CN106193253A - A kind of construction method of pipe gallery drainage pipeline - Google Patents

A kind of construction method of pipe gallery drainage pipeline Download PDF

Info

Publication number
CN106193253A
CN106193253A CN201610664522.0A CN201610664522A CN106193253A CN 106193253 A CN106193253 A CN 106193253A CN 201610664522 A CN201610664522 A CN 201610664522A CN 106193253 A CN106193253 A CN 106193253A
Authority
CN
China
Prior art keywords
steel
buttress
construction
chute
drainage pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610664522.0A
Other languages
Chinese (zh)
Other versions
CN106193253B (en
Inventor
李玉磊
钟俊彬
高宇
刘秉祺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201610664522.0A priority Critical patent/CN106193253B/en
Publication of CN106193253A publication Critical patent/CN106193253A/en
Application granted granted Critical
Publication of CN106193253B publication Critical patent/CN106193253B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/46Foundations for supply conduits or other canals

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

It is an object of the present invention to provide a kind of construction method for pipe gallery drainage pipeline, it is characterised in that described construction method comprises the following steps: A, making concrete buttress, reserved back-grouting hole on concrete buttress;B, utilize I-steel and steel construction chute composition arrangement for adjusting height, and the steel structure support being used for fixing drainage pipeline is fixed on this arrangement for adjusting height;C, utilize arrangement for adjusting height that steel structure support is adjusted to the setting height(from bottom) preset, use non-shrinkage concrete to fill between steel structure support and concrete buttress closely knit;D, by fixing steel band, drainage pipeline is arranged on steel structure support.The present invention is by the setting height(from bottom) between regulation I-steel and steel construction chute, it is possible to resolve the constructional difficulties that multiple buttress construction reference, construction error are brought to pipeline construction, improves the safety of pipeline.

Description

A kind of construction method of pipe gallery drainage pipeline
Technical field
The present invention relates to the technical field of pipe gallery drainage pipeline, a kind of pipe gallery drainage pipeline Construction method.
Background technology
In the pipe gallery including drainage pipeline in, drainage pipeline is not fixed relative to position with piping lane base plate, and buttress is arranged Precision requires height, and is difficulty with the standardized construction of buttress or support.Concrete buttress construction error is relatively big, different size Steel structure support there is the problems such as built-in fitting, processing and fixed precision.Multiple buttress construction reference, construction error bring construction Difficulty, may cause pipeline discontinuity simultaneously, affect the safe operation of pipeline.
Summary of the invention
It is an object of the present invention to provide the construction method of a kind of pipe gallery drainage pipeline, on concrete buttress, by setting Put I-steel, steel construction chute, it is achieved standardization steel structure support scalable, thus meet the installation of pipe gallery drainage pipeline Requirement.
To achieve these goals, the technical scheme is that the construction method of a kind of pipe gallery drainage pipeline, its It is characterised by that described construction method comprises the following steps:
A, making concrete buttress, reserved back-grouting hole on concrete buttress;
B, utilize I-steel and steel construction chute composition arrangement for adjusting height, utilize on concrete buttress reserved back-grouting hole This arrangement for adjusting height is installed, and the steel structure support being used for fixing drainage pipeline is fixed on this arrangement for adjusting height;
C, utilize arrangement for adjusting height that steel structure support is adjusted to the setting height(from bottom) preset, steel structure support and concrete buttress Between use non-shrinkage concrete fill closely knit;
D, by fixing steel band, drainage pipeline is arranged on steel structure support.
According to a preferred embodiment of the invention, in step B, arrangement for adjusting height includes I-steel and matches with I-steel Close the steel construction chute arranged, in back-grouting hole reserved on concrete buttress, I-steel is set, and carries out concrete secondary Grouting is fixing, and steel structure support and the steel construction chute arranged that matches with I-steel weld mutually.
According to a preferred embodiment of the invention, concrete buttress has been arranged side by side two back-grouting holes, each secondary Arranging an I-steel in grout hole, steel structure support both sides are all welded with steel construction chute, and every I-steel and steel construction prop up The steel construction chute of frame side connects.
According to a preferred embodiment of the invention, described I-steel includes the edge of a wing, inner side, outer side wing edge and connects inboard wing Edge and the web of outer side wing edge, described steel construction chute includes the substrate welded with steel structure support side, and the two ends of substrate set Being equipped with chute, inside described I-steel, the chute at described steel construction chute two ends is inserted at the two ends on the edge of a wing respectively.
According to a preferred embodiment of the invention, steel construction chute is provided with bolt hole, steel construction chute and I-steel it Between be bolted.
According to a preferred embodiment of the invention, concrete buttress is connected with pipe gallery base plate by embedded bar.
The present invention is on concrete buttress, by arranging I-steel, steel construction chute, it is achieved standardization steel structure support can Regulation, thus meet pipe gallery drainage pipeline requirement is set.The present invention is by between regulation I-steel and steel construction chute Setting height(from bottom), it is possible to resolve multiple buttress construction reference, construction error water supply and sewerage pipeline are constructed the constructional difficulties brought, improve row The safety of waterpipe.
Accompanying drawing explanation
Fig. 1 is the structural representation of present example.
Fig. 2 is I-I profile in Fig. 1.
Fig. 3 is II-II profile in Fig. 1.
Detailed description of the invention
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
The present invention is the construction method of a kind of pipe gallery drainage pipeline, it is characterised in that described construction method includes following Step: A, making concrete buttress 1, reserved back-grouting hole 2 on concrete buttress 1;B, utilize I-steel and steel construction sliding Groove composition arrangement for adjusting height, and the steel structure support 5 being used for fixing drainage pipeline is fixed on this arrangement for adjusting height;C、 Utilize arrangement for adjusting height steel structure support 5 is adjusted to the setting height(from bottom) preset, steel structure support 5 and concrete buttress 1 it Between use non-shrinkage concrete 8 fill closely knit;D, by fixing steel band 9, drainage pipeline 10 is arranged on steel structure support 5.
According to a preferred embodiment of the invention, on concrete buttress 1, reserved attachment structure is reserved on concrete buttress Back-grouting hole 2, arrangement for adjusting height includes I-steel 3 and the steel construction chute 4 arranged that matches with I-steel 3, coagulation I-steel 3 is set in back-grouting hole 2 reserved on soil buttress 1, and carries out concrete seven back-grouting and fix, steel structure support 5 And the steel construction chute 4 phase welding arranged that matches with I-steel 3.
Fig. 1, Fig. 2 and Fig. 3 show by the present invention make for pipe gallery drainage pipeline buttress.Concrete buttress 1 is connected with pipe gallery base plate 11 by embedded bar, reserved two back-grouting holes 2 on concrete buttress 1;Each secondary fills Slurry hole 2 is fixed an I-steel 3, and uses non-shrinkage concrete 7 to fill real;Steel construction chute 4 and steel knot with bolt hole Structure support 5 welds;I-steel 3 both sides flange plate is inserted in the chute at steel construction chute 4 two ends, adjusts size B with satisfied row Waterpipe designed elevation, uses fixing bolt 6 to tighten fixing between I-steel 3 and steel construction chute 4;Steel structure support 5 He Non-shrinkage concrete 8 is used to fill closely knit between concrete buttress 1;After non-shrinkage concrete Final 8 degree is formed, utilize fixing steel band 9 fix a drainpipe 10.Arranging two boss on steel structure support 5, arrange support seat between two boss, drainage pipeline 10 is put Putting in the bearing between two boss, fixing steel band 9 is wound on the outside of drainage pipeline 10, and the two ends of fixing steel band 9 are fixed On the boss of steel structure support 5.
According to a preferred embodiment of the invention, described I-shaped 3 ladle includes the edge of a wing, inner side, outer side wing edge and connects inboard wing Edge and the web of outer side wing edge, described steel construction chute 4 includes the substrate welded with steel structure support side, the two ends court of substrate Being provided with chute in outward direction, inside described I-steel, the cunning at described steel construction chute two ends is inserted at the two ends on the edge of a wing respectively Groove.
In figure, A is the height of concrete buttress 1, and B is the height bottom drainage pipeline 10 to concrete buttress 1 top, and C is To the height of pipe gallery base plate 11 bottom drainage pipeline 10.
Above content is to combine concrete preferred implementation further description made for the present invention, it is impossible to assert The present invention is embodied as being confined to these explanations above-mentioned.For general technical staff of the technical field of the invention, Without departing from the inventive concept of the premise, it is also possible to make some simple deduction or replace, all should be considered as belonging to the present invention Protection domain.

Claims (6)

1. the construction method of a pipe gallery drainage pipeline, it is characterised in that described construction method comprises the following steps:
A, making concrete buttress, reserved back-grouting hole on concrete buttress;
B, utilize I-steel and steel construction chute composition arrangement for adjusting height, utilize on concrete buttress reserved back-grouting hole This arrangement for adjusting height is installed, and the steel structure support being used for fixing drainage pipeline is fixed on this arrangement for adjusting height;
C, utilize arrangement for adjusting height that steel structure support is adjusted to the setting height(from bottom) preset, steel structure support and concrete buttress Between use non-shrinkage concrete fill closely knit;
D, by fixing steel band, drainage pipeline is arranged on steel structure support.
A kind of construction method for pipe gallery drainage pipeline buttress, it is characterised in that: step In B, arrangement for adjusting height includes I-steel and the steel construction chute arranged that matches with I-steel, reserved on concrete buttress Back-grouting hole in I-steel is set, and it is fixing to carry out concrete secondary grouting, steel structure support and matching with I-steel The steel construction chute arranged welds mutually.
A kind of construction method for pipe gallery drainage pipeline buttress, it is characterised in that: coagulation It is arranged side by side two back-grouting holes on soil buttress, an I-steel, steel structure support two have been set in each back-grouting hole Side is all welded with steel construction chute, and the steel construction chute of every I-steel and steel structure support side connects.
A kind of construction method for pipe gallery drainage pipeline buttress, it is characterised in that: described I-steel includes the edge of a wing and the web of outer side wing edge inside the edge of a wing, inner side, outer side wing edge and connection, described steel construction chute bag Including the substrate welded with steel structure support side, the two ends of substrate are provided with chute, and inside described I-steel, the two ends on the edge of a wing are divided Do not insert the chute at described steel construction chute two ends.
A kind of construction method for pipe gallery drainage pipeline buttress, it is characterised in that: steel is tied It is provided with bolt hole on structure chute, is bolted between steel construction chute and I-steel.
A kind of construction method for pipe gallery drainage pipeline buttress, it is characterised in that: coagulation Soil buttress is connected with pipe gallery base plate by embedded bar.
CN201610664522.0A 2016-08-15 2016-08-15 Construction method of comprehensive pipe gallery drainage pipeline Active CN106193253B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610664522.0A CN106193253B (en) 2016-08-15 2016-08-15 Construction method of comprehensive pipe gallery drainage pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610664522.0A CN106193253B (en) 2016-08-15 2016-08-15 Construction method of comprehensive pipe gallery drainage pipeline

Publications (2)

Publication Number Publication Date
CN106193253A true CN106193253A (en) 2016-12-07
CN106193253B CN106193253B (en) 2021-06-25

Family

ID=57514407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610664522.0A Active CN106193253B (en) 2016-08-15 2016-08-15 Construction method of comprehensive pipe gallery drainage pipeline

Country Status (1)

Country Link
CN (1) CN106193253B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759385A (en) * 2017-01-16 2017-05-31 温州市龙湾大地绿化有限公司 Municipal drainage pipeline pit supporting construction
CN107795755A (en) * 2017-10-11 2018-03-13 江苏士林电气设备有限公司 A kind of piping lane support for being easy to firm installation
CN109914571A (en) * 2019-03-20 2019-06-21 湖南建工集团有限公司 A kind of basement drainage ditch formwork system, casting system and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201908447U (en) * 2010-12-10 2011-07-27 中建六局第三建筑工程有限公司 Lift-type horizontal safety net
CN202580316U (en) * 2012-05-18 2012-12-05 中国水电顾问集团贵阳勘测设计研究院 Saddle support for water-diversion exposed pipe
CN202790919U (en) * 2012-09-12 2013-03-13 北京城建设计研究总院有限责任公司 Adjustable pipeline fixing support for underground tunnels
US8671627B2 (en) * 2009-07-28 2014-03-18 Frederick S. Marshall System for forming a movable slab foundation
CN104452810A (en) * 2014-11-27 2015-03-25 中国二十冶集团有限公司 Device and method for installing pipeline supporting pier in pipe ditch
CN204266225U (en) * 2014-11-12 2015-04-15 铜陵有色金属集团铜冠建筑安装股份有限公司 A kind of standard device installs parallels pre-embedded device
CA2942828A1 (en) * 2014-03-28 2015-10-01 Public Joint Stock Company "Transneft" Stationary pipeline support
CN105781569A (en) * 2016-03-28 2016-07-20 北京市政建设集团有限责任公司 Large-diameter shield tunnel comprehensive pipe gallery and construction method thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8671627B2 (en) * 2009-07-28 2014-03-18 Frederick S. Marshall System for forming a movable slab foundation
CN201908447U (en) * 2010-12-10 2011-07-27 中建六局第三建筑工程有限公司 Lift-type horizontal safety net
CN202580316U (en) * 2012-05-18 2012-12-05 中国水电顾问集团贵阳勘测设计研究院 Saddle support for water-diversion exposed pipe
CN202790919U (en) * 2012-09-12 2013-03-13 北京城建设计研究总院有限责任公司 Adjustable pipeline fixing support for underground tunnels
CA2942828A1 (en) * 2014-03-28 2015-10-01 Public Joint Stock Company "Transneft" Stationary pipeline support
CN204266225U (en) * 2014-11-12 2015-04-15 铜陵有色金属集团铜冠建筑安装股份有限公司 A kind of standard device installs parallels pre-embedded device
CN104452810A (en) * 2014-11-27 2015-03-25 中国二十冶集团有限公司 Device and method for installing pipeline supporting pier in pipe ditch
CN105781569A (en) * 2016-03-28 2016-07-20 北京市政建设集团有限责任公司 Large-diameter shield tunnel comprehensive pipe gallery and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759385A (en) * 2017-01-16 2017-05-31 温州市龙湾大地绿化有限公司 Municipal drainage pipeline pit supporting construction
CN107795755A (en) * 2017-10-11 2018-03-13 江苏士林电气设备有限公司 A kind of piping lane support for being easy to firm installation
CN107795755B (en) * 2017-10-11 2019-08-13 江苏士林电气设备有限公司 A kind of piping lane bracket convenient for firm installation
CN109914571A (en) * 2019-03-20 2019-06-21 湖南建工集团有限公司 A kind of basement drainage ditch formwork system, casting system and construction method

Also Published As

Publication number Publication date
CN106193253B (en) 2021-06-25

Similar Documents

Publication Publication Date Title
CN106193253A (en) A kind of construction method of pipe gallery drainage pipeline
EP2653629A1 (en) Mounting base
CN105544587B (en) The construction method of tower crane is fixed using combined type foundation for tower crane
CN104482299B (en) A kind of underground utilities box culvert
CN107022947A (en) A kind of pre-buried shaped steel carvel joint bolt type connection locator of the prefabricated arch rib of concrete segment and its construction method
CN103243815A (en) End-anchored composite beam structure and corresponding reinforcing construction method
CN106978818A (en) Connecting assembly, wind generating set foundation and manufacturing method thereof
CN108005401A (en) A kind of support and change method of the column of existing frame structure base isolation reinforcement
CN106245526A (en) The splicing structure of mining under railways protecting wall, straight wall and shield and construction method
CN106436972A (en) Prefabricated PCFexternal wall board with window frame and installing method thereof
CN106088143A (en) A kind of construction method for pipe gallery drainage pipeline buttress
CN105040989B (en) Anchor and its construction method for anchoring prefabricated superimposed sheet and prefabricated components
CN106836829B (en) A kind of mounting structure and its installation method of ring crane corbel
CN105256896B (en) It is a kind of to be used for Side fascia and the metal connecting piece of agent structure
CN209704585U (en) A kind of built-in slip casting pipe for shield tunnel
CN109440544A (en) A kind of track girder and the connection structure of shield duct piece and attaching method thereof
CN106049644A (en) Detection boring rapid restoration support mould apparatus for concrete drain pipe culvert and restoration method thereof
CN209243470U (en) A kind of connection structure of track girder and shield duct piece
CN106567538B (en) A kind of positioning mold of toilet concrete flanging
CN106192608B (en) A kind of coke oven coke-pusher machine track foundation construction method
CN208949920U (en) Single side formwork system
CN205975663U (en) A buttress adjusting device for utility tunnel drainage pipe
CN206070561U (en) A kind of buttress for pipe gallery drainage pipeline
CN206034199U (en) Coke oven coke pusher rail foundation structure
CN206591451U (en) A kind of positioner installed for vertical reinforcement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant