CN106207869A CN201610530400.2A CN201610530400A CN106207869A CN 106207869 A CN106207869 A CN 106207869A CN 201610530400 A CN201610530400 A CN 201610530400A CN 106207869 A CN106207869 A CN 106207869A
Authority
CN
China
Prior art keywords
touring
wire
construction technology
restringing
another
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610530400.2A
Other languages
English (en)
Inventor
吴长贵
周建锋
陈晓军
翟万山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yongtai Amperex Technology Ltd
Original Assignee
Jiangsu Yongtai Amperex Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yongtai Amperex Technology Ltd filed Critical Jiangsu Yongtai Amperex Technology Ltd
Priority to CN201610530400.2A priority Critical patent/CN106207869A/zh
Publication of CN106207869A publication Critical patent/CN106207869A/zh
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • H02G1/04Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables for mounting or stretching

Landscapes

  • Soil Working Implements (AREA)

Abstract

本发明公开了一种巡回拖线法施工工艺,所述施工工艺的方法为:首先,选择一端为放置线盘及收、紧线地场;其次,在另一终端侧将两边线(10kV)或一边线与另一边第二相(400V)相连接,在终端横担两端安装导线滑轮两只形成环形回路,中间杆将需更换导线分别装于安装的滑车内;最后,放线盘端将新导线与须更换旧导线相连接,另一根导线与绞磨机相连接进行牵引更换导线作业。本工艺可以提高施工速度及效率,在农、配网施工时可实施巡回拖线的方法进行放线施工,即放线盘、收紧线可在同一端实施作业,这样施工现场人员相对集中,便于管理,减少了青苗损失及群工误工,也降低了生产成本及安全风险。

Description

一种巡回拖线法施工工艺
技术领域
本发明涉及电力施工技术领域,尤其涉及一种巡回拖线法施工工艺。
背景技术
传统放线施工方法普遍存在施工效率低,不便于对现场施工人员进行有效管理,生产成本高及安全风险高等缺陷。
因此,需要提供一种巡回拖线法施工工艺来解决上述问题。
发明内容
为了解决该问题,本发明公开了一种巡回拖线法施工工艺,它为了提高施工速度及效率,在农、配网施工时可实施巡回拖线的方法进行放线施工,即放线盘、收紧线可在同一端实施作业,这样施工现场人员相对集中,便于管理,减少了青苗损失及群工误工,也降低了生产成本及安全风险。一种巡回拖线法施工工艺,其特征在于:所述施工工艺的方法为:首先,选择一端为放置线盘及收、紧线地场;其次,在另一终端侧将两边线(10kV)或一边线与另一边第二相(400V)相连接,在终端横担两端安装导线滑轮两只形成环形回路,中间杆将需更换导线分别装于安装的滑车内;最后,放线盘端将新导线与须更换旧导线相连接,另一根导线与绞磨机相连接进行牵引更换导线作业。
附图说明
图1是本发明的施工工艺示意图。
具体实施方式
在下文的描述中,给出了大量具体的细节以便提供对本发明更为彻底的理解。然而,对于本领域技术人员来说显而易见的是,本发明可以无需一个或多个这些细节而得以实施。在其他的例子中,为了避免与本发明发生混淆,对于本领域公知的一些技术特征未进行描述。
为了彻底了解本发明,将在下列的描述中提出详细的工艺。显然,本发明的施行并不限定于本领域的技术人员所熟习的特殊细节。本发明的较佳实施例详细描述如下,然而除了这些详细描述外,本发明还可以具有其他实施方式。
以下对本发明的实施例做出详细描述。
一种巡回拖线法施工工艺,其特征在于:所述施工工艺的方法为:首先,选择一端为放置线盘及收、紧线地场;其次,在另一终端侧将两边线(10kV)或一边线与另一边第二相(400V)相连接,在终端横担两端安装导线滑轮两只形成环形回路,中间杆将需更换导线分别装于安装的滑车内;最后,放线盘端将新导线与须更换旧导线相连接,另一根导线与绞磨机相连接进行牵引更换导线作业。
本实施例的有益效果为:
本发明可以提高施工速度及效率,在农、配网施工时可实施巡回拖线的方法进行放线施工,即放线盘、收紧线可在同一端实施作业,这样施工现场人员相对集中,便于管理,减少了青苗损失及群工误工,也降低了生产成本及安全风险。
本发明已经通过上述实施例进行了说明,但应当理解的是,上述实施例只是用于举例和说明的目的,而并非将本发明限制于所描述的实施例范围内。此外本领域技术人员可以理解的是,本发明并不局限于上述实施例,根据本发明的教导还可以做出更多种的变型和修改,这些变型和修改均落在本发明所要求保护的范围以内。本发明的保护范围由附属的权利要求书及其等效范围所界定。

Claims (1)

1.一种巡回拖线法施工工艺,其特征在于:所述施工工艺的方法为:首先,选择一端为放置线盘及收、紧线地场;其次,在另一终端侧将两边线(10kV)或一边线与另一边第二相(400V)相连接,在终端横担两端安装导线滑轮两只形成环形回路,中间杆将需更换导线分别装于安装的滑车内;最后,放线盘端将新导线与须更换旧导线相连接,另一根导线与绞磨机相连接进行牵引更换导线作业。
CN201610530400.2A 2016-06-28 2016-06-28 一种巡回拖线法施工工艺 Pending CN106207869A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610530400.2A CN106207869A (zh) 2016-06-28 2016-06-28 一种巡回拖线法施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610530400.2A CN106207869A (zh) 2016-06-28 2016-06-28 一种巡回拖线法施工工艺

Publications (1)

Publication Number Publication Date
CN106207869A true CN106207869A (zh) 2016-12-07

Family

ID=57472384

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610530400.2A Pending CN106207869A (zh) 2016-06-28 2016-06-28 一种巡回拖线法施工工艺

Country Status (1)

Country Link
CN (1) CN106207869A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112582938A (zh) * 2020-11-12 2021-03-30 国核电力规划设计研究院有限公司 架空地线更换方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5727777A (en) * 1995-08-30 1998-03-17 Hien Electric Industries, Ltd. Spiral hanger for a cable and method of installing a cable using the same
DE19839739A1 (de) * 1998-09-01 2000-03-02 Abb Patent Gmbh Verfahren und Vorrichtung zum Einziehen oder Verlegen von elektrischen oder optischen Leitern
CN102044851A (zh) * 2009-10-22 2011-05-04 江苏藤仓亨通光电有限公司 不停电更换光纤复合架空地线或普通架空地线的方法
CN103441451A (zh) * 2013-08-26 2013-12-11 国网河南省电力公司周口供电公司 一种架空线路跨越敷线装置
CN103594961A (zh) * 2013-11-01 2014-02-19 国家电网公司 一种更换电缆线的方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5727777A (en) * 1995-08-30 1998-03-17 Hien Electric Industries, Ltd. Spiral hanger for a cable and method of installing a cable using the same
DE19839739A1 (de) * 1998-09-01 2000-03-02 Abb Patent Gmbh Verfahren und Vorrichtung zum Einziehen oder Verlegen von elektrischen oder optischen Leitern
CN102044851A (zh) * 2009-10-22 2011-05-04 江苏藤仓亨通光电有限公司 不停电更换光纤复合架空地线或普通架空地线的方法
CN103441451A (zh) * 2013-08-26 2013-12-11 国网河南省电力公司周口供电公司 一种架空线路跨越敷线装置
CN103594961A (zh) * 2013-11-01 2014-02-19 国家电网公司 一种更换电缆线的方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112582938A (zh) * 2020-11-12 2021-03-30 国核电力规划设计研究院有限公司 架空地线更换方法

Similar Documents

Publication Publication Date Title
CN205033405U (zh) 一种切割用分线网
CN106207869A (zh) 一种巡回拖线法施工工艺
CN206963276U (zh) 一种方便使用的农业用锄头
CN205272373U (zh) 密炼机的切线型转子
CN204023055U (zh) 一种带全刃口刀片割纱器的锭子
CN106532557B (zh) 跨越10kv线路施工平台工具装置
CN202260254U (zh) 一种带电更换四分裂导线直线整串绝缘子可调式卡具
CN203222641U (zh) 一种麻轮网布结构
CN206148187U (zh) 摇篮式张力放线装置
CN204849132U (zh) 籽棉清理机高效格条栅筛网
CN204384636U (zh) 一种电缆盘车
CN207151298U (zh) 水利工程用的坡面种植槽
CN206789980U (zh) 一种带有滑轮走线装置的带电跨越架
CN204896602U (zh) 双螺旋左右排料装置
CN103199478A (zh) 联板放线器
CN203095472U (zh) 一种避免钢丝绳缠绕的卷扬机轴
CN202625511U (zh) 一种零散电缆汇放支架
CN206553058U (zh) 一种土工布吊具
CN204835455U (zh) 电缆放线架
CN204707639U (zh) 一种滴灌带布设装置
CN209134975U (zh) 一种塑料薄膜铺设工具
CN204518333U (zh) 稻田筑埂机
CN202123579U (zh) 一种多线切割机的钢线引入端装置
CN205701902U (zh) 一种多头放线机
CN202888770U (zh) 联板放线器

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161207

WD01 Invention patent application deemed withdrawn after publication