CN106182383B - A kind of charge car - Google Patents

A kind of charge car Download PDF

Info

Publication number
CN106182383B
CN106182383B CN201610804378.6A CN201610804378A CN106182383B CN 106182383 B CN106182383 B CN 106182383B CN 201610804378 A CN201610804378 A CN 201610804378A CN 106182383 B CN106182383 B CN 106182383B
Authority
CN
China
Prior art keywords
frame
discharge bin
governor motion
cloth
scraping plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610804378.6A
Other languages
Chinese (zh)
Other versions
CN106182383A (en
Inventor
宫开元
刘正恩
张思新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Shengshi Kaiyuan Equipment Technology Co., Ltd.
Original Assignee
Zhongyang Huaibei Mining Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongyang Huaibei Mining Machinery Co Ltd filed Critical Zhongyang Huaibei Mining Machinery Co Ltd
Priority to CN201610804378.6A priority Critical patent/CN106182383B/en
Publication of CN106182383A publication Critical patent/CN106182383A/en
Application granted granted Critical
Publication of CN106182383B publication Critical patent/CN106182383B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/02Feeding the unshaped material to moulds or apparatus for producing shaped articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/29Producing shaped prefabricated articles from the material by profiling or strickling the material in open moulds or on moulding surfaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Road Paving Machines (AREA)

Abstract

The invention discloses a kind of charge car, solves the plant issue that the fixed production line of integrated house sheet material needs, it is characterised in that including walking mechanism, frame, discharge bin, transition hopper, scraping plate mechanism, governor motion, cloth releasing mechanism, allocation mechanism, electric cabinet, inverter, battery pack;Walking mechanism is arranged on below frame;Discharge bin is arranged on the top of frame, and allocation mechanism is arranged on discharge bin lower end, and transition hopper is arranged on mouth under allocation mechanism, and the lower mouth of transition hopper sets secondary funnel;The both sides of secondary funnel set governor motion, and governor motion is supported on scraping plate mechanism, and scraping plate mechanism is supported in frame;Cloth releasing mechanism is arranged in frame;Electric cabinet, inverter, battery pack are separately mounted in the neutral on the left of frame.The present invention realize both forward and reverse directions walking can cloth, grid cloth is laid simultaneously with the bed of material in walking process, and grid cloth has been clipped between the bed of material, and automaticity is high, time saving and energy saving efficiency high.

Description

A kind of charge car
Technical field
The present invention relates to a kind of production equipment of wallboard, more particularly to a kind of fixed production of integrated house sheet material Charge car on line.
Background technology
, it is necessary to a kind of bed material charge car on the fixed production line of integrated house sheet material.The effect of the car is to be expert to pass by The laying of bed material and grid cloth is completed in journey, i.e., one layer of about 10mm bed material is laid in the template on platform, and away from bed material Layer bottom about 2mm place one layer of grid cloth of paving.At present, it there is no and can meet to walk in the fixed production line of integrated house sheet material Bed material and the charge car of grid cloth laying are completed in journey.
The content of the invention
It is an object of the invention to overcome the deficiencies in the prior art to provide a kind of charge car, in advance or retreats both direction The laying of bed material and grid cloth can be completed in walking process.
It is a feature of the present invention that including walking mechanism, frame, discharge bin, transition hopper, scraping plate mechanism, governor motion, Cloth releasing mechanism, allocation mechanism, electric cabinet, inverter, battery pack;Walking mechanism is arranged on below frame;Discharge bin is arranged on machine The top of frame, allocation mechanism are arranged on discharge bin lower end, and transition hopper is arranged on mouth under allocation mechanism, and the lower mouth of transition hopper is set Put secondary funnel;The both sides of secondary funnel set governor motion, and governor motion is supported on scraping plate mechanism, and scraping plate mechanism is supported on In frame;Cloth releasing mechanism is arranged in frame;Electric cabinet, inverter, battery pack are separately mounted in the neutral on the left of frame.
Further, the steel pipe of the upper and lower opening of a traverse is welded in the lower end of the bulkhead of discharge bin, in built-in group of steel pipe Glassware;Setting gauge connects motor reducer, is driven by motor reducer.
Further, described governor motion include be made up of square tube, connecting plate U types suspension bracket, adjustment roller, bearing pin, support Frame, electric pushrod, fixed adjustment roller between connecting plate lower end, U types suspension bracket are hung on bracket among square tube by bearing pin;Electricity The end of dynamic push rod one end connecting square pipes, other end connecting bracket.
As shown from the above technical solution, the present invention realize both forward and reverse directions walking can cloth, grid cloth in walking process Laid simultaneously with the bed of material, grid cloth has been clipped between the bed of material, and dispensing speed is not influenceed by material level height in discharge bin, cloth Uniformly, automaticity is high, time saving and energy saving efficiency high.
Brief description of the drawings
Fig. 1 is the front view of the present invention.
Fig. 2 is the right view of the present invention.
Fig. 3 is Fig. 1 A-A direction views.
Fig. 4 is the left view of governor motion in Fig. 2.
Fig. 5 is the structural representation of allocation mechanism.
In figure, 1. walking mechanisms, 2. frames, 3. discharge bins, 4. transition hoppers, 5. scraping plate mechanisms, 6. regulation machines Structure, 7. cloth releasing mechanisms, 8. allocation mechanisms, 9. electric cabinets, 10. inverters, 11. battery packs, No. 12. 2 funnels, 13. nets Ge Bu, 14. platforms;
81. bulkhead, 82. steel pipes, 83. setting gauges, 84. motor reducers;
60.U type suspension brackets, 61. square tubes, 62. connecting plates, 63. adjustment rollers, 64. bearing pins, 65. brackets, 66. electric pushrods.
Embodiment
The present invention is further illustrated below in conjunction with the accompanying drawings.
As shown in figure 1, the present invention is a kind of bed material charge car newly manufactured and designed, including with lower component:Walking mechanism 1, Frame 2, discharge bin 3, transition hopper 4, scraping plate mechanism 5, governor motion 6, cloth releasing mechanism 7, allocation mechanism 8, electric cabinet 9, inversion Device 10, battery pack 11 etc..
The association of each part is as follows:Walking mechanism 1 includes two driving wheels, and two driven pulleys, driving wheel is by decelerating through motor Machine drives, and walking mechanism 1 is arranged on the lower section of frame 2.Discharge bin 3 is arranged on the top of frame 2, and allocation mechanism 8 is arranged on blowing The lower end of storehouse 3, transition hopper 4 are arranged on 8 times mouths of allocation mechanism, and the lower mouth of transition hopper 4 sets secondary funnel 12;Secondary funnel 12 Both sides governor motion 6 is set, governor motion 6 is supported on scraping plate mechanism 5, and scraping plate mechanism 5 is supported in frame 2;Put cloth machine Structure 7 is arranged in frame 2;Electric cabinet 9, inverter 10, battery pack 11 are separately mounted in the neutral in the left side of frame 2.
The drive bed material charge car both forward and reverse directions that act as of walking mechanism 1 are at the uniform velocity walked, and speed is adjustable;Frame 2 is support Framework, play a part of to support other each parts;The effect of discharge bin 3 is to hold material;The effect of transition funnel 4 is to make material suitable Freely accurately fall into the secondary funnel 12 of scraping plate mechanism;The effect of scraping plate mechanism 5 is to strike off the material fallen in pattern plate bolster, Tiling is full in whole pattern plate bolster, and by the regulation of blade height the shop fixtures bed of material can be made to reach the thickness of requirement;Governor motion 6 effect is tensioning grid cloth 13, makes to leave certain gap between grid cloth 13 and platform 14, so that material is fallen into, makes grid Cloth 13 is clipped in the bed of material;The effect of cloth releasing mechanism 7 is the i.e. grid cloth 13 of cloth bundle is rotated by certain speed, ensures grid cloth 13 Some tension;The effect of allocation mechanism 8 is to ensure the uniform blowing of material, initial bed is reached the thickness of requirement;Electric cabinet 9 Effect is to control the rotating of movable motor, controls the speed of travel, controls rotating speed of setting gauge etc.;The effect of inverter 10 be by The direct current of battery pack output becomes alternating current;The effect of battery pack 11 is to provide power supply for charge car.
Operation principle describes:
The charge car for filling material is walked above the platform 14 for fixing template by certain speed, in front of direction of travel Cloth releasing mechanism 7 put grid cloth 13 by certain speed, the governor motion 6 in front of direction of travel is tensioned grid cloth 13, makes grid cloth Certain gap is left between 13 and platform 14, while allocation mechanism 8 is uniformly dialled down material by certain speed, a part of material The gap flowed into by the hole on grid cloth 13 between grid cloth 13 and platform 14, a part stay in the upper strata of grid cloth 13, so There is material above grid cloth 13 and below, that is, grid cloth 13 is clipped between material.Charge car moves ahead, in direction of traffic The scraper plate of the scraping plate mechanism 5 at rear strikes off material by certain thickness and forms satisfactory initial bed.When charge car completes one Charge car is transferred on the platform on another production line by the cloth of production line, ferry bus, charge car opposite direction walking cloth.
Further, as shown in figure 5, the allocation mechanism 8 of the present invention can be improved as follows:In the bulkhead 81 of discharge bin 3 The steel pipe 82 of the upper and lower opening of a traverse is welded in lower end, in the built-in setting gauge 83 of steel pipe 82.Setting gauge 83 connects motor reducer 84, drive by motor reducer 84, rotated by the speed to match with the charge car speed of travel, make the blowing speed of discharge bin 3 Degree is not influenceed by level of filler material height in discharge bin 3, uniform distribution.
Further, as shown in Fig. 2 governor motion of the present invention 6 includes the U being made up of square tube 61, connecting plate 62 Type suspension bracket 60, adjustment roller 63, bearing pin 64, bracket 65, electric pushrod 66, fixed adjustment roller 63 between the lower end of connecting plate 62, U types Suspension bracket 60 is hung on bracket 65 among square tube 61 by bearing pin 64;U types suspension bracket 60 can drive the adjustment roller 63 to be with bearing pin 64 The heart deflects.With reference to shown in Fig. 4, the end of one end connecting square pipes 61 of electric pushrod 66, other end connecting bracket 65.Electric pushrod 66 By pushing or pulling on U types suspension bracket 60, U types suspension bracket 60 is set to drive adjustment roller 63 to be deflected centered on bearing pin 64, so as to change adjustment Is realized at the both ends of roller 63 by the correction of grid cloth 13, corrects the deviation phenomenon of grid cloth 13 in time for the tensile force of grid cloth 13.

Claims (2)

1. a kind of charge car, including walking mechanism (1), frame (2), discharge bin (3), transition hopper (4), scraping plate mechanism (5), tune Save mechanism (6), cloth releasing mechanism (7), electric cabinet (9), inverter (10), battery pack (11);The lower mouth of transition hopper (4) sets two Secondary funnel (12);Walking mechanism (1) is arranged on below frame (2);Discharge bin (3) is arranged on the top of frame (2), governor motion (6) it is supported on scraping plate mechanism (5), scraping plate mechanism (5) is supported in frame (2);Cloth releasing mechanism (7) is arranged in frame (2); Electric cabinet (9), inverter (10), battery pack (11) are separately mounted in the neutral on the left of frame (2);
It is characterized in that:Also include allocation mechanism (8), allocation mechanism (8) is arranged on discharge bin (3) lower end, transition hopper (4) peace The mouth under allocation mechanism (8), the both sides of secondary funnel (12) set governor motion (6);
Described allocation mechanism (8) is to weld the steel pipe of the upper and lower opening of a traverse in the lower end of the bulkhead (81) of discharge bin (3) (82), in steel pipe (82) built-in setting gauge (83);Setting gauge (83) connection motor reducer (84), by motor reducer (84) Driving.
2. charge car as claimed in claim 1, it is characterised in that:Described governor motion (6) is included by square tube (61), connection U types suspension bracket (60), adjustment roller (63), bearing pin (64), bracket (65), the electric pushrod (66) of plate (62) composition, connecting plate (62) Fixed adjustment roller (63) between lower end, U types suspension bracket (60) are hung on bracket (65) among square tube (61) by bearing pin (64); The end of electric pushrod (66) one end connecting square pipes (61), other end connecting bracket (65).
CN201610804378.6A 2016-09-06 2016-09-06 A kind of charge car Active CN106182383B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610804378.6A CN106182383B (en) 2016-09-06 2016-09-06 A kind of charge car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610804378.6A CN106182383B (en) 2016-09-06 2016-09-06 A kind of charge car

Publications (2)

Publication Number Publication Date
CN106182383A CN106182383A (en) 2016-12-07
CN106182383B true CN106182383B (en) 2018-02-09

Family

ID=58066426

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610804378.6A Active CN106182383B (en) 2016-09-06 2016-09-06 A kind of charge car

Country Status (1)

Country Link
CN (1) CN106182383B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108297263B (en) * 2018-04-18 2023-12-01 李钰 Movable type template-preserving integrated plate forming machine

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06226726A (en) * 1993-02-05 1994-08-16 Sekisui Chem Co Ltd Method of measuring raw material for cement mortal molding
CN202575489U (en) * 2012-05-29 2012-12-05 珠海亚泰电子科技有限公司 Rectification device
CN203228300U (en) * 2013-05-24 2013-10-09 陈中生 Squeezing type board machine
CN203579854U (en) * 2013-11-26 2014-05-07 河北雪龙机械制造有限公司 Distributing device used in concrete component producing system
CN205497742U (en) * 2016-02-29 2016-08-24 中鸿基(北京)集成房屋科技有限公司 Foaming cement cloth machine with net cloth flush mounting
CN206030198U (en) * 2016-09-06 2017-03-22 淮北中阳矿山机械有限公司 Material distribution vehicle

Also Published As

Publication number Publication date
CN106182383A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN204173499U (en) A kind of tubing wrapping machine automatically put pipe device
CN203903518U (en) Overhead fixed type efficient spiral material leveling machine
CN206720526U (en) A kind of elevator advertising board fixer
CN100381643C (en) Long slope vibratory slipform shaping mill
CN107938535A (en) Cone automatic deploying and retracting machine
CN110000891B (en) Integrated distributing machine for concrete
CN107826625A (en) A kind of feeding uniformly and automatic blanking elevator
CN106182383B (en) A kind of charge car
CN206615668U (en) Feeder
CN206030198U (en) Material distribution vehicle
CN201471583U (en) Material distributor
CN203173540U (en) Elevated rail walking type spiral efficient bin levelling system
CN108422543A (en) The rotary-type automation fabricated device of roller
CN102491056A (en) Garbage feeder
CN105936423A (en) Sintered brick setting machine
CN103737714B (en) Semi automatic block streamline
CN210451501U (en) Synchronous handling device of many vertical reinforcing bars when improved generation reinforcing bar net piece welding
CN206915189U (en) Plastic pipe auto tube feeding cap equipment
CN202181900U (en) Inverted arch sliding mode concrete tunnel lining steel mould trolley
CN208499471U (en) A kind of speed leveling style bucket elevator
CN203919334U (en) A kind ofly be used in the distributing trolley that on brickmaking machine, material controlling flexibly can be whole
CN206842461U (en) A kind of teaching automatic plate loader
CN203901486U (en) Continuous manufacturing machine for building foamed concrete insulation board
CN203096535U (en) Railway self-compacting concrete moving filling machine
CN202380747U (en) Concrete pouring and feeding device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180808

Address after: 234300 modern industrial park, Si Tu, Sixian, Suzhou, Anhui

Patentee after: Anhui Shengshi Kaiyuan Equipment Technology Co., Ltd.

Address before: 235100 No. 38 locust Road, Suixi Economic Development Zone, Suixi County, Huaibei, Anhui

Patentee before: Zhongyang Huaibei Mining Machinery Co., Ltd.

TR01 Transfer of patent right