CN106192771A - The steel truss support of a kind of pier cap beam construction and method for dismounting - Google Patents

The steel truss support of a kind of pier cap beam construction and method for dismounting Download PDF

Info

Publication number
CN106192771A
CN106192771A CN201610837349.XA CN201610837349A CN106192771A CN 106192771 A CN106192771 A CN 106192771A CN 201610837349 A CN201610837349 A CN 201610837349A CN 106192771 A CN106192771 A CN 106192771A
Authority
CN
China
Prior art keywords
iron
steel
platform
bridle iron
bridle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610837349.XA
Other languages
Chinese (zh)
Other versions
CN106192771B (en
Inventor
陈国民
曾高全
郎欢
李涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201610837349.XA priority Critical patent/CN106192771B/en
Publication of CN106192771A publication Critical patent/CN106192771A/en
Application granted granted Critical
Publication of CN106192771B publication Critical patent/CN106192771B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses the steel truss support method of pier cap beam construction, in the preformed hole that performance of concrete column confined top is formed, penetrate rod iron;Bridle iron, mounting platform elevation and subsidence regulating device on bridle iron are installed at rod iron two ends;Lifting platform adjusting means arranges carrying steel girder platform;Arranging cushion block, set shaped steel formwork on carrying steel girder platform, casting concrete then forms the concrete bent cap of bridge pier;During dismounting, first lifting platform adjusting means is carried out step-down operation to turn down height;Remove set shaped steel formwork;According to the reverse order installed, remove successively.The method of the present invention, the activity time of pier cap beam construction can be shortened, it is ensured that the quick formation of the steel truss support of pier cap beam construction, improve the working security of support system, realize stablizing of pier cap beam template, ensure the quality technology effect that bent cap concrete placings is closely knit.During dismounting, remove according to the reverse order installed, disassembling section time can be greatly shortened, improve the safety of disassembling section.

Description

The steel truss support of a kind of pier cap beam construction and method for dismounting
Technical field
The present invention relates to steel truss support and the method for dismounting of a kind of pier cap beam construction, particularly relate to a kind of pier cap beam The steel truss support of construction and method for dismounting.
Background technology
The steel truss support of traditional pier cap beam construction and method for dismounting, it is common that after performance of concrete column confined is formed, at pier Hole reserved on post penetrates shaped steel or rod iron forms steel truss support point, and its strong point directly spreads after transverse lap I-steel Little steel plate is installed jack, is symmetrically installed contact steel truss formation Coping Construction platform;In construction, the rod iron of installation there will be Rotate, be difficult to keep balance, the contact portion of contact I-steel and little steel plate need to be carried out welding connection, even to I-steel Carry out welding in the lump to be connected with rod iron;When the steel truss operation platform load formed occurs unbalance change, steel truss is supporting The unsafe condition of longitudinal and transverse two directions skew is there will be on some rod iron;It is unfavorable for the assembling and disassembling of steel truss, and makees in high-altitude The activity time of industry is longer, and work efficiency is low, is unfavorable for that the Pier Formwork at pier cap beam is installed and concrete formation pouring construction; This construction technology being mainly the steel truss support that pier cap beam is constructed and method need to improve.Use the pier cap beam after improving The steel truss support construction technology of construction and method, can shorten the activity time of pier cap beam construction, it is ensured that pier cap beam is constructed The quick formation of steel truss support, improve the working security of support system, it is achieved stablizing of pier cap beam template, ensure lid The quality technology effect that beam concrete placings is closely knit.
Summary of the invention
For above-mentioned deficiency present in prior art, the invention provides the steel truss support of a kind of pier cap beam construction Construction technology, it is easy to the construction technology improved method of steel truss support of pier cap beam construction designing and constructing.
In order to solve above-mentioned technical problem, present invention employs following technical scheme;A kind of steel truss of pier cap beam construction The construction method that frame supports, comprises the steps:
(1) according to technological requirement, after performance of concrete column confined pours, preformed hole is formed on performance of concrete column confined top;In preformed hole Penetrate rod iron;
(2) according to technological requirement, it is symmetrically installed bridle iron at rod iron two ends, bridle iron is symmetrically installed lifting platform regulation dress Put;Lifting platform adjusting means is to lift to regulate the height of platform;
(3) according to technological requirement, arranging carrying steel girder platform in lifting platform adjusting means, carrying steel girder platform supports In the lifting platform adjusting means of two adjacent performance of concrete column confineds;Carrying steel girder platform arranges cushion block, at cushion block Upper installation set shaped steel formwork, casting concrete then forms the bent cap of bridge pier.
(4) concrete bent cap is after concrete strength reaches, and when needing to remove, carries out as steps described below: first by steel Left and right two the lifting platform adjusting meanss installed on bearing carry out step-down operation, turn down the height of platform;Then, according to work Skill requires to remove set shaped steel formwork;Afterwards, according to install reverse order, remove successively cushion block, remove carrying steel girder platform, Remove the rod iron in bridle iron and preformed hole.
Further feature is: bridle iron is connected on bridle iron sleeve, or arranges bridle iron sleeve, steel on bridle iron Support base sleeve barrel is enclosed within rod iron;Bridle iron sleeve is disposed radially several steel bushing trip bolt holes, has fastened at steel bushing Being screwed into screw in screw hole, the front end of screw is tight against on the lateral surface of rod iron.
Compared with prior art, the inventive method has the advantage that
The steel truss support construction method of the pier cap beam construction after 1, the present invention improves, can shorten the operation of pier cap beam construction Time, it is ensured that the quick formation of the steel truss support of pier cap beam construction, improve the working security of support system, it is achieved bridge pier Stablizing of capping beam template, ensures the quality technology effect that bent cap concrete placings is closely knit.
2, difformity pier stud condition and the needs of reserved bearing duct form can be met, enrich existing bridge coping and execute Work scheme engineering legislation.
3, during dismounting, remove according to the reverse order installed, disassembling section time can be greatly shortened, shorten work high above the ground Activity time, improve disassembling section safety.
Accompanying drawing explanation
Fig. 1 is the supporting construction schematic diagram of method for supporting of the present invention;
Fig. 2 is that bridle iron coordinates mounting structure schematic diagram with rod iron;
Fig. 3 is that bridle iron, rod iron coordinate mounting structure schematic diagram with bridge pier column;
Fig. 4 is that bridle iron, rod iron coordinate mounting structure sectional view with bridge pier column.
In accompanying drawing: 1 bridge pier column, 2 bridle irons, 3 lifting platform adjusting meanss, 4 carrying steel truss are put down Platform, 5 cushion blocks, 6 set shaped steel formworks, 7 bent caps, 8 bridle iron sleeves, 9 rod irons, 10 steel bushing trip bolt holes, 11 screws, ribbed panel under 12 bridle iron curved plate 13 steel bushings, 14 bridle iron platform ribbed panel 15 arc-shaped steels Plate ribbed panel.
Detailed description of the invention
With detailed description of the invention, the present invention is described in further detail below in conjunction with the accompanying drawings.A kind of pier cap beam construction Steel truss support and method for dismounting, comprise the steps:
(1) according to technological requirement, after performance of concrete column confined 1 pours, preformed hole is formed on performance of concrete column confined 1 top;At concrete Rod iron 9 is penetrated in the preformed hole of pier stud 1;
(2) according to technological requirement, it is symmetrically installed bridle iron 2 at rod iron two ends, bridle iron 2 is symmetrically installed lifting platform regulation Device 3;Bridle iron 2 is the steel structure support that can bear weight, and lifting platform adjusting means 3 can lift, and relies on pneumatic, liquid Dynamic or machinery etc. lifts, to regulate the height of platform;
(3) according to technological requirement, lifting platform adjusting means 3 arranges carrying steel girder platform 4, carries steel girder platform 4 It is supported in the lifting platform adjusting means 3 of adjacent two performance of concrete column confined 1;Regulate one or more platform liter as required Falling tone regulating device 3 carries height or the levelness of steel girder platform 4 with regulation;Carrying steel girder platform 4 arranges cushion block 5, Installing set shaped steel formwork 6 on cushion block 5, casting concrete then forms the bent cap 7 of bridge pier.Carrying steel girder platform 4 is to hold By the steel structure support of weight, cushion block 5 is evenly arranged on carrying steel girder platform 4, and set shaped steel formwork 6 is according to the bent cap of bridge pier The shape (structure) of 7 is arranged, casting concrete in the cavity that set shaped steel formwork 6 is formed, and is met technological requirement after drying Bent cap 7.
(4) the concrete bent cap 7 formed, after concrete strength reaches, when needing to remove, is carried out by the following method: First two, the left and right lifting platform adjusting means 3 being symmetrically installed on bridle iron is carried out step-down operation, turns down the height of platform, Make set shaped steel formwork 6 and bent cap 7 be separated from or loosen;Then, set shaped steel formwork 6 is removed according to technological requirement or prior art; Finally, according to the reverse order installed, remove cushion block 5 successively, remove carrying steel girder platform 4, dismounting bridle iron 2 and preformed hole Interior rod iron 9.
The lower end of bridle iron 2 is supported on rod iron 9, and match with the lateral surface of performance of concrete column confined 1 in its side, in order to prevent Bridle iron 2 produces, and bridle iron 2 is improved as follows by the present invention further: the riser medial surface of bridle iron 2 and performance of concrete column confined 1 lateral surface is identical arc-shaped curved surface, and cooperation face between the two is the arc-shaped curved surface design matched, and can prevent bridle iron The inclination of 2, and can be close together;It addition, for guarantee bridle iron 2 positioning correcting coupled and install convenient, bridle iron 2 with Using the carrying of bridle iron sleeve 8 form to design and produce between rod iron 9, bridle iron 2 is connected on bridle iron sleeve 8, or steel props up Cover for seat cylinder 8 and bridle iron 2 are fabricated to integrative-structure (arranging bridle iron sleeve 8 on bridle iron 2), and bridle iron sleeve 8 is enclosed within steel On rod 9, on bridle iron sleeve 8, radially it is designed with several steel bushing trip bolt holes 10, in steel bushing trip bolt hole simultaneously Being screwed into screw 11 in 10, the front end of screw 11, just can bridle iron 2 when mounted and rod iron 9 tight against on the lateral surface of rod iron 9 Between fastening combine, and bridle iron 2 entirety is anti-owing to cambered design and the bridge pier surface of riser fit tightly inclines, and is formed surely Fixed, complete steel truss support system.
As shown in Figure 2,3, bridle iron 2 is provided with bridle iron curved plate 12, by bridle iron curved plate 12 and coagulation Knoll post 1 lateral surface matches, and cooperation face between the two is identical arc;Bridle iron sleeve 8 is arranged and adds under steel bushing Floor 13, bridle iron platform ribbed panel 14, to improve the strength and stiffness of bridle iron sleeve 8, it is also possible to the steel at bridle iron 2 props up Seat curved plate 12 outer surface arranges curved plate ribbed panel 15, to improve its strength and stiffness.
Use steel truss support construction technology and the method for the pier cap beam construction after improving, pier cap beam construction can be shortened Activity time, it is ensured that the quick formation of the steel truss support of pier cap beam construction, improve the working security of support system, real Stablizing of existing pier cap beam template, ensures the quality technology effect that bent cap concrete placings is closely knit.Its technological process is as follows:
(1) erection sequence: 1. performance of concrete column confined 1 pour formation → 2. penetrate in the preformed hole of performance of concrete column confined 1 top rod iron 9 → 3. bridle iron 2, bridle iron sleeve 8 → be 4. symmetrically installed lifting platform regulation dress on bridle iron it is symmetrically installed at rod iron 9 two ends Put 3 → 5. the equal cloth pad on carrying steel girder platform 4 of carrying steel girder platform 4 → 6. is installed in lifting platform adjusting means 3 The casting concrete of block 5 → 7. install on cushion block 5 set shaped steel formwork 6 → 8. then forms the bent cap 7 of bridge pier.
(2) dismounting order: concrete bent cap 7 concrete strength 1. formed reaches → 2. to being symmetrically installed on bridle iron Lifting platform adjusting means 3 is turned down height → 3. remove set shaped steel formwork 6 → 4. remove cushion block 5 → 5. remove carrying steel truss and is put down Platform 4 → 6. remove the rod iron 9 in bridle iron 2 and preformed hole.
The steel truss support construction technology of described a kind of pier cap beam construction and method, can shorten pier cap beam construction Activity time, it is ensured that the quick formation of the steel truss support of pier cap beam construction, improves the working security of support system, it is achieved Stablizing of pier cap beam template, ensures the quality technology effect that bent cap concrete placings is closely knit.Also dependent on meeting difformity pier stud Condition and the needs of reserved bearing duct form, enrich existing bridge coping arrangement and method for construction engineering legislation.
Above example is only in order to illustrate technical scheme and unrestricted, although with reference to preferred embodiment to this Bright it is described in detail, it will be understood by those within the art that, technical scheme can be modified Or equivalent, without deviating from objective and the scope of technical solution of the present invention, it all should contain the claim in the present invention In the middle of scope.

Claims (2)

1. the steel truss support of pier cap beam construction and method for dismounting, it is characterised in that comprise the steps:
(1) according to technological requirement, after performance of concrete column confined pours, preformed hole is formed on performance of concrete column confined top;In preformed hole Penetrate rod iron;
(2) according to technological requirement, it is symmetrically installed bridle iron at rod iron two ends, bridle iron is symmetrically installed lifting platform regulation dress Put;Lifting platform adjusting means can lift to regulate the height of platform;
(3) according to technological requirement, arranging carrying steel girder platform in lifting platform adjusting means, carrying steel girder platform supports In the lifting platform adjusting means of two adjacent performance of concrete column confineds;Carrying steel girder platform arranges cushion block, at cushion block Upper installation set shaped steel formwork, casting concrete then forms the bent cap of bridge pier;
(4) concrete bent cap is after concrete strength reaches, and when needing to remove, carries out as steps described below: first by bridle iron Left and right two lifting platform adjusting meanss of upper installation carry out step-down operation, turn down the height of platform;Then, want according to technique Seek dismounting set shaped steel formwork;Afterwards, according to the reverse order installed, remove cushion block successively, remove carrying steel girder platform, dismounting Rod iron in bridle iron and preformed hole.
The steel truss support of pier cap beam the most according to claim 1 construction and method for dismounting, it is characterised in that: bridle iron Being connected on bridle iron sleeve, or arrange bridle iron sleeve on bridle iron, bridle iron sleeve is enclosed within rod iron;At bridle iron set Being disposed radially several steel bushing trip bolt holes on Tong, be screwed into screw in steel bushing trip bolt hole, the front end of screw is tight It is against on the lateral surface of rod iron.
CN201610837349.XA 2016-09-21 2016-09-21 A kind of steel truss support and method for dismounting of pier cap beam construction Active CN106192771B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610837349.XA CN106192771B (en) 2016-09-21 2016-09-21 A kind of steel truss support and method for dismounting of pier cap beam construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610837349.XA CN106192771B (en) 2016-09-21 2016-09-21 A kind of steel truss support and method for dismounting of pier cap beam construction

Publications (2)

Publication Number Publication Date
CN106192771A true CN106192771A (en) 2016-12-07
CN106192771B CN106192771B (en) 2018-04-24

Family

ID=58067846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610837349.XA Active CN106192771B (en) 2016-09-21 2016-09-21 A kind of steel truss support and method for dismounting of pier cap beam construction

Country Status (1)

Country Link
CN (1) CN106192771B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107653781A (en) * 2017-09-20 2018-02-02 龙元建设集团股份有限公司 Big steel pipe truss and construction method for bent cap cast-in-place construction
CN109024298A (en) * 2018-08-27 2018-12-18 中铁四局集团市政工程有限公司 Construction method of bent cap
CN111379199A (en) * 2020-03-30 2020-07-07 中铁二院工程集团有限责任公司 Construction device, construction system and construction method for void pile plate structure
CN111893897A (en) * 2020-08-13 2020-11-06 中国水利水电第八工程局有限公司 Supporting device for bridge capping beam construction and bridge capping beam construction method
CN115233562A (en) * 2022-08-22 2022-10-25 中国十九冶集团有限公司 Formwork supporting system for pouring of highway bridge engineering cover beam and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102234982A (en) * 2011-05-10 2011-11-09 吴江市明港道桥工程有限公司 Circular pier capping beam supporting device
KR20120034187A (en) * 2012-03-21 2012-04-10 원대연 Constrution methoed for prestressed composite truss girder using steel truss member
CN202359506U (en) * 2011-12-15 2012-08-01 中交四航局第一工程有限公司 Double hoop supporting system for pier column capping beam
CN204510005U (en) * 2015-01-20 2015-07-29 中国建筑第七工程局有限公司 A kind of Coping Construction operating platform
CN204919347U (en) * 2015-08-07 2015-12-30 山西四建集团有限公司 Iron wedge support system with adjustable pier is accepted bent cap construction and is used
CN105369745A (en) * 2014-08-26 2016-03-02 葛洲坝集团第五工程有限公司 Bridge support exchanging and lifting reaction frame
CN105735149A (en) * 2016-03-04 2016-07-06 中交路桥(北京)科技有限公司 Bridge jacking counter-force device suitable for narrow and small space between beam bottom and cover beam

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102234982A (en) * 2011-05-10 2011-11-09 吴江市明港道桥工程有限公司 Circular pier capping beam supporting device
CN202359506U (en) * 2011-12-15 2012-08-01 中交四航局第一工程有限公司 Double hoop supporting system for pier column capping beam
KR20120034187A (en) * 2012-03-21 2012-04-10 원대연 Constrution methoed for prestressed composite truss girder using steel truss member
CN105369745A (en) * 2014-08-26 2016-03-02 葛洲坝集团第五工程有限公司 Bridge support exchanging and lifting reaction frame
CN204510005U (en) * 2015-01-20 2015-07-29 中国建筑第七工程局有限公司 A kind of Coping Construction operating platform
CN204919347U (en) * 2015-08-07 2015-12-30 山西四建集团有限公司 Iron wedge support system with adjustable pier is accepted bent cap construction and is used
CN105735149A (en) * 2016-03-04 2016-07-06 中交路桥(北京)科技有限公司 Bridge jacking counter-force device suitable for narrow and small space between beam bottom and cover beam

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107653781A (en) * 2017-09-20 2018-02-02 龙元建设集团股份有限公司 Big steel pipe truss and construction method for bent cap cast-in-place construction
CN109024298A (en) * 2018-08-27 2018-12-18 中铁四局集团市政工程有限公司 Construction method of bent cap
CN111379199A (en) * 2020-03-30 2020-07-07 中铁二院工程集团有限责任公司 Construction device, construction system and construction method for void pile plate structure
CN111379199B (en) * 2020-03-30 2021-08-03 中铁二院工程集团有限责任公司 Construction device, construction system and construction method for void pile plate structure
CN111893897A (en) * 2020-08-13 2020-11-06 中国水利水电第八工程局有限公司 Supporting device for bridge capping beam construction and bridge capping beam construction method
CN115233562A (en) * 2022-08-22 2022-10-25 中国十九冶集团有限公司 Formwork supporting system for pouring of highway bridge engineering cover beam and construction method

Also Published As

Publication number Publication date
CN106192771B (en) 2018-04-24

Similar Documents

Publication Publication Date Title
CN106192771A (en) The steel truss support of a kind of pier cap beam construction and method for dismounting
CN103669224A (en) Method and steel pipe support for construction of arch tower of inclined arch tower double-cable-plane prestressed concrete cable-stayed bridge
CN107653781A (en) Big steel pipe truss and construction method for bent cap cast-in-place construction
CN106337369A (en) Steel-truss supporting method for construction of cap beam of pier
CN105401679A (en) Large-gradient cast-in-place concrete inclined roof construction method
CN105464216A (en) Construction method for ultrahigh oblique post with super-large cross section based on integral lifting formwork reinforcing system
CN205636474U (en) Assembled bracket structure
CN106758872A (en) Wavelike steel webplate SCC engineering methods hang movable hanging basket and the method using its construction with car convolution
CN106758846A (en) Cast-in-place box beam bracket and construction method
CN107268455B (en) Concrete girder gooseneck composite structure beam cradle construction method
CN108149643A (en) RCC double curvature arch dam is two-way adjustable to turn over rising mould plate and construction method
CN109629449A (en) A kind of steel case arch bridge arch springing toughened internal stress installation locating support and alignment method
CN111851317B (en) Method for installing arch ring of arch bridge
CN206667042U (en) Bridge expanssion joint installation and adjustment instrument
CN102286927A (en) Integral mounting construction method of bridge pier column bent cap reinforcement cage
CN106906750B (en) Multi-functional across the railway line swing bridge girder closing construction mould bases of one kind and its construction method
CN105442453A (en) Construction method for suspension bridge tower crossbeam combination support
CN206328668U (en) A kind of prefabricated bent cap shell component of huge thin-walled
CN106592446A (en) Assembling construction method of precast segmental balanced cantilever with side-span wet joints
CN107740345A (en) A kind of monoblock type welds steel anchor box and its mounting process entirely
CN206070387U (en) A kind of steel truss support structure of pier cap beam construction
CN106759880A (en) Prefabricated superposed beam quickly positions adjustment frock and method with prefabricated post junction
CN206219976U (en) A kind of automatic arc regulation bridle iron suitable for science of bridge building concrete cylinder
CN216640277U (en) Radial adjustable supporting force device for close contact of lower chord of beam-arch combined bridge curve
CN106522542B (en) A kind of light engine position hydraulic climbing die block system and its method of climbing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant