CN106194186A - The drilling release control method of coal wall stope drift active workings advance support section deformation - Google Patents

The drilling release control method of coal wall stope drift active workings advance support section deformation Download PDF

Info

Publication number
CN106194186A
CN106194186A CN201610529896.1A CN201610529896A CN106194186A CN 106194186 A CN106194186 A CN 106194186A CN 201610529896 A CN201610529896 A CN 201610529896A CN 106194186 A CN106194186 A CN 106194186A
Authority
CN
China
Prior art keywords
coal
drilling
boring
control method
advance support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610529896.1A
Other languages
Chinese (zh)
Inventor
杨培举
刘长友
吴锋锋
鲁岩
杨敬轩
张宁波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201610529896.1A priority Critical patent/CN106194186A/en
Publication of CN106194186A publication Critical patent/CN106194186A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Remote Sensing (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The drilling release control method of a kind of coal wall stope drift active workings advance support section deformation, belongs to the drilling release control method of roadway deformation.The surrounding rock of actual mining roadway that coal wall lead abutment pressure causes softens, and reduces the control effect of advance support.The feature dynamically elapsed according to stope, uses auger coal mining machine construction destressing borehole, reduces tunnel superficial part surrouding rock stress, alleviates the control difficulty that the heavily stressed softening of roadway surrounding rock brings.Technical essential: in the design three presbyopia boring of tunnel coal side, according to drift section size and coal body physical and mechanical parameter, determine level and vertical dimension between the degree of depth of boring and adjacent boring, spiral drill shearer production system is arranged in tunnel, at destressing borehole of constructing near position, the lead abutment pressure zone of influence, and with the propelling of work surface, constantly move forward drilling-production equipment.Use drilling pressure relief method to be conducive to improving the control effect of ahead work face supporting, reduce labor strength, improve working surface production efficiency.

Description

The drilling release control method of coal wall stope drift active workings advance support section deformation
Technical field
The present invention relates to the drilling release control method of a kind of roadway deformation, particularly a kind of coal wall stope drift active workings The drilling release control method of advance support section deformation.
Background technology
Coal wall stope drift active workings are by after lead abutment pressure effect, and country rock often produces big convergent deformation, Affecting it normally to use, and this section of tunnel is the overlapped points of each system of working surface production, production process is many, and equipment is many, operation Personnel are many, complex process, it is ensured that the adjoining rock stability in this tunnel, region, it is ensured that enough work spaces become Face Pressure control Emphasis and difficult point.
At present, stope drift active workings mainly use close standing props to carry out strengthening supporting in the lead abutment pressure zone of influence, this supporting Mode is possible to prevent back inbreak, often cannot effectively control the deformation of country rock, particularly country rock under high stress Softening transform problem, in this case, need back production limit, limit in termination district, tunnel is carried out expand side, caunch and undercut.Pillar Shifting set with roadway deformation after be treated as improve working face efficiency main bottleneck.
In recent years, quickly propel needs to adapt to fully-mechanized mining working, start to develop corresponding termination and advanced automatic moving type Hydraulic support, after using self-advancing hydraulic support, in the range of making this, supporting intensity obtains raising further, and reduces workman's labor Fatigue resistance, improves the speed of advancement of this area equipment, it is achieved that cut payroll to improve efficiency.But tunnel is enclosed by termination with advanced hydraulic support Rock deformation bad adaptability, bigger roadway deformation will affect the normal passage of support, and then affect the normal production of work surface.
The deformation of the surrounding rock in tunnel that the lead abutment pressure that has its source in of ahead work face support issues causes, current solution Method is by improving supporting intensity to adapt to heavily stressed host rock environment, but cannot effectively control weak surrounding rock and heavily stressed lead The country rock softening transform caused.If taking certain technological means, reducing the stress level in this region country rock, or controlling a pressure-bearing Power increase degree, will fundamentally solve corresponding ore deposit pressure control problem.
The country rock pressure relief method being applicable to stope drift active workings at present has two kinds, including fluting release and standing release.Right In fluting release, there is no facility of suitably slotting at present, conventional rows of large diameter borehole substitutes.Due to bore mode in a row Mostly being difficult to form continuous release drainage, the stress formed between hole is concentrated, and have impact on the surrouding rock stress transfer to deep.Actual application In, carry out restricted explosion sometimes with boring end pot hole blasting method, forms that one continuous print is loose, crushed zone, a pressure-bearing will be propped up Power peak value transfers to country rock deep, forms standing release.The major issue becoming row hole drilling release is highdensity brill In the construction of hole, frequent mobile drill, labor intensity is big, and efficiency is low.When using explosion to carry out assisting release, except blasting activities itself Safety problem outside, country rock dilatation dilatancy can be made to significantly increase, increase tunnel convergent deformation.
Auger coal mining machine applies to a kind of coal excavation apparatus of thin seam mining condition, it is adaptable to yield is less, especially It it is the exploitation of ultra-thin coal seam in Aged mine.Auger coal mining machine can get out continuous drilling hole simultaneously, forms a sipes, from So define the pressure relief groove with release effect.And auger coal mining machine has supporting walking mechanism and transportation system, machine Tool level is high, and labor intensity is low, rapidly and efficiently can construct for release, adapt to lead abutment pressure and looked unfamiliar with work Produce the feature of dynamic reach, advanced section roadway surrounding rock can be carried out again effective release, reduce surrouding rock deformation, reduce termination and surpass Proparea labor strength, improves the production efficiency of whole work surface.
Summary of the invention
The invention aims to provide the drilling of a kind of coal wall stope drift active workings advance support section deformation to unload voltage-controlled Method processed, it is achieved advanced section roadway surrounding rock carries out effective release, reduces surrouding rock deformation, reduces termination and advanced district workman work Intensity, improves the production efficiency of whole work surface.
The object of the present invention is achieved like this: this drilling pressure relief method is at the design three presbyopia boring of tunnel coal side, root According to drift section size and coal body physical and mechanical parameter, determine level and vertical dimension, lane between the degree of depth of boring and adjacent boring Spiral drill shearer production system is arranged, at destressing borehole of constructing near position, the lead abutment pressure zone of influence, and with work in road The propelling in face, constantly move forward drilling-production equipment;
Specifically comprise the following steps that
A, outside the lead abutment pressure zone of influence, coal wall, along tunnel coal side to coal body internal drilling, utilize advanced Coal body after drilling is loosened by bearing capacity;
B, employing auger coal mining machine construction working face stope drift active workings advance support section destressing borehole;
C, destressing borehole use three flower hole arrangements.
The described destressing borehole degree of depth is not less than 15m.
Between adjacent boring, vertical dimension is more than with the ratio of horizontal rangeWhereinInternal friction for coal body Angle.
Beneficial effect and advantage: according to the working environment of coal wall lead abutment pressure zone of influence release engineering, give Go out to use auger coal mining machine to carry out the technical method of drilling release, meet work surface and constantly advance needs.Three presbyopia are used to unload The layout of pressure boring and form of construction work, and according to the failure by shear intensity of coal body, determine the relative location parameter between drilling hole, carry The concentrated stress fracturing effect to roadway's sides coal body after high drilling.
The region of high stress is made to shift to country rock deep by release, it is possible to decrease or eliminate the heavily stressed surrounding rock of actual mining roadway caused Softening transform, improve stope advance support technique effect.Auger coal mining machine drilling can get out brill continuously simultaneously Adopting hole, can be formed with the sipes of beneficially surrouding rock deformation release, drilling Mechanization Level is high, and labor intensity is low, and adapts to back production The feature that working surface production dynamically moves forward.Boring uses three presbyopia to arrange, the beneficially failure by shear of coal body between hole increases country rock Loosening deformation, improve release effect.
Accompanying drawing explanation
Fig. 1 is the coal wall advance support section drilling release horizontal layout schematic diagram of the present invention
Fig. 2 is that the coal wall advance support section drilling destressing borehole of the present invention arranges schematic diagram.
In figure: 1, coal-face;2, stope drift active workings;3, goaf;4, boring;5, drilling depth;6, spiral drill shearer Machine;7, drag conveyor;8, elevating conveyor;9, conveying coal equipment;10, coal seam;11, top board;12, base plate;13, head-room;14, hole Between horizontal range;15, vertical dimension between hole.
Detailed description of the invention
This drilling pressure relief method is the boring arranged in tunnel coal side design three presbyopia, according to drift section size and coal body Physical and mechanical parameter, determines level and vertical dimension between the degree of depth of boring and adjacent boring, arranges that spiral drill shearer is raw in tunnel Product system, at destressing borehole of constructing near position, the lead abutment pressure zone of influence, and with the propelling of work surface, constantly move forward drilling Equipment;
Specifically comprise the following steps that
A, outside the lead abutment pressure zone of influence, coal wall, along tunnel coal side to coal body internal drilling, utilize advanced Coal body after drilling is loosened by bearing capacity;
B, employing auger coal mining machine construction working face stope drift active workings advance support section destressing borehole;
C, destressing borehole use three flower hole arrangements.
The described destressing borehole degree of depth is not less than 15m.
Between adjacent boring, vertical dimension is more than with the ratio of horizontal rangeWhereinInternal friction for coal body Angle.
Below in conjunction with the accompanying drawings the implementation process of the present invention is described further:
Embodiment 1: the drilling release control method of coal wall of the present invention stope drift active workings advance support section deformation, implements Process mainly includes three aspects: the design of drilling parameter, drilling system designs the type selecting with equipment, and drilling technological design With construction.
The design of drilling parameter: according to coal seam 10 condition and tunnel 2 design parameter, determine degree of depth d 5 of boring 4, boring Horizontal range w 14 and boring between vertical dimension h 15.
The design of drilling system and the type selecting of equipment: according to tunnel 2 cross dimensions and base plate 12 condition, determine the fortune coal of drilling The parameter of the equipment such as system composition and auger coal mining machine 6, drag conveyor 7 and elevating conveyor 9 and model.
Drilling technological design and construction: design the layout of each production equipment, the coordinating and the edge of production system of production link The passage process forward in tunnel.
The drilling release control method concrete operation step of coal wall of the present invention stope drift active workings advance support section deformation As follows:
First have to according to heading sizes, it is desirable to drilling depth 5 is general at more than 15m, according to head-room, it is desirable to boring height Degree 16 meets with head-room 13Horizontal range 14 and vertical dimension 15 examination between boring meetWherein,Internal friction angle for rock mass.
Select to meet the auger coal mining machine 6 of bore size requirement, select and scraping that auger machine-made egg-shaped or honey-comb coal briquets function power matches Plate conveyer 7 and elevating conveyor 8, it is desirable to drag conveyor and elevating conveyor transport capacity are more than the 1.2 of spiral drill shearer drilling ability Times.Assistant conveyance uses the mine of railless free-wheeled vehicle, and conveying coal equipment 9 can be selected for shuttle vehicle coal conveying, during other assistant conveyance mode, and fortune Coal equipment 9 selects belt conveyer, when selecting belt conveyer, it is desirable to its transport capacity is more than auger coal mining machine drilling ability 1.2 times.
Drilling construction is placed in beyond lead abutment pressure coverage, and equipment is arranged after putting in place, auger coal mining machine water Flat drill is adopted, drill bit coal cutting, and auger stem draws coal, and coal is directly loadable into drag conveyor after going out boring, proceeds to elevating conveyor, loads fortune coal Shuttle car or belt conveyor.When drilling is to projected depth 5, exiting drilling rod, auger coal mining machine integral forward lead, reach distance is for setting Horizontal range 14 between meter hole.After rig moves on to position, adjusting drill height, making vertical dimension between boring is design load 15, under starting One circulation drilling.With the propelling of work surface 1, boring mining roadway and enter under lead abutment pressure effect, tunnel superficial part country rock is because boring Adopt and be prone to loose damage, cause supporting pressure increased area and shift to coal body deep, thus reduce roadway convergence deformation, for work Normal production in face provides enough work spaces.
Embodiment of the present invention described in detail above, in addition to the explanation indicated in figure, rock mass internal friction described in scheme Angle, assistant conveyance, railless free-wheeled vehicle, belt conveyer and supporting pressure increased area etc. are concept commonly used in the art and equipment, institute State specific implementation process must be understood by the person skilled in the art.The above is the detailed description of the invention of the present invention and is transported Know-why, its embody use release principle control coal wall stope drift active workings advance support section surrouding rock deformation skill Within art thought falls within scope.

Claims (3)

1. a drilling release control method for coal wall stope drift active workings advance support section deformation, is characterized in that: this drilling Release control method is in the design three presbyopia boring of tunnel coal side, according to drift section size and coal body physical and mechanical parameter, really Level and vertical dimension between the degree of depth of fixed boring and adjacent boring, arrange spiral drill shearer production system in tunnel, near super Position, front abutment pressure zone of influence construction destressing borehole, and with the propelling of work surface, constantly move forward drilling-production equipment;
Specifically comprise the following steps that
A, outside the lead abutment pressure zone of influence, coal wall, along tunnel coal side to coal body internal drilling, utilize advanced pressure-bearing Coal body after drilling is loosened by power;
B, employing auger coal mining machine construction working face stope drift active workings advance support section destressing borehole;
C, destressing borehole use three flower hole arrangements.
The drilling release control method of coal wall the most according to claim 1 stope drift active workings advance support section deformation, It is characterized in that: the destressing borehole degree of depth is not less than 15m.
The drilling release control method of coal wall the most according to claim 1 stope drift active workings advance support section deformation, It is characterized in that: between adjacent boring, vertical dimension is more than with the ratio of horizontal rangeWhereinInternal friction for coal body Angle.
CN201610529896.1A 2016-07-06 2016-07-06 The drilling release control method of coal wall stope drift active workings advance support section deformation Pending CN106194186A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610529896.1A CN106194186A (en) 2016-07-06 2016-07-06 The drilling release control method of coal wall stope drift active workings advance support section deformation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610529896.1A CN106194186A (en) 2016-07-06 2016-07-06 The drilling release control method of coal wall stope drift active workings advance support section deformation

Publications (1)

Publication Number Publication Date
CN106194186A true CN106194186A (en) 2016-12-07

Family

ID=57472437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610529896.1A Pending CN106194186A (en) 2016-07-06 2016-07-06 The drilling release control method of coal wall stope drift active workings advance support section deformation

Country Status (1)

Country Link
CN (1) CN106194186A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930691A (en) * 2017-04-25 2017-07-07 山东科技大学 A kind of drilling construction method in driving along next gob unloading blast hole
WO2019170043A1 (en) * 2018-07-10 2019-09-12 山东科技大学 Target bearing pressure-based pressure relief drill hole interval determination method
CN111441817A (en) * 2020-04-02 2020-07-24 中国矿业大学 Method for reinforcing gas extraction by synergistic effect of coal seam drilling jet fracturing and mining pressure
CN112360470A (en) * 2020-10-28 2021-02-12 中煤科工开采研究院有限公司 Construction method for improving stress environment of advanced support pressure section of mining roadway
CN114893127A (en) * 2022-07-14 2022-08-12 陕西太合工程技术服务有限责任公司 Directional hydraulic drilling and mining integrated mining device and method for thin coal seam
CN115977637A (en) * 2023-03-01 2023-04-18 中国矿业大学(北京) Continuous pressure relief system and method for interior of surrounding rock of continuous large-deformation roadway

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101713290A (en) * 2009-12-10 2010-05-26 天地科技股份有限公司 Method for clearing rock burst of full-mine laneway deep in mine
CN102296957A (en) * 2011-07-22 2011-12-28 山东科技大学 Method of transfixing and distressing with one explosion during tunneling of seam roadway with rock burst
CN102425416A (en) * 2011-09-12 2012-04-25 山东科技大学 Coal mine high stress area roadway driving face impact ground pressure control method
CN102678120A (en) * 2012-05-18 2012-09-19 河南大有能源股份有限公司 Method for releasing pressure and removing danger of rock burst
CN102777180A (en) * 2012-07-26 2012-11-14 山东能源集团有限公司 Method for actively and regionally preventing and controlling rock burst in coal mines
CN103397883A (en) * 2013-08-21 2013-11-20 大同煤矿集团有限责任公司 Comprehensive control method for rockburst in multiple-coalbed mining mine
CN103557000A (en) * 2013-11-07 2014-02-05 北京科技大学 Method for preventing gob-side entry rock burst through side-drawing filling

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101713290A (en) * 2009-12-10 2010-05-26 天地科技股份有限公司 Method for clearing rock burst of full-mine laneway deep in mine
CN102296957A (en) * 2011-07-22 2011-12-28 山东科技大学 Method of transfixing and distressing with one explosion during tunneling of seam roadway with rock burst
CN102425416A (en) * 2011-09-12 2012-04-25 山东科技大学 Coal mine high stress area roadway driving face impact ground pressure control method
CN102678120A (en) * 2012-05-18 2012-09-19 河南大有能源股份有限公司 Method for releasing pressure and removing danger of rock burst
CN102777180A (en) * 2012-07-26 2012-11-14 山东能源集团有限公司 Method for actively and regionally preventing and controlling rock burst in coal mines
CN103397883A (en) * 2013-08-21 2013-11-20 大同煤矿集团有限责任公司 Comprehensive control method for rockburst in multiple-coalbed mining mine
CN103557000A (en) * 2013-11-07 2014-02-05 北京科技大学 Method for preventing gob-side entry rock burst through side-drawing filling

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李建民等: "《浅析开滦赵各庄矿动力显现与防治措施》", 《煤矿开采》 *
雷学义等: "《高应力巷道迎头超前钻孔卸压模拟分析》", 《煤矿安全》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930691A (en) * 2017-04-25 2017-07-07 山东科技大学 A kind of drilling construction method in driving along next gob unloading blast hole
WO2019170043A1 (en) * 2018-07-10 2019-09-12 山东科技大学 Target bearing pressure-based pressure relief drill hole interval determination method
CN111441817A (en) * 2020-04-02 2020-07-24 中国矿业大学 Method for reinforcing gas extraction by synergistic effect of coal seam drilling jet fracturing and mining pressure
CN112360470A (en) * 2020-10-28 2021-02-12 中煤科工开采研究院有限公司 Construction method for improving stress environment of advanced support pressure section of mining roadway
CN114893127A (en) * 2022-07-14 2022-08-12 陕西太合工程技术服务有限责任公司 Directional hydraulic drilling and mining integrated mining device and method for thin coal seam
CN115977637A (en) * 2023-03-01 2023-04-18 中国矿业大学(北京) Continuous pressure relief system and method for interior of surrounding rock of continuous large-deformation roadway
CN115977637B (en) * 2023-03-01 2023-08-08 中国矿业大学(北京) Continuous pressure relief system and method for interior of surrounding rock of continuous large-deformation roadway

Similar Documents

Publication Publication Date Title
CN108612530B (en) Mining method for hanging wall surrounding rock crushing inclined medium-thickness ore body
CN106194186A (en) The drilling release control method of coal wall stope drift active workings advance support section deformation
CN106121648B (en) Sublevel open stoping chassis route ore drawing subsequent filling mining method
WO2016206618A1 (en) Longwall mine construction method n00
CN104806244B (en) Filling mining method for slant middle-thick ore body
CN105569659B (en) A kind of tunnel hydraulic slotted liner technique directional blasting cuts top pressure relief method
CN107829742B (en) Caving-filling-open stope-caving mining method
CN103939102B (en) A kind of solid filling reclaims opencut side eventually and presses down the coal-mining method of coal
CN102635356A (en) Medium-length hole mining method in multiple blasting free faces of high dipping thin veins
CN105952450B (en) A kind of new method of the double stope collaboration exploitations in underground mine underground
CN104481539A (en) Extruding blasting caving mining method for self-pulling slot
CN104047629B (en) The method that thin coal bed fully-mechanized mining gob side entry retaining directional drilling extraction closes on lower coal-bed gas
CN109869150B (en) Mine resource subsection full-mining local-charging mining method
CN108756882A (en) A kind of district sublevel entry adopts recovery method without the short length of filling of driving formula
CN103104260B (en) Under complex geological condition, comprehensive-machine is to hand-pulled noodles coal-mining method
CN106223956A (en) Medium-length hole courtyard mining afterwards filling method
CN112282806A (en) Thick coal seam forced mining roadway blasting pressure relief and long anchor rod cooperative roof control method
CN101498216A (en) Thick coal seam large height workface step coal wall coal mining method
CN112922596A (en) Dendritic backward type underground mining method for thin coal seam at end slope of strip mine
CN106640080A (en) Deep part high-stress environment self-stabilizing arched stope arrangement mining method
CN101737051A (en) Covering layer forming method of blind ore bodies
CN101915099B (en) Bidirectional U-shaped coal-mining method of thick coal bed by gateway layout along stability layer
CN109268013A (en) A kind of fully-mechanized mining working Length discrepancy big angle rotary production practice
CN113153291A (en) Comprehensive mechanical continuous mining method for hydraulic fracturing of gently inclined hard rock
CN109973094B (en) Mine resource same-face full-mining local-filling mining method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161207