CN106194218A - 高水头深厚砂层地区的盾构端头土体加固体系 - Google Patents

高水头深厚砂层地区的盾构端头土体加固体系 Download PDF

Info

Publication number
CN106194218A
CN106194218A CN201610776141.1A CN201610776141A CN106194218A CN 106194218 A CN106194218 A CN 106194218A CN 201610776141 A CN201610776141 A CN 201610776141A CN 106194218 A CN106194218 A CN 106194218A
Authority
CN
China
Prior art keywords
stabilization zone
soil body
shield
high water
reinforcement system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610776141.1A
Other languages
English (en)
Other versions
CN106194218B (zh
Inventor
朱炎兵
何亚飞
罗会平
董俊
张庆
陈辉
王鹏
张波
周华海
燕喜军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201610776141.1A priority Critical patent/CN106194218B/zh
Publication of CN106194218A publication Critical patent/CN106194218A/zh
Application granted granted Critical
Publication of CN106194218B publication Critical patent/CN106194218B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明提供了一种高水头深厚砂层地区的盾构端头土体加固体系,包括位于盾构隧道端部的盾构端头井及其外围的主体围护结构,所述主体围护结构靠近隧道的一侧设置有加固区,盾构隧道穿过加固区;其特征在于:还包括止水帷幕,止水帷幕环绕设置于加固体外侧的土体内,止水帷幕两端与主体围护结构的接缝处均通过接头旋喷桩封闭。本发明减小高水头深厚砂层地区的盾构进出洞过程中土体出现的涌水、涌砂的风险。

Description

高水头深厚砂层地区的盾构端头土体加固体系
技术领域
本发明属于轨道交通工程、市政道路、综合管廊等工程领域,具体涉及一种高水头深厚砂层地区的盾构端头土体加固体系。
背景技术
在地铁工程中,盾构法是区间隧道施工的一种常见方法。盾构的始发与到达是盾构施工过程中的两个关键节点,同时也是施工的重难点。盾构端头加固通常采用竖直注浆、旋喷加固或者水平冻结法。采用竖直注浆、旋喷加固形成的加固体均匀性较差,会出现漏水、漏砂等现象,影响了加固土体的整体质量,并且局部土体会出现强度未达到设计指标或施工要求而产生塌方进而威胁到盾构进出洞时的安全。采用水平冻结法进行加固时,冻结加固体所产生的冻胀及融沉较难控制,对周边环境影响较大。并且采用水平冻结法时需要在车站端墙施工冻结管,冻结管施工会对车站侧墙及防水层造成损伤,影响车站的结构安全及防水效果。另外冷冻法相比竖直加固而言,造价增加较多,经济性较差。
发明内容
本发明的目的就是针对现有技术的缺陷,提供一种高水头深厚砂层地区的盾构端头土体加固体系,减小高水头深厚砂层地区的盾构进出洞过程中土体出现的涌水、涌砂的风险。
本发明提供了一种高水头深厚砂层地区的盾构端头土体加固体系,包括位于盾构隧道端部的盾构端头井及位于盾构端头井外围的主体围护结构,所述主体围护结构靠近隧道的一侧设置有加固区,盾构隧道穿过加固区;其特征在于:还包括止水帷幕,止水帷幕设置于加固区外围;止水帷幕两端与主体围护结构通过接头旋喷桩连接。
所述加固区外侧的土体内设置有降水井,降水井位于止水帷幕和加固区之间。
所述加固区包括主加固区和次加固区,主加固区和次加固区沿盾构隧道的延伸方向并排布置,盾构隧道穿过主加固区和次加固区,主加固区靠近于主体围护结构,主加固区的宽度大于次加固区。
所述加固区还包括弱加固区,弱加固区位于主加固区和次加固区顶面与地面之间的土体内。
所述主加固区和主体围护结构之间设置有墙缝旋喷桩。
所述加固区外侧的土体内设置有观察井,观察井位于止水帷幕和加固区之间。
所述主加固区的采用三轴搅拌桩,三轴搅拌桩相互咬合,其水泥掺量为20%-24%;次加固区的采用三轴搅拌桩,三轴搅拌桩相互咬合,其水泥掺量为12%-18%;弱加固区的采用三轴搅拌桩,三轴搅拌桩相互咬合,其水泥掺量为7%-10%。
所述降水井的底端位于加固区的下方。
所述降水井内部均匀间隔设置有滤水管;降水井内壁不间断均匀分布有中粗砂;降水井内壁顶部采用粘性土层。
所述止水帷幕采用三轴搅拌桩,三轴搅拌桩相互咬合。
本发明在盾构端头采用了三轴搅拌桩进行加固,加固区的均匀性好,加固区的土体的物理力学性能得到明显改善。为了保证三轴搅拌桩加固体与车站主体结构围护之间的密贴性,在三轴搅拌桩加固区与主体围护结构之间增设了墙缝旋喷桩进行补强。同时本发明在加固区外围增设了三轴搅拌桩的止水帷幕,止水帷幕的与主体围护结构的接缝处用接头旋喷桩进行封闭,有效减少涌水涌砂风险。本发明对加固范围内的土体布置了降水井,在盾构进出洞前进对土体进行提前疏干,这种方式能有效减少加固范围内的土体含水量,可以有效的提高盾构端头土体的强度。本技术方案通过上述三种技术措施可以减小高水头深厚砂层地区的盾构进出洞过程中土体出现的涌水、涌砂的风险。同时本发明设置有观察井,在盾构始发或到达前7天进行降水试运行,对坑内土体进行疏干,根据降水试运行情况确定盾构始发或到达前的运行时间并进行维护施工。
附图说明
图1是本发明结构示意图;
图2是本发明A-A剖视图;
图3是降水井示意图;
其中,1—止水帷幕;2—次加固区;3—主加固区;4—接头旋喷桩;5—墙缝旋喷桩;6—降水井;7—观察井;8—主体围护结构;9—盾构隧道;10—弱加固区;11-地面,12-滤水管,13-中粗砂,14-粘性土,15-盾构端头井。
具体实施方式
下面结合附图和具体实施例对本发明作进一步的详细说明,便于清楚地了解本发明,但它们不对本发明构成限定。
如图所示,本发明提供了一种高水头深厚砂层地区的盾构端头土体加固体系,包括位于盾构隧道9端部的盾构端头井15及其外围的主体围护结构8,所述主体围护结构8靠近隧道的一侧设置有加固区,盾构隧道9穿过加固区;其特征在于:还包括止水帷幕1,止水帷幕1环绕设置于加固体外侧的土体内,止水帷幕1两端与主体围护结构8的接缝处均通过接头旋喷桩4封闭。所述止水帷幕1采用三轴搅拌桩,三轴搅拌桩相互咬合。止水帷幕1用于保护整个加固区域的止水封闭性,作为加固区域防水的第一道屏障。
所述加固区外侧的土体内设置有降水井6,降水井6位于止水帷幕1和加固区之间。降水井6内部均匀间隔设置有滤水管12;降水井6内壁不间断均匀分布有中粗砂13;降水井6内壁顶部采用粘性土14层。降水井6用于在盾构进出洞前进对土体进行提前疏干,这种方式能有效减少加固范围内的土体含水量,可以有效的提高盾构端头土体的强度。所述降水井6的底端位于加固区的下方5m,保证加固区域周围土体含水量均符合施工需求。
所述加固区包括主加固区3和次加固区2,主加固区3和次加固区2沿盾构隧道9的延伸方向并排布置,盾构隧道9穿过主加固区3和次加固区2,主加固区3靠近于主体围护结构8。所述加固区还包括弱加固区10,弱加固区10位于主加固区3和次加固区2顶面与地面11之间的土体内。所述主加固区3的采用三轴搅拌桩,三轴搅拌桩相互咬合,其水泥掺量为20%-24%;次加固区2的采用三轴搅拌桩,三轴搅拌桩相互咬合,其水泥掺量为12%-18%;弱加固区10的采用三轴搅拌桩,三轴搅拌桩相互咬合,其水泥掺量为7%-10%。根据盾构隧道周围土体不同的需求将加固区进行区域划分,有效节约成本。
所述主加固区3和主体围护结构8之间设置有墙缝旋喷桩5,保证主加固区3与主体围护结构8之间密贴性与止水效果。
所述加固区外侧的土体内设置有观察井7,观察井7位于止水帷幕1和加固区之间。在盾构始发或到达前7天进行降水试运行,对坑内土体进行疏干,根据降水试运行情况确定盾构始发或到达前的运行时间。
施工时,首先施工盾构端头井的主体围护结构8。然后在主体围护结构8外侧施工6米长度的主加固区3三轴搅拌桩20%水泥掺量,在主加固区3三轴搅拌桩20%水泥掺量外施工3米长度的次加固区2三轴搅拌桩15%水泥掺量。然后在加固区的外侧设置一圈三轴搅拌桩止水帷幕1,止水帷幕1之间和加固区的边缘之间存在间隙。然后在三轴搅拌桩止水帷幕1与围护结8接缝处采用两根接头旋喷桩4进行封闭。待加固区强度达标后,施工墙缝旋喷桩5,实现主加固区3和主体围护结构8之间间隙的封闭。
盾构机出洞前,施工人员在主体围护结构凿出一个圆洞,用于盾构机的进出,不会用盾构机的刀盘来磨围护结构。盾构机出洞时,盾构机的刀盘依次通过切割止水帷幕和加固区和墙缝旋喷桩,到达端头井。
盾构机进洞前,施工人员在主体围护结构凿出一个圆洞,用于盾构机的进出,不会用盾构机的刀盘来磨围护结构。盾构机进洞时,盾构机的刀盘依次通过切割墙缝旋喷桩、加固区和止水帷幕,到达端头井。
其中主加固区3三轴搅拌桩20%水泥掺量3在平面布置上沿盾构隧道9方向的宽度为6m;次加固区2三轴搅拌桩15%水泥掺量2在平面布置上沿盾构隧道9方向的宽度为3m并与主加固区3三轴搅拌桩20%水泥掺量3进行搭接。主加固区3三轴搅拌桩20%水泥掺量3与次加固区2三轴搅拌桩15%水泥掺量2在平面布置上垂直盾构隧道9方向应超出盾构隧道9边缘2.8m。三轴搅拌桩止水帷幕1中心线与主体主体围护结构8间距为15m。在竖向布置上,盾构隧道9顶部以上3m至底部以下3m范围均为主加固区3三轴搅拌桩20%水泥掺量3与次加固区2三轴搅拌桩15%水泥掺量2加固范围。三轴搅拌桩止水帷幕1长度从地面11至盾构隧道9底部以下7m。弱加固区10三轴搅拌桩7%水泥掺量10长度从地面11至盾构隧道9顶部以上3m。墙缝旋喷桩5长度为地面11至盾构隧道9底部以下3m。接缝旋喷桩4长度与三轴搅拌桩止水帷幕1长度相同。其中墙缝旋喷桩5与接缝旋喷桩4水泥掺量不小于200kg/m。
本说明书未作详细描述的内容属于本领域专业技术人员公知的现有技术。

Claims (10)

1.一种高水头深厚砂层地区的盾构端头土体加固体系,包括位于盾构隧道(9)端部的盾构端头井(15)及位于盾构端头井(15)外围的主体围护结构(8),所述主体围护结构(8)靠近隧道的一侧设置有加固区,盾构隧道(9)穿过加固区;其特征在于:还包括止水帷幕(1),止水帷幕(1)设置于加固区外围;止水帷幕(1)两端与主体围护结构(8)通过接头旋喷桩(4)连接。
2.根据权利要求1所述的高水头深厚砂层地区的盾构端头土体加固体系,其特征在于所述加固区外侧的土体内设置有降水井(6),降水井(6)位于止水帷幕(1)和加固区之间。
3.根据权利要求1所述的高水头深厚砂层地区的盾构端头土体加固体系,其特征在于所述加固区包括主加固区(3)和次加固区(2),主加固区(3)和次加固区(2)沿盾构隧道(9)的延伸方向并排布置,盾构隧道(9)穿过主加固区(3)和次加固区(2),主加固区(3)靠近于主体围护结构(8)。
4.根据权利要求3所述的高水头深厚砂层地区的盾构端头土体加固体系,其特征在于所述加固区还包括弱加固区(10),弱加固区(10)位于主加固区(3)和次加固区(2)顶面与地面(11)之间的土体内。
5.根据权利要求4所述的高水头深厚砂层地区的盾构端头土体加固体系,其特征在于主加固区(3)和主体围护结构(8)之间设置有墙缝旋喷桩(5)。
6.根据权利要求1所述的高水头深厚砂层地区的盾构端头土体加固体系,其特征在于所述加固区外侧的土体内设置有观察井,观察井位于止水帷幕(1)和加固区之间。
7.根据权利要求4所述的高水头深厚砂层地区的盾构端头土体加固体系,其特征在于主加固区(3)的采用三轴搅拌桩,三轴搅拌桩相互咬合,其水泥掺量为20%-24%;次加固区(2)的采用三轴搅拌桩,三轴搅拌桩相互咬合,其水泥掺量为12%-18%;弱加固区(10)的采用三轴搅拌桩,三轴搅拌桩相互咬合,其水泥掺量为7%-10%。
8.根据权利要求2所述的高水头深厚砂层地区的盾构端头土体加固体系,其特征在于降水井(6)的底端位于加固区的下方。
9.根据权利要求8所述的高水头深厚砂层地区的盾构端头土体加固体系,其特征在于降水井(6)内部均匀间隔设置有滤水管(12);降水井(6)内壁不间断均匀分布有中粗砂(13);降水井(6)内壁顶部采用粘性土(14)层。
10.根据权利要求1所述的高水头深厚砂层地区的盾构端头土体加固体系,其特征在于止水帷幕(1)采用三轴搅拌桩,三轴搅拌桩相互咬合。
CN201610776141.1A 2016-08-30 2016-08-30 高水头深厚砂层地区的盾构端头土体加固体系 Active CN106194218B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610776141.1A CN106194218B (zh) 2016-08-30 2016-08-30 高水头深厚砂层地区的盾构端头土体加固体系

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610776141.1A CN106194218B (zh) 2016-08-30 2016-08-30 高水头深厚砂层地区的盾构端头土体加固体系

Publications (2)

Publication Number Publication Date
CN106194218A true CN106194218A (zh) 2016-12-07
CN106194218B CN106194218B (zh) 2019-12-06

Family

ID=58089833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610776141.1A Active CN106194218B (zh) 2016-08-30 2016-08-30 高水头深厚砂层地区的盾构端头土体加固体系

Country Status (1)

Country Link
CN (1) CN106194218B (zh)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812540A (zh) * 2017-03-20 2017-06-09 中铁十四局集团有限公司 一种盾构始发素墙封闭止水加固结构及施工工艺
CN106988753A (zh) * 2017-05-08 2017-07-28 中建三局基础设施工程有限公司 一种u形素混凝土地连墙加钢套筒盾构结构及其接收方法
CN107419748A (zh) * 2017-09-26 2017-12-01 悉地(苏州)勘察设计顾问有限公司 一种跨越轨道盾构区间的管廊施工结构
CN108086292A (zh) * 2017-11-30 2018-05-29 中国二十冶集团有限公司 水泥搅拌桩加固后顶管施工的控制方法
CN108612106A (zh) * 2016-12-10 2018-10-02 中铁十二局集团有限公司 地铁砂层明挖基坑施工方法
CN109024645A (zh) * 2018-09-21 2018-12-18 北京市勘察设计研究院有限公司 一体化止水帷幕、海绵城市水循环系统和方法
CN110005450A (zh) * 2019-04-19 2019-07-12 中铁第四勘察设计院集团有限公司 一种地铁车站与盾构隧道接口防水结构及施工方法
CN110005419A (zh) * 2019-04-09 2019-07-12 上海市机械施工集团有限公司 一种盾构隧道端头加固方法
CN110700842A (zh) * 2019-11-11 2020-01-17 山东大学 一种适用于盾构端头富水砂层段的超前注浆加固方法
CN112282767A (zh) * 2020-10-21 2021-01-29 江苏旭辰交通科技发展有限公司 一种富水粉细砂地质下盾构端头土体超深加固施工方法
CN113236306A (zh) * 2021-06-17 2021-08-10 北京市政建设集团有限责任公司 一种富水砂层盾构法施工用的地铁站端头加固结构
CN113530555A (zh) * 2021-06-28 2021-10-22 中铁(上海)投资集团有限公司 一种盾构进出洞垂直冻结与水泥系联合加固的施工方法
CN113530559A (zh) * 2021-07-15 2021-10-22 中交隧道工程局有限公司 一种富水砂层地质盾构接收端头的加固方法及加固结构
CN114320324A (zh) * 2021-12-31 2022-04-12 杭州咏赋建筑设计咨询有限公司 一种基于止水帷幕的盾构始发接收加固结构及方法
CN114606929A (zh) * 2022-03-24 2022-06-10 浙江土工岩土科技有限公司 一种流砂地层超深盾构井出入端加固结构及其施工方法
CN114960711A (zh) * 2021-02-24 2022-08-30 中交隧道工程局有限公司 一种基于盾构掘进的端头加固施工方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892846A (zh) * 2010-07-13 2010-11-24 中铁三局集团有限公司 高水压地层盾构淹埋式接收封堵超挖空隙的方法
CN102352753A (zh) * 2011-06-29 2012-02-15 中铁第四勘察设计院集团有限公司 冻结加固+堆土灌水的盾构到达接收方法
CN102425423A (zh) * 2011-12-31 2012-04-25 上海市机械施工有限公司 一种盾构在穿越管线过程中进洞的施工方法
CN202865850U (zh) * 2012-09-19 2013-04-10 中国水电顾问集团华东勘测设计研究院 近端头井盾构隧道上基坑开挖支护结构
CN103790592A (zh) * 2014-01-27 2014-05-14 中铁二十二局集团第一工程有限公司 一种端头土体加固系统和方法
CN103924987A (zh) * 2014-04-24 2014-07-16 中铁十一局集团城市轨道工程有限公司 一种smw工法桩盾构洞门防渗水结构及其施工方法
CN204000836U (zh) * 2014-03-27 2014-12-10 南昌轨道交通集团有限公司 一种用于盾构端头井周边建筑物地基加固的结构
CN206000553U (zh) * 2016-08-30 2017-03-08 中铁第四勘察设计院集团有限公司 高水头深厚砂层地区的盾构端头土体加固体系

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892846A (zh) * 2010-07-13 2010-11-24 中铁三局集团有限公司 高水压地层盾构淹埋式接收封堵超挖空隙的方法
CN102352753A (zh) * 2011-06-29 2012-02-15 中铁第四勘察设计院集团有限公司 冻结加固+堆土灌水的盾构到达接收方法
CN102425423A (zh) * 2011-12-31 2012-04-25 上海市机械施工有限公司 一种盾构在穿越管线过程中进洞的施工方法
CN202865850U (zh) * 2012-09-19 2013-04-10 中国水电顾问集团华东勘测设计研究院 近端头井盾构隧道上基坑开挖支护结构
CN103790592A (zh) * 2014-01-27 2014-05-14 中铁二十二局集团第一工程有限公司 一种端头土体加固系统和方法
CN204000836U (zh) * 2014-03-27 2014-12-10 南昌轨道交通集团有限公司 一种用于盾构端头井周边建筑物地基加固的结构
CN103924987A (zh) * 2014-04-24 2014-07-16 中铁十一局集团城市轨道工程有限公司 一种smw工法桩盾构洞门防渗水结构及其施工方法
CN206000553U (zh) * 2016-08-30 2017-03-08 中铁第四勘察设计院集团有限公司 高水头深厚砂层地区的盾构端头土体加固体系

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612106A (zh) * 2016-12-10 2018-10-02 中铁十二局集团有限公司 地铁砂层明挖基坑施工方法
CN106812540A (zh) * 2017-03-20 2017-06-09 中铁十四局集团有限公司 一种盾构始发素墙封闭止水加固结构及施工工艺
CN106988753A (zh) * 2017-05-08 2017-07-28 中建三局基础设施工程有限公司 一种u形素混凝土地连墙加钢套筒盾构结构及其接收方法
CN107419748A (zh) * 2017-09-26 2017-12-01 悉地(苏州)勘察设计顾问有限公司 一种跨越轨道盾构区间的管廊施工结构
CN108086292A (zh) * 2017-11-30 2018-05-29 中国二十冶集团有限公司 水泥搅拌桩加固后顶管施工的控制方法
CN109024645B (zh) * 2018-09-21 2023-11-28 北京市勘察设计研究院有限公司 一体化止水帷幕、海绵城市水循环系统和方法
CN109024645A (zh) * 2018-09-21 2018-12-18 北京市勘察设计研究院有限公司 一体化止水帷幕、海绵城市水循环系统和方法
CN110005419A (zh) * 2019-04-09 2019-07-12 上海市机械施工集团有限公司 一种盾构隧道端头加固方法
CN110005450A (zh) * 2019-04-19 2019-07-12 中铁第四勘察设计院集团有限公司 一种地铁车站与盾构隧道接口防水结构及施工方法
CN110005450B (zh) * 2019-04-19 2024-05-03 中铁第四勘察设计院集团有限公司 一种地铁车站与盾构隧道接口防水结构及施工方法
CN110700842A (zh) * 2019-11-11 2020-01-17 山东大学 一种适用于盾构端头富水砂层段的超前注浆加固方法
CN112282767A (zh) * 2020-10-21 2021-01-29 江苏旭辰交通科技发展有限公司 一种富水粉细砂地质下盾构端头土体超深加固施工方法
CN114960711A (zh) * 2021-02-24 2022-08-30 中交隧道工程局有限公司 一种基于盾构掘进的端头加固施工方法
CN113236306B (zh) * 2021-06-17 2022-04-22 北京市政建设集团有限责任公司 一种富水砂层盾构法施工用的地铁站端头加固结构
CN113236306A (zh) * 2021-06-17 2021-08-10 北京市政建设集团有限责任公司 一种富水砂层盾构法施工用的地铁站端头加固结构
CN113530555A (zh) * 2021-06-28 2021-10-22 中铁(上海)投资集团有限公司 一种盾构进出洞垂直冻结与水泥系联合加固的施工方法
CN113530559A (zh) * 2021-07-15 2021-10-22 中交隧道工程局有限公司 一种富水砂层地质盾构接收端头的加固方法及加固结构
CN114320324A (zh) * 2021-12-31 2022-04-12 杭州咏赋建筑设计咨询有限公司 一种基于止水帷幕的盾构始发接收加固结构及方法
CN114606929A (zh) * 2022-03-24 2022-06-10 浙江土工岩土科技有限公司 一种流砂地层超深盾构井出入端加固结构及其施工方法

Also Published As

Publication number Publication date
CN106194218B (zh) 2019-12-06

Similar Documents

Publication Publication Date Title
CN106194218A (zh) 高水头深厚砂层地区的盾构端头土体加固体系
CN107676097B (zh) 一种高水压软土地层hfe组合式盾构始发方法
CN104074525B (zh) 全断面注浆、矩形水平冻结与管棚联合加固结构及方法
CN106437726B (zh) 浅埋暗挖隧道过地裂缝破碎带施工方法
CN206000553U (zh) 高水头深厚砂层地区的盾构端头土体加固体系
CN108194102B (zh) 隧道初期支护变形侵限段拆除及安全受力转换施工方法
CN106837353A (zh) 填充性岩溶隧道施工处理方法
CN107654234A (zh) 一种地铁隧道穿越地铁车站地下连续墙的施工方法
CN106285715B (zh) 土压平衡盾构机近距离侧穿初支暗挖隧道的施工方法
CN110067563A (zh) 临近城市建筑及道路的车站出入口主体结构施工方法
CN205172598U (zh) 管幕旋喷桩支护结构
CN102619522A (zh) 一种地铁联络通道施工方法
CN108843333A (zh) 湿陷性黄土地区暗挖双连拱隧道穿越既有铁路的施工方法
CN207131404U (zh) 铁路隧道超深竖井冻结法施工结构体系
CN105971614A (zh) 应用于上软下硬复合地层的盾构机及盾构施工方法
CN206174963U (zh) 过地裂缝破碎带的浅埋暗挖隧道支护结构
CN105697033A (zh) 一种隧道工程无模板处治岩体空腔的施工方法
CN108979659A (zh) 软土富水大断面隧道群下穿构筑物的加固结构及方法
CN106522989A (zh) 风井结构和盾构掘进平行施工的方法
CN109296371A (zh) Mjs法与水平冻结法联合加固承压富水砂性地层交叠车站下穿段的体系及其施工方法
CN104675405B (zh) 一种矩形顶管机进洞的辅助结构及施工方法
CN107620600A (zh) 一种mjs工法和管幕法联合支护大断面小净距暗挖工法
CN109578007B (zh) 穿越高角度逆冲富水富砂断层隧道开挖及排水施工方法
CN103711492A (zh) 一种顶进式电缆套管通道施工方法
CN109026055A (zh) 洞门环梁施工中的冻结壁围护结构及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant