CN106208083B CN201610879312.3A CN201610879312A CN106208083B CN 106208083 B CN106208083 B CN 106208083B CN 201610879312 A CN201610879312 A CN 201610879312A CN 106208083 B CN106208083 B CN 106208083B
Authority
CN
China
Prior art keywords
upfc
circuit
configuration
configure
thermostabilization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610879312.3A
Other languages
Chinese (zh)
Other versions
CN106208083A (en
Inventor
林俊杰
程伦
申旭辉
曹树江
罗红梅
樊彦坤
唐晓骏
高泽明
霍启迪
王生彬
李晓郡
翟万生
李旭
王瑞欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610879312.3A priority Critical patent/CN106208083B/en
Publication of CN106208083A publication Critical patent/CN106208083A/en
Application granted granted Critical
Publication of CN106208083B publication Critical patent/CN106208083B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/04Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
    • H02J3/06Controlling transfer of power between connected networks; Controlling sharing of load between connected networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

An embodiment of the present invention provides a kind of method and devices of acquisition THE UPFC configuration.This method includes:It is distributed according to the trend of circuit, determines the configure the line of at least two THE UPFC UPFC;Determine the method for operation of the UPFC configure the lines and the configuration parameter of UPFC;Accident analysis is carried out to the UPFC configure the lines according to the identified method of operation and configuration parameter, obtains the power flow transfer state of the UPFC configure the lines after a failure;The corresponding UPFC configure the lines of the most preferably described power flow transfer state are determined as final configuration mode.The embodiment of the present invention is distributed rationally by the UPFC of multichannel and a variety of methods of operation, and the balanced trend distribution of section improves thermostabilization nargin, improves ability to transmit electricity to greatest extent.

Description

A kind of method and device obtaining THE UPFC configuration
Technical field
The present invention relates to technical field of power systems, more particularly to a kind of acquisition THE UPFC (Unified Power Flow Controller, UPFC) configuration method and device.
Background technology
In the evolution of electric system, the advantage of Power System Interconnection gradually displays.Power System Interconnection helps to realize Two things diametrically opposed to each other and region are complementary, achieve the purpose that more reasonably to utilize the energy.China's power grid has realized national network at present, and Actively development exchange 1000kV and direct current ± 800kV extra-high voltage projects, purpose are exactly to further strengthen between each power grid Contact, realize distributing rationally for resource.Also produce that such as interconnection tie power fluctuation, accident are chain involves electricity after Power System Interconnection The problems such as magnet ring net circulation.These problems bring new challenge to the operation control of power grid, often draw in extreme circumstances The chain reaction of the system failure is sent out, the range that causes the accident expands.
With further strengthening for China's 500kV main grid structures, the interconnection between each province is strengthened therewith.However, Near extra-high voltage drop point, trend, which is collected or sent out, more to be concentrated, and the trend in each channel in province's discontinuity surface is caused to be unevenly distributed weighing apparatus. When N-1 failures (being disconnected after a line fault) occurs for the heavier double-circuit line of trend, power is mainly transferred to and its electricity Other loop line road on the closer same channel of gas distance, leads to the heavy duty of other loop line road or overload, and due to circuit The limitation of the thermostabilization limit, trend is unevenly distributed weighing apparatus so that end face causes defeated from making full use of the ability to transmit electricity of circuit between saving Electric energy power declines.Wherein, the thermostabilization limit is the current-carrying capability of circuit, and the maximum temperature that can bear for a long time by circuit is determined It is fixed.
UPFC is flexible AC transmitting system (Flexible Alternative Current Transmission Systems, FACTS) it is most complicated in family be also a kind of most attractive compensator, it combines many FACTS devices Flexible control means, it is considered to be it is most creative, and the FACTS elements that function is most powerful.UPFC is by one by the change of current The alternating voltage that device generates is sealed in and is added in power transmission line phase voltage, make its amplitude and phase angle can consecutive variations, to realize line Road is active and the accurate of reactive power is adjusted, it can be achieved that balanced trend distribution, raising electric network transportation ability and damping system are shaken The effect swung.
Therefore, rational UPFC configurations how are obtained in power grid and carry out balanced trend distribution, and then are improved power grid and conveyed energy Power just becomes particularly important.
Invention content
The embodiment of the present invention provides a kind of method and device obtaining unified UPFC configurations, can balanced trend distribution, into And improve electric network transportation ability.
To solve the above-mentioned problems, the invention discloses a kind of methods of acquisition THE UPFC configuration, including:
It is distributed according to the trend of circuit, determines the configure the line of at least two THE UPFC UPFC;
Determine the method for operation of the UPFC configure the lines and the configuration parameter of UPFC;
Accident analysis is carried out to the UPFC configure the lines according to the identified method of operation and configuration parameter, described in acquisition The power flow transfer state of UPFC configure the lines after a failure;
The corresponding UPFC configure the lines of the most preferably described power flow transfer state are determined as final configuration mode.
Further, described to be distributed according to the trend of circuit, determine the layout line of at least two THE UPFC UPFC Road, including:
According to the trend and the thermostabilization limit before the line fault, the load state of the circuit is determined;
According to the trend and the thermostabilization limit after the line fault, the thermostabilization nargin of the circuit is counted;
Determine configuration UPFC's according to the load state and the thermostabilization nargin in the circuit for meeting preset condition Circuit;
On the circuit of the configuration UPFC, it is distributed according to the highly resistance of the direction of tide of circuit and circuit, described in determination The installation position of UPFC.
Further, described to be determined according to the load state and the thermostabilization nargin in the circuit for meeting preset condition The circuit of UPFC is configured, including:
According to the load state and the thermostabilization in the circuit that flexible AC transmitting system FACTS equipment is not configured Nargin determines the circuit of configuration UPFC.
Further, the method for operation of the determination UPFC configure the lines and the configuration parameter of UPFC, including:
According to the through-flow electric current of the UPFC, the capacity of the reference voltage and the UPFC of the UPFC is determined;
According to the trend distribution of the circuit before the configuration UPFC, the control model and circuit at UPFC series connection end are determined The initial value of control parameter;
The control model of the UPFC parallel connected ends is determined according to the reactive power exchange of the UPFC and system.
Further, the control model of the UPFC parallel connected ends is to determine Reactive Power Control pattern.
Further, the method for operation determined by the basis and configuration parameter carry out failure point to the UPFC configure the lines Analysis, obtains the power flow transfer state of the UPFC configure the lines after a failure, including:
According to the identified method of operation and configuration parameter, the double-circuit line trend of the UPFC configure the lines is adjusted, is united Count the thermostabilization nargin of an other loop line in the double-circuit line after N-1 failures;
Obtain the ratio of the thermostabilization nargin and the UPFC capacity, wherein the ratio is for characterizing the trend Transfering state.
The invention also discloses a kind of devices of acquisition THE UPFC configuration, including:
Circuit determination unit determines at least two THE UPFC UPFC's for being distributed according to the trend of circuit Configure the line;
Parameter determination unit, the configuration parameter of the method for operation and UPFC for determining the UPFC configure the lines;
Analytic unit, for carrying out failure to the UPFC configure the lines according to the identified method of operation and configuration parameter Analysis, obtains the power flow transfer state of the UPFC configure the lines after a failure;
Determination unit is configured, it is final for the corresponding UPFC configure the lines of the most preferably described power flow transfer state to be determined as Configuration mode.
Further, the circuit determination unit includes:
Determination subelement is loaded, for according to the trend and the thermostabilization limit before the line fault, determining the circuit Load state;
Subelement is counted, for according to the trend and the thermostabilization limit after the line fault, counting the heat of the circuit Stability margin;
Route determination subelement, in the circuit for meeting preset condition according to the load state and the thermostabilization Nargin determines the circuit of configuration UPFC;
Location determination subelement, for the circuit in the configuration UPFC, according to the direction of tide of circuit and circuit Highly resistance is distributed, and determines the installation position of the UPFC.
Further, the route determination subelement, in the circuit that flexible AC transmitting system FACTS equipment is not configured The middle circuit that configuration UPFC is determined according to the load state and the thermostabilization nargin.
Further, the parameter determination unit includes:
First determination subelement determines reference voltage and the institute of the UPFC for the through-flow electric current according to the UPFC State the capacity of UPFC;
Second determination subelement determines the UPFC strings for being distributed according to the trend of the circuit before the configuration UPFC Join the control model at end and the initial value of circuit control parameter;
Third determination subelement, the control for determining the UPFC parallel connected ends according to the reactive power exchange of the UPFC and system Molding formula.
Further, the control model of the UPFC parallel connected ends is to determine Reactive Power Control pattern.
Further, the analytic unit includes:
Subelement is adjusted, for according to the identified method of operation and configuration parameter, adjusting the UPFC configure the lines Double-circuit line trend counts the thermostabilization nargin of an other loop line in the double-circuit line after N-1 failures;
Obtain subelement, the ratio for obtaining the thermostabilization nargin and the UPFC capacity, wherein the ratio is used In the characterization power flow transfer state.
Compared with prior art, the embodiment of the present invention includes following advantages:
The embodiment of the present invention is distributed rationally by the UPFC of multichannel and a variety of methods of operation, the balanced trend of section Distribution, improves thermostabilization nargin, improves ability to transmit electricity to greatest extent.
Description of the drawings
Fig. 1 is a kind of step flow chart of the embodiment of the method for acquisition UPFC configurations of the present invention;
Fig. 2 is a kind of step flow chart of the embodiment of the method for acquisition UPFC configuration routes;
Fig. 3 is certain year Hebei electric system rack schematic diagram;
The step of Fig. 4 is the embodiment of the method for a kind of method of operation of determining UPFC configure the lines and the configuration parameter of UPFC Flow chart;
Fig. 5 is a kind of step flow for the embodiment of the method obtaining the power flow transfer state of UPFC configure the lines after a failure Figure;
Fig. 6 is that UPFC distributes preceding Lucheng-Xin An N-1 failures rear portion separated time road active power song rationally under certain year basal profile Line;
Fig. 7 is under certain year basal profile using Lucheng-Xin An N-1 failures rear portion after UPFC configuration methods of the embodiment of the present invention Separated time road active power curves;
Fig. 8 is a kind of structure diagram of the device embodiment of acquisition THE UPFC configuration;
Fig. 9 is a kind of structure diagram of the embodiment of circuit determination unit;
Figure 10 is a kind of structure diagram of the embodiment of parameter determination unit;
Figure 11 is a kind of structure diagram of the embodiment of analytic unit.
Specific implementation mode
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, below in conjunction with the accompanying drawings and specific real Applying mode, the present invention is described in further detail.
Referring to Fig.1, the step flow chart for showing the embodiment of the method for acquisition UPFC of the present invention a kind of, can specifically wrap Include following steps:
Step 101, it is distributed according to the trend of circuit, determines at least two UPFC configure the lines.
The embodiment of the present invention is unevenly distributed weighing apparatus to solve important line section tidal current in power grid, to meet the thermostabilization limit It is required that and the problem of cause section ability to transmit electricity to decline, distributed rationally by the UPFC of multi-line and a variety of methods of operation, it is real The ability to transmit electricity for improving circuit to greatest extent is showed.
In this step, first have to filter out that be likely to result in important section circuit heavy duty super in existing network system The circuit of stability limit is overheated, UPFC configurations are then carried out on these circuits, carrys out balanced trend distribution.
The method for determining configure the line has very much, is distributed according to the trend of each circuit to determine that UPFC matches Set circuit.
As shown in Fig. 2, the method that UPFC configures route is obtained for one of which, including:
Step 201, according to the trend and the thermostabilization limit before line fault, the load state of circuit is determined.
This step is distributed according to the trend before each line fault to determine the loading condition of each circuit first, is that underloading is gone back It is heavy duty.The trend distribution of circuit can specifically include the trend of circuit and the thermostabilization limit of the circuit.Wherein, line fault Preceding trend can be obtained by existing tidal current survey (such as RTU, remote terminal terminal, data acquisition device) and computational methods, It can specifically include one of following or arbitrary combination:Voltage and current (amplitude, phase angle), active power and the idle work(of circuit Rate etc..The thermostabilization limit of circuit can be arranged according to the thermostabilization limit of circuit itself to be obtained.
After the trend and the thermostabilization limit for knowing each circuit, you can according to the size of trend and its corresponding thermostabilization Limit size judges the loading condition of circuit, such as can be previously according to settings such as the ratios of trend and the thermostabilization limit The standard of underloading and load, underloading or heavy duty are divided by each circuit.
Step 202, according to the trend and the thermostabilization limit after line fault, the thermostabilization nargin of circuit is counted.
This step can obtain the trend and the thermostabilization limit of circuit, and then calculate and obtain after N-1 failures occur for circuit The thermostabilization nargin of circuit.Thermostabilization nargin calculation formula is as follows:
Thermostabilization nargin=1- trends/thermostabilization limit
In the formula, if thermostabilization nargin is more than zero, then it represents that N-1 failures under which, the in addition trend on a loop line road Level disclosure satisfy that long-term running requirement.If being less than zero, then it represents that under which, in addition the trend level of circuit alreadys exceed The thermostabilization limit, and will be inversely proportional therewith reduction according to the throughput time beyond horizontal difference, circuit.
It can also be carried out at the same time without inevitable sequencing between step 201 and step 202.
Step 203, determine configuration UPFC's according to load state and thermostabilization nargin in the circuit for meeting preset condition Circuit.
In this step, in order to avoid influencing each other between different power electronic equipments, string benefit etc. can be not configured The circuit of configuration UPFC is determined in the circuit of FACTS equipment according to load state and thermostabilization nargin.Specifically, can be lightly loaded And UPFC circuits are configured on the higher circuit of thermostabilization nargin.
For example, building Hebei electric system research level year mode data as Research foundation, rack schematic diagram such as Fig. 3 institutes Show.
Wherein Lucheng-Xin An loads 3200MW, and Yangquan-Xibaipo loads 2100MW.It can be seen that the pungent linear load of the Lushui River is heavier, heat is steady It is relatively low to determine nargin, and Yangquan-Xi Bai line loads are lighter.There is higher thermostabilization nargin in view of Yangquan-Xibaipo circuit, because And consider in Yangquan-Xibaipo double loop installing UPFC devices and using the tide of its power flowcontrol function optimization Shanxi Ji Sheng discontinuity surface Flow distribution, to ensure that it is more than thermal stability limit not have heavy-haul line after N-1 failures occur for circuit.
To 500kV circuits in survey region do three forever N-1 analyze, Lucheng station near extra-high voltage drop point, trend send out compared with To concentrate, each channel trend in province's discontinuity surface is caused to be unevenly distributed.The pungent wire arrangement road post-fault system transient stability in Lucheng-is still A large amount of power flow transfer to pungent another loop lines of the Lushui River cause Lucheng-Xin Anxianlu to be limited more than thermostabilization.
By the visible Yangquan in other channels-Xibaipo light load on analysis section, fail to make full use of the defeated of circuit Electric energy power.When N-1 occurs for the heavier double-circuit line of trend, the power transfer born is less and the pungent another loop line heavy duty work(of the Lushui River Rate is larger, is increased because circuit overheats the steady operation heavier arc sag that generates heat, if handling not in time, it would be possible to cascading failure occur, to being System operation brings imponderable risk and loss.
Step 204, it on the circuit of configuration UPFC, is distributed, is determined according to the highly resistance of the direction of tide of circuit and circuit The installation position of UPFC.
In this step, UPFC can be mounted on to the sending end and receiving end of circuit first according to the direction of tide of circuit, and The case where subsequent classification statistics is mounted on sending end and receiving end.This statistics, it is main to consider that UPFC is separately mounted to sending end or receiving end, it controls The difference of capacity needed for the effect and UPFC of Line Flow processed.
It can also be distributed according to the existing highly resistance of circuit, UPFC is mounted on line side or bus bar side, and subsequent classification is united Meter is mounted on the case where line side or bus bar side.This statistics, it is main to consider that UPFC is separately mounted to line side or bus bar side, it controls The difference of capacity needed for the effect and UPFC of Line Flow.
Specifically, determining the final infields UPFC according to the installed capacity of UPFC and effect.
After determining UPFC configure the lines according to above-mentioned steps, step 102 is continued to execute.
Step 102, the method for operation of UPFC configure the lines and the configuration parameter of UPFC are determined.
In this step it needs to be determined that the initial launch mode of UPFC configure the lines and the initial configuration parameters of UPFC.Specifically As shown in figure 4, may include:
Step 401, according to the through-flow electric current of UPFC, the reference voltage of UPFC and the capacity of UPFC are determined.
Specifically, after can be according to Load flow calculation, the through-flow electric current of UPFC in power flow solutions, and keeping through-flow electric current big On the basis of small no more than UPFC capacities of equipment, to determine the series transformer primary side of UPFC and the reference voltage of secondary side With capacity and the secondary side voltage of the shunt transformer of UPFC.
Step 402, it is distributed according to the trend of the circuit before configuration UPFC, determines the control model and circuit at UPFC series connection end The initial value of control parameter.
Specifically, be distributed according to the trend of circuit before the requirement of UPFC tide models and configuration UPFC, it can be first by series connection End control model is set to alignment road power control mode, determines the initial value of the parameters such as circuit control parameter P0, Q0.
Then, according to initial value P0, Q0 of the requirement of UPFC tide models and circuit UPFC control parameters, by the control of series connection end Molding formula is set to injecting voltage control model, and Load flow calculation obtains the injecting voltage U0 and angle phi 0 of circuit UPFC.
Step 403, the control model of UPFC parallel connected ends is determined according to the reactive power exchange of UPFC and power grid.
According to the reactive power size that parallel connected end after installation UPFC is absorbed from system, to determine the control model of parallel connected end, Control model in view of determining node voltage is easy to cause that reactive power exchange is excessive, is difficult to control the capacity of UPFC, the parallel connected end Control model generally determines Reactive Power Control pattern.
It, can be parallel without severe steps sequence between above step 401~403.
Step 103, accident analysis is carried out to UPFC configure the lines according to the identified method of operation and configuration parameter, obtained The power flow transfer state of UPFC configure the lines after a failure.
It specifically can be with as shown in figure 5, including:
Step 501, according to the identified method of operation and configure parameter adjustment UPFC configure the lines double-circuit line trend, Count the thermostabilization nargin of an other loop line in double-circuit line after N-1 failures.
Step 502, the ratio of thermostabilization nargin and UPFC capacity is obtained.
Wherein, the ratio of thermostabilization nargin and UPFC capacity can be used for characterizing power flow transfer state.
Thermostabilization nargin/UPFC capacity of multiple UPFC configure the lines can be obtained according to above-mentioned steps 501~502, so Step 104 is executed afterwards.
Step 104, the corresponding UPFC configure the lines of optimum load flow transfering state are determined as final configuration mode.
This step can be corresponding with the ratio of UPFC capacity by best thermostabilization nargin in each UPFC configure the lines UPFC configure the lines are determined as final UPFC configuration modes, i.e., in various modes, choose thermostabilization nargin and UPFC capacity The maximum configuration of ratio, i.e. best configuration.
The embodiment of the present invention is distributed rationally by the UPFC of multichannel and a variety of methods of operation, the balanced trend of section Distribution, improves thermostabilization nargin, improves ability to transmit electricity to greatest extent.
In another embodiment of the invention, this method can also include:
All section channels are scanned, carrying out UPFC to each section channel according to the method for above-described embodiment distributes rationally, and Pass through the validity of corresponding failure proof UPFC distributed rationally to improving section ability to transmit electricity.
In the validity distributed rationally to improving section ability to transmit electricity for assessing UPFC, can come in terms of following three Assessment:
Configure the raising amount of the section Limiting Level of UPFC;The raising amount of different channel configuration UPFC;UPFC is assessed to disconnected The influence etc. of the face limit.
In a specific example, still to build in a manner of Hebei electric system research level year data as Research foundation, Fig. 3 Shown in for rack schematic diagram.
Using UPFC configuration schemes, it is arranged on light-loaded circuit Yangquan-Xibaipo double loop that Jin Ji saves discontinuity surface UPFC devices adjust series side voltage magnitude and phase angle, make line by setting the effective power flow and reactive power flow reference value of circuit Road effective power flow is controlled in designated value.It is no more than thermostabilization constraint to reach after optimization section tidal current distribution meets N-1 Requirement, Yangquan-Xibaipo double loop power flowcontrol of UPFC will be installed in 2*1900MW, to reach the pungent line normal mode of the Lushui River Lower load reduction occurs to be no more than thermal stability limit after N-1 Fault load flows are transferred to pungent another time of the Lushui River, while being controlled by UPFC The line power of trend is constant, and then reaches and optimize section tidal current raising thermostabilization nargin and section transmission of electricity energy by installing UPFC The requirement of power.
Carrying out UPFC, to distribute front and back section tidal current rationally as shown in table 1, before section tidal current is by configuring after configuration UPFC 5360MW is improved to 6140MW, and section ability to transmit electricity improves 14.6%, and trend is less than line after the failure after distributing rationally The thermal stability limit on road.Fault simulation curve graph is as Figure 6-Figure 7.
The part circuit wattful power that-Xin An N-1 failures in Lucheng are front and back under certain year basal profile of table 1 and UPFC configurations are front and back Rate contrast table
It should be noted that for embodiment of the method, for simple description, therefore it is all expressed as a series of action group It closes, but those skilled in the art should understand that, the embodiment of the present invention is not limited by the described action sequence, because according to According to the embodiment of the present invention, certain steps can be performed in other orders or simultaneously.Secondly, those skilled in the art also should Know, embodiment described in this description belongs to preferred embodiment, and the involved action not necessarily present invention is implemented Necessary to example.
With reference to Fig. 8, a kind of structure diagram for the device embodiment obtaining THE UPFC configuration of the present invention is shown, It can specifically include:
Circuit determination unit 801 determines at least two THE UPFC UPFC for being distributed according to the trend of circuit Configure the line;
Parameter determination unit 802, the configuration parameter of the method for operation and UPFC for determining the UPFC configure the lines;
Analytic unit 803, for being carried out to the UPFC configure the lines according to the identified method of operation and configuration parameter Accident analysis obtains the power flow transfer state of the UPFC configure the lines after a failure;
Determination unit 804 is configured, for the corresponding UPFC configure the lines of the most preferably described power flow transfer state to be determined as most Whole configuration mode.
The embodiment of the present invention realizes that the UPFC of multichannel and a variety of methods of operation is distributed rationally by said units, balanced The trend distribution of section, improves thermostabilization nargin, improves ability to transmit electricity to greatest extent.
In another embodiment, as shown in figure 9, circuit determination unit 801 may include:
Determination subelement 901 is loaded, for according to the trend and the thermostabilization limit before the line fault, determining the line The load state on road;
Subelement 902 is counted, for according to the trend and the thermostabilization limit after the line fault, counting the circuit Thermostabilization nargin;
Route determination subelement 903, in the circuit for meeting preset condition according to the load state and the heat Stability margin determines the circuit of configuration UPFC;
Location determination subelement 904, for the circuit in the configuration UPFC, according to the direction of tide and circuit of circuit Highly resistance distribution, determine the installation position of the UPFC.
Wherein, route determination subelement 903, in the circuit that flexible AC transmitting system FACTS equipment is not configured The circuit of configuration UPFC is determined according to the load state and the thermostabilization nargin.
In another embodiment, as shown in Figure 10, parameter determination unit 802 may include:
First determination subelement 1001 determines the reference voltage of the UPFC for the through-flow electric current according to the UPFC With the capacity of the UPFC;
Second determination subelement 1002, for being distributed according to the trend of the circuit before the configuration UPFC, described in determination The control model at UPFC series connection end and the initial value of circuit control parameter;
Third determination subelement 1003, for determining the UPFC parallel connected ends according to the reactive power exchange of the UPFC and system Control model.
Wherein, the control model of UPFC parallel connected ends can be to determine Reactive Power Control pattern.
In another embodiment, as shown in figure 11, analytic unit 803 may include:
Subelement 1101 is adjusted, for according to the identified method of operation and configuration parameter, adjusting the UPFC layout lines The double-circuit line trend on road counts the thermostabilization nargin of an other loop line in the double-circuit line after N-1 failures;
Obtain subelement 1102, the ratio for obtaining the thermostabilization nargin and the UPFC capacity, wherein the ratio Value is for characterizing the power flow transfer state.
For device embodiments, since it is basically similar to the method embodiment, so fairly simple, the correlation of description Place illustrates referring to the part of embodiment of the method.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with The difference of other embodiment, the same or similar parts between the embodiments can be referred to each other.
It should be understood by those skilled in the art that, the embodiment of the embodiment of the present invention can be provided as method, apparatus or calculate Machine program product.Therefore, the embodiment of the present invention can be used complete hardware embodiment, complete software embodiment or combine software and The form of the embodiment of hardware aspect.Moreover, the embodiment of the present invention can be used one or more wherein include computer can With in the computer-usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) of program code The form of the computer program product of implementation.
The embodiment of the present invention be with reference to according to the method for the embodiment of the present invention, terminal device (system) and computer program The flowchart and/or the block diagram of product describes.It should be understood that flowchart and/or the block diagram can be realized by computer program instructions In each flow and/or block and flowchart and/or the block diagram in flow and/or box combination.These can be provided Computer program instructions are set to all-purpose computer, special purpose computer, Embedded Processor or other programmable data processing terminals Standby processor is to generate a machine so that is held by the processor of computer or other programmable data processing terminal equipments Capable instruction generates for realizing in one flow of flow chart or multiple flows and/or one box of block diagram or multiple boxes The device of specified function.
These computer program instructions, which may also be stored in, can guide computer or other programmable data processing terminal equipments In computer-readable memory operate in a specific manner so that instruction stored in the computer readable memory generates packet The manufacture of command device is included, which realizes in one flow of flow chart or multiple flows and/or one side of block diagram The function of being specified in frame or multiple boxes.
These computer program instructions can be also loaded into computer or other programmable data processing terminal equipments so that Series of operation steps are executed on computer or other programmable terminal equipments to generate computer implemented processing, thus The instruction executed on computer or other programmable terminal equipments is provided for realizing in one flow of flow chart or multiple flows And/or in one box of block diagram or multiple boxes specify function the step of.
Although the preferred embodiment of the embodiment of the present invention has been described, once a person skilled in the art knows bases This creative concept, then additional changes and modifications can be made to these embodiments.So the following claims are intended to be interpreted as Including preferred embodiment and fall into all change and modification of range of embodiment of the invention.
Finally, it is to be noted that, herein, relational terms such as first and second and the like be used merely to by One entity or operation are distinguished with another entity or operation, without necessarily requiring or implying these entities or operation Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant meaning Covering non-exclusive inclusion, so that process, method, article or terminal device including a series of elements not only wrap Those elements are included, but also include other elements that are not explicitly listed, or further include for this process, method, article Or the element that terminal device is intrinsic.In the absence of more restrictions, being wanted by what sentence "including a ..." limited Element, it is not excluded that there is also other identical elements in process, method, article or the terminal device including the element.

Claims (10)

1. a kind of method obtaining THE UPFC configuration, which is characterized in that including:
It is distributed according to the trend of circuit, determines the configure the line of at least two THE UPFC UPFC;
Determine the method for operation of the UPFC configure the lines and the configuration parameter of UPFC;
Accident analysis is carried out to the UPFC configure the lines according to the identified method of operation and configuration parameter, obtains the UPFC The power flow transfer state of configure the line after a failure;
The corresponding UPFC configure the lines of the most preferably described power flow transfer state are determined as final configuration mode.
2. according to the method described in claim 1, it is characterized in that, described according to the distribution of the trend of circuit, determination at least two The configure the line of THE UPFC UPFC, including:
According to the trend and the thermostabilization limit before the line fault, the load state of the circuit is determined;
According to the trend and the thermostabilization limit after the line fault, the thermostabilization nargin of the circuit is counted;
The circuit of configuration UPFC is determined according to the load state and the thermostabilization nargin in the circuit for meeting preset condition;
On the circuit of the configuration UPFC, it is distributed according to the highly resistance of the direction of tide of circuit and circuit, determines the UPFC's Installation position.
3. according to the method described in claim 2, it is characterized in that, described bear in the circuit for meeting preset condition according to described Load situation and the thermostabilization nargin determine the circuit of configuration UPFC, including:
According to the load state and the thermostabilization nargin in the circuit that flexible AC transmitting system FACTS equipment is not configured Determine the circuit of configuration UPFC.
4. method as claimed in any of claims 1 to 3, which is characterized in that the determination UPFC layout lines The method of operation on road and the configuration parameter of UPFC, including:
According to the through-flow electric current of the UPFC, the capacity of the reference voltage and the UPFC of the UPFC is determined;
According to the trend distribution of the circuit before the configuration UPFC, control model and the circuit control at UPFC series connection end are determined The initial value of parameter;
The control model of the UPFC parallel connected ends is determined according to the reactive power exchange of the UPFC and system.
5. according to the method described in claim 4, it is characterized in that, the control model of the UPFC parallel connected ends is to determine reactive power Control model.
6. according to the method described in claim 4, it is characterized in that, the method for operation determined by the basis and configuration parameter pair The UPFC configure the lines carry out accident analysis, obtain the power flow transfer state of the UPFC configure the lines after a failure, including:
According to the identified method of operation and configuration parameter, the double-circuit line trend of the UPFC configure the lines is adjusted, N-1 is counted After failure in the double-circuit line an other loop line thermostabilization nargin;
Obtain the ratio of the thermostabilization nargin and the UPFC capacity, wherein the ratio is for characterizing the power flow transfer State.
7. a kind of device obtaining THE UPFC configuration, which is characterized in that including:
Circuit determination unit determines the configuration of at least two THE UPFC UPFC for being distributed according to the trend of circuit Circuit;
Parameter determination unit, the configuration parameter of the method for operation and UPFC for determining the UPFC configure the lines;
Analytic unit, for carrying out failure point to the UPFC configure the lines according to the identified method of operation and configuration parameter Analysis, obtains the power flow transfer state of the UPFC configure the lines after a failure;
Determination unit is configured, for the corresponding UPFC configure the lines of the most preferably described power flow transfer state to be determined as final configuration Mode.
8. device according to claim 7, which is characterized in that the circuit determination unit includes:
Determination subelement is loaded, for according to the trend and the thermostabilization limit before the line fault, determining the negative of the circuit Load situation;
Subelement is counted, for according to the trend and the thermostabilization limit after the line fault, counting the thermostabilization of the circuit Nargin;
Route determination subelement, in the circuit for meeting preset condition according to the load state and the thermostabilization nargin Determine the circuit of configuration UPFC;
Location determination subelement, for the circuit in the configuration UPFC, according to the highly resistance of the direction of tide of circuit and circuit Distribution, determines the installation position of the UPFC.
9. device according to claim 8, which is characterized in that
The route determination subelement, described in the basis in the circuit that flexible AC transmitting system FACTS equipment is not configured Load state and the thermostabilization nargin determine the circuit of configuration UPFC.
10. the device according to any one of claim 7 to 9, which is characterized in that the parameter determination unit includes:
First determination subelement, reference voltage for according to the through-flow electric current of the UPFC, determining the UPFC and described The capacity of UPFC;
Second determination subelement determines UPFC series connection end for being distributed according to the trend of the circuit before the configuration UPFC Control model and circuit control parameter initial value;
Third determination subelement, the control mould for determining the UPFC parallel connected ends according to the reactive power exchange of the UPFC and system Formula;
The control model of the UPFC parallel connected ends is to determine Reactive Power Control pattern;
The analytic unit includes:
Subelement is adjusted, for according to the identified method of operation and configuration parameter, adjusting the double back of the UPFC configure the lines Line Flow counts the thermostabilization nargin of an other loop line in the double-circuit line after N-1 failures;
Obtain subelement, the ratio for obtaining the thermostabilization nargin and the UPFC capacity, wherein the ratio is used for table Levy the power flow transfer state.
CN201610879312.3A 2016-10-09 2016-10-09 A kind of method and device obtaining THE UPFC configuration Active CN106208083B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610879312.3A CN106208083B (en) 2016-10-09 2016-10-09 A kind of method and device obtaining THE UPFC configuration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610879312.3A CN106208083B (en) 2016-10-09 2016-10-09 A kind of method and device obtaining THE UPFC configuration

Publications (2)

Publication Number Publication Date
CN106208083A CN106208083A (en) 2016-12-07
CN106208083B true CN106208083B (en) 2018-09-07

Family

ID=57521385

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610879312.3A Active CN106208083B (en) 2016-10-09 2016-10-09 A kind of method and device obtaining THE UPFC configuration

Country Status (1)

Country Link
CN (1) CN106208083B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108306300B (en) * 2018-01-30 2020-09-01 中国电力科学研究院有限公司 Method and system for determining capacity of unified power flow controller on main network section
CN111564846A (en) * 2020-05-21 2020-08-21 国网江西省电力有限公司电力科学研究院 Green scheduling-oriented power flow optimization control method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003174725A (en) * 2001-12-04 2003-06-20 Kansai Electric Power Co Inc:The Distribution system voltage control method
CN101548447A (en) * 2006-10-05 2009-09-30 Abb研究有限公司 Determination and use of power system sensitivities for power flow control
CN103166217A (en) * 2011-12-13 2013-06-19 浙江省电力公司 Transmission grid phase shifter optimal configuration method
CN105119269A (en) * 2015-07-23 2015-12-02 国家电网公司 Random power flow calculation method taking regard of multiterminal unified power flow controller
CN105186495A (en) * 2015-08-31 2015-12-23 国家电网公司 Power grid on-line data based running strategy optimization method for unified power flow controller
CN105552916A (en) * 2015-12-17 2016-05-04 江苏省电力公司电力经济技术研究院 UPFC (unified power flow controller) system-level control method with circuit power out-of-limit control function

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003174725A (en) * 2001-12-04 2003-06-20 Kansai Electric Power Co Inc:The Distribution system voltage control method
CN101548447A (en) * 2006-10-05 2009-09-30 Abb研究有限公司 Determination and use of power system sensitivities for power flow control
CN103166217A (en) * 2011-12-13 2013-06-19 浙江省电力公司 Transmission grid phase shifter optimal configuration method
CN105119269A (en) * 2015-07-23 2015-12-02 国家电网公司 Random power flow calculation method taking regard of multiterminal unified power flow controller
CN105186495A (en) * 2015-08-31 2015-12-23 国家电网公司 Power grid on-line data based running strategy optimization method for unified power flow controller
CN105552916A (en) * 2015-12-17 2016-05-04 江苏省电力公司电力经济技术研究院 UPFC (unified power flow controller) system-level control method with circuit power out-of-limit control function

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
统一潮流控制器(UPFC)装置选址和定容研究;刘新 等;《中国高等学校电力系统及其自动化专业第二十四届学术年会论文集(上册)》;20081031;第165-169页 *

Also Published As

Publication number Publication date
CN106208083A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
WO2016141683A1 (en) Implementation method for energy internet absorbing large-scale distributed power supply
US10389125B2 (en) Expanded reactive following for distributed generation and loads of other reactive controller(s)
CN104459393A (en) Large-capacity adjustable simulation RLC test load
CN104993484A (en) Active electrical filter
CN103915809B (en) A kind of alternating current circuit for multiple fission conductor does not have a power failure de-icing method and device thereof
CN103606932A (en) Load-related automatic control method of low-voltage dynamic reactive compensation capacitor
CN106953320B (en) A kind of transmission line of electricity overload controlling method based on UPFC
CN106208083B (en) A kind of method and device obtaining THE UPFC configuration
CN107994584A (en) A kind of major loop wiring construction of compensator
CN103715692B (en) A kind of 1000kV/500kV/220kV electromagnetic looped network unlinks choose opportunities method
WO2018009837A1 (en) Dynamic reactive compensation
CN106786607B (en) A kind of method of determining UPFC project installation position and installed capacity
CN106816881B (en) Series compensation device and capacity optimization method thereof
CN103986151A (en) Alternating-current receiving end grid direct-current receiving scale calculation method
CN105958481B (en) A kind of UPFC inverter Optimal Capacity method
CN106712068A (en) Parallel hybrid DC power transmission system and reactive power regulation optimization method thereof
CN107276103B (en) A kind of series-parallel inverter coordination control strategy of UPFC improving ac bus voltage support intensity
CN107611993B (en) A kind of idle work optimization method suitable for extra-high voltage half-wave power transmission system
CN108964120A (en) Low pressure distributed photovoltaic access capacity optimal control method
CN202929060U (en) Linear load for uninterrupted power source test for electric power
CN103762584B (en) Tandem type multi-terminal direct current transmission system and loss compensation method
Shang et al. A new volt/VAR control for distributed generation
CN106953336B (en) A kind of ac bus voltage adjusting method based on UPFC
CN108475927A (en) Independent active and reactive power flow control method is carried out using locally available parameter
Choudekar et al. Congestion management of IEEE 30 bus system using thyristor controlled series compensator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant