipe prepares and checks;
B () pipe pickling: selecting concentration is the sulphuric acid of 20%, at room temperature soaks 20~30min, then heats sulphuric acid To 40~50 DEG C, after pickling, wash pipe with clear water, and use sodium carbonate liquor to be neutralized, then with hot water injection 3~4 Secondary, and be dried;
C () heating of pipe blank: pipe is delivered to hot rolling workshop, uses rotary heating furnace to heat pipe, heating-up temperature Control at 1100~1280 DEG C, control heat time heating time 1.5~2.5h;
D () perforation molding: placed on the securing means by the pipe after cooling, carries out calibration centering, then coordinates perforation Machine, wears into the hollow billet of hollow rear wall by pipe, and one end is socket, and the other end is bellmouth, the internal diameter bigger than the external diameter of socket 3 of bellmouth ~5mm, then hollow billet is rolled thin on elongator, extend into steel pipe;
(e) steel pipe inspection for the first time: the steel pipe of molding is placed on pipeline, steel pipe is carried out first operation inspection Test, steel pipe sampling is carried out surface quality testing, the surface condition of range estimation steel pipe, then carries out second operation work inspection, to steel pipe External diameter and the wall thickness of steel pipe measured by sampling calibrator, then carries out three process inspection, surveys steel pipe sampling Steel Ruler The flexibility of dimension pipe, then deposits steel pipe isolation off quality;
F () steel pipe reheats;
(g) plug;
H () Steel pipe fixed length cuts: automatically controlled adjustment control panel at the casing of whole cutter sweep, adjusts control panel Lengthwise position, adjusts control panel to 0.5m~0.8m above operating board, then along draw-in groove, cutting bed is slided into operating board On, then carry out steel pipe surveying length, stick an adhesive tape in the cut place of steel pipe, and adhesive tape is made in order, ending bonding, then by steel Pipe is put in anticorrosive paint, can pull steel pipe after being totally submerged out, is torn by adhesive tape after dry, steel pipe leaves one clearly Cutting seam, fixed length cutting is then conducted batch-wise, 5~10 steel pipes is passed on backing roll, then controls hold-down devices at the uniform velocity Declining, pressure roller pushes down steel pipe, then washes away emery wheel with cooling-lubricant, is then turned on motor, control motor speed 2000~ 3000 revs/min, adjusting cutting bed about recycling positioner, cutting seam is quickly moved to the left side of emery wheel, it is fixed then to utilize Position device controls cutting bed and the most at the uniform velocity slides, and often moves 1cm and carries out position alignment work between emery wheel and cutting seam, works as emery wheel During with cutting seam consistency from top to bottom, uniform descent control panel, emery wheel is fixed length cutting steel pipe at cutting seam, and cutting speed controls 1.2m/min, after the equal fixed length cutting of steel pipe, focuses on waste material with hairbrush and rag;
(i) steel pipe cutting part edge reconditioning: select burr removing device that the cutting part of steel pipe is carried out edge reconditioning, The anterior angle of the cutting edge of cutter head being controlled at 20~30 °, relief angle controls, at 6~10 °, to use cutter head deburring;
The second time inspection of (j) steel pipe;
K () packs.
Further, in step (h), after every batch of Steel pipe fixed length cutting, use shower nozzle that draw-in groove carries out clear water flushing work, spray Head is sprayed to two ends by the middle part of draw-in groove, and spray angle keeps 10~30 °, then with rag, draw-in groove is carried out wiping.
Further, in step (j), steel pipe second time inspection is identical with the front three process inspection of inspection for the first time, increases 4th procedure inspection, carries out compression test to steel pipe sampling air pressure testing machine, and each pressing time continues 4~6min, when After test pressure reaches 1.5MPa, keep voltage stabling control 10~12min, the resistance to compression situation of inspection outer wall of steel pipe.
Further, in step (k), to checking qualified steel pipe to stack respectively according to product material, specification, and do corresponding Mark, then carry out packing work, then underproof steel pipe is focused on, recycle.
Further, in step (h), cutter sweep includes casing and operating board, and casing is provided with control panel, control panel Being provided with motor, control panel is fixedly connected with clamp system, and clamp system is provided with extension steel plate, and the one end extending steel plate sets There are emery wheel, emery wheel and motor belt transmission;Operating board is provided with draw-in groove, slidably connects cutting bed in draw-in groove, the two of cutting bed Side is equipped with positioner, and positioner is provided with backing roll, and positioner is provided with hold-down devices, and hold-down devices is provided with to be led To bar, guide post is slidably connected to the top of positioner, and the top of guide post is provided with pressing plate, and hold-down devices is provided with pressure roller, pressure Roller is located at the top of backing roll.
Due to the fact that and have employed technique scheme, have the advantages that
1, qualified pipe is carried out pickling processes by the present invention, removes oxide skin and the corrosion thing on pipe surface, at pickling Reason rear surface cleaning light, is difficult to loss of gloss and fades, and not yellowing improves the quality of pipe;Pipe perforation molding obtains high-quality, height Intensity steel pipe;The cut place of the steel pipe after surveying length is arranged cutting seam, is specially and sticks an adhesive tape in the cut place of steel pipe, and Adhesive tape is made in order, ending bonding, then steel pipe is put in anticorrosive paint, steel pipe after being totally submerged, can be pulled out, will after dry Adhesive tape tears, so that it may stay one to cut seam clearly on steel pipe, so utilizes positioner to control cutting bed the most at the uniform velocity Slide, often move 1cm and carry out position alignment work between emery wheel and cutting seam so that emery wheel and cutting seam consistency from top to bottom, then divide Batch carrying out fixed length cutting, owing to steel pipe is clamped between backing roll and pressure roller, in cutting process, not have position inclined for steel pipe Move phenomenon so that between length and the full-length of required steel pipe of the steel pipe after cutting, deviation controls within 2mm, improve Cutting accuracy;To the edge reconditioning of steel pipe cutting part, remove the burr of cutting part, improve flatness;The most just can get not The steel pipe finished product of same specification length, is applicable to various forms of gas-fired kitchen pipe laying, applied widely, improves construction Efficiency, reduces construction cost.
2, the present invention is in the mill, carries out checking for the first time to the steel pipe after perforation molding, is substantially carried out steel tube surface matter Amount inspection, the external diameter of steel pipe and the measurement of wall thickness and the measurement of flexibility of steel pipe, can deposit steel pipe isolation off quality, Steel pipe after fixed length cutting carries out second time again check, be substantially carried out steel tube surface quality inspection, the external diameter of steel pipe and wall thickness Measurement, the measurement of flexibility of steel pipe and steel pipe compression test, can improve steel pipe end product quality, improve gas-fired kitchen pipeline and spread If safety.
3, qualified steel pipe is stacked respectively by the present invention according to product material, specification, and does corresponding mark, to qualified one-tenth Product manage in an orderly manner, it is to avoid the confusion of production line;Being focused on by underproof steel pipe, recycle, reduction is manufactured into This.
Accompanying drawing explanation
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is the flow chart of gas-fired kitchen pipeline manufacturing process of the present invention;
Fig. 2 is the structural representation of cutter sweep in the present invention;
Fig. 3 is the front view of Fig. 2;
Fig. 4 is the structural representation that in the present invention, cutting bed is connected with positioner;
Fig. 5 is the structural representation that in the present invention, positioner is connected with hold-down devices.
Detailed description of the invention
As shown in Figures 1 to 5, for the gas-fired kitchen pipeline manufacturing process related in the present invention, following step is specifically included Rapid:
A () pipe prepares and checks: pipe has the various shapes such as circle, square or polygon, it is necessary to according to the actual requirements Carry out selecting corresponding shape, then the profile of pipe is checked, use range estimation, the quality of the pipe matter to steel pipe finished product Amount has directly impact.
B () pipe pickling: selecting concentration is the sulphuric acid of 20%, at room temperature soaks 20~30min, then heats sulphuric acid To 40~50 DEG C, after pickling, wash pipe with clear water, and use sodium carbonate liquor to be neutralized, then with hot water injection 3~4 Secondary, and be dried.
C () heating of pipe blank: pipe is delivered to hot rolling workshop, uses rotary heating furnace to heat pipe, heating-up temperature Control at 1100~1280 DEG C, control heat time heating time 1.5~2.5h.
D () perforation molding: placed on the securing means by the pipe after cooling, carries out calibration centering, then coordinates perforation Machine, wears into the hollow billet of hollow rear wall by pipe, and one end is socket, and the other end is bellmouth, the internal diameter bigger than the external diameter of socket 3 of bellmouth ~5mm, then hollow billet is rolled thin on elongator, extend into steel pipe.
(e) steel pipe inspection for the first time: the steel pipe of molding is placed on pipeline, steel pipe is carried out first operation inspection Test, steel pipe sampling is carried out surface quality testing, the surface condition of range estimation steel pipe.Inspection is carried out according to table 1:
Table 1
Carry out second operation work inspection again, steel pipe sampling is measured with calibrator external diameter and the wall thickness of steel pipe.Check according to Table 2 is carried out:
Table 2
Then carry out three process inspection, steel pipe sampling is measured the flexibility of steel pipe, then by quality by Steel Ruler The isolation of underproof steel pipe is deposited.Inspection is carried out according to table 3:
Table 3
F () steel pipe reheats: heating in up-to-standard steel pipe is delivered to smelting furnace by conveyer belt, steel pipe is sent to smelting furnace Time middle, temperature controls at about 1300 DEG C, Fuel Selection acetylene.
(g) plug: use sizing mill to proceed to sizing by taper bit high-speed rotary.Pipe diameter is by sizing mill drill bit Outer diameter length determine.Steel pipe, after sizing, enters in cooling tower, and by water-spraying control, steel pipe is after cooling it is necessary to rectified Directly.Steel pipe is delivered to metal defect detection machine (or hydrostatic test) by conveyer belt after aligning and is carried out internal flaw detection.Split if steel duct has Stricture of vagina, the problem such as bubble, will be detected out.Also to be selected by strict craft after steel pipe quality inspection.
H () Steel pipe fixed length cuts: Steel pipe fixed length cutting uses custom-designed cutter sweep, and it mainly includes casing 1 He Operating board 2.Casing 1 is provided with control panel 3, and control panel 3 is provided with motor 4, and control panel 3 is fixedly connected with clamp system 5, clamp system 5 is provided with extension steel plate 6, and the one end extending steel plate 6 is provided with emery wheel 7, emery wheel 7 and motor 4 belt transmission.Operation Platform 2 is provided with draw-in groove 8, slidably connects cutting bed 9 in draw-in groove 8, and the both sides of cutting bed 9 are equipped with positioner 10, and two fixed Position device 10 is in same level position.Positioner 10 is provided with backing roll 11, and positioner 10 is provided with hold-down devices 12, Hold-down devices 12 is provided with guide post 13, and guide post 13 is slidably connected to the top of positioner 10, and the top of guide post 13 sets Having pressing plate 14, pressing plate 14 is by external drive effect.Hold-down devices 12 is provided with pressure roller 15, and the upper of backing roll 11 be located at by pressure roller 15 Side.
Automatically controlled adjustment control panel 3 at the casing 1 of whole cutter sweep, adjusts the lengthwise position of control panel 3, will control Panel 3 processed adjusts to 0.5m~0.8m above operating board 2, can allow the installation of cutting bed 9.Again that cutting bed 9 is sliding along draw-in groove 8 Enter on operating board 2.Then carry out steel pipe surveying length, stick an adhesive tape in the cut place of steel pipe, and adhesive tape is made in order, ending Bonding, then steel pipe is put in anticorrosive paint, steel pipe can be pulled after being totally submerged out, adhesive tape is torn, on steel pipe after dry Stay one to cut seam clearly, again steel pipe is carried out preservative treatment.Then fixed length cutting is conducted batch-wise, by 5~10 steel pipes It is passed on backing roll 11, the most mutual square of steel pipe, the phenomenon that steel pipe stacks must not occur.Control hold-down devices 12 more at the uniform velocity Decline, steel pipe pushed down by pressure roller 15, in order to avoid pressure roller 15 leaves cut to steel tube surface, can before pressure roller 15 contacts with steel pipe, Steel pipe is laid one layer of bed course.Then wash away emery wheel 7 with cooling-lubricant, be then turned on motor 4, control motor 4 rotating speed 2000~3000 revs/min, recycling positioner about 10 adjusts cutting bed 9, and cutting seam is quickly moved to the left side of emery wheel 7, Then utilize positioner 10 to control cutting bed 9 the most at the uniform velocity to slide, often move 1cm and carry out position between emery wheel 7 and cutting seam Alignment work, when emery wheel 7 and cutting seam consistency from top to bottom, uniform descent control panel 3, emery wheel 7 is fixed length cutting at cutting seam Steel pipe, cutting speed controls at 1.2m/min.After the equal fixed length cutting of steel pipe, focus on waste material with hairbrush and rag.
After every batch of Steel pipe fixed length cutting, using shower nozzle that draw-in groove 8 is carried out clear water flushing work, shower nozzle is by the centre of draw-in groove 8 Position is sprayed to two ends, and spray angle keeps 10~30 °, then with rag, draw-in groove 8 is carried out wiping.
(i) steel pipe cutting part edge reconditioning: select burr removing device that the cutting part of steel pipe is carried out edge reconditioning, The anterior angle of the cutting edge of cutter head being controlled at 20~30 °, relief angle controls, at 6~10 °, to use cutter head deburring.
(j) steel pipe second time inspection: steel pipe second time inspection is identical with the front three process inspection of inspection for the first time, increases 4th procedure inspection, carries out compression test to steel pipe sampling air pressure testing machine, and each pressing time continues 4~6min, when After test pressure reaches 1.5MPa, keep voltage stabling control 10~12min, the resistance to compression situation of inspection outer wall of steel pipe.Steel pipe resistance to compression is surveyed Examination pressure be above standard test pressure time, technical staff is negotiable determines other tolerance.
K () packs: to checking qualified steel pipe to stack respectively according to product material, specification, and do corresponding mark, then enter Row packing work, then focuses on underproof steel pipe, recycles.
Qualified pipe is carried out pickling processes by the present invention, removes oxide skin and corrosion thing, the pickling processes on pipe surface Rear surface cleaning light, is difficult to loss of gloss and fades, and not yellowing improves the quality of pipe;Pipe perforation molding obtains high-quality, high-strength Degree steel pipe;The cut place of the steel pipe after surveying length is arranged cutting seam, is specially and sticks an adhesive tape in the cut place of steel pipe, and will Adhesive tape is made in order, ending bonding, then is put into by steel pipe in anticorrosive paint, can pull steel pipe out, by glue after dry after being totally submerged Band tears, so that it may stays one to cut seam clearly on steel pipe, so utilizes positioner 10 to control cutting bed 9 the most at the uniform velocity Slide, often move 1cm and carry out position alignment work between emery wheel 7 and cutting seam so that emery wheel 7 and cutting seam consistency from top to bottom, then Fixed length cutting is conducted batch-wise, and owing to steel pipe is clamped between backing roll 11 and pressure roller 15, in cutting process, steel pipe does not haves Position shift phenomenon so that between length and the full-length of required steel pipe of the steel pipe after cutting deviation control 2mm with In, improve cutting accuracy;To the edge reconditioning of steel pipe cutting part, remove the burr of cutting part, improve flatness;The most just may be used Obtain the steel pipe finished product of different size length, be applicable to various forms of gas-fired kitchen pipe laying, applied widely, carry High efficiency of construction, reduces construction cost.
Steel pipe after perforation molding in the mill, is carried out checking for the first time, is substantially carried out steel tube surface quality by the present invention Inspection, the external diameter of steel pipe and the measurement of wall thickness and the measurement of flexibility of steel pipe, can deposit steel pipe isolation off quality, then Steel pipe after fixed length cutting carries out second time check, be substantially carried out steel tube surface quality inspection, the external diameter of steel pipe and wall thickness Measurement, the measurement of flexibility of steel pipe and steel pipe compression test, can improve steel pipe end product quality, improves gas-fired kitchen pipe laying Safety.
These are only the specific embodiment of the present invention, but the technical characteristic of the present invention is not limited thereto.Any with this Based on bright, for solving essentially identical technical problem, it is achieved essentially identical technique effect, done simple change, etc. With replacement or modification etc., all it is covered by among protection scope of the present invention.

Claims (5)

1. gas-fired kitchen pipeline manufacturing process, it is characterised in that comprise the steps:
A () pipe prepares and checks;
B () pipe pickling: selecting concentration is the sulphuric acid of 20%, at room temperature soaks 20~30min, then sulphuric acid is heated to 40 ~50 DEG C, after pickling, wash pipe with clear water, and use sodium carbonate liquor to be neutralized, then with hot water injection 3~4 times, and It is dried;
C () heating of pipe blank: pipe is delivered to hot rolling workshop, uses rotary heating furnace to heat pipe, heating and temperature control At 1100~1280 DEG C, control heat time heating time 1.5~2.5h;
D () perforation molding: placed on the securing means by the pipe after cooling, carries out calibration centering, then coordinates perforating machine, will Pipe wears into the hollow billet of hollow rear wall, and one end is socket, and the other end is bellmouth, the internal diameter bigger than the external diameter of socket 3 of bellmouth~ 5mm, then rolls hollow billet thin on elongator, extends into steel pipe;
(e) steel pipe inspection for the first time: the steel pipe of molding is placed on pipeline, steel pipe is carried out first process inspection, right Steel pipe sampling carries out surface quality testing, the surface condition of range estimation steel pipe, then carries out second operation work inspection, uses steel pipe sampling External diameter and the wall thickness of steel pipe measured by calibrator, then carries out three process inspection, steel pipe sampling Steel Ruler is measured steel pipe Flexibility, then steel pipe isolation off quality is deposited;
F () steel pipe reheats;
(g) plug;
H () Steel pipe fixed length cuts: automatically controlled adjustment control panel at the casing of whole cutter sweep, adjusts the longitudinal direction of control panel Position, adjusts control panel to 0.5m~0.8m above operating board, then slides on operating board by cutting bed along draw-in groove, connect And carry out steel pipe surveying length, stick an adhesive tape in the cut place of steel pipe, and adhesive tape is made in order, ending bonding, then steel pipe is put Enter in anticorrosive paint, steel pipe after being totally submerged, can be pulled out, after dry, adhesive tape is torn, steel pipe stays one cut clearly Slot, is then conducted batch-wise fixed length cutting, is passed on backing roll by 5~10 steel pipes, then controls hold-down devices uniform descent, Steel pipe pushed down by pressure roller, then washes away emery wheel with cooling-lubricant, is then turned on motor, control motor speed 2000~3000 turns/ Point, adjust cutting bed about recycling positioner, cutting seam is quickly moved to the left side of emery wheel, then utilizes positioner control Cutting bed processed the most at the uniform velocity slides, and often moves 1cm and carries out position alignment work between emery wheel and cutting seam, when emery wheel and cutting seam During consistency from top to bottom, uniform descent control panel, emery wheel is fixed length cutting steel pipe at cutting seam, and cutting speed controls at 1.2m/ Min, after the equal fixed length cutting of steel pipe, focuses on waste material with hairbrush and rag;
(i) steel pipe cutting part edge reconditioning: select burr removing device that the cutting part of steel pipe is carried out edge reconditioning, by cutter The anterior angle of the cutting edge of head controls at 20~30 °, and relief angle controls, at 6~10 °, to use cutter head deburring;
The second time inspection of (j) steel pipe;
K () packs.
Gas-fired kitchen pipeline manufacturing process the most according to claim 1, it is characterised in that: in step (h), every batch of steel pipe After fixed length cutting, using shower nozzle that draw-in groove carries out clear water flushing work, shower nozzle is sprayed to two ends by the middle part of draw-in groove, injection Angle keeps 10~30 °, then with rag, draw-in groove is carried out wiping.
Gas-fired kitchen pipeline manufacturing process the most according to claim 1, it is characterised in that: in step (j), steel pipe second Secondary inspection is identical with the front three process inspection of inspection for the first time, increases by the 4th procedure inspection, tries steel pipe sampling air pressure The machine of testing carries out compression test, and each pressing time continues 4~6min, after test pressure reaches 1.5MPa, keeps voltage stabling control 10~12min, the resistance to compression situation of inspection outer wall of steel pipe.
Gas-fired kitchen pipeline manufacturing process the most according to claim 1, it is characterised in that: in step (k), inspection is closed The steel pipe of lattice is stacked respectively according to product material, specification, and does corresponding mark, then carries out packing work, then by defective Steel pipe focus on, recycle.
Gas-fired kitchen pipeline manufacturing process the most according to claim 1, it is characterised in that: in step (h), described cutting Device includes that casing and operating board, described casing are provided with control panel, and described control panel is provided with motor, described chain of command Plate is fixedly connected with clamp system, and described clamp system is provided with extension steel plate, and one end of described extension steel plate is provided with emery wheel, institute State emery wheel and described motor belt transmission;Described operating board is provided with draw-in groove, slidably connects cutting bed in described draw-in groove, described The both sides of cutting bed are equipped with positioner, and described positioner is provided with backing roll, and described positioner is provided with down and press-fits Putting, described hold-down devices is provided with guide post, and described guide post is slidably connected to the top of described positioner, described guide post Top be provided with pressing plate, described hold-down devices is provided with pressure roller, and the top of described backing roll is located at by described pressure roller.
CN201610613265.8A 2016-07-29 2016-07-29 Gas-fired kitchen pipeline manufacturing process Active CN106216950B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610613265.8A CN106216950B (en) 2016-07-29 2016-07-29 Gas-fired kitchen pipeline manufacturing process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610613265.8A CN106216950B (en) 2016-07-29 2016-07-29 Gas-fired kitchen pipeline manufacturing process

Publications (2)

Publication Number Publication Date
CN106216950A true CN106216950A (en) 2016-12-14
CN106216950B CN106216950B (en) 2018-11-16

Family

ID=57536137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610613265.8A Active CN106216950B (en) 2016-07-29 2016-07-29 Gas-fired kitchen pipeline manufacturing process

Country Status (1)

Country Link
CN (1) CN106216950B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110405419A (en) * 2019-07-29 2019-11-05 中国石油集团渤海石油装备制造有限公司 A kind of preparation method of short ruler anti-corrosive steel tube
CN111155119A (en) * 2019-12-31 2020-05-15 西安赛尔电子材料科技有限公司 Pickling method of stainless steel sensor
CN112792396A (en) * 2020-12-25 2021-05-14 中山弗雷德机械有限公司 Equidistance cutting control system
CN113653313A (en) * 2021-09-01 2021-11-16 中铁天丰建筑工程有限公司 Outer wall scaffold support device for building curtain wall

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1996012574A1 (en) * 1994-10-20 1996-05-02 Sumitomo Metal Industries, Ltd. Method of manufacturing seamless steel pipes and manufacturing equipment therefor
CN102363862A (en) * 2011-10-10 2012-02-29 刘群联 Method for manufacturing seamless steel tube
CN103921065A (en) * 2014-03-18 2014-07-16 泰州双羊精密无缝钢管有限公司 Manufacturing method of vehicle seamless steel tubes
CN104209363A (en) * 2014-08-27 2014-12-17 无锡市华牧机械有限公司 Stainless steel pipe processing technology
CN104325262A (en) * 2014-10-16 2015-02-04 海盐三鑫钢管有限公司 Processing method for small-pipe-diameter thick-wall pipe used for automobile shock absorber
CN104492850A (en) * 2014-12-02 2015-04-08 安徽天大石油管材股份有限公司 Production method of high-finish steel tube

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1996012574A1 (en) * 1994-10-20 1996-05-02 Sumitomo Metal Industries, Ltd. Method of manufacturing seamless steel pipes and manufacturing equipment therefor
CN102363862A (en) * 2011-10-10 2012-02-29 刘群联 Method for manufacturing seamless steel tube
CN103921065A (en) * 2014-03-18 2014-07-16 泰州双羊精密无缝钢管有限公司 Manufacturing method of vehicle seamless steel tubes
CN104209363A (en) * 2014-08-27 2014-12-17 无锡市华牧机械有限公司 Stainless steel pipe processing technology
CN104325262A (en) * 2014-10-16 2015-02-04 海盐三鑫钢管有限公司 Processing method for small-pipe-diameter thick-wall pipe used for automobile shock absorber
CN104492850A (en) * 2014-12-02 2015-04-08 安徽天大石油管材股份有限公司 Production method of high-finish steel tube

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110405419A (en) * 2019-07-29 2019-11-05 中国石油集团渤海石油装备制造有限公司 A kind of preparation method of short ruler anti-corrosive steel tube
CN110405419B (en) * 2019-07-29 2020-06-19 中国石油集团渤海石油装备制造有限公司 Preparation method of short anticorrosive steel pipe
CN111155119A (en) * 2019-12-31 2020-05-15 西安赛尔电子材料科技有限公司 Pickling method of stainless steel sensor
CN112792396A (en) * 2020-12-25 2021-05-14 中山弗雷德机械有限公司 Equidistance cutting control system
CN113653313A (en) * 2021-09-01 2021-11-16 中铁天丰建筑工程有限公司 Outer wall scaffold support device for building curtain wall

Also Published As

Publication number Publication date
CN106216950B (en) 2018-11-16

Similar Documents

Publication Publication Date Title
CN106216950A (en) Gas-fired kitchen pipeline manufacturing process
WO2019104814A1 (en) Construction process for wind power tower barrel
CN102172814B (en) Method for manufacturing longitudinal submerged arc welded pipe
CN104741741A (en) Automatic tube butt joint all-position TIG welding technology for coiled tubing
CN102950432A (en) Q245R longitudinal submerged arc welded natural gas blow-down pipe manufacturing method
DE10331000B3 (en) Production of welded large pipes in the form of screw-threaded pipes made from hot rolled steel comprises decoiling the hot strip, joining the beginning of the strip with the beginning of a precursor strip and further processing
CN103710715A (en) Cold-drawing and cold-rolling mixed molding method of stainless steel seamless pipe
CN102744472B (en) Device for mechanically positioning screw tracks on numerical control thread repairing lathe and positioning method
CN103357697A (en) Manufacturing technology of longitudinal submerged arc welded pipe
CN107159714B (en) The method that a kind of pair of cold rolling support roller working face carries out local reconditioning
CN101716634B (en) Automatic laser tracking positioning device and method for straightening drill pipe of oil well
CN103599928B (en) Production method for rolling special pipeline steel through steckle mill
CN100408905C (en) Manufacturing method of seamless steel pipe for pressure pipeline
CN205464709U (en) Automatic flame cutting machine of elbow pipe end
CN103737084B (en) A kind of pipe end coating topping machanism
CN110640399A (en) Production process for preparing cold-rolled thin-wall sleeve
CN101812856B (en) Production process of steel pile structure of cutter suction dredger
CN112432592A (en) Horizontal steel coil shape quality detection device and detection method thereof
CN110026734B (en) Production process of hollow steel by direct drilling method
CN102990287B (en) Processing method of decorative stainless steel ball with thick wall
CN201239828Y (en) Apparatus for repairing interior surface crack of steel pipe
CN107443016A (en) A kind of ultra-thin interior combined helical pipe tubulation welding method
CN106944796A (en) A kind of aviation slewing parts leakproof chromium processing method
CN102247989A (en) Production process for four-roll planetary hot-rolled tube machine
CN109227046A (en) A kind of production method of pass template

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 312500 Xinchang provincial high and New Technology Industrial Park (Xinchang Yu Village), Xinchang, Zhejiang Province

Applicant after: XINCHANG GREAT WALL AIR-CONDITIONING PARTS Co.,Ltd.

Address before: 312500 Xinchang provincial high and New Technology Industrial Park (Xinchang Yu Village), Xinchang, Zhejiang Province

Applicant before: XINCHANG GREAT WALL AIR CONDITION PARTS Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Manufacturing process of pipeline for gas kitchenware

Effective date of registration: 20220125

Granted publication date: 20181116

Pledgee: Agricultural Bank of China Limited by Share Ltd. Xinchang county subbranch

Pledgor: XINCHANG GREAT WALL AIR-CONDITIONING PARTS Co.,Ltd.

Registration number: Y2022330000174

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230323

Granted publication date: 20181116

Pledgee: Agricultural Bank of China Limited by Share Ltd. Xinchang county subbranch

Pledgor: XINCHANG GREAT WALL AIR-CONDITIONING PARTS Co.,Ltd.

Registration number: Y2022330000174