CN106193781B - Mechanical device for erecting pole - Google Patents
Mechanical device for erecting pole Download PDFInfo
- Publication number
- CN106193781B CN106193781B CN201610724761.0A CN201610724761A CN106193781B CN 106193781 B CN106193781 B CN 106193781B CN 201610724761 A CN201610724761 A CN 201610724761A CN 106193781 B CN106193781 B CN 106193781B
- Authority
- CN
- China
- Prior art keywords
- pedestal
- shaft tower
- vertical columns
- adjusting screw
- buried
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
Abstract
A kind of mechanical device for erecting pole of the present invention, it includes pedestal, vertical columns there are two being set on pedestal, adjusting screw rod is provided on the vertical columns, the lower drive shaft being longitudinally arranged is provided between the hypomere of two vertical columns, the leading portion and back segment of lower drive shaft are connected respectively by the retarder of worm and gear with adjusting screw rod, the top of the adjusting screw rod is provided with lifting platform, the upper transmission shaft being longitudinally arranged is provided between two lifting platforms, the whorl brace rod of lateral arrangement is provided on lifting platform, the leading portion and back segment of upper transmission shaft are connected respectively by the retarder of worm and gear with whorl brace rod, whorl brace rod is engaged with turbine below, the output terminal of turbine is towards on the inside of vertical columns, the output terminal of turbine is connected with movable arms to the left, at least two groups of standard shaft tower fixtures are provided between two movable arms.Mechanical device for erecting pole of the invention has installation rapid and convenient, labor-saving advantage.
Description
Technical field
The present invention relates to a kind of mechanical device for erecting pole.
Background technology
In recent years, due to EI Nino phenomenon etc., the natural calamities such as various icing, accumulated snow, mud-rock flow, Super Typhoon
It frequently occurs, strong influence is generated to the production and living of people.For electric system, these serious natural calamities
It often results in transmission line of electricity and falls the major accidents such as tower (bar), broken string, the safe operation of serious threat power grid.Nearly more than 50 years both at home and abroad
Thousands of times of all kinds of natural calamity accidents that power grid occurs, cause huge loss, using the southern ice and snow sleet calamity of 2008 as allusion quotation
Type.The big snow disaster in the middle and lower reach of Yangtze River caused transmission line of electricity large area disastrous accident at that time, was brought to national economy huge
Loss, 169 counties have a power failure, and because ice damage, snow disaster cause a wide range of main grid structure of transmission line of electricity that the event of falling tower occurs in succession, failure adds up
6767, stoppage in transit circuit causes substation to stop transport 831.
Power grid salvaging is very urgent, but shaft tower etc. repairs the carrying of substance into the bottleneck of repairing.Therefore one is sought
Kind of quality is small, intensity is high, convenient transportation, good weatherability, adapt to mountain area power construction Novel electric pole it is particularly important, so as to come more
Mend reinforced concrete pole build heaviness, transport difficult, tower material burn into shaft crack, the problems such as trip-out rate is high.
The content of the invention
It is labor-saving mechanical vertical the purpose of the present invention is to overcome the above shortcomings and to provide a kind of installation rapid and convenient
Lever apparatus.
The object of the present invention is achieved like this:
A kind of mechanical device for erecting pole, it includes pedestal, and front and rear two vertical columns being vertically arranged are provided on pedestal,
Pre-buried shaft tower anchor ear is provided between the hypomere of two vertical columns, the adjusting spiral shell being vertically arranged is provided on the vertical columns
Bar, the lower drive shaft being longitudinally arranged is provided between the hypomere of two vertical columns, and lower drive shaft stretches out the both ends of vertical columns
Lower handwheel is provided with, the leading portion and back segment of lower drive shaft are connected respectively by the retarder of worm and gear with adjusting screw rod, described
The top of adjusting screw rod is provided with lifting platform, and the upper transmission shaft being longitudinally arranged is provided between two lifting platforms, and upper transmission shaft is stretched
Go out the handwheel that is provided at both ends with of lifting platform, the whorl brace rod of lateral arrangement, the leading portion of upper transmission shaft are provided on lifting platform
It being connected respectively by the retarder of worm and gear with whorl brace rod with back segment, whorl brace rod is engaged with worm gear below,
For the output terminal of worm gear towards on the inside of vertical columns, the output terminal of worm gear is connected with movable arms to the left, between two movable arms
It is provided at least two groups of standard shaft tower fixtures;
The trundle of folding is provided on the pedestal.
Pedestal notch is offered in the middle part of the pedestal, pedestal notch extends to the left hand edge of pedestal, pedestal notch to the left
Right hand edge shape be the semicircle coincide with pre-buried shaft tower shape.
Compared with prior art, the beneficial effects of the invention are as follows:
Compound polyurethane material electric pole quality of the present invention is small, intensity is high, can upper high mountain, can across valley, adapt to mountain area electric power
The needs of construction, compound polyurethane material electric pole, 12 meters of weight is only 200 kilograms or so, and its fracture moment of flexure is more than
280KNm, therefore even if under the big attached ice operating mode of 60m/s Super Typhoons, wire icing thickness more than 70mm, can also deal with certainly
Such as, a look of fear not.Compound polyurethane material electric pole is easily installed, and is suitable for the use of mountain area area;Compound polyurethane material electric pole
Even if in mountain area, as long as also 6 people achieve that carrying and installation, the significantly cost-effective and time.Compound polyurethane material electric pole
Good All-around Property, can effectively resist the natural calamities such as Super Typhoon, big thickness icing, accumulated snow, mud-rock flow, can effectively carry
High power grid normal operation assurance coefficient.Mechanical device for erecting pole of the invention has installation rapid and convenient, labor-saving advantage.
Description of the drawings
Fig. 1 is the structure diagram of compound polyurethane material electric pole.
Fig. 2 is the front view of mechanical device for erecting pole when movable arms are horizontally disposed.
Fig. 3 is the top view of mechanical device for erecting pole when movable arms are horizontally disposed.
The side view of mechanical device for erecting pole when Fig. 4 is vertically arranged for movable arms.
Fig. 5 is schematic diagram when standard shaft tower fixture is intended to hold tightly in standard shaft tower.
Fig. 6 is schematic diagram when standard shaft tower fixture holds standard shaft tower tightly.
Schematic diagram when standard shaft tower is connected with standard shaft tower fixture when Fig. 7 is mechanical device for erecting pole operation.
The schematic diagram of standard shaft tower transverse state when Fig. 8 is mechanical device for erecting pole operation.
The standard shaft tower oblique schematic diagram lifted when Fig. 9 is mechanical device for erecting pole operation.
The schematic diagram of standard shaft tower motion state straight down when Figure 10 is mechanical device for erecting pole operation.
Standard shaft tower moves downwardly to the schematic diagram of lowest part when Figure 11 is mechanical device for erecting pole operation.
Wherein:
Compound polyurethane material electric pole 1, pre-buried shaft tower 1.1, standard shaft tower 1.2, basis 1.3, bolt 1.4
Mechanical device for erecting pole 3, pedestal 3.1, pedestal notch 3.2, vertical columns 3.3, adjusting screw rod 3.4, lower drive shaft
3.5th, lower handwheel 3.6, lifting platform 3.7, upper transmission shaft 3.8, upper handwheel 3.9, whorl brace rod 3.10, worm gear 3.11, activity branch
Arm 3.12, standard shaft tower fixture 3.13.
Specific embodiment
Referring to Fig. 1, a kind of compound polyurethane material electric pole 1 of the present invention, it includes pre-buried shaft tower 1.1 and standard
Shaft tower 1.2, the pre-buried shaft tower 1.1 and standard shaft tower 1.2 are down big up small cone cylinder structure, the pre-buried shaft tower
1.1 lower semisection is embedded in basis 1.3, and the lower end of the standard shaft tower 1.2 is sheathed on the upper end of pre-buried shaft tower 1.1, standard
Shaft tower 1.2 is fastened the two by multiple bolts 1.4 with socket place of the pre-buried shaft tower 1.1 in the two, the inner wall of standard shaft tower 1.2
With the outer wall of pre-buried shaft tower 1.1 bonding agent is filled in the socket place of the two.The hollow position suitable for reading of pre-buried shaft tower 1.1 is provided with ten thousand
To level meter, Universal level-metre is used to detect the verticality of pre-buried shaft tower 1.1.
A kind of mounting structure of compound polyurethane material electric pole, the earth's surface in installation place digs the hole of depth 2000mm, in hole
Basis 1.3 is poured, the plug-in opening of 1500mm depths, the lower mouth ruler of the bore of plug-in opening and pre-buried shaft tower 1.1 are provided on basis 1.3
It is very little consistent, pre-buried shaft tower 1.1 is plugged in plug-in opening, the lower semisection of the pre-buried shaft tower 1.1 is embedded in basis 1.3, described pre-
It buries lower semisection on shaft tower 1.1 and stretches out 1.3 top of basis, the lower end of the standard shaft tower 1.2 is sheathed on the upper of pre-buried shaft tower 1.1
The socket place height of end, standard shaft tower 1.2 and pre-buried shaft tower 1.1 is 500mm, is as a kind of preferably pre-buried 1.1 height of shaft tower
3000mm, 1.2 height of standard shaft tower are 12000~15000mm.
A kind of mechanical pole type installation method of compound polyurethane material electric pole:
Basis is poured Step 1: digging pit
Step 2: pre-buried shaft tower is plugged in basis
Pre-buried shaft tower is inserted in basis, the adjusting of verticality is carried out by the Universal level-metre on pre-buried shaft tower, is adopted
The gap between pre-buried shaft tower and basis is filled with filler material, ensures the verticality of pre-buried shaft tower;
Step 3: it is arranged standard shaft tower in pre-buried shaft tower upper end
Standard shaft tower using mechanical device for erecting pole 3 is vertically lifted, is then sheathed on the lower end of standard shaft tower pre-buried
Shaft tower upper end first coats bonding agent in pre-buried shaft tower upper end outer wall before being arranged, then puts down standard shaft tower, until standard shaft tower
Consolidation is contacted with pre-buried shaft tower, fastens pre-buried shaft tower and standard shaft tower finally by multiple bolts.
Referring to Fig. 2~Fig. 6, the mechanical device for erecting pole 3 include pedestal 3.1, the pedestal 3.1 be rectangular configuration, institute
The trundle that is provided with and can fold on pedestal 3.1 is stated, the middle part of the pedestal 3.1 offers pedestal notch 3.2, pedestal notch
3.2 extend to the left hand edge of pedestal 3.1 to the left, and the right hand edge shape of pedestal notch 3.2 is coincide with pre-buried shaft tower shape half
Circle is provided with the vertical columns 3.3 being vertically arranged, two vertical columns on 3.2 pedestal 3.1 in the front-back direction of pedestal notch
Pre-buried shaft tower anchor ear is provided between 3.3 hypomere, the adjusting screw rod 3.4 being vertically arranged is provided on the vertical columns 3.3,
The lower drive shaft 3.5 being longitudinally arranged is provided between the hypomere of two vertical columns 3.3, lower drive shaft 3.5 stretches out vertical columns
Handwheel 3.6 under 3.3 being provided at both ends with, the leading portion and back segment of lower drive shaft 3.5 are arranged at the step of vertical columns 3.3
On, the leading portion and back segment of lower drive shaft 3.5 are connected respectively by the retarder of worm and gear with adjusting screw rod 3.4, so as to set about
The power of wheel 3.6 passes to adjusting screw rod 3.4 by lower drive shaft 3.5.The top of the adjusting screw rod 3.4 is provided with lifting platform
3.7, the upper transmission shaft 3.8 being longitudinally arranged is provided between two lifting platforms 3.7, upper transmission shaft 3.8 stretches out the two of lifting platform 3.7
End is provided with handwheel 3.9, and the leading portion and back segment of upper transmission shaft 3.8 are arranged on the top chock of lifting platform 3.7, lifting platform
The whorl brace rod 3.10 of lateral arrangement is provided on 3.7, the leading portion and back segment of upper transmission shaft 3.8 pass through worm and gear respectively
Retarder is connected with whorl brace rod 3.10, and whorl brace rod 3.10 is engaged with worm gear 3.11 below, worm gear 3.11 it is defeated
Outlet is connected with movable arms 3.12, two movable arms to the left towards 3.3 inside of vertical columns, the output terminal of worm gear 3.11
At least two groups of standard shaft tower fixtures 3.13 are provided between 3.12.
Referring to Fig. 7~Figure 11, step 3 is as follows using the job step of mechanical device for erecting pole 3:
1st, open fold trundle, mechanical device for erecting pole is moved at pre-buried shaft tower, the pedestal notch of pedestal with
The outer wall contraposition of pre-buried shaft tower, then pre-buried shaft tower anchor ear holds pre-buried shaft tower tightly, and steel is squeezed by prefabricated location hole on pedestal
Pricker is so as to firm banking;
2nd, referring to Fig. 7, adjust lower handwheel and lifting platform is caused to be in low level, handwheel causes movable arms to be in lodging in adjusting
State is fixed on the lower end of standard shaft tower to be installed in two movable arms by standard shaft tower fixture;
3rd, referring to Fig. 8~Figure 10, handwheel causes movable arms to be in vertical state in adjusting, and standard shaft tower is located at pre- at this time
It buries directly over shaft tower, in pre-buried shaft tower upper end, outer wall coats bonding agent, referring to Figure 11, then adjusts lower handwheel, and lifting platform declines,
Movable arms are vertically lowered so that standard shaft tower lower end is sheathed on pre-buried shaft tower upper end, releases the standard shaft tower on standard shaft tower
The constraint of fixture, standard shaft tower falls to be tightly sleeved by dead weight with pre-buried shaft tower, finally by multiple bolts by pre-buried shaft tower
It is fastened with standard shaft tower;
4th, adjust lower handwheel and so that lifting platform is in low level, handwheel so that movable arms are in lodging state in adjusting, tears open
Except the constraint of pre-buried shaft tower fixture, act the fixation drill rod of bottom plate, pack up pedestal.
Claims (1)
1. a kind of mechanical device for erecting pole, it is characterised in that it includes pedestal (3.1), is provided on pedestal (3.1) front and rear vertical
Two vertical columns (3.3) of arrangement are provided with pre-buried shaft tower anchor ear between the hypomere of two vertical columns (3.3), described solid
Determine to be provided with the adjusting screw rod (3.4) being vertically arranged on column (3.3), be provided between the hypomere of two vertical columns (3.3)
The lower drive shaft (3.5) being longitudinally arranged, lower drive shaft (3.5) stretch out vertical columns (3.3) being provided at both ends under handwheel
(3.6), the leading portion of lower drive shaft (3.5) and back segment are connected respectively by the retarder of worm and gear with adjusting screw rod (3.4), institute
The top for stating adjusting screw rod (3.4) is provided with lifting platform (3.7), be provided between two lifting platforms (3.7) be longitudinally arranged it is upper
Transmission shaft (3.8), what upper transmission shaft (3.8) stretched out lifting platform (3.7) is provided at both ends with handwheel (3.9), on lifting platform (3.7)
The whorl brace rod (3.10) of lateral arrangement is provided with, the leading portion and back segment of upper transmission shaft (3.8) pass through worm and gear respectively
Retarder is connected with whorl brace rod (3.10), and whorl brace rod (3.10) is engaged with worm gear (3.11) below, worm gear
(3.11) output terminal is connected with movable arms to the left towards vertical columns (3.3) inside, the output terminal of worm gear (3.11)
(3.12), at least two groups of standard shaft tower fixtures (3.13) are provided between two movable arms (3.12);
The trundle of folding is provided on the pedestal (3.1);
Pedestal notch (3.2) is offered in the middle part of the pedestal (3.1), pedestal notch (3.2) extends to pedestal (3.1) to the left
Left hand edge, the right hand edge shape of pedestal notch (3.2) are the semicircle coincideing with pre-buried shaft tower shape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610724761.0A CN106193781B (en) | 2016-08-25 | 2016-08-25 | Mechanical device for erecting pole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610724761.0A CN106193781B (en) | 2016-08-25 | 2016-08-25 | Mechanical device for erecting pole |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106193781A CN106193781A (en) | 2016-12-07 |
CN106193781B true CN106193781B (en) | 2018-05-29 |
Family
ID=57524636
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610724761.0A Active CN106193781B (en) | 2016-08-25 | 2016-08-25 | Mechanical device for erecting pole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106193781B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107248264A (en) * | 2017-06-28 | 2017-10-13 | 依塔科技有限公司 | A kind of debris flow early-warning device and method for early warning |
CN110984675B (en) * | 2019-12-19 | 2020-12-22 | 吴乾臻 | Pole erecting device for electric power laying and using method thereof |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB190910639A (en) * | 1909-05-05 | 1909-12-23 | Seneca George Milton | Improvements in Pulling Machines. |
US5794387A (en) * | 1997-03-20 | 1998-08-18 | Musco Corporation | Device and method to lift and manipulate poles which are mounted onto a base |
AU3616199A (en) * | 1999-04-20 | 2000-11-02 | Abacus Holdings Limited | Column counterbalancing apparatus |
CN106948644B (en) * | 2015-11-13 | 2019-01-18 | 嘉兴市南湖区翊轩塑料五金厂(普通合伙) | Power grid electric pole sets up self-loading-unloading device and its construction method |
CN106948646B (en) * | 2015-11-13 | 2019-07-12 | 福鼎诺一家居设计有限公司 | Power grid electric pole sets up Self-loading-unloading tool car construction method |
CN205976698U (en) * | 2016-08-25 | 2017-02-22 | 无锡市同腾复合材料有限公司 | Mechanical type pole setting device |
-
2016
- 2016-08-25 CN CN201610724761.0A patent/CN106193781B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106193781A (en) | 2016-12-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106121343B (en) | Compound polyurethane material electric pole and its installation method | |
CN106245983B (en) | The hydraulic pressure pole type installation method of compound polyurethane material electric pole | |
CN202023404U (en) | Multifunctional pole erecting device | |
CN106193781B (en) | Mechanical device for erecting pole | |
CN106351503B (en) | The mechanical pole type installation method of compound polyurethane material electric pole | |
CN206233543U (en) | A kind of climbing device for jacking construction platform | |
CN205719174U (en) | Ultrasonic radar water-level gauge mounting bracket | |
CN103938663A (en) | Correction device of inclined power transmission tower made of signal-splicing steel angle principal material | |
CN209210319U (en) | It drives a vehicle dedicated maintenance hanging basket | |
CN207159953U (en) | The inspection platform of south water to north gate opening/closing electric block | |
CN205976698U (en) | Mechanical type pole setting device | |
CN206768646U (en) | A kind of highway multifunctional monitoring bar | |
CN102518147B (en) | Anchoring and retaining structure for reducing support height of existing overhigh retaining wall | |
CN205976699U (en) | Fluid pressure type pole setting device | |
CN209353766U (en) | A kind of deep pit monitor protective device based on road engineering | |
CN205976686U (en) | Polyurethane combined material pole | |
CN106121353B (en) | Hydraulic vertical lever apparatus | |
CN207193754U (en) | A kind of urban road and bridge on highway maintenance Hanging Basket | |
CN203569906U (en) | Anti-sliding device of canopy sloping roof without column | |
CN205617771U (en) | Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft | |
CN101514556A (en) | Prefabricated tower crane foundation and a dedicated hydraulic installation piling machine thereof | |
CN206514912U (en) | Surcharge water level meter support supplementary structure | |
CN206191228U (en) | Stable form ultrasonic radar fluviograph installing support | |
CN107642102B (en) | A kind of damping electric pole | |
CN206626273U (en) | A kind of city piping lane construction supporting mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |