CN106182405A - A kind of preparation method of prefabricated component - Google Patents

A kind of preparation method of prefabricated component Download PDF

Info

Publication number
CN106182405A
CN106182405A CN201610585031.7A CN201610585031A CN106182405A CN 106182405 A CN106182405 A CN 106182405A CN 201610585031 A CN201610585031 A CN 201610585031A CN 106182405 A CN106182405 A CN 106182405A
Authority
CN
China
Prior art keywords
prefabricated component
connection
built
hole
mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610585031.7A
Other languages
Chinese (zh)
Inventor
俞大有
陈定球
刘斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mingsheng Drawin Technology Investment Co Ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201610585031.7A priority Critical patent/CN106182405A/en
Publication of CN106182405A publication Critical patent/CN106182405A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/022Means for inserting reinforcing members into the mould or for supporting them in the mould
    • B28B23/024Supporting means

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention relates to a kind of construction techniques, specifically disclose the preparation method of a kind of prefabricated component, described prefabricated component is provided with built-in connection, comprises the steps: installing of (1) mould;(2) laying of embedded bar rack;(3) mould is connected with the fixing of built-in connection;(4) embedded bar rack is fixed with the colligation of built-in connection;(5) molding is poured;(6) demoulding.In the implementation process of the present invention, multiple positions of built-in connection are all fixed, form multiple spot one side, when can avoid built-in connection only one end is connected with template, owing to causing built-in connection generation floating, torsion and sideslip during casting concrete or vibration moulding, and then cause later stage securing member to be difficult to remove, and during prefabricated component assembly, built-in connection to connecting it can be difficult to the phenomenon connected occurs.The enforcement of the present invention, can be effectively improved the quality of production and the efficiency of construction of prefabricated component assembling process of prefabricated component.

Description

A kind of preparation method of prefabricated component
Technical field
The present invention relates to a kind of construction techniques, be specifically related to the preparation method of a kind of prefabricated component.
Background technology
In assembled architecture construction field, speed of application and the precision of prefabricated component on-site consolidation become assembly concrete The important key technology of structure, directly determines quality and the efficiency of construction of whole engineering.At present, prefabricated component be linked and packed main It is to use to be attached by built-in connection, but, due to all kinds of deviations during preform production, in assembling construction mistake Cheng Zhong, often results in the problem appearance that built-in connection does not docks, so generally requires workmen and be corrected, or prefabricated Part can not normally use, and does not only result in that speed of application is slow, increase production cost, even affects construction quality.
On the one hand the problem causing built-in connection not dock is due to operative's error in built-in fitting production process Cause built-in connection to position inaccuracy, be on the other hand the fixing insecure of built-in connection, in prefabricated component vibration moulding During create relative movement with template, and then cause positioning inaccuracy.And in the preparation process of prefabricated component, pre-buried connection The mode of built-in connection with bar frame colligation is carried out, owing to not having in template by location and fixing generally only employing of part Impetus, usual built-in connection and bar frame are not formed with template and are reliably connected, and cause the mistake in prefabricated component vibration moulding In journey, built-in connection and template create relative movement, in producing in particular by formwork erection, during grouting, and bar-mat reinforcement Frame can entirety float, and on the one hand causes built-in connection to position inaccuracy, on the other hand affects the quality of production of prefabricated component, add The deviation that vibration moulding process produces, will have a strong impact on the docking of prefabricated component.
In sum, need exploitation badly a kind of easy and simple to handle, can effectively position and fix the system of the prefabricated component of built-in connection Preparation Method.
Summary of the invention
It is an object of the invention to provide a kind of easy and simple to handle, can effectively position and fix the system of the prefabricated component of built-in connection Preparation Method.
Above-mentioned purpose is to be achieved through the following technical solutions: the preparation method of a kind of prefabricated component, and described prefabricated component is provided with pre- Bury connector, comprise the steps:
(1) the installing of mould: install mould according to the specification of prefabricated component, and according to the pre-buried position of connector at mould Hole, location is offered in relevant position;
(2) laying of embedded bar rack;
(3) mould is connected with the fixing of built-in connection: be fixed on mould by securing member by built-in connection, described Securing member is connected through location Kong Bingyu built-in connection;
(4) embedded bar rack is fixed with the colligation of built-in connection;
(5) molding is poured;
(6) demoulding.
The preparation method of a kind of prefabricated component proposed by the invention, is embedded with the prefabricated component of built-in connection for preparation, By built-in connection and embedded bar rack being connected with mould, reach location and the purpose of fixing built-in connection, real Existing built-in connection must be accurately positioned, to dock the technical problem of difficulty during solving prefabricated component assembly.The enforcement of the present invention During, by securing member, built-in connection and embedded bar rack are connected with mould, on the one hand play location and fix The purpose of built-in connection, multiple positions of built-in connection are all fixed, and form multiple spot one side, only can avoid built-in connection When one end is connected with template, owing to causing built-in connection generation floating, torsion during casting concrete or vibration moulding Turning and sideslip, i.e. with coupled template out of plumb, connector is not horizontally disposed, and then causes later stage securing member to be difficult to Remove, and during prefabricated component assembly, built-in connection to connecting it can be difficult to the phenomenon generation connected.On the other hand due in advance Bury connector integral with bar frame colligation, the effect of fixing bar frame can be played simultaneously, can effectively prevent from pouring coagulation During soil, bar frame floats, it is ensured that preform production quality.Therefore the enforcement of the present invention, the life of prefabricated component can be effectively improved Yield and quality and the efficiency of construction of prefabricated component assembling process.For preventing from positioning hole spillage, the most described securing member and hole, location mistake It is full of and coordinates or matched in clearance, the most preferably use pad to cover hole, location, certainly, it is possible to adopt and prevent in other ways in stencil sidewalls Hole, location spillage.
Further, the securing member described in step (3) is bolt.Use bolt as securing member, connect reliable, and be prone to Dismounting.When built-in connection is pre-buried branch sleeve, it is not necessary to use nut, screw rod is inserted in described sleeve through hole, location ?;When built-in connection is pre-buried connecting plate, nut may be provided at and may also be arranged on outside template inside template.
Further, hole, described location is bar hole, and described bolt is T-bolt;Concretely comprising the following steps of described step (5): Turn bolt so that the screw head of bolt is parallel with described bar hole, while mould of dismantling, bolt is passed from bar hole. When fastening, the preferably screw head of T-bolt is vertically arranged with bar hole.It is arranged such, without securing member is complete during form removal Remove, half-twist, efficiency of construction can be improved, securing member is stayed on built-in connection simultaneously, during form removal can being prevented The connector blocking of built-in connection.
Further, described built-in connection is branch sleeve, and in step (3), bolt through hole, location and inserts branch sleeve In, branch sleeve is fixed on mould.
Further, described branch sleeve includes that sleeve body, described sleeve body at least include the first connecting portion and second Connecting portion, described first connecting portion and the second connecting portion are vertically arranged and are fixedly connected into entirety, described first connecting portion and Two connecting portions are provided with threaded connection hole, and described sleeve body is provided with keeper, described keeper and the first connecting portion and/or Two connecting portions are fixing to be connected;Described keeper is fixed by described step (4) with described embedded bar rack colligation.During application, By this adapter sleeve with being embedded in prefabricated component, the first connecting portion and the second connecting portion is utilized to connect set adjacent with this prefabricated component respectively Other prefabricated components put, compare the construction method that sleeve dislocation is pre-buried, not only reduce the usage amount of template, reduce sleeve accurately fixed The difficulty that position is pre-buried, and actual condition is embedded with the prefabricated component stress of this branch sleeve at grade, stress is more closed Reason.And this branch sleeve is rational in infrastructure, the first connecting portion and the second connecting portion intersect vertically setting, and the two mutually constitutes anchoring Part, not only increases the resistance to drawing ability of branch sleeve, and can effectively prevent under external force branch sleeve at prefabricated component Interior movement, as when during connection construction, swivel bolt is fastenedly connected.Additionally, the setting of keeper, on the one hand, During branch sleeve is pre-buried, use band that embedded bar and keeper are carried out colligation, be beneficial to exist branch sleeve colligation On bar frame;On the other hand, branch sleeve is played booster action, connect for fixing the first connecting portion and second that connects Portion, beneficially branch sleeve resist the impact of concrete, and the collision of transportation at casting process, prevent branch sleeve from becoming Shape, it is ensured that the first connecting portion and the second connecting portion are in same level, and both of which keeps level, prevents prefabricated component from assembling Journey connects difficulty, the most also can increase branch sleeve anchor force in prefabricated component.
Further, the two ends of described sleeve body are provided with threaded connection hole, and described sleeve body is provided with at least one and determines Position muscle, the two ends of described positioning bar are connected with the two ends of sleeve body respectively, and described positioning bar is at least provided with a bending part.This The two ends of the branch sleeve in invention are equipped with threaded connection hole, during application, by this adapter sleeve with being embedded in prefabricated component, utilize The threaded connection hole at its two ends connects other prefabricated components being disposed adjacent with this prefabricated component respectively, compares sleeve pre-buried the executing of dislocation Work method, not only reduces the usage amount of template, reduces sleeve and is accurately positioned pre-buried difficulty, and is embedded with this in actual condition even At grade, stress is the most reasonable for the prefabricated component stress of female connector cylinder.Additionally, the setting of positioning bar, on the one hand, at adapter sleeve During cylinder is pre-buried, uses band that embedded bar and positioning bar are carried out colligation, be beneficial to branch sleeve colligation at bar-mat reinforcement On frame, especially positioning bar is provided with bending part, has certain space between positioning bar and sleeve body, be beneficial to by positioning bar with Embedded bar carries out colligation, beneficially constructing operation, and colligation is the most firm;On the other hand, play to add to branch sleeve and pretend With, add resistance to drawing ability and the loading functionality of branch sleeve, effectively prevent axial in prefabricated component of branch sleeve With move radially, beneficially branch sleeve resists the impact of concrete, and the collision of transportation, the company of preventing at casting process Connect colleting deformation, it is ensured that sleeve two ends are in same level, i.e. and two ends all keep level, during preventing prefabricated component assembling Connect difficulty, the most also can increase branch sleeve anchor force in prefabricated component.
Further, the perforate end of described sleeve body is provided with flange, and the external diameter of described flange is more than or equal to described stripe shape The length in hole;Described flange is close to the template inwall of mould by described step (3), and covers described bar hole.It is arranged such, Can prevent from positioning hole spillage, meanwhile, in casting process, the setting of flange increase effectively contacting of sleeve body end and template Area, flange tightly withstand in template, on the one hand prevent the position of branch sleeve during casting concrete from moving or structure become Shape, ensures vertical as far as possible, and the end face of the opening of branch sleeve is parallel with the side of prefabricated component, on the other hand can effectively prevent Concrete slurry is entered in threaded mouth.
Further, described flange is prepared by magnetic material.It is arranged such, utilizes the magnetic of flange it to be fixed firmly On the mould of limit, it is ensured that still prevent threaded mouth while the end face of the opening of branch sleeve is parallel with the side of prefabricated component Interior entrance concrete slurry.
Further, described built-in connection is connecting plate, and described connecting plate is provided with anchoring supporting leg, bolt in step (3) It is connected through hole, location and connecting plate are fixing, described keeper is fixed with described embedded bar rack colligation by step (4).This Time, need to be in the reservation operations hole, inner side of connecting plate.
Further, after completing step (3), at pre-buried connecting plate, clog foam for molding reservation operations hole;Or becoming Arranging magnetic holder at type reservation operations hole, described magnetic holder adsorbs in the template of mould.So, it is provided that two kinds of molding reservation operations The method in hole, first method, after prefabricated component shaping and demoulding, foam is deducted;Second method controls reserved by magnetic holder Hole forming position, registration, before concreting, adsorbs magnetic holder at preformed hole molding on mould inner wall, when pouring Concrete final set after, due to the magnetic force of magnetic holder, magnetic holder is viscous firmly to be inhaled in template, dismantles and pours with while mould Magnetic holder is deviate from from prefabricated component, solves prepared hole forming device from preformed hole, depart from the technical problem of difficulty, simplify Releasing process, improves efficiency of construction.Preferably at least in the another side setting being oppositely arranged in mould contact surface with magnetic holder absorption NULL, so can be reduced or avoided the absorption affinity to prefabricated component inside reinforcing bar and built-in fitting so that magnetic holder be more easy to Mould departs from prefabricated component together.Preferably, the one side of described magnetic holder is adsorbed on mould, and remaining each is all enclosed with NULL. Being arranged such, be reduced to minimum by magnetic holder to the magnetic attraction of prefabricated component inside reinforcing bar and built-in fitting, NULL is to magnetic simultaneously Box serves certain protective effect, prevents concrete erosion magnetic holder.
Accompanying drawing explanation
The accompanying drawing of the part constituting the present invention is used for providing a further understanding of the present invention, and the present invention's is schematic real Execute example and illustrate for explaining the present invention, being not intended that inappropriate limitation of the present invention.
Fig. 1 and Fig. 2 is respectively the prefabricated component preparation process schematic diagram involved by one embodiment of the present invention;
Fig. 3 and Fig. 4 is respectively the structural representation of the prefabricated component involved by one embodiment of the present invention;
Fig. 5~7 is respectively the structural representation of the branch sleeve involved by one embodiment of the present invention;
Fig. 8 and Fig. 9 is respectively the connection node schematic diagram after the prefabricated component assembling involved by one embodiment of the present invention;
Figure 10 is the sectional drawing of the prefabricated component forming process involved by one embodiment of the present invention;
Figure 11 is the structural representation of the magnetic holder involved by one embodiment of the present invention.
In figure:
1 template 2 positions hole 3 bar frame 4 branch sleeve
5 connecting plate 6 prefabricated component 7 bolt 8 sleeve body
9 first connecting portion 10 second connecting portion 11 threaded connection hole 12 first dowels
13 second dowel 14 the 3rd dowel 15 flanges 16 anchor supporting leg
17 positioning bar 18 bending part 19 reservation operations hole 20 magnetic holders
21 NULL 22 electromagnetic switch 23 foams
Detailed description of the invention
Describing the present invention below in conjunction with the accompanying drawings, the description of this part is only exemplary and explanatory, should not Protection scope of the present invention is had any restriction effect.Additionally, those skilled in the art are according to the description of presents, can be right In presents, the feature in embodiment and in different embodiment carries out respective combination.
Embodiments of the invention are as follows, and with reference to Fig. 1~4, the preparation method of a kind of prefabricated component, described prefabricated component 6 is provided with pre- Bury connector, comprise the steps:
(1) the installing of mould: install mould according to the specification of prefabricated component 6, and according to the pre-buried position of connector at mould Relevant position offer location hole 2;(2) laying of embedded bar rack 3;(3) mould is connected with the fixing of built-in connection: will Built-in connection is fixed on mould by securing member, and described securing member through hole 2, location and is connected with built-in connection;(4) The colligation of embedded bar rack 3 and built-in connection is fixed;(5) molding is poured;(6) demoulding.
The preparation method of a kind of prefabricated component 6 proposed by the invention, is embedded with the prefabricated component of built-in connection for preparation 6, by built-in connection and embedded bar rack 3 being connected with mould, reach location and the purpose of fixing built-in connection, Realize built-in connection must be accurately positioned, to dock the technical problem of difficulty during solving prefabricated component 6 assembly.Specific construction mistake Cheng Zhong, determines the pre-buried position of built-in connection, offers hole 2, location in the relevant position of mould, lays embedded bar rack 3, Use securing member to be fixed with built-in connection by mould, then built-in connection is carried out colligation with bar frame 3 fix, then pour Concrete, the demoulding after prefabricated component 6 molding.In the implementation process of the present invention, by securing member by built-in connection and pre-buried steel Muscle rack 3 is connected with mould, on the one hand plays location and the purpose of fixing built-in connection, and multiple positions of built-in connection are equal Fixed, formed multiple spot one side, when built-in connection only one end can be avoided to be connected with template 1, due to casting concrete or shake Built-in connection generation floating, torsion and sideslip is caused, i.e. with coupled template 1 out of plumb, even during dynamic molding Interface is not horizontally disposed, and then causes later stage securing member to be difficult to remove, and during prefabricated component 6 assembly, built-in connection To connecting it can be difficult to the phenomenon connected occurs.On the other hand integral, simultaneously with bar frame 3 colligation due to built-in connection Can play the effect of fixing bar frame 3, during can effectively preventing casting concrete, bar frame 3 floats, it is ensured that prefabricated Part 6 quality of production.Therefore the enforcement of the present invention, the quality of production and the prefabricated component 6 that can be effectively improved prefabricated component 6 assemble executing of process Work efficiency rate.For preventing from positioning hole 2 spillage, the most described securing member and location hole 2 interference fit or matched in clearance, the most preferably at mould Plate 1 sidewall uses pad to cover hole 2, location, certainly, it is possible to adopts and prevents from other ways positioning hole 2 spillage.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 1 and Fig. 2, the preparation of described prefabricated component 6 Method, the securing member described in step (3) is bolt 7.Use bolt 7 as securing member, connect reliable, and be readily disassembled.When When built-in connection is pre-buried branch sleeve 4, it is not necessary to use nut, screw rod is inserted in described sleeve through hole 2, location; When built-in connection is pre-buried connecting plate 5, nut may be provided at and may also be arranged on outside template 1 inside template 1.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 1 and Fig. 2, hole, described location 2 is bar shaped Hole, described bolt 7 is T-bolt 7;Concretely comprising the following steps of described step (5): turn bolt 7 so that the screw head of bolt 7 and institute State bar hole parallel, while mould of dismantling, make bolt 7 pass from bar hole.When fastening, preferably T-bolt 7 Screw head is vertically arranged with bar hole.It is arranged such, without securing member is removed completely during form removal, half-twist, can improve and execute Work efficiency rate, stays on built-in connection by securing member simultaneously, can prevent the connector blocking of built-in connection during form removal.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 1 and Fig. 3, described built-in connection is for even Female connector cylinder 4, in step (3), bolt 7 through hole 2, location and inserts in branch sleeve 4, is fixed on mould by branch sleeve 4.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 3 and Fig. 5, described branch sleeve 4 includes Sleeve body 8, described sleeve body 8 at least includes the first connecting portion 9 and the second connecting portion 10, described first connecting portion 9 and Two connecting portions 10 are vertically arranged and are fixedly connected into entirety, and described first connecting portion 9 and the second connecting portion 10 are provided with threaded Hole 11, described sleeve body 8 is provided with keeper, described keeper and the first connecting portion 9 and/or the second connecting portion 10 is fixing even Connect;Described keeper is fixed by described step (4) with the colligation of described embedded bar rack 3.During application, by this adapter sleeve with pre- It is embedded in prefabricated component 6, utilizes the first connecting portion 9 and the second connecting portion 10 to connect other that be disposed adjacent with this prefabricated component 6 respectively Prefabricated component 6, compares the construction method that sleeve dislocation is pre-buried, not only reduces the usage amount of template 1, reduces sleeve and is accurately positioned pre-buried Difficulty, and actual condition is embedded with prefabricated component 6 stress of this branch sleeve 4 at grade, stress is the most reasonable.And This branch sleeve 4 is rational in infrastructure, and the first connecting portion 9 and the second connecting portion 10 intersect vertically setting, and the two mutually constitutes anchoring piece, Not only increase the resistance to drawing ability of branch sleeve 4, and can effectively prevent under external force branch sleeve 4 at prefabricated component 6 Interior movement, as when during connection construction, swivel bolt 7 is fastenedly connected.Additionally, the setting of keeper, on the one hand, During branch sleeve 4 is pre-buried, use band that embedded bar and keeper are carried out colligation, be beneficial to tie up branch sleeve 4 Prick on bar frame 3;On the other hand, branch sleeve 4 is played booster action, connect the first connecting portion 9 and for fixing Two connecting portions 10, beneficially branch sleeve 4 resist the impact of concrete, and the collision of transportation at casting process, prevent Branch sleeve 4 deforms, it is ensured that the first connecting portion 9 and the second connecting portion 10 are in same level, and both of which keeps level, anti- Only connect difficulty during prefabricated component 6 assembling, the most also can increase the branch sleeve 4 anchor force in prefabricated component 6.
Preferably, such as Fig. 3 and Fig. 5, described keeper includes the first dowel 12, and the two ends of described first dowel 12 are respectively Connect the first connecting portion 9 and the second connecting portion 10.It is arranged such, fixes the first connecting portion 9 and phase para-position of the second connecting portion 10 Put, indeformable at process or the transportation branch sleeve 4 of concreting, especially ensure that the two is mutually perpendicular to all the time, I.e. ensure that the end face of the opening of branch sleeve 4 is parallel with the side of prefabricated component 6, prevent bolt 7 in connection procedure from cannot tighten very Extremely cannot be with docking sleeve.
Preferably, such as Fig. 3 and Fig. 5, described keeper also includes the second dowel 13 and the 3rd dowel 14, and described second even The one end connecing muscle 13 is connected with described first connector, and the other end is fixed on the first connecting portion 9 and connection of the second connecting portion 10 Place, one end of described 3rd dowel 14 is connected with described second connector, and the other end is fixed on the first connecting portion 9 and second and connects Connect the junction in portion 10.It is arranged such, the structural behaviour of branch sleeve 4 is played further booster action, prevents adapter sleeve Cylinder 4 deformation, adds the anti-pulling ability of branch sleeve 4.
Preferably, such as Fig. 3 and Fig. 5, described second dowel 13 and the 3rd dowel 14 are all arranged in arcuation.It is arranged such, Described second dowel 13 and the 3rd dowel 14, in butterfly-shaped, add resistance to drawing ability and the loading functionality of branch sleeve 4, have Prevent branch sleeve 4 axially and radially moving in prefabricated component 6 to effect, it is ensured that the first connecting portion 9 and the second connecting portion 10 It is in same level, it is ensured that the end face of the opening of branch sleeve 4 is parallel with the side of prefabricated component 6;On the other hand, second connects Between muscle 13 and the 3rd dowel 14 and sleeve body 8, there is certain space, be beneficial to connect the second dowel 13 and the 3rd Muscle 14 and embedded bar carry out colligation, beneficially constructing operation, and colligation is the most firm.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 4 and Fig. 6, the two of described sleeve body 8 End is provided with threaded connection hole 11, and described sleeve body 8 is provided with at least positioning bar 17, and the two ends of described positioning bar 17 are respectively Being connected with the two ends of sleeve body 8, described positioning bar 17 is at least provided with a bending part 18.Branch sleeve 4 in the present invention Two ends are equipped with threaded connection hole 11, during application, by this adapter sleeve with being embedded in prefabricated component 6, utilize the screw thread at its two ends even Connect hole 11 and connect other prefabricated components 6 being disposed adjacent with this prefabricated component 6 respectively, compare the construction method that sleeve dislocation is pre-buried, no Only reduce the usage amount of template 1, reduce sleeve and be accurately positioned pre-buried difficulty, and actual condition is embedded with this branch sleeve 4 Prefabricated component 6 stress at grade, stress is the most reasonable.Additionally, the setting of positioning bar 17, on the one hand, at branch sleeve 4 During pre-buried, use band that embedded bar and positioning bar 17 are carried out colligation, be beneficial to branch sleeve 4 colligation at bar-mat reinforcement On frame 3, especially positioning bar 17 is provided with bending part 18, has certain space between positioning bar 17 and sleeve body 8, and being beneficial to will Positioning bar 17 and embedded bar carry out colligation, beneficially constructing operation, and colligation is the most firm;On the other hand, to branch sleeve 4 Play booster action, add resistance to drawing ability and the loading functionality of branch sleeve 4, effectively prevent branch sleeve 4 in advance Axially and radially moving in product 6, beneficially branch sleeve 4 resist the impact of concrete at casting process, and transport The collision of journey, prevents branch sleeve 4 from deforming, it is ensured that sleeve two ends are in same level, i.e. and two ends all keep level, prevents Connect difficulty during prefabricated component 6 assembling, the most also can increase the branch sleeve 4 anchor force in prefabricated component 6.
Preferably, such as Fig. 4 and Fig. 6, described sleeve body 8 is provided with two positioning bars 17, two described positioning bars 17 In axis is generally aligned in the same plane.It is arranged such, during sleeve body 8 is pre-buried, after casting concrete, drastically increases connection The structural strength that sleeve 4 is connected with prefabricated component 6, substantially increases resistance to drawing ability and the loading functionality of embedded sleeve barrel, meanwhile, After positioning bar 17 and embedded bar carry out colligation, stress balance, prevent branch sleeve 4 occurred level in casting process from moving.
Preferably, described sleeve body 8 is provided with four positioning bars 17, and the positioning bar 17 being disposed adjacent is mutually perpendicular to.So Arranging, sleeve body 8 structure is the most firm, and impact resistance is higher, and direction does not the most occur bending deformation in the horizontal and vertical direction, simultaneously Positioning bar 17 is the most firm with embedded bar colligation.
When branch sleeve 4 and side form are fixed, masterpiece is exerted oneself easy sideslip, for this impact is reduced or eliminated, same time outside The about utilization of template 1, increases torque resistant ability, branch sleeve 4 with stirrup or vertical muscle by tied silk colligation together.Its location The form of muscle 17, as it is shown in fig. 7, the form of positioning bar 17 is hoop, on the one hand plays the effect of similar stirrup, the opposing party's face Easily realize its colligation.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 5 and Fig. 6, opening of described sleeve body 8 Nose end is provided with flange 15, and the external diameter of described flange 15 is more than or equal to the length of described strip-type hole;By described in described step (3) Flange 15 is close to template 1 inwall of mould, and covers described bar hole.It is arranged such, can prevent from positioning hole 2 spillage, water meanwhile During building, the setting of flange 15 increase effectively the contact area of sleeve body 8 end and template 1, flange 15 top tightly In template 1, on the one hand prevent the position of branch sleeve 4 during casting concrete from moving or malformation, ensure as far as possible Vertically, the end face of the opening of branch sleeve 4 is parallel with the side of prefabricated component 6, on the other hand can effectively preventing threaded mouth Enter concrete slurry.
On the basis of above-described embodiment, in another embodiment of the present invention, described flange 15 is prepared by magnetic material.So Arrange, utilize the magnetic of flange 15 can be securely seated between on the mould of limit, it is ensured that the end face of the opening of branch sleeve 4 is with pre- Concrete slurry is entered in still preventing threaded mouth while the side of product 6 is parallel.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 8 and Fig. 9, described built-in connection is for even Fishplate bar 5, described connecting plate 5 is provided with anchoring supporting leg 16, and in step (3), bolt 7 is fixing with connecting plate 5 through hole 2, location is connected, Described keeper is fixed by step (4) with the colligation of described embedded bar rack 3.Now, behaviour need to be reserved in the inner side of connecting plate 5 Make hole 19.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 2 and Fig. 8, after completing step (3), in advance Bury and clog foam 23 at connecting plate 5 for molding reservation operations hole 19;Or such as Figure 10, magnetic is set at molding reservation operations hole 19 Box 20, described magnetic holder 20 adsorbs in the template 1 of mould.So, it is provided that the method in two kinds of molding reservation operations holes 19, first The method of kind, deducts foam 23 after prefabricated component 6 shaping and demoulding;Second method controls preformed hole molding position by magnetic holder 20 Put, registration, before concreting, magnetic holder 20 is adsorbed at preformed hole molding on mould inner wall, when the coagulation poured After soil final set, due to the magnetic force of magnetic holder 20, magnetic holder 20 is viscous firmly to be inhaled in template 1, dismantles while pouring use mould Magnetic holder 20 is deviate from from prefabricated component 6, solves prepared hole forming device from preformed hole, depart from the technical problem of difficulty, simplify Releasing process, improves efficiency of construction.Preferably at least adsorbing, with magnetic holder 20, the another side being oppositely arranged in mould contact surface NULL 21 is set, to prefabricated component 6 internal reinforcing bar and the absorption affinity of built-in fitting so can be reduced or avoided, so that magnetic holder 20 are more easy to depart from prefabricated component 6 with mould.Preferably, the one side of described magnetic holder 20 is adsorbed on mould, and remaining each is all wrapped up There is NULL 21.It is arranged such, the magnetic attraction of internal to prefabricated component 6 for magnetic holder 20 reinforcing bar and built-in fitting is reduced to minimum, NULL 21 serves certain protective effect to magnetic holder 20 simultaneously, prevents concrete erosion magnetic holder 20.
Preferably, NULL 21 is rubber.Rubber has certain resistance magnetic action, and corrosion resistance is preferable simultaneously, and with mixed The adhesion of solidifying soil is more weak, therefore protection and magnetism isolating effect are good, and beneficially magnetic holder 20 and the disengaging of prefabricated component 6.
Preferably, described NULL 21 is galvanized iron sheet.Galvanized iron sheet has a higher magnetic reluctance, can reflect simultaneously and Reflection magnetic force, can play the disengaging of the magnetic force strengthening magnetic holder 20 with contacting dies one side, beneficially magnetic holder 20 and prefabricated component 6.
Preferably, such as Figure 11, described magnetic holder 20 is electromagnetism box 20, and described electromagnetism box 20 is provided with electromagnetic switch 22.It is arranged such, Magnetic holder 20 magnetic force is controlled, it is simple to the regulation magnetic holder 20 fixed position on mould, simultaneously, it is only necessary to close by controlling electromagnetic switch 22 Close electromagnetic switch 22, magnetic holder 20 can be taken off from mould.
Wherein, in Fig. 1, A represents that template opens hole, location, and B represents the connection of template and branch sleeve, and C represents that prefabricated component pours Molding, D represents that E represents the prefabricated component after the demoulding by parallel as bar hole for T-bolt rotation;In Fig. 2, A represents that template is opened calmly Hole, position, B represents the connection of template and connecting plate, and C represents the setting of reservation operations hole forming equipment, and D represents that prefabricated component waters and builds up Type the demoulding.It should be noted that Fig. 1 and Fig. 2 the particular content of the incomplete expression present invention, as do not represented pre-buried connection Set up concrete with the connection of embedded bar rack and mould of part.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For Yuan, under the premise without departing from the principles of the invention, it is also possible to make some improvements and modifications, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (10)

1. a preparation method for prefabricated component, described prefabricated component is provided with built-in connection, it is characterised in that comprise the steps:
(1) the installing of mould: install mould according to the specification of prefabricated component, and according to corresponding at mould of the pre-buried position of connector Hole, location is offered in position;
(2) laying of embedded bar rack;
(3) mould is connected with the fixing of built-in connection: be fixed on mould by securing member by built-in connection, described fastening Part is connected through location Kong Bingyu built-in connection;
(4) embedded bar rack is fixed with the colligation of built-in connection;
(5) molding is poured;
(6) demoulding.
The preparation method of prefabricated component the most according to claim 1, it is characterised in that the securing member described in step (3) is Bolt.
The preparation method of prefabricated component the most according to claim 2, it is characterised in that hole, described location is bar hole, described Bolt is T-bolt;Concretely comprising the following steps of described step (5): turn bolt so that the screw head of bolt is put down with described bar hole OK, dismantling makes bolt pass from bar hole while mould.
The preparation method of prefabricated component the most according to claim 3, it is characterised in that described built-in connection is adapter sleeve Cylinder, in step (3), bolt through hole, location and inserts in branch sleeve, is fixed on mould by branch sleeve.
The preparation method of prefabricated component the most according to claim 4, it is characterised in that described branch sleeve includes that sleeve is originally Body, described sleeve body at least includes the first connecting portion and the second connecting portion, and described first connecting portion and the second connecting portion are vertical Arranging and be fixedly connected into entirety, described first connecting portion and the second connecting portion are provided with threaded connection hole, in described sleeve body It is provided with keeper, described keeper and the first connecting portion and/or the fixing connection of the second connecting portion;By described in described step (4) Keeper is fixed with described embedded bar rack colligation.
The preparation method of prefabricated component the most according to claim 4, it is characterised in that the two ends of described sleeve body are provided with spiral shell Stricture of vagina connecting hole, described sleeve body is provided with at least positioning bar, the two ends of described positioning bar respectively with the two of sleeve body End is connected, and described positioning bar is at least provided with a bending part.
7. according to the preparation method of the prefabricated component described in claim 4~6 any one, it is characterised in that described sleeve body Perforate end be provided with flange, the external diameter of described flange is more than or equal to the length of described strip-type hole;By described in described step (3) Flange is close to the template inwall of mould, and covers described bar hole.
The preparation method of prefabricated component the most according to claim 7, it is characterised in that described flange is prepared by magnetic material.
The preparation method of prefabricated component the most according to claim 3, it is characterised in that described built-in connection is connecting plate, Described connecting plate is provided with anchoring supporting leg, and in step (3), bolt is connected through hole, location and connecting plate are fixing, will in step (4) Described keeper is fixed with described embedded bar rack colligation.
The preparation method of prefabricated component the most according to claim 9, it is characterised in that after completing step (3), in pre-buried company Foam is clogged for molding reservation operations hole at fishplate bar;Or magnetic holder is set at molding reservation operations hole, the absorption of described magnetic holder exists In the template of mould.
CN201610585031.7A 2016-07-22 2016-07-22 A kind of preparation method of prefabricated component Pending CN106182405A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610585031.7A CN106182405A (en) 2016-07-22 2016-07-22 A kind of preparation method of prefabricated component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610585031.7A CN106182405A (en) 2016-07-22 2016-07-22 A kind of preparation method of prefabricated component

Publications (1)

Publication Number Publication Date
CN106182405A true CN106182405A (en) 2016-12-07

Family

ID=57492460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610585031.7A Pending CN106182405A (en) 2016-07-22 2016-07-22 A kind of preparation method of prefabricated component

Country Status (1)

Country Link
CN (1) CN106182405A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109278183A (en) * 2018-11-14 2019-01-29 河南中安征信建筑科技有限公司 The magnetism positioning device and application method of energy saving prefabricated component exposed steel bar

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07300990A (en) * 1994-05-09 1995-11-14 Furukawa Electric Co Ltd:The Precast member and its manufacture
JPH08232347A (en) * 1995-02-27 1996-09-10 Takenaka Komuten Co Ltd High adhesion embedding device for concrete
CN1236047A (en) * 1998-05-14 1999-11-24 许恒嘉 Mounting and construction method for building built-in part and its auxiliary fixture
CN101538899A (en) * 2009-04-14 2009-09-23 中建三局第二建设工程有限责任公司 Fixation and installation method of embedded iron parts
CN201539100U (en) * 2009-11-03 2010-08-04 余新亮 Simple mould fitting for construction floor prepared holes
CN201730336U (en) * 2010-03-17 2011-02-02 李明芳 Split bolt sleeve
CN202097831U (en) * 2011-04-21 2012-01-04 昆明铁路轨枕有限责任公司 Concrete sleeper embedded parts positioning device
CN202644992U (en) * 2012-06-08 2013-01-02 中国十七冶集团有限公司 Movable die for reserving hole in box body or wellhead for building
CN202781403U (en) * 2012-08-28 2013-03-13 上海庄辰机械有限公司 Magnetic fixator for building mould
CN203626054U (en) * 2013-08-14 2014-06-04 中国建筑东北设计研究院有限公司 U-shaped anchor bar embedded part
CN203684398U (en) * 2013-12-16 2014-07-02 中国建筑第六工程局有限公司 Device for positioning embedded parts in reinforced concrete structure
CN205051281U (en) * 2015-09-02 2016-02-24 中国建筑第八工程局有限公司 Pre -buried location structure of shear force wall line box
CN105696838A (en) * 2016-03-03 2016-06-22 王腾飞 Embedded part
CN205369538U (en) * 2015-12-28 2016-07-06 大连三川建筑科技有限公司 Fixed adjusting device between PCF board and precast concrete side fascia

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07300990A (en) * 1994-05-09 1995-11-14 Furukawa Electric Co Ltd:The Precast member and its manufacture
JPH08232347A (en) * 1995-02-27 1996-09-10 Takenaka Komuten Co Ltd High adhesion embedding device for concrete
CN1236047A (en) * 1998-05-14 1999-11-24 许恒嘉 Mounting and construction method for building built-in part and its auxiliary fixture
CN101538899A (en) * 2009-04-14 2009-09-23 中建三局第二建设工程有限责任公司 Fixation and installation method of embedded iron parts
CN201539100U (en) * 2009-11-03 2010-08-04 余新亮 Simple mould fitting for construction floor prepared holes
CN201730336U (en) * 2010-03-17 2011-02-02 李明芳 Split bolt sleeve
CN202097831U (en) * 2011-04-21 2012-01-04 昆明铁路轨枕有限责任公司 Concrete sleeper embedded parts positioning device
CN202644992U (en) * 2012-06-08 2013-01-02 中国十七冶集团有限公司 Movable die for reserving hole in box body or wellhead for building
CN202781403U (en) * 2012-08-28 2013-03-13 上海庄辰机械有限公司 Magnetic fixator for building mould
CN203626054U (en) * 2013-08-14 2014-06-04 中国建筑东北设计研究院有限公司 U-shaped anchor bar embedded part
CN203684398U (en) * 2013-12-16 2014-07-02 中国建筑第六工程局有限公司 Device for positioning embedded parts in reinforced concrete structure
CN205051281U (en) * 2015-09-02 2016-02-24 中国建筑第八工程局有限公司 Pre -buried location structure of shear force wall line box
CN205369538U (en) * 2015-12-28 2016-07-06 大连三川建筑科技有限公司 Fixed adjusting device between PCF board and precast concrete side fascia
CN105696838A (en) * 2016-03-03 2016-06-22 王腾飞 Embedded part

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109278183A (en) * 2018-11-14 2019-01-29 河南中安征信建筑科技有限公司 The magnetism positioning device and application method of energy saving prefabricated component exposed steel bar
CN109278183B (en) * 2018-11-14 2023-10-17 河南中安征信建筑科技有限公司 Magnetic positioning device for exposed reinforcing steel bars of energy-saving prefabricated member and use method

Similar Documents

Publication Publication Date Title
CN206090861U (en) Portable built -in fitting is used in curtain installation
CN108425375A (en) A kind of basis prefabricated post and its connection structure and its construction method
CN109707040A (en) A kind of assembly concrete frame beam column connecting structure of the steel pipe with U-shaped steel corbel
CN208267118U (en) A kind of embedded part system and the curtain wall for cladding concrete segment curtain wall
CN109208790A (en) Circular arc shear wall single side formwork construction method
JPH0913321A (en) Reinforced structure of bridge pier column
CN201411899Y (en) Template structure for tower-silo reinforcement construction
CN210210805U (en) Prefabricated part mould
CN106182405A (en) A kind of preparation method of prefabricated component
CN207549035U (en) A kind of precast beam molding die
CN109056595A (en) A kind of grout sleeve Joining Technology of prefabricated overhead guardrail board
CN209369338U (en) A kind of taper pile shuttering location structure
CN208762857U (en) A kind of science of bridge building steel reinforced concrete vibration damping pier stud
KR20140058076A (en) Construction method for connecting new and old concrete
CN110306790A (en) After pour reserved opening closure and hang die worker's tool and its hang mould method
CN105951987A (en) Sub-frame post-cast joint with external permanent aluminum plate outer mold
CN207919747U (en) A kind of high-strength high concrete assembled frame structure system of ductility
JP5186315B2 (en) Anticorrosion lining method for column members
CN206245467U (en) A kind of precast frame attachment means
AU2008201637B2 (en) Concrete pit component and method of manufacture of same
CN211080767U (en) Superposed beam, superposed beam and cast-in-place column connecting node
CN210529735U (en) Building steel structure platform base
CN209162874U (en) A kind of basis prefabricated post and foundation structure
JP5290714B2 (en) PRECAST CONCRETE MEMBER FOR WAVE RETURN PART OF DAM WALL WALL
CN110409710A (en) A kind of composite beam, composite beam and cast-in-place column connected node and its construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161207