CN106181293B - 铁芯组件装配机构的铁芯弹簧出料单元 - Google Patents

铁芯组件装配机构的铁芯弹簧出料单元 Download PDF

Info

Publication number
CN106181293B
CN106181293B CN201610759802.XA CN201610759802A CN106181293B CN 106181293 B CN106181293 B CN 106181293B CN 201610759802 A CN201610759802 A CN 201610759802A CN 106181293 B CN106181293 B CN 106181293B
Authority
CN
China
Prior art keywords
iron core
core spring
rack
spring offset
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610759802.XA
Other languages
English (en)
Other versions
CN106181293A (zh
Inventor
叶显华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yueqing Huatian Electric Power Technology Co., Ltd.
Original Assignee
Yueqing Huatian Electric Power Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yueqing Huatian Electric Power Technology Co Ltd filed Critical Yueqing Huatian Electric Power Technology Co Ltd
Priority to CN201610759802.XA priority Critical patent/CN106181293B/zh
Publication of CN106181293A publication Critical patent/CN106181293A/zh
Application granted granted Critical
Publication of CN106181293B publication Critical patent/CN106181293B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/001Article feeders for assembling machines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Automatic Assembly (AREA)
  • Springs (AREA)

Abstract

本发明公开了一种铁芯组件装配机构的铁芯弹簧出料单元,该铁芯组件装配机构的铁芯弹簧出料单元包括安装在两条铁芯弹簧移位导轨的滑块上的铁芯弹簧移位板,铁芯弹簧移位板的中间位置设有气缸避让槽,铁芯弹簧移位板的下端面安装有与之垂直的齿条移位气缸安装板,齿条移位气缸安装板上安装有齿条移位滑台气缸,齿条移位滑台气缸的滑台上安装有移位齿条安装板,移位齿条安装板位于铁芯弹簧移位板上的气缸避让槽内,移位齿条安装板的上平面安装有铁芯弹簧移位齿条,移位齿条安装板的上平面通过一对导向杆支座安装有一根铁芯弹簧移位导向杆。通过上述方式,本发明操作方便,不会使工件磨损,工作效率高。

Description

铁芯组件装配机构的铁芯弹簧出料单元
技术领域
本发明涉及机械自动化领域,特别是涉及一种铁芯组件装配机构的铁芯弹簧出料单元。
背景技术
目前机械自动化的趋势日益明显,在生产的过程中,通常需要将部件装配在一起,在装配的过程中就需要输送物料,传统的出料步骤会使得机器与工件产生摩擦碰撞,造成工件磨损,而且还需要人工控制,效率低下,有鉴于此,有必要对现有的铁芯组件装配机构的铁芯弹簧出料单元予以改进。
发明内容
本发明主要解决的技术问题是提供一种铁芯组件装配机构的铁芯弹簧出料单元,其结构简单,易操作,出料便捷,工件磨损小,工作效率高,机器的使用寿命长,降低了生产成本。
为解决上述技术问题,本发明采用的一个技术方案是:提供一种铁芯组件装配机构的铁芯弹簧出料单元,该铁芯组件装配机构的铁芯弹簧出料单元包括安装在两条铁芯弹簧移位导轨的滑块上的铁芯弹簧移位板,铁芯弹簧移位板的中间位置设有气缸避让槽,铁芯弹簧移位板的下端面安装有与之垂直的齿条移位气缸安装板,齿条移位气缸安装板上安装有齿条移位滑台气缸,齿条移位滑台气缸的滑台上安装有移位齿条安装板,移位齿条安装板位于铁芯弹簧移位板上的气缸避让槽内,移位齿条安装板的上平面安装有铁芯弹簧移位齿条,移位齿条安装板的上平面通过一对导向杆支座安装有一根铁芯弹簧移位导向杆,铁芯弹簧移位导向杆上套装有两个铁芯弹簧顶针安装块,铁芯弹簧移位导向杆上位于两个铁芯弹簧顶针安装块之间套装有铁芯弹簧移位齿轮,铁芯弹簧移位齿轮和铁芯弹簧移位齿条相啮合,两个铁芯弹簧顶针安装块上均安装有铁芯弹簧顶针,两根铁芯弹簧顶针上均套装有可滑动的套筒,移位齿条安装板的上平面还安装有三个呈品字形排布的夹头,三个夹头上通过螺栓固定有铁芯弹簧移位安装板,铁芯弹簧移位安装板的上平面安装有相对应的两个移位连杆座,两个移位连杆座上均销接一对铁芯弹簧移位连杆,每对铁芯弹簧移位连杆分别通过螺丝与两个套筒铰接。
本发明的有益效果是:本发明一种铁芯组件装配机构的铁芯弹簧出料单元,其结构简单,易操作,出料便捷,工件磨损小,工作效率高,机器的使用寿命长,降低了生产成本。
附图说明
图1是本发明铁芯组件装配机构的铁芯弹簧出料单元的结构示意图。
具体实施方式
下面结合附图对本发明较佳实施例进行详细阐述,以使发明的优点和特征能更易于被本领域技术人员理解,从而对本发明的保护范围做出更为清楚明确的界定。
请参阅图1,本发明实施例包括:
一种铁芯组件装配机构的铁芯弹簧出料单元,该铁芯组件装配机构的铁芯弹簧出料单元包括铁芯弹簧移位板45191,铁芯弹簧移位板45191的中间位置设有气缸避让槽,铁芯弹簧移位板45191的下端面安装有与之垂直的齿条移位气缸安装板45192,齿条移位气缸安装板45192上安装有齿条移位滑台气缸45193,齿条移位滑台气缸45193的滑台上安装有移位齿条安装板45194,移位齿条安装板45194位于铁芯弹簧移位板45191上的气缸避让槽内,移位齿条安装板45194的上平面安装有铁芯弹簧移位齿条45195,移位齿条安装板45194的上平面通过一对导向杆支座安装有一根铁芯弹簧移位导向杆45196,铁芯弹簧移位导向杆45196上套装有两个铁芯弹簧顶针安装块45197,铁芯弹簧移位导向杆45196上位于两个铁芯弹簧顶针安装块45197之间套装有铁芯弹簧移位齿轮45198,铁芯弹簧移位齿轮45198和铁芯弹簧移位齿条45195相啮合,两个铁芯弹簧顶针安装块45197上均安装有铁芯弹簧顶针45199,两根铁芯弹簧顶针45199上均套装有可滑动的套筒451910,移位齿条安装板45194的上平面还安装有三个呈品字形排布的夹头451911,三个夹头451911上通过螺栓固定有铁芯弹簧移位安装板451912,铁芯弹簧移位安装板451912的上平面安装有相对应的两个移位连杆座,两个移位连杆座上均销接一对铁芯弹簧移位连杆451913,每对铁芯弹簧移位连杆451913分别通过螺丝与两个套筒451910铰接。
本发明铁芯组件装配机构的铁芯弹簧出料单元工作时,两个铁芯弹簧分别套在两根顶针45199上,齿条移位滑台气缸45193运转使得铁芯弹簧移位齿条45195带动铁芯弹簧移位齿轮45198旋转,从而使得铁芯弹簧移位导向杆45196旋转,铁芯弹簧移位导向杆45196旋转使得两个铁芯弹簧顶针安装块45197上的铁芯弹簧移位连杆451913带动铁芯弹簧顶针45199上移,机器重复以上工作步骤。
本发明铁芯组件装配机构的铁芯弹簧出料单元,其结构简单,易操作,出料便捷,工件磨损小,工作效率高,机器的使用寿命长,降低了生产成本。
以上所述仅为本发明的实施例,并非因此限制本发明的专利范围,凡是利用本发明说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其他相关的技术领域,均同理包括在本发明的专利保护范围内。

Claims (1)

1.一种铁芯组件装配机构的铁芯弹簧出料单元,其特征在于:该铁芯组件装配机构的铁芯弹簧出料单元包括安装在两条铁芯弹簧移位导轨的滑块上的铁芯弹簧移位板,铁芯弹簧移位板的中间位置设有气缸避让槽,铁芯弹簧移位板的下端面安装有与之垂直的齿条移位气缸安装板,齿条移位气缸安装板上安装有齿条移位滑台气缸,齿条移位滑台气缸的滑台上安装有移位齿条安装板,移位齿条安装板位于铁芯弹簧移位板上的气缸避让槽内,移位齿条安装板的上平面安装有铁芯弹簧移位齿条,移位齿条安装板的上平面通过一对导向杆支座安装有一根铁芯弹簧移位导向杆,铁芯弹簧移位导向杆上套装有两个铁芯弹簧顶针安装块,铁芯弹簧移位导向杆上位于两个铁芯弹簧顶针安装块之间套装有铁芯弹簧移位齿轮,铁芯弹簧移位齿轮和铁芯弹簧移位齿条相啮合,两个铁芯弹簧顶针安装块上均安装有铁芯弹簧顶针,两根铁芯弹簧顶针上均套装有可滑动的套筒,移位齿条安装板的上平面还安装有三个呈品字形排布的夹头,三个夹头上通过螺栓固定有铁芯弹簧移位安装板,铁芯弹簧移位安装板的上平面安装有相对应的两个移位连杆座,两个移位连杆座上均销接一对铁芯弹簧移位连杆,每对铁芯弹簧移位连杆分别通过螺丝与两个套筒铰接。
CN201610759802.XA 2016-08-30 2016-08-30 铁芯组件装配机构的铁芯弹簧出料单元 Expired - Fee Related CN106181293B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610759802.XA CN106181293B (zh) 2016-08-30 2016-08-30 铁芯组件装配机构的铁芯弹簧出料单元

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610759802.XA CN106181293B (zh) 2016-08-30 2016-08-30 铁芯组件装配机构的铁芯弹簧出料单元

Publications (2)

Publication Number Publication Date
CN106181293A CN106181293A (zh) 2016-12-07
CN106181293B true CN106181293B (zh) 2018-06-26

Family

ID=58089538

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610759802.XA Expired - Fee Related CN106181293B (zh) 2016-08-30 2016-08-30 铁芯组件装配机构的铁芯弹簧出料单元

Country Status (1)

Country Link
CN (1) CN106181293B (zh)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2489973A (en) * 2011-04-13 2012-10-17 Honda Motor Co Ltd Valve spring seat supply apparatus
CN202743987U (zh) * 2012-09-26 2013-02-20 周俊雄 一种弹簧自动上料装置
CN104942562A (zh) * 2015-06-30 2015-09-30 苏州昌飞自动化设备厂 阀芯自动组装机的弹簧上料机构
CN205271326U (zh) * 2015-12-21 2016-06-01 苏州研高自动化科技有限公司 一种阀芯装弹簧送料机构
CN205465136U (zh) * 2016-03-28 2016-08-17 广东庞德智能科技有限公司 一种弹簧上料装置
CN205968069U (zh) * 2016-08-30 2017-02-22 吴中区横泾嘉运模具厂 铁芯组件装配机构的铁芯弹簧出料单元

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2489973A (en) * 2011-04-13 2012-10-17 Honda Motor Co Ltd Valve spring seat supply apparatus
CN202743987U (zh) * 2012-09-26 2013-02-20 周俊雄 一种弹簧自动上料装置
CN104942562A (zh) * 2015-06-30 2015-09-30 苏州昌飞自动化设备厂 阀芯自动组装机的弹簧上料机构
CN205271326U (zh) * 2015-12-21 2016-06-01 苏州研高自动化科技有限公司 一种阀芯装弹簧送料机构
CN205465136U (zh) * 2016-03-28 2016-08-17 广东庞德智能科技有限公司 一种弹簧上料装置
CN205968069U (zh) * 2016-08-30 2017-02-22 吴中区横泾嘉运模具厂 铁芯组件装配机构的铁芯弹簧出料单元

Also Published As

Publication number Publication date
CN106181293A (zh) 2016-12-07

Similar Documents

Publication Publication Date Title
CN106078159B (zh) 铁芯组件装配机构的铁芯弹簧上料装置
CN106392545B (zh) 电磁阀部分组装机的螺帽上料旋转单元
CN205968069U (zh) 铁芯组件装配机构的铁芯弹簧出料单元
CN106181293B (zh) 铁芯组件装配机构的铁芯弹簧出料单元
CN104476211A (zh) 一种机床小半径交换台
CN102806485A (zh) 附件头拉紧装置及机床
CN106181291A (zh) 铁芯组件装配机构的铁芯杆上料夹爪单元
CN103001404A (zh) 一种转子换向器自动压入机
CN105127523A (zh) 强承载力高速攻牙装置
CN106181306B (zh) 压缩机曲轴与消音套头装配机的消音套头组装机构
CN106181292B (zh) 铁芯组件装配机构的铁芯弹簧出料组件
CN104482198A (zh) 电控电动amt选换档执行机构总成
CN106217361B (zh) 铁芯组件装配机构的橡胶块出料机械手
CN204437092U (zh) 一种传动连接装置
CN106312503A (zh) 扣环上料机构的供料装置
CN106553141B (zh) 割草机机头部分组装机的定位组件
CN206316979U (zh) 割草机机头部分组装机的定位组件
CN206552829U (zh) 刹车泵泵盖上料机的夹料组件
CN106425390B (zh) 割草机机头的轴承与齿轮轴装配机的扣环换位组件
CN106514175B (zh) 割草机机头部分组装机的轴承出料组件
CN106695628B (zh) 割草机机头组装流水线的夹具定位开合装置
CN106271500B (zh) 压缩机曲轴与消音套头装配机的换位机械手
CN204308569U (zh) 一种机床小半径交换台
CN106514174A (zh) C型扣环上料设备的定位组件
CN204308506U (zh) 对表面复合修复后的活塞杆进行冷压处理的冷压装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180528

Address after: 325600 No. 10 Ning Ning Road, Gai Zhu Village, Chengnan street, Yueqing, Zhejiang -1

Applicant after: Yueqing Huatian Electric Power Technology Co., Ltd.

Address before: 215103 2 group of Ma Jia Cun, Heng Jing Town, Wuzhong District, Suzhou, Jiangsu

Applicant before: Heng Jingjiayun mould factory, Wuzhong District

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180626

Termination date: 20180830