CN106193100B - A kind of installation method of large-scale impingement type hydraulic generator group casing - Google Patents
A kind of installation method of large-scale impingement type hydraulic generator group casing Download PDFInfo
- Publication number
- CN106193100B CN106193100B CN201610577413.5A CN201610577413A CN106193100B CN 106193100 B CN106193100 B CN 106193100B CN 201610577413 A CN201610577413 A CN 201610577413A CN 106193100 B CN106193100 B CN 106193100B
- Authority
- CN
- China
- Prior art keywords
- casing
- flange face
- stent
- installation method
- well type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention discloses a kind of installation method of large-scale impingement type hydraulic generator group casing, it is desirable to provide a kind of installation method of the fast large-scale impingement type hydraulic generator group casing of installation speed.It its comprise the following steps:(1)Casing and steady boom girder are assembled, positioning is then supported casing using section steel manufacture well type stent, the lower end of stent is supported on steady boom girder and is fixedly connected with steady boom girder, and upper end is contacted with the flange face of casing;And setting strut to carry out reinforcing support to casing in well type frame upper, well type stent and the contact position of strut and casing are welded;(2)After the completion for the treatment of cabinet supports positioning, concreting is carried out;(3)After the completion of concreting, well type stent and its strut on steady boom girder are removed, with the levelness in the spirit level measurement casing upper flange face with micrometer head, micro grinding process is carried out to the flange face for being unsatisfactory for requiring.The present invention is suitable for installing and using for all kinds of large vertical water turbine machines.
Description
Technical field
The present invention relates to hydro-electric power generating equipment installing engineering technical field, is sent out more particularly, to a kind of large-scale impulse water wheel
The installation method of motor group casing.
Background technology
The flange face on casing top is the pedestal for carrying impact type unit water pilot bearing, and use divides valve to transport more, live group
Concreting is carried out after dress, welding, adjustment.Since the flange face on casing top is the basis of water pilot bearing, water is directly affected
Guide bearing installation quality, so the requirement of its levelness needs to meet:≦0.04mm/m.In actual installation process, on casing
The flange face in portion need to carry out concreting after the completion of assembled before concreting, welding, adjustment, reinforcing, and concrete pours
The levelness of the flange face on casing top to adjusting is produced into considerable influence when building, therefore, to casing before concreting
Reinforcing and concreting after the construction method of processing to the flange face on casing top directly affect the installation quality of unit.
In recent years, as the continuous developing in South America water power market, the installation number of high water head impact type unit gradually increase.Traditional side
Method is substantially after concreting, and the flange face on casing top is reprocessed using lathe scene.
The content of the invention
The present invention overcomes in the prior art the shortcomings that, there is provided a kind of installation speed is fast, and installation accuracy is high and follow-up adjusts
The installation method of whole impingement type hydraulic generator group casing large-scale easily and fast.
In order to solve the above-mentioned technical problem, the present invention is achieved by the following technical solutions:
A kind of installation method of large-scale impingement type hydraulic generator group casing, it comprises the following steps:
(1) casing and steady boom girder are assembled, and the both ends of steady boom girder are poured in base concrete,
After casing and the assembling in place of steady boom girder, precision adjustment is carried out to the center of casing flange face, elevation, horizontal level, so
Positioning is supported casing using section steel manufacture well type stent afterwards, the lower end of stent be supported on steady boom girder and with steady water
Grid girder is fixedly connected, and upper end is contacted with the flange face of casing;And strut is set to reinforce casing in well type frame upper
Support, well type stent and the contact position of strut and casing are welded;
(2) after the completion for the treatment of cabinet supports positioning, carry out concreting, in casting process, concrete need uniformly, it is symmetrical under
Material, is aided with the flange face deflection on dial gauge monitoring casing top, adjusts concrete discharging orientation and speed in time;
(3) after the completion of concreting, well type stent and its strut on steady boom girder are removed, with the water with micrometer head
The levelness in quasi- instrument measurement casing upper flange face, micro grinding process is carried out to the flange face for being unsatisfactory for requiring.
Preferably, the perpendicular support that the strut includes support machine casing top bevel and lower end is overlapped with cabinet sides, with
And the horizontal support of support machine casing top adjacent bevel surfaces;The horizontal support two is one group, is connected by connecting rod with well type stent,
The perpendicular supporting welding is in horizontal support.
Preferably, the well type stent is made of the welding of 200 ㎜ I-steel.
Preferably, the steady boom girder is made of the welding of 280 ㎜ I-steel.
Preferably, the strut uses 160 ㎜ I-steel.
Compared with prior art, the invention has the advantages that:
1st, the present invention can effectively increase construction efficiency, accelerate construction progress, and shorten the duration of construction.
2nd, the present invention substantially reduces deformation of sedimentation of the casing in concreting process, effectively reduces installation wind
Danger.On the other hand, deflection diminish without using lathe reprocess, reduce Work tool input cost, effectively increase through
Ji benefit, has especially saved purchase, the cost of transportation of the Work tool of overseas project.
3rd, installation method of the invention has low cost, speed of application is fast, cost savings are notable, is impact type machine at home and abroad
Group installation provides the characteristics of convenient.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is attached drawing needed in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also
To obtain other attached drawings according to these attached drawings.
Fig. 1 is sectional schematic diagram when being installed with the present invention, wherein not installing well type stent.
Fig. 2 is sectional schematic diagram when being poured with the present invention.
Fig. 3 is the assembling schematic diagram of casing and well type stent.
Fig. 4 is the top view of well type stent.
In figure:The flange face on 1-casing top, 2-casing inclined plate, 3-housing side wall, 4-steady boom girder, 5-match somebody with somebody
Water ring pipe, 6-well type stent, the perpendicular support between 7-casing inclined plate and housing side wall, between 8-casing inclined plate and casing inclined plate
Horizontal support, 9-concrete.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of not making the creative labor
Embodiment, belongs to the scope of protection of the invention.
A kind of installation method of large-scale impingement type hydraulic generator group casing, as shown in Figs. 1-2, it comprises the following steps:
(1) casing and steady boom girder are assembled, and the both ends of steady boom girder are poured in base concrete,
After casing and the assembling in place of steady boom girder, precision adjustment is carried out to the center of casing flange face, elevation, horizontal level, so
Positioning is supported casing using section steel manufacture well type stent (as shown in Figure 3,4) afterwards, the lower end of stent is supported in steady boom
It is fixedly connected on girder and with steady boom girder, upper end is contacted with the flange face of casing;And strut is set in well type frame upper
Reinforcing support is carried out to casing, well type stent and the contact position of strut and casing are welded;
(2) after the completion for the treatment of cabinet supports positioning, carry out concreting, in casting process, concrete need uniformly, it is symmetrical under
Material, is aided with the flange face deflection on dial gauge monitoring casing top, adjusts concrete discharging orientation and speed in time;
(3) after the completion of concreting, well type stent and its strut on steady boom girder are removed, with the water with micrometer head
The levelness in quasi- instrument measurement casing upper flange face, micro grinding process is carried out to the flange face for being unsatisfactory for requiring.
Wherein, the perpendicular support that the strut includes support machine casing top bevel and lower end is overlapped with cabinet sides, Yi Jizhi
Support the horizontal support of cabinet top adjacent bevel surfaces;The horizontal support two is one group, is connected by connecting rod with well type stent, described
Perpendicular supporting welding is in horizontal support.
Wherein, the well type stent is made of the welding of 200 ㎜ I-steel.
Wherein, the steady boom girder is made of the welding of 280 ㎜ I-steel.
Wherein, the strut uses 160 ㎜ I-steel.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention
With within principle, any modification, equivalent replacement, improvement and so on, should all be included in the protection scope of the present invention god.
Claims (5)
1. a kind of installation method of large-scale impingement type hydraulic generator group casing, it is characterised in that comprise the following steps:
(1)Casing and steady boom girder are assembled, and the both ends of steady boom girder are poured in base concrete, it is standby
After shell and the assembling in place of steady boom girder, precision adjustment is carried out to the center of casing flange face, elevation, horizontal level, is then adopted
Be supported positioning to casing with section steel manufacture well type stent, the lower end of stent be supported on steady boom girder and with steady boom master
Beam is fixedly connected, and upper end is contacted with the flange face of casing;And set strut to carry out reinforcing support to casing in well type frame upper,
The contact position of well type stent and strut and casing is welded;
(2)After the completion for the treatment of cabinet supports positioning, concreting is carried out, in casting process, concrete needs uniform, symmetrical blanking,
It is aided with the flange face deflection on dial gauge monitoring casing top, adjusts concrete discharging orientation and speed in time;
(3)After the completion of concreting, well type stent and its strut on steady boom girder are removed, with the spirit level with micrometer head
The levelness in casing upper flange face is measured, micro grinding process is carried out to the flange face for being unsatisfactory for requiring.
2. the installation method of large-scale impingement type hydraulic generator group casing according to claim 1, it is characterised in that:The support
Bar includes support machine casing top bevel and lower end and the perpendicular support of cabinet sides overlap joint, and adjacent bevel surfaces at the top of support machine casing
Horizontal support;The horizontal support two is one group, is connected by connecting rod with well type stent, the perpendicular supporting welding is in horizontal support
On.
3. the installation method of large-scale impingement type hydraulic generator group casing according to claim 1 or claim 2, it is characterised in that:Institute
Well type stent is stated to be made of the welding of 200 ㎜ I-steel.
4. the installation method of large-scale impingement type hydraulic generator group casing according to claim 3, it is characterised in that:It is described steady
Boom girder is made of the welding of 280 ㎜ I-steel.
5. the installation method of large-scale impingement type hydraulic generator group casing according to claim 4, it is characterised in that:The support
Bar uses 160 ㎜ I-steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610577413.5A CN106193100B (en) | 2016-07-21 | 2016-07-21 | A kind of installation method of large-scale impingement type hydraulic generator group casing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610577413.5A CN106193100B (en) | 2016-07-21 | 2016-07-21 | A kind of installation method of large-scale impingement type hydraulic generator group casing |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106193100A CN106193100A (en) | 2016-12-07 |
CN106193100B true CN106193100B (en) | 2018-05-04 |
Family
ID=57492007
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610577413.5A Active CN106193100B (en) | 2016-07-21 | 2016-07-21 | A kind of installation method of large-scale impingement type hydraulic generator group casing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106193100B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59210127A (en) * | 1983-05-14 | 1984-11-28 | Toshiba Corp | Housing structure for installing turbine power generator |
CN101476330A (en) * | 2009-01-24 | 2009-07-08 | 中国建筑第二工程局有限公司 | Thick and large-volume concrete elastic base and construction method thereof |
CN103572774A (en) * | 2012-07-25 | 2014-02-12 | 中国二十冶集团有限公司 | Leveling ruler flat underboarding mortar bedding method |
CN104100437A (en) * | 2014-06-26 | 2014-10-15 | 中国葛洲坝集团股份有限公司 | Lower bracket mounting foundation positioning device and method of hydroelectric generating set |
-
2016
- 2016-07-21 CN CN201610577413.5A patent/CN106193100B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59210127A (en) * | 1983-05-14 | 1984-11-28 | Toshiba Corp | Housing structure for installing turbine power generator |
CN101476330A (en) * | 2009-01-24 | 2009-07-08 | 中国建筑第二工程局有限公司 | Thick and large-volume concrete elastic base and construction method thereof |
CN103572774A (en) * | 2012-07-25 | 2014-02-12 | 中国二十冶集团有限公司 | Leveling ruler flat underboarding mortar bedding method |
CN104100437A (en) * | 2014-06-26 | 2014-10-15 | 中国葛洲坝集团股份有限公司 | Lower bracket mounting foundation positioning device and method of hydroelectric generating set |
Also Published As
Publication number | Publication date |
---|---|
CN106193100A (en) | 2016-12-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101956457B (en) | Method for constructing rectangular steel pipe concrete column | |
CN102029473B (en) | Aerological welding method of steel sleeve | |
CN105821769A (en) | Large-angle inclined leg pier pouring construction method | |
CN106759457A (en) | The installation method of cantilever design high-accuracy built-in fitting | |
CN105604183A (en) | Construction method of rear welded joints of a truss | |
CN101695804A (en) | Precise processing technology for split dismantling type steel structural parts | |
CN101476330B (en) | Thick and large-volume concrete elastic base and construction method thereof | |
CN208733666U (en) | A kind of fixing bolt preformed hole template tool | |
CN106193100B (en) | A kind of installation method of large-scale impingement type hydraulic generator group casing | |
CN108214824A (en) | Tower method for manufacturing component, tower component and the method for building tower | |
CN103341706B (en) | A kind of 300 feet of pile legs of self-elevating drilling platform structure jig frame specials | |
CN100510296C (en) | High precision mounting construction method of super sized iron piece | |
CN203846403U (en) | Assembled type ashore temporary buttress device | |
CN106271404A (en) | A kind of manufacture method of large-scale Water distribution circular pipe | |
CN201381517Y (en) | Concrete elastic base for supporting large-scale gas turbine generator | |
CN213896816U (en) | Y-shaped support frame | |
CN109440564A (en) | A kind of construction site assembled road | |
CN104153386B (en) | Pile foundation support table periphery facade bed course tool-type punching block and construction method thereof | |
CN211547741U (en) | Height-adjustable internal support cutting split heads | |
CN204078040U (en) | A kind of jig frame special manufacturing marine stern axle tube segmentation | |
CN209338940U (en) | A kind of construction site assembled road | |
CN201129274Y (en) | Apparatus for split jointing wind power generator tower cylinder bodies | |
CN110952448A (en) | Construction method of steel shell concrete combined cable tower | |
CN206732438U (en) | A kind of steel structure bridge support frame | |
CN201679228U (en) | Shell support steel mould structure of hydraulic power plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |