CN106193093B - Rim of a cup foundation forms is reinforced and hydraulic pressure construction process for removing - Google Patents

Rim of a cup foundation forms is reinforced and hydraulic pressure construction process for removing Download PDF

Info

Publication number
CN106193093B
CN106193093B CN201610719119.3A CN201610719119A CN106193093B CN 106193093 B CN106193093 B CN 106193093B CN 201610719119 A CN201610719119 A CN 201610719119A CN 106193093 B CN106193093 B CN 106193093B
Authority
CN
China
Prior art keywords
template
cup
rim
concrete
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610719119.3A
Other languages
Chinese (zh)
Other versions
CN106193093A (en
Inventor
郑建国
孙兆岐
吕兆旭
王卫政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongqi Jiaojian Group Corp Ltd
Original Assignee
Zhongqi Jiaojian Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongqi Jiaojian Group Corp Ltd filed Critical Zhongqi Jiaojian Group Corp Ltd
Priority to CN201610719119.3A priority Critical patent/CN106193093B/en
Publication of CN106193093A publication Critical patent/CN106193093A/en
Application granted granted Critical
Publication of CN106193093B publication Critical patent/CN106193093B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of reinforcing of rim of a cup foundation forms and hydraulic pressure construction process for removing, include the following steps:(One)Preparation of construction;(Two)Template construct;(Three)Template construction;(Four)Concreting;(Five)Form removable;(Six)Template is cleared up.Beneficial effects of the present invention:The construction technology is swift to operate, easy, and the scene of can reducing repeats to install the cumbersome process such as reinforcing;Prove that prefabricated rim of a cup template is used in turn up to ten times or more through using;The template is made of finished product prefabrication system, strictly controls construction quality in manufacturing process, template self stability is strong.

Description

Rim of a cup foundation forms is reinforced and hydraulic pressure construction process for removing
Technical field
The present invention relates to a kind of reinforcing of rim of a cup foundation forms and hydraulic pressure construction process for removing, belong to building construction technology neck Domain.
Background technology
With the extensive use of steel construction under construction, steel structure member batch production, industrialization production substantially reduce work The journey duration, and the traditional construction method of concrete foundation cushion cap rim of a cup template is an important factor for influencing duration, construction quality, for passing The template installation of system reinforces, removes way, and main problem is that construction technology is cumbersome, the bad control of rim of a cup template position, and difficult To be used in turn, duration progress is influenced, effectively to solve above construction problem of cushion cap rim of a cup template, concrete cushion cap rim of a cup template It reinforces and hydraulic pressure removes the construction being used in turn and starts to be widely applied in engineering.The tradition of rim of a cup foundation forms is applied Work engineering method is that Assembling installs after reinforcing bar binding, but because rim of a cup space is small and has certain depth after concrete placings, it is difficult to tear open Mould, be construction personnel very headache the problem of, and template cannot reuse, and cause great waste of material.
Invention content
The technical problem to be solved by the present invention is to:A kind of rim of a cup foundation forms is provided to reinforce and hydraulic pressure Demolition Construction work Skill.
In order to solve the above technical problems, the technical solution adopted by the present invention is:
Rim of a cup foundation forms provided by the invention is reinforced and hydraulic pressure construction process for removing, includes the following steps:
(1) preparation of construction
Preparation of construction:Drawing is checked, calculation template dosage draws template blanking figure, purchases template and consumables associated therewith, establishment Scheme trains and tells somebody what one's real intentions are.
1) according to the template construct drawing blanking of drafting
Whole rim of a cup template is processed, 50 × 5mm galvanized angle iron bound edges must be used at external corner, in galvanized angle iron bound edge and mould Plate contact surface uniformly smears fluid sealant, prevents concrete slurry from immersing, and influences concrete surface perception and generates form removal resistance.
2) rim of a cup template is higher 300mm than cushion cap concrete, is spudding in Φ's 60 with hole making drill from rim of a cup template top 100mm Construction hole, uses when being removed so as to reinforcing template.
(2) template construct
1) when template is processed, stitching portion adds the lumps of wood to be reinforced as interior village, and lumps of wood support, plane are added along rim of a cup high uniformity Diagonal brace is reinforced, and per pass lumps of wood spacing is not more than 300mm.
2) it is spudded in 5 by plum blossom-shaped using 20 hole making drills of Φ in the bottom of rim of a cup template and is vented hole.Because when pouring concrete It need to be poured in rim of a cup surrounding annular and be easy to accumulate water and air in rim of a cup bottom, such as no hole easily causes rim of a cup bottom concrete and occurs Honeycomb, and when rim of a cup template Integral type hydraulic lifting, because lower seal space is also easy to produce siphonage, cause rim of a cup to be promoted tired Difficulty, reserved air hole thoroughly solve the problems, such as this.
3) 2 hydraulic supports are welded with 10# I-steel, flange beam stand length is the same as rim of a cup template width suitable for reading, round steel U-shaped Ring center is concentric with 60 holes of Φ above rim of a cup.
(3) template construction
1) after the completion of foundation platform surrounding formwork erection, can mounting cup mouth template, installation before in rim of a cup template four sides Heart position is up and down with ink fountain pop-up center line convenient for the installation correction of rim of a cup template, and flat place fixes two in rim of a cup template depth 60 × 80 lumps of wood, the lumps of wood is than foundation platform per elongated segment 200mm.
2) after the completion of cushion cap surrounding formwork erection is reinforced, handle cup mouth template is hung in cushion cap center according to basic baseline and cup Mouth center line is fallen using line and the marker of infrared ray proofreads position, and the lumps of wood of rim of a cup both sides is fixed on iron nail after calibration and is held In platform template.
3) after rim of a cup Template Location with 48 reinforcing bars of Φ on the upside of the rim of a cup, reserve and passed through in circular hole and cushion cap formwork reinforcement steel pipe It is connected with fastener, it is ensured that rim of a cup template does not deviate when pouring concrete, non-rising.
(4) concreting
Annular it must pour centered on rim of a cup when concrete placings and pour concrete thickness every time and cannot be more than 500mm, Yi Mianyin Slump is flowed, and rim of a cup displacement is caused.
(5) form removable
After the completion of concrete placings, waits for that concrete initial set is completed, the fastener and the lumps of wood for being fixed on rim of a cup are removed, two pieces of 50mm are taken Thick plank is placed on rim of a cup both sides, and both ends are placed in the template of cushion cap periphery, when preventing hydraulic jack from promoting rim of a cup template, causes Concrete damages around rim of a cup, and the flange beam stand being welded is placed on 48 steel pipes of rim of a cup both sides Φ, and rim of a cup is run through from round steel U-loop Template takes four 3-5T hydraulic jacks to be placed in below holder, and bottom is placed on plank widthwise central, by after the completion of putting by four Worker pressurizes to jack simultaneously, and 4 points are wanted uniform and stable to pressurize, and template is slowly promoted, and waits for that template is promoted to 10 centimetres or so When, illustrate that rim of a cup template is completely disengaged with concrete, can stop being promoted, is sling using tower crane or the direct handle cup mouth template of crane.
(6) template is cleared up
It is after rim of a cup template is split out, removing surface is clean and dry.Brushing releasing agent when re-using can continue to have enough to meet the need It uses.
Concrete described in step (4) template construction includes the ingredient of following parts by weight:100 parts of cement, water 60- 90 parts, 30-40 parts of flyash, 12-26 parts of basalt fibre, 8-16 parts of kaolin, 5-14 parts of quartz sand, ethyl methacrylate 14-23 parts, 16-24 parts of acrylic resin, 15-27 parts of isocyanates.
The preparation method of the concrete, includes the following steps:
(1), first it is made to be uniformly mixed cement, water, flyash, basalt fibre stirring, 60-80 DEG C of whipping temp stirs Mix 30-40min.
(2), so that it is uniformly mixed kaolin, quartz sand, acrylic resin stirring, be then added into step (1) and obtain To blending ingredients in, stirring make its be uniformly mixed.
(3), ethyl methacrylate, isocyanates are added in the blending ingredients that step (2) obtains, stirring makes its mixing Uniformly, 90-100 DEG C of whipping temp, 20-40min is to get concrete for stirring.
Beneficial effects of the present invention:
Constructing operation is simple:Using the construction technology, the scene of can reducing repeats to install the cumbersome process such as reinforcing, it is only necessary to carry Material is saved in preceding preformed cups mouth template, recycling.Thoroughly solve because cup mouth size is small, when form removable time-consuming and laborious difficulty Topic.
It is repeatable to utilize:It proves that prefabricated rim of a cup template is used in turn up to ten times or more through using, solves former rim of a cup The traditional construction way that template is removed, installed again one by one, has saved a large amount of templates.Manpower and materials are saved, cost is reduced Accelerate the progress of construction.
Reliable construction quality:The template is made of finished product prefabrication system, and construction quality, mould are strictly controlled in manufacturing process Plate self stability is strong.It can ensure that damaged degree is minimum in work progress.It ensure that the construction quality on rim of a cup basis.
Description of the drawings
Fig. 1 is bottom plate aperture position schematic diagram.
Fig. 2 is Template Location schematic diagram.
Fig. 3 is that template fixes schematic diagram.
Fig. 4 is formwork reinforcement schematic diagram.
Fig. 5 is that hydraulic top fixes elevation.
Specific implementation mode
Embodiment 1
Rim of a cup foundation forms provided in this embodiment is reinforced and hydraulic pressure construction process for removing, includes the following steps:
(1) preparation of construction
Preparation of construction:Drawing is checked, calculation template dosage draws template blanking figure, purchases template and consumables associated therewith, establishment Scheme trains and tells somebody what one's real intentions are.
1) according to the template construct drawing blanking of drafting
Whole rim of a cup template is processed, 50 × 5mm galvanized angle iron bound edges must be used at external corner, in galvanized angle iron bound edge and mould Plate contact surface uniformly smears fluid sealant, prevents concrete slurry from immersing, and influences concrete surface perception and generates form removal resistance.
2) rim of a cup template is higher 300mm than cushion cap concrete, is spudding in Φ's 60 with hole making drill from rim of a cup template top 100mm Construction hole, uses when being removed so as to reinforcing template.
(2) template construct
1) when template is processed, stitching portion adds the lumps of wood to be reinforced as interior village, and lumps of wood support, plane are added along rim of a cup high uniformity Diagonal brace is reinforced, and per pass lumps of wood spacing is not more than 300mm.
2) it is spudded in 5 by plum blossom-shaped using 20 hole making drills of Φ in the bottom of rim of a cup template and is vented hole (as shown in Figure 1).Cause It need to be poured in rim of a cup surrounding annular when pouring concrete and be easy to accumulate water and air in rim of a cup bottom, such as no hole easily causes rim of a cup There is honeycomb in bottom concrete, and when rim of a cup template Integral type hydraulic lifting, because lower seal space is also easy to produce siphonage, causes cup Mouth promotes difficulty, and reserved air hole thoroughly solves the problems, such as this.
3) 2 hydraulic supports are welded with 10# I-steel, flange beam stand length is the same as rim of a cup template width suitable for reading, round steel U-shaped Ring center is concentric with 60 holes of Φ above rim of a cup.
(3) template construction
1) after the completion of foundation platform surrounding formwork erection, can mounting cup mouth template, installation before in rim of a cup template four sides Heart position is up and down with ink fountain pop-up center line convenient for the installation correction of rim of a cup template, and flat place fixes two in rim of a cup template depth 60 × 80 lumps of wood, the lumps of wood is than foundation platform per elongated segment 200mm.As shown in Figure 2.
2) after the completion of cushion cap surrounding formwork erection is reinforced, handle cup mouth template is hung in cushion cap center according to basic baseline and cup Mouth center line is fallen using line and the marker of infrared ray proofreads position, and the lumps of wood of rim of a cup both sides is fixed on iron nail after calibration and is held In platform template.As shown in Figure 3.
3) after rim of a cup Template Location with 48 reinforcing bars of Φ on the upside of the rim of a cup, reserve and passed through in circular hole and cushion cap formwork reinforcement steel pipe It is connected with fastener, it is ensured that rim of a cup template does not deviate when pouring concrete, non-rising.As shown in Figure 4.
(4) concreting
Annular it must pour centered on rim of a cup when concrete placings and pour concrete thickness every time and cannot be more than 500mm, Yi Mianyin Slump is flowed, and rim of a cup displacement is caused.
(5) form removable
After the completion of concrete placings, waits for that concrete initial set is completed, the fastener and the lumps of wood for being fixed on rim of a cup are removed, two pieces of 50mm are taken Thick plank is placed on rim of a cup both sides, and both ends are placed in the template of cushion cap periphery, when preventing hydraulic jack from promoting rim of a cup template, causes Concrete damages around rim of a cup, and the flange beam stand being welded is placed on 48 steel pipes of rim of a cup both sides Φ, and rim of a cup is run through from round steel U-loop Template takes four 3-5T hydraulic jacks to be placed in below holder, and bottom is placed on plank widthwise central, by after the completion of putting by four Worker pressurizes to jack simultaneously, and 4 points are wanted uniform and stable to pressurize, and template is slowly promoted, and waits for that template is promoted to 10 centimetres or so When, illustrate that rim of a cup template is completely disengaged with concrete, can stop being promoted, is sling using tower crane or the direct handle cup mouth template of crane. As shown in Figure 5.
(6) template is cleared up
It is after rim of a cup template is split out, removing surface is clean and dry.Brushing releasing agent when re-using can continue to have enough to meet the need It uses.

Claims (1)

1. rim of a cup foundation forms is reinforced and hydraulic pressure construction process for removing, which is characterized in that include the following steps:
(1) preparation of construction
Preparation of construction:Check drawing, calculation template dosage draws template blanking figure, purchases template and consumables associated therewith, drawing up a plan, It trains and tells somebody what one's real intentions are;
1) according to the template construct drawing blanking of drafting
Whole rim of a cup template is processed, 50 × 5mm galvanized angle iron bound edges must be used at external corner, be connect with template in galvanized angle iron bound edge Contacting surface uniformly smears fluid sealant, prevents concrete slurry from immersing, and influences concrete surface perception and generates form removal resistance;
2) rim of a cup template is higher 300mm than cushion cap concrete, in the construction for the Φ 60 that spudded in from rim of a cup template top 100mm with hole making drill Hole uses when being removed so as to reinforcing template;
(2) template construct
1) when template is processed, stitching portion adds the lumps of wood to be reinforced as interior village, and lumps of wood support, plane diagonal brace are added along rim of a cup high uniformity It reinforces, per pass lumps of wood spacing is not more than 300mm;
2) it is spudded in 5 by plum blossom-shaped using 20 hole making drills of Φ in the bottom of rim of a cup template and is vented hole;
3) 2 hydraulic supports are welded with 10# I-steel, flange beam stand length is with rim of a cup template width suitable for reading, in round steel U-loop Heart position is concentric with 60 holes of Φ above rim of a cup;
(3) template construction
1) after the completion of foundation platform surrounding formwork erection, can mounting cup mouth template, installation before in foundation platform template four sides Heart position is up and down with ink fountain pop-up center line convenient for the installation correction of rim of a cup template, and flat place fixes two in rim of a cup template depth 60mm × 80mm lumps of wood, the lumps of wood is than foundation platform per segment length 200mm;
2) after the completion of cushion cap surrounding formwork erection is reinforced, handle cup mouth template is hung in cushion cap center according in basic baseline and rim of a cup Heart line is fallen using line and the marker of infrared ray proofreads position, and the lumps of wood of rim of a cup both sides is fixed on cap mold with iron nail after calibration On plate;
3) it is passed through from the reserved circular hole on the upside of rim of a cup with 48 reinforced tubes of Φ after rim of a cup Template Location, with cushion cap formwork reinforcement steel pipe It is connected with fastener, it is ensured that rim of a cup template does not deviate when pouring concrete, non-rising;
(4) concreting
When concrete placings centered on rim of a cup annular pour and pour every time concrete thickness cannot be more than 500mm, in order to avoid because slump flow, Cause rim of a cup displacement;
(5) form removable
It after the completion of concrete placings, waits for that concrete initial set is completed, the fastener and the lumps of wood for being fixed on rim of a cup is removed, take two pieces of 50mm thick Plank is placed on rim of a cup both sides, and both ends are placed in the template of cushion cap periphery, when preventing hydraulic jack from promoting rim of a cup template, causes rim of a cup Surrounding concrete damages, and the flange beam stand being welded is placed on rim of a cup both sides, runs through rim of a cup mould from round steel U-loop with 48 reinforced tubes of Φ Plate takes four 3-5T hydraulic jacks to be placed in below holder, and bottom is placed on plank widthwise central, by after the completion of putting by four works People pressurizes to jack simultaneously, and 4 points are wanted uniform and stable to pressurize, and template is slowly promoted, when template is promoted to 10 centimetres, explanation Rim of a cup template is completely disengaged with concrete, can stop being promoted, and is sling using tower crane or the direct handle cup mouth template of crane;
(6) template is cleared up
It is after rim of a cup template is split out, removing surface is clean and dry;Brushing releasing agent when re-using, can continue turnover makes With.
CN201610719119.3A 2016-08-25 2016-08-25 Rim of a cup foundation forms is reinforced and hydraulic pressure construction process for removing Active CN106193093B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610719119.3A CN106193093B (en) 2016-08-25 2016-08-25 Rim of a cup foundation forms is reinforced and hydraulic pressure construction process for removing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610719119.3A CN106193093B (en) 2016-08-25 2016-08-25 Rim of a cup foundation forms is reinforced and hydraulic pressure construction process for removing

Publications (2)

Publication Number Publication Date
CN106193093A CN106193093A (en) 2016-12-07
CN106193093B true CN106193093B (en) 2018-08-21

Family

ID=57525237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610719119.3A Active CN106193093B (en) 2016-08-25 2016-08-25 Rim of a cup foundation forms is reinforced and hydraulic pressure construction process for removing

Country Status (1)

Country Link
CN (1) CN106193093B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109488023A (en) * 2017-09-12 2019-03-19 中国三冶集团有限公司 A kind of cup core form removable device
CN109372003B (en) * 2018-12-07 2024-04-26 中国二十二冶集团有限公司 Deep cup rim template of bearing platform foundation and construction method for removing cup rim template
CN109797770A (en) * 2019-01-04 2019-05-24 中国华冶科工集团有限公司 A kind of independent rim of a cup foundation construction bracing means and reinforcement means
CN112482747B (en) * 2020-11-23 2022-08-19 中国建筑第二工程局有限公司 Indefinite-length aluminum die reinforcing device and die assembly and assembly method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4787779A (en) * 1987-01-29 1988-11-29 Clark Howard E Method and apparatus for raising and supporting a foundation
CN202450538U (en) * 2012-01-11 2012-09-26 山东达驰电气有限公司 Cup-shaped basic inner cup opening moldboard box
CN203066099U (en) * 2013-01-21 2013-07-17 中国十七冶集团有限公司 Combined steel formwork used for cup foundation construction
CN203200774U (en) * 2013-04-12 2013-09-18 浙江萧峰建设集团有限公司 Improved device for fixing position of cup core template of column foundation with large volume and high cup rim
CN205224080U (en) * 2015-12-09 2016-05-11 中铁二十局集团电气化工程有限公司 Cup -shaped basic construction structures of contact net

Also Published As

Publication number Publication date
CN106193093A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN106193093B (en) Rim of a cup foundation forms is reinforced and hydraulic pressure construction process for removing
CN108678258A (en) Large span hemispherical armored concrete dome structure and its construction method
CN103615053B (en) Monolithic reinforced concrete structure post empiricism engineering method
CN105275209A (en) Special-shaped spatial curved surface water concrete construction method
CN205604088U (en) But bent cap quick adjustment support
CN108755984A (en) Late poured band support construction method based on concrete square column
CN102587663A (en) Concrete construction process of steel tube columns of super-high-rise building
CN105201204B (en) A kind of method and structure of rotten when preventing pouring reinforcement concrete column suspension column
CN205894670U (en) Concrete connects template structure of stubble construction between floor
CN103255866A (en) Manufacturing method of roof circular arc-shaped dome structure
CN104153573A (en) Pouring formwork and construction method for V-shaped cylindrical concrete
CN108571166A (en) A kind of deformation joint formwork construction method
CN107859061A (en) A kind of construction method of box culvert primary concreting
CN205712565U (en) A kind of prefabricated two-sided wall
CN112412013A (en) Construction method for plugging reserved hole of structural outer wall
CN104453235B (en) Current conversion station fire wall construction technology
CN104131635B (en) Method and platform for constructing peripheral shear wall of prefabricated staircase
CN105275198B (en) A kind of shear-wall strengthening formwork structure and its construction method
CN104912209B (en) Bars In Poured Concrete Slab reserved holes of pipes plugging device and processing and plugging construction method
CN205476468U (en) Non - design, can all rotary die plate bodys be prefabricated staircase bench template
CN203603462U (en) Post-cast strip beam plate formwork supporting structure
CN206034946U (en) Structure is handled to large -scale pressure vertical shaft concrete defect based on slipform technology
CN204001713U (en) V-type cylinder oblique line section concrete is built mould
CN108071194A (en) A kind of cast-in-situ floor and thickness control of protection cover of rebar device and its construction technology
CN108331343A (en) The construction method of Cantilever Beams and aluminum alloy mould plate lap-joint

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant