CN106193488A - Metope clean board construction technique and metope clean board mounting structure - Google Patents
Metope clean board construction technique and metope clean board mounting structure Download PDFInfo
- Publication number
- CN106193488A CN106193488A CN201610663648.6A CN201610663648A CN106193488A CN 106193488 A CN106193488 A CN 106193488A CN 201610663648 A CN201610663648 A CN 201610663648A CN 106193488 A CN106193488 A CN 106193488A
- Authority
- CN
- China
- Prior art keywords
- clean board
- steel
- metope
- plate
- geosyncline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/072—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of specially adapted, structured or shaped covering or lining elements
- E04F13/073—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of specially adapted, structured or shaped covering or lining elements for particular building parts, e.g. corners or columns
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0803—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
- E04F13/0805—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and the wall
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0803—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
- E04F13/081—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements
- E04F13/0821—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements the additional fastening elements located in-between two adjacent covering elements
- E04F13/0825—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements the additional fastening elements located in-between two adjacent covering elements engaging side holes preformed into the covering elements
Abstract
The invention provides a kind of metope clean board construction technique and metope clean board mounting structure, belong to technical field of building construction, this construction technology includes, at metope fixation steel plate built-in fitting, adjacent steel plate built-in fitting interval is arranged;Arranging rustless steel geosyncline, rustless steel geosyncline and corresponding metope interval to arrange on ground, the length direction of rustless steel geosyncline is parallel to the length direction of the metope of correspondence;Installing clean board in rustless steel geosyncline, clean board is connected in rustless steel geosyncline;Os Draconis are utilized to be connected fixing to clean board and steel plate built-in fitting.Metope clean board mounting structure uses this construction technology to make.After clean board is arranged on metope, beneficially heat insulation, the sound insulation in room, there is insulation, antidetonation and preferable fire protecting performance simultaneously, safe and reliable, it is provided that more comfortable environment.
Description
Technical field
The present invention relates to technical field of building construction, in particular to a kind of metope clean board construction technique.
Background technology
It is known that aerospace engineering high-quality precision and sophisticated technology require strictly reach ultimate attainment, space flight Factory Building processing installation equipment with
Sample is the most accurate, and this must have the clean room meeting equipment purity requirements in the most just requiring space flight processing Factory Building.In recent years
Coming, it is more extensive that clean board is applied in space flight Factory Building, and in clean room construction technology level directly determines Factory Building, space flight sets
The cleanliness factor of standby environment.In installation process, due to the special environment of space flight Factory Building, carry out in many rooms of space flight Factory Building
Furred ceiling and interlayer is set at metope.
Furred ceiling finishing material is to discriminate between the Main Basis of furred ceiling title, mainly has: light steel keel gypsum board furred ceiling, plasterboard
Furred ceiling, mineral wool board ceiling, clamping plate furred ceiling, abnormity strip aluminum-pinch furred ceiling, square plating paint aluminum-pinch furred ceiling, stained glass furred ceiling,
Aluminum honeycomb perforated sound-absorbing plate furred ceiling, the compound furred ceiling in full room etc., occupy considerable status, to room in whole indoor decoration
End face makees suitable decoration, can not only beautify indoor environment, moreover it is possible to build colourful interior space artistic image.
Inventor finds under study for action, and traditional ceiling construction at least has a disadvantage in that
The construction technology of metope clean board installation is not carried out for aviation Factory Building.
Summary of the invention
It is an object of the invention to provide a kind of metope clean board construction technique, do not have to improve in traditional technology
The problem carrying out the construction technology of metope clean board installation for aviation Factory Building.
The present invention also aims to provide a kind of metope clean board mounting structure, to improve in traditional aviation Factory Building not
The problem that metope clean board causes Factory Building comfort difference is installed.
Embodiments of the invention are achieved in that
Based on above-mentioned first purpose, the invention provides a kind of metope clean board construction technique, this construction technology bag
Include following steps:
Step S100, at metope fixation steel plate built-in fitting, adjacent described steel plate built-in fitting interval arrange;
Step S200, arranging rustless steel geosyncline on ground, described rustless steel geosyncline and corresponding metope interval are arranged, described
The length direction of rustless steel geosyncline is parallel to the length direction of the metope of correspondence;
Step S300, in described rustless steel geosyncline install clean board, described clean board is connected in described rustless steel geosyncline;
Step S400, Os Draconis are utilized to be connected fixing to clean board and steel plate built-in fitting.
In preferred embodiment of the present invention, described step S100 includes, described steel plate built-in fitting is set to rectangular slab, institute
Stating rectangular slab uses four chemical bolts to be fixed on metope, and four described chemical bolts lay respectively at four angles of described rectangular slab
Place.
In preferred embodiment of the present invention, described step S200 includes, described rustless steel geosyncline is set to rectangular channel, institute
Stating rustless steel geosyncline and include groove bottom wall and two the groove sidewalls being oppositely arranged, two described groove sidewalls are divided into and are positioned at described bottom land
Two sides of the length direction of wall, and fixing with described groove bottom wall is connected, described groove bottom wall and ground use that bolt is fixing to be connected
Connect.
In preferred embodiment of the present invention, in described step S300, with the described cleaning of described rustless steel geosyncline clamping
The one side of plate is provided with depressed part, and described depressed part caves inward along the side surface direction being perpendicular to described clean board, described recessed
The portion of falling into is for accommodating the bolt for fixing described rustless steel groove.
In preferred embodiment of the present invention, in described step S300, described rustless steel geosyncline is arranged with junction, ground
Arc inner corner trim aluminium section bar, described arc inner corner trim aluminium section bar is had to be positioned at the side away from described metope of described rustless steel geosyncline.
In preferred embodiment of the present invention, in described step S300, described clean board is provided with polylith, and every piece described clean
Clean plate is set to rectangular plate-like, is connected by middle word aluminium section bar between adjacent described clean board.
In preferred embodiment of the present invention, described clean board includes four continuous print sides, each described clean board
Side is provided with holding tank, two holding tank docking of adjacent described clean board, is formed for accommodating described middle word aluminium section bar
Space.
In preferred embodiment of the present invention, described step S400 includes, solid by square steel between adjacent described clean board
Fixed connection, is connected fixing to described square steel and corresponding described clean board by angle steel in the relative both sides of described square steel;Institute
Stating Os Draconis and include installing plate and two connecting plates being oppositely arranged, two described connecting plates are perpendicular to described installing plate, two
Described connecting plate lays respectively between described square steel and corresponding described angle steel, is positioned at the described square steel of same group, described angle steel
And described connecting plate is fixing connects;Described installing plate is fixed on described steel plate built-in fitting.
Based on above-mentioned second purpose, the invention provides a kind of metope clean board mounting structure, including steel plate built-in fitting, clean
Clean plate main body, Os Draconis and middle word aluminium section bar, wherein:
Described steel plate built-in fitting is fixing with metope to be connected, and the side of described Os Draconis is installed on described steel plate built-in fitting, its phase
To opposite side be connected with described clean board, be provided with described middle word aluminium section bar between adjacent described clean board.
In preferred embodiment of the present invention, also including angle steel and square steel, adjacent described clean board passes through described square steel
Connecting, described angle steel is provided with two, and two angle steel lay respectively on relative two side of described square steel, each described angle
One plate face of steel is connected with described clean board, and its another plate face is fixing with described square steel to be connected;Described Os Draconis include installing plate with
And two connecting plates being oppositely arranged, two described connecting plates are perpendicular to described installing plate, and two described connecting plates lay respectively at
Between described square steel and corresponding described angle steel, it is positioned at the described square steel of same group, described angle steel and described connecting plate and fixes
Connect;Described installing plate is fixed on described steel plate built-in fitting.
The embodiment of the present invention provides the benefit that:
In sum, the metope clean board construction technique that the embodiment of the present invention provides, simple and reasonable steps, during construction
Flexible to operation, save construction period;Meanwhile, after clean board is arranged on metope, beneficially heat insulation, the sound insulation in room,
There is insulation, antidetonation and preferable fire protecting performance simultaneously, safe and reliable, it is provided that more comfortable environment.The most such as
Under:
The metope clean board construction technique that the present embodiment provides, first installs steel plate built-in fitting at body of wall, and steel plate is pre-buried
The simple in construction of part, flatness is high, after steel plate installation of embedded parts, it is possible to the error produced during effectively making up wall construction,
Improve the flatness of installed surface, it is simple to the installation of clean board, clean board installation site is more accurate, and globality is more preferable.On ground
Face arranges rustless steel geosyncline, is attached as intermediate connector by rustless steel geosyncline when clean board is connected with ground, clean
The mounting structure of plate is more firm, more reasonable with the fit structure on ground, and ensure that the perpendicularity of clean board, it is simple to steel
Plate built-in fitting coordinates to be installed, and after the splicing of polylith clean board, overall structure flatness is more preferable.Clean board and steel plate built-in fitting are by dragon
Bone connects, and keel structure is simple, and low cost of manufacture reduces construction cost, and Os Draconis are first arranged on steel plate built-in fitting, the most again
Being connected with Os Draconis by clean board, easy to operate, after clean board is connected with steel plate built-in fitting, polylith clean board is spliced into entirety, whole
The sound construction of body, flatness is high.After clean board installation, the sound-insulating and heat-insulating in house is effective, and fire protecting performance is good, uses peace
Complete reliable, use comfortable.
The metope clean board mounting structure that the present embodiment provides, it is simple and reasonable, it is simple to construction, and polylith clean board is spelled
Sound construction overall after connecing is reliable, uses safety;There is heat insulation, soundproof effect, use comfortable.
Accompanying drawing explanation
In order to be illustrated more clearly that the technical scheme of the embodiment of the present invention, below by embodiment required use attached
Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, and it is right to be therefore not construed as
The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to according to this
A little accompanying drawings obtain other relevant accompanying drawings.
Fig. 1 is the schematic diagram of the metope clean board mounting structure of the embodiment of the present invention;
Fig. 2 is the clean board attachment structure figure with rustless steel geosyncline of the embodiment of the present invention;
Fig. 3 is the structure chart of the clean board of the embodiment of the present invention;
Fig. 4 is the square steel attachment structure figure with angle steel of the embodiment of the present invention.
In figure:
Steel plate built-in fitting 100, chemical bolt 110,
Clean board main body 200, depressed part 210,
Os Draconis 300,
Middle word aluminium section bar 400,
Angle steel 500,
Square steel 600, the first plate face 610, the second plate face 620, the 3rd plate face 630, the 4th plate face 640,
Rustless steel geosyncline 700,
Arc inner corner trim aluminium section bar 800.
Detailed description of the invention
It is known that aerospace engineering high-quality precision and sophisticated technology require strictly reach ultimate attainment, space flight Factory Building processing installation equipment with
Sample is the most accurate, and this must have the clean room meeting equipment purity requirements in the most just requiring space flight processing Factory Building.In recent years
Coming, it is more extensive that clean board is applied in space flight Factory Building, and in clean room construction technology level directly determines Factory Building, space flight sets
The cleanliness factor of standby environment.Do not carry out the construction work of metope clean board installation for Factory Building during traditional aviation construction of hydropower
Skill.
In consideration of it, designer of the present invention devises a kind of metope clean board construction technique and metope clean board is installed
Structure, by arranging clean board in aviation Factory Building, adds the sound insulation of Factory Building, effect of heat insulation, meanwhile, the fire prevention of whole Factory Building
Excellent performance, safe and reliable, use comfortable.
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is
The a part of embodiment of the present invention rather than whole embodiments.Generally implement with the present invention illustrated described in accompanying drawing herein
The assembly of example can be arranged with various different configurations and design.
Therefore, detailed description to the embodiments of the invention provided in the accompanying drawings is not intended to limit claimed below
The scope of the present invention, but be merely representative of the selected embodiment of the present invention.Based on the embodiment in the present invention, this area is common
The every other embodiment that technical staff is obtained under not making creative work premise, broadly falls into the model of present invention protection
Enclose.
It should also be noted that similar label and letter represent similar terms, therefore, the most a certain Xiang Yi in following accompanying drawing
Individual accompanying drawing is defined, then need not it be defined further and explains in accompanying drawing subsequently.
In describing the invention, it should be noted that term " vertically ", " interior ", " outward " etc. instruction orientation or position
Relation is based on orientation shown in the drawings or position relationship, or the orientation usually put when this invention product uses or position
Relation, is for only for ease of the description present invention and simplifies description rather than instruction or imply that the device of indication or element must have
Have specific orientation, with specific azimuth configuration and operation, be therefore not considered as limiting the invention.Additionally, term " the
One ", " second ", " the 3rd ", " the 4th " etc. are only used for distinguishing and describe, and it is not intended that instruction or hint relative importance.
In describing the invention, in addition it is also necessary to explanation, unless otherwise clearly defined and limited, term " arrange ",
" install ", " being connected ", " connection " should be interpreted broadly, and connect for example, it may be fixing, it is also possible to be to removably connect, or one
Body ground connects;Can be to be mechanically connected, it is also possible to be electrical connection;Can be to be joined directly together, it is also possible to indirect by intermediary
It is connected, can be the connection of two element internals.For the ordinary skill in the art, can be with in concrete condition understanding
State term concrete meaning in the present invention.
It should be noted that in the case of not conflicting, the embodiment in the present invention and the feature in embodiment can phases
Combination mutually.
Metope clean board construction technique embodiment
Refer to Fig. 1-Fig. 4, present embodiments provide a kind of metope clean board construction technique, at aviation Factory Building
Metope install clean board, improve the sound insulation of Factory Building, effect of heat insulation, use more safety and comfort.Clean board is preferably arranged to square
Shape plate, it is simple to processing and manufacturing, easy for installation, it is simple to coordinate and install, further, be respectively provided with recessed in four sides of clean board
Falling into portion 210, depressed part 210 caves inward along the direction being perpendicular to corresponding side surface, this depressed part 210.This construction technology include as
Lower step:
Step S100, at metope fixation steel plate built-in fitting 100, adjacent described steel plate built-in fitting 100 interval is arranged.Carry out
Before steel plate built-in fitting 100 is installed, first the house constructed is detected, enter according to construction plan and field measurement size
Row setting-out, during setting-out, general first from the beginning of wall column, according to the inclined degree of wall column, size can be adjusted a little.Throw by laser device
Penetrate vertical line on cylinder, line taking 2 draw " V " mark with pencil, with ink fountain the place of making a mark eject receive limit partition wall limit
Line.Eject other each metope posts the most in the same fashion and receive the wall sideline on limit, should ensure that these four lines are in a vertical,
To ensure to install the vertical of metope.The outer surface of construction steel plate the to be ensured built-in fitting 100 of partition wall girder steel is flushed with cylinder, gold
When belonging to the construction of rock wool-steel plywood support steel beam on the basis of partition wall inner edge in receive 10mm, as regulating the vertical regulation of partition wall
Size.Referring to Fig. 1, after steel plate built-in fitting 100 is arranged on metope, steel plate built-in fitting 100 is provided with multiple, and each steel plate is pre-buried
The flatness of part 100 should be consistent, it is ensured that in multiple steel plate built-in fittings 100 are generally aligned in the same plane.Being preferably arranged to, steel plate is pre-buried
Part 100 is set to rectangular plate-like, and each steel plate built-in fitting 100 includes that two the plate faces being oppositely arranged are good between two plate faces
Four sides of continuous print, install steel plate built-in fitting 100 time, it is ensured that the flatness in two plate faces, it is simple to steel plate built-in fitting 100
It is adjusted so that in multiple plate faces of multiple steel plate built-in fittings 100 are generally aligned in the same plane, improves installation quality.Each steel plate
Built-in fitting 100 is bolted on metope, and each steel plate built-in fitting 100 is fixed on metope by four chemical bolts 110
On, and four chemical bolts 110 are positioned at four angles of steel plate built-in fitting 100, during practical operation, it is ensured that four titbit bolts are tight
Gu degree is consistent so that it is when accepting External Force Acting can uniform stressed, and prevent because discontinuity cause single chemistry
The phenomenon of bolt 110 stress destruction.
Step S200, arranging rustless steel geosyncline 700 on ground, described rustless steel geosyncline 700 and corresponding metope interval set
Putting, the length direction of described rustless steel geosyncline 700 is parallel to the length direction of the metope of correspondence.Refer to Fig. 2, carry out cleaning
In the installation process of plate, it is positioned at the installation inconvenience of the clean board on ground, immobilizes, therefore, install at ground setting position
Rustless steel geosyncline 700, rustless steel geosyncline 700 is fixedly connected with the ground, and then, then is connected with rustless steel geosyncline 700 by clean board
, easy to operate, convenient fixing.Rustless steel geosyncline 700 is preferably arranged to rectangular channel, and it includes groove bottom wall and two side channels
Wall, two groove sidewalls are oppositely arranged, on two sides of the length direction laying respectively at groove bottom wall, two groove sidewalls and groove bottom wall
Securing connection, the mode that groove bottom wall connects with ground periwinkle collecting is fixing to be connected.The simple in construction of rustless steel geosyncline 700, easy to process,
Save manufacturing cost.Clean board is directly connected in rustless steel geosyncline 700, easy for installation, can arrange glue in clean board plate face
Glutinous agent is fixing with rustless steel geosyncline 700 to be connected, and improves structural integrity.When carrying out rustless steel geosyncline 700 and installing, it is ensured that stainless
The length direction of steel geosyncline 700 is parallel with the length direction of corresponding metope, and groove sidewall is parallel with metope, after installation, and clean board
Good with the depth of parallelism of steel plate built-in fitting 100.After clean board is arranged on rustless steel geosyncline 700, depressed part 210 and bolt position pair
Should, i.e. depressed part 210 has reserved installing space to bolt, and clean board is tightr with coordinating of rustless steel geosyncline 700.In order to carry
High rustless steel geosyncline 700 and the connectivity robustness on ground, rustless steel geosyncline 700 and junction, ground are provided with arc inner corner trim aluminium profiles
Material 800, arc inner corner trim aluminium section bar 800 is positioned at the side away from metope of rustless steel geosyncline 700.
Step S400, utilizes Os Draconis 300 to be connected fixing with steel plate built-in fitting 100 for clean board.After the splicing of polylith clean board
Covering whole metope, every piece of clean board connects by Os Draconis 300 are fixing with corresponding steel plate built-in fitting 100.Refer to Fig. 1, real
During the construction of border, being connected by middle word aluminium section bar 400 between adjacent clean board, after the most adjacent clean board is stitched together, two clean
Two depressed parts 210 of clean plate dock, and define the space of like aperture, are then arranged in this space by middle word aluminium section bar 400,
Both serve the effect connecting adjacent clean board, meanwhile, the part not exposed, do not affect the sight of clean board.Depressed part
210 are holding tank, it is possible to the placement headspace of middle word aluminium section bar 400.There is between adjacent clean board middle word aluminium section bar
400, it is possible to ensure the flatness in clean board plate face, improve the quality of construction.Refer to Fig. 1 and Fig. 3, clean in order to improve further
The integral firmness of clean plate, adjacent clean board is connected by angle steel 500 and square steel 600, and square steel 600 is the ring of rectangle in cross section
Shape structure, it includes the first the 610, second plate face the 620, the 3rd, plate face plate face 630 and the 4th plate face 640 being sequentially connected with, first
Plate face 610 and the 3rd plate face 630 are oppositely arranged, and the second plate face 620 and the 4th plate face 640 are oppositely arranged, and fit in the first plate face 610
On adjacent two clean boards, the second plate face 620 and the 4th plate face 640 are respectively perpendicular to the plate face of clean board, in the second plate face
Being provided with angle steel 500 between 620 and clean board, be provided with angle steel 500 between the 4th plate face 640 and clean board, angle steel 500 wraps
Including orthogonal two plates, fits with the second plate face 620 in the plate face of a plate, fits with clean board in the plate face of another plate,
And angle steel 500 is fixing with clean board and square steel 600 respectively is connected, i.e. complete the connection of adjacent two clean boards.Square steel 600 hides
Gear, at the connection gap of adjacent two clean boards, adds sound insulation and effect of heat insulation, improves the fire resistance of body of wall.Os Draconis
300 include installing plate and two connecting plates being oppositely arranged, and two connecting plates are perpendicular to installing plate, one of them connecting plate position
Between the second plate face 620 and angle steel 500, another connecting plate between the 4th plate face 640 and angle steel 500, the plate of connecting plate
The plate face laminating of face and angle steel 500, the plate face laminating of the plate face of connecting plate and square steel 600.It is positioned at square steel 600, the angle of same group
Steel 500 and the fixing connection of connecting plate, described installing plate is fixed on described steel plate built-in fitting 100, it is achieved that fixed by clean board
On steel plate built-in fitting 100.One steel plate built-in fitting 100 correspondence connects fixing for two clean boards, saves steel plate built-in fitting
The quantity of 100, simplifies structure, shortens construction period.
Metope clean board mounting structure embodiment
Refer to Fig. 1, Fig. 3 and Fig. 4, present embodiments provide a kind of metope clean board mounting structure, steel plate built-in fitting
100, clean board main body 200, Os Draconis 300, middle word aluminium section bar 400, angle steel 500 and square steel 600, steel plate built-in fitting 100 and wall
Face is fixing to be connected, and the side of Os Draconis 300 is installed on steel plate built-in fitting 100, and its relative opposite side is connected with clean board, adjacent clean
It is provided with middle word aluminium section bar 400 between clean plate.Adjacent clean board is connected by square steel 600, and angle steel 500 is provided with two, two
Angle steel 500 lays respectively on relative two side of square steel 600, and a plate face of each angle steel 500 is connected with clean board, and it is another
One plate face is fixing with square steel 600 to be connected.
Concrete, square steel 600 is the circulus of rectangle in cross section, its first plate face 610 including being sequentially connected with, the
Two plate face the 620, the 3rd plate face 630 and the 4th plate faces 640, the first plate face 610 and the 3rd plate face 630 be oppositely arranged, the second plate face
620 and the 4th plate face 640 be oppositely arranged, the first plate face 610 is fitted on adjacent two clean boards, the second plate face 620 and the 4th
Plate face 640 is respectively perpendicular to the plate face of clean board, is provided with angle steel 500, at the 4th plate between the second plate face 620 and clean board
Being provided with angle steel 500 between face 640 and clean board, angle steel 500 includes orthogonal two plates, the plate face and second of a plate
Fitting in plate face 620, fits with clean board in the plate face of another plate, and angle steel 500 is fixing even with clean board and square steel 600 respectively
Connect, i.e. complete the connection of adjacent two clean boards.Square steel 600 blocks at the connection gap of adjacent two clean boards, increases
Sound insulation and effect of heat insulation, improve the fire resistance of body of wall.Os Draconis 300 include installing plate and two connections being oppositely arranged
Plate, two connecting plates are perpendicular to installing plate, and one of them connecting plate is between the second plate face 620 and angle steel 500, and another connects
Plate between the 4th plate face 640 and angle steel 500, the plate face laminating of the plate face of connecting plate and angle steel 500, the plate face of connecting plate with
The plate face laminating of square steel 600.Being positioned at the fixing connection of square steel 600, angle steel 500 and connecting plate of same group, described installing plate is solid
Due to described steel plate built-in fitting 100, it is achieved that clean board is fixed on steel plate built-in fitting 100.One steel plate built-in fitting 100 is right
Should connect fixing for two clean boards, save the quantity of steel plate built-in fitting 100, simplify structure, shorten construction period.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for the skill of this area
For art personnel, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, that is made any repaiies
Change, equivalent, improvement etc., should be included within the scope of the present invention.
Claims (10)
1. a metope clean board construction technique, it is characterised in that this construction technology comprises the steps:
Step S100, at metope fixation steel plate built-in fitting, adjacent described steel plate built-in fitting interval arrange;
Step S200, arranging rustless steel geosyncline on ground, described rustless steel geosyncline and corresponding metope interval are arranged, described stainless
The length direction of steel geosyncline is parallel to the length direction of the metope of correspondence;
Step S300, in described rustless steel geosyncline install clean board, described clean board is connected in described rustless steel geosyncline;
Step S400, Os Draconis are utilized to be connected fixing to clean board and steel plate built-in fitting.
Metope clean board construction technique the most according to claim 1, it is characterised in that described step S100 includes,
Described steel plate built-in fitting is set to rectangular slab, and described rectangular slab uses four chemical bolts to be fixed on metope, four described chemistry
Bolt lays respectively at four angles of described rectangular slab.
Metope clean board construction technique the most according to claim 1, it is characterised in that described step S200 includes,
Described rustless steel geosyncline is set to rectangular channel, and described rustless steel geosyncline includes groove bottom wall and two the groove sidewalls being oppositely arranged,
Two described groove sidewalls are divided into two sides of the length direction being positioned at described groove bottom wall, and fixing with described groove bottom wall are connected,
Described groove bottom wall is fixing with ground employing bolt to be connected.
Metope clean board construction technique the most according to claim 3, it is characterised in that in described step S300, with
The one side of the described clean board of described rustless steel geosyncline clamping is provided with depressed part, and described depressed part is along being perpendicular to described cleaning
The side surface direction of plate caves inward, and described depressed part is for accommodating the bolt for fixing described rustless steel groove.
Metope clean board construction technique the most according to claim 1, it is characterised in that in described step S300, institute
Stating rustless steel geosyncline and junction, ground is provided with arc inner corner trim aluminium section bar, described arc inner corner trim aluminium section bar is positioned at described rustless steel
The side away from described metope of geosyncline.
Metope clean board construction technique the most according to claim 1, it is characterised in that in described step S300, institute
Stating clean board and be provided with polylith, every piece of described clean board is set to rectangular plate-like, by middle word aluminum between adjacent described clean board
Section bar connects.
Metope clean board construction technique the most according to claim 6, it is characterised in that described clean board includes four
Continuous print side, the side of each described clean board is provided with holding tank, two holding tank docking of adjacent described clean board, shape
Become the space for accommodating described middle word aluminium section bar.
8. according to the metope clean board construction technique described in claim 6 or 7, it is characterised in that described step S400
Including, connect, in the relative both sides of described square steel by angle steel by described by square steel is fixing between adjacent described clean board
Square steel is fixing with corresponding described clean board to be connected;Described Os Draconis include installing plate and two connecting plates being oppositely arranged, two
Individual described connecting plate is perpendicular to described installing plate, two described connecting plates lay respectively at described square steel and corresponding described angle steel it
Between, it is positioned at the fixing connection of the described square steel of same group, described angle steel and described connecting plate;Described installing plate is fixed on described steel
Plate built-in fitting.
9. a metope clean board mounting structure, it is characterised in that include steel plate built-in fitting, clean board main body, Os Draconis and in
Word aluminium section bar, wherein:
Described steel plate built-in fitting is fixing with metope to be connected, and the side of described Os Draconis is installed on described steel plate built-in fitting, and it is relative
Opposite side is connected with described clean board, is provided with described middle word aluminium section bar between adjacent described clean board.
Metope clean board mounting structure the most according to claim 9, it is characterised in that also include angle steel and square steel, phase
Adjacent described clean board is connected by described square steel, and described angle steel is provided with two, and two angle steel lay respectively at the phase of described square steel
To two sides on, a plate face of each described angle steel is connected with described clean board, and its another plate face is fixed with described square steel
Connect;Described Os Draconis include installing plate and two connecting plates being oppositely arranged, and two described connecting plates are perpendicular to described installation
Plate, two described connecting plates lay respectively between described square steel and corresponding described angle steel, are positioned at described square steel, the institute of same group
State angle steel and the fixing connection of described connecting plate;Described installing plate is fixed on described steel plate built-in fitting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610663648.6A CN106193488A (en) | 2016-08-12 | 2016-08-12 | Metope clean board construction technique and metope clean board mounting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610663648.6A CN106193488A (en) | 2016-08-12 | 2016-08-12 | Metope clean board construction technique and metope clean board mounting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106193488A true CN106193488A (en) | 2016-12-07 |
Family
ID=57515257
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610663648.6A Pending CN106193488A (en) | 2016-08-12 | 2016-08-12 | Metope clean board construction technique and metope clean board mounting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106193488A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113356502A (en) * | 2021-07-22 | 2021-09-07 | 苏州金螳螂建筑装饰股份有限公司 | Rapid plate dismounting structure and mounting process |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101047308B1 (en) * | 2010-10-20 | 2011-07-07 | 썬파크 주식회사 | Exterior structure of building outer wall using open joint method |
CN201943226U (en) * | 2011-01-28 | 2011-08-24 | 中建三局装饰有限公司 | Insertion and hang type pottery tube curtain wall |
CN202809899U (en) * | 2012-10-11 | 2013-03-20 | 李月芹 | Combined type partition wall board |
CN202990352U (en) * | 2013-01-09 | 2013-06-12 | 深圳市维业装饰集团股份有限公司 | Hanging decorative material |
CN204960073U (en) * | 2015-07-22 | 2016-01-13 | 江苏鑫宇装饰有限公司 | There is not horizontal fossil fragments curtain |
-
2016
- 2016-08-12 CN CN201610663648.6A patent/CN106193488A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101047308B1 (en) * | 2010-10-20 | 2011-07-07 | 썬파크 주식회사 | Exterior structure of building outer wall using open joint method |
CN201943226U (en) * | 2011-01-28 | 2011-08-24 | 中建三局装饰有限公司 | Insertion and hang type pottery tube curtain wall |
CN202809899U (en) * | 2012-10-11 | 2013-03-20 | 李月芹 | Combined type partition wall board |
CN202990352U (en) * | 2013-01-09 | 2013-06-12 | 深圳市维业装饰集团股份有限公司 | Hanging decorative material |
CN204960073U (en) * | 2015-07-22 | 2016-01-13 | 江苏鑫宇装饰有限公司 | There is not horizontal fossil fragments curtain |
Non-Patent Citations (2)
Title |
---|
北京土木建筑学会: "《钢结构工程施工组织设计实例》", 31 August 2006, 中国计划出版社 * |
张豫: "《建筑与装饰工程施工工艺 第2版》", 31 January 2016, 北京理工大学出版社 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113356502A (en) * | 2021-07-22 | 2021-09-07 | 苏州金螳螂建筑装饰股份有限公司 | Rapid plate dismounting structure and mounting process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103510631B (en) | A kind of indoor sound insulation constructing structure and construction method thereof | |
US7404273B2 (en) | Wall and partition construction and method including a laterally adjustable flanged stud | |
CN104032925B (en) | CSI house wall ground Stilt layer construction method | |
CN107435394B (en) | Partition wall and connecting structure thereof | |
CN111764542A (en) | Assembled indoor partition wall | |
RU2014134178A (en) | METHOD AND SYSTEM FOR BUILDING A BUILDING | |
WO2020012484A2 (en) | Prefabricated construction wall assembly | |
CN106284815A (en) | Furred ceiling clean board construction technique | |
CN108035455B (en) | Modular wood structure wall and assembling method thereof | |
US20050102969A1 (en) | Wall and partition construction and method using hat-channel members | |
CN106193488A (en) | Metope clean board construction technique and metope clean board mounting structure | |
CN111188448B (en) | Unit type adjustable suspended ceiling structure | |
US8800228B2 (en) | Sculpted room system | |
CN205224503U (en) | Prefabricated composite wall panel | |
CN215166847U (en) | Exterior wall system | |
CN216920972U (en) | Connection structure of furred ceiling board and wallboard of whole bathroom | |
CN105401680A (en) | House roof system | |
CN114856188B (en) | Construction method for mounting special-shaped roof | |
CN108179893A (en) | Assembled kitchen and its installation method | |
CN207700454U (en) | It is a kind of can unilateral construction light steel keel partition | |
CN205591394U (en) | Pin -connected panel aluminium system abatvoix wall | |
CN108643466A (en) | A kind of photovoltaic installation system for foam cement composite plate roofing | |
CN220538964U (en) | Assembled partition wall of interchangeable veneer | |
CN220620589U (en) | Skeleton partition wall suitable for steel bearing diagonal | |
CN114109069B (en) | Old community safety transformation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161207 |
|
RJ01 | Rejection of invention patent application after publication |