CN106181231A - GCr15 hydraulic hammer piston production technology - Google Patents

GCr15 hydraulic hammer piston production technology Download PDF

Info

Publication number
CN106181231A
CN106181231A CN201610532689.1A CN201610532689A CN106181231A CN 106181231 A CN106181231 A CN 106181231A CN 201610532689 A CN201610532689 A CN 201610532689A CN 106181231 A CN106181231 A CN 106181231A
Authority
CN
China
Prior art keywords
gcr15
production technology
retention time
temperature
well formula
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610532689.1A
Other languages
Chinese (zh)
Inventor
陶云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ma'anshan Yunlin Baicheng Machinery Manufacturing Co Ltd
Original Assignee
Ma'anshan Yunlin Baicheng Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ma'anshan Yunlin Baicheng Machinery Manufacturing Co Ltd filed Critical Ma'anshan Yunlin Baicheng Machinery Manufacturing Co Ltd
Priority to CN201610532689.1A priority Critical patent/CN106181231A/en
Publication of CN106181231A publication Critical patent/CN106181231A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/18Hardening; Quenching with or without subsequent tempering
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D6/00Heat treatment of ferrous alloys
    • C21D6/04Hardening by cooling below 0 degrees Celsius
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/0068Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for particular articles not mentioned below

Abstract

The invention discloses a kind of GCr15 hydraulic hammer piston production technology, include following processing step: select high-quality beating steel GCr15, use vacuum outgas steel ingot, ingot head opening position resection is more than 15%, after steel ingot former portion resection is more than 2%, carries out being forged into circle, forging ratio >=5:1, then carrying out spheroidizing, surface grinding, surface roughness must reach ultrasonic examination requirement: performs by JB/T5000.15 2007 standard, reaches two grades of flaw detections;Present invention employs new material Gcr15/9cr2mo and production technology makes the product of pure production domesticization, substantially increase service life.

Description

GCr15 hydraulic hammer piston production technology
Technical field
The present invention relates to hydraulic part field, particularly belong to GCr15 hydraulic hammer piston production technology.
Background technology
Hydraulic breaking hammer is formed by numerous assembling parts, and each part plays vital effect, hydraulic crushing Hammer piston is after by hydraulic-driven, produces high intensity, and high vibration and a core part of altofrequency impact energy, it is durable Degree and improve hitting dynamics and be just particularly important, once it is by side force or fall block and deform, and can make in hydraulic breaking hammer Locking pulled by cylinder body and reversal valve, causes whole hydraulic breaking hammer to be scrapped, the most badly damaged hydraulic pump of excavator.Thus can make Become huge economic loss and seriously delay normal production.The piston of hydraulic breaking hammer is based on import at present, and use cost is huge Greatly.
Summary of the invention
It is an object of the invention to provide a kind of GCr15 hydraulic hammer piston production technology, have employed new material Gcr15/ 9cr2mo and production technology make the product of pure production domesticization, substantially increase service life.
Technical scheme is as follows:
GCr15 hydraulic hammer piston production technology, includes following processing step:
1), selecting high-quality beating steel GCr15, use vacuum outgas steel ingot, ingot head opening position resection is more than 15%, and steel ingot is former After portion's resection is more than 2%, carries out being forged into circle, forging ratio >=5:1, then carry out spheroidizing, surface grinding, rough surface Degree must reach ultrasonic examination requirement: performs by JB/T5000.15-2007 standard, reaches two grades of flaw detections;
2), finishing operation:
After 1-2mm surplus is stayed in the rough turn molding of a, numerically controlled lathe, carry out cold-heat treatment processing;
After b, cold-heat treatment, carry out ultrasonic examination, detect a flaw and reach two grades of flaw detection requirements with reference to JB/T5000.15-2007, and do Hardness test, case hardness requires that at HRC58-62, core hardness requires at HRC42-44, and qualified rear numerical control carries out finish turning, Ask and leave 0.3-0.5mm allowance;
3), heat treatment
Workpiece after polish is put into well formula glowing furnace and carries out Quenching Treatment, hardening heat 350-400 DEG C, temperature retention time 3h, Hardening heat 450-500 DEG C, temperature retention time 7h;Temper, temperature 260 DEG C ± 5 DEG C, insulation is carried out at well formula tempering furnace Time 20h, then air cooling;
4), bead, cold treatment
Entering cooler bin after piston ball blast, in cooling the temperature inside the box is-140 DEG C, isothermal holding took out after 7 hours.
Described well formula glowing furnace of being put into by workpiece after polish carries out Quenching Treatment, hardening heat 380 DEG C, temperature retention time 3h, hardening heat 480 DEG C, temperature retention time 7h;Temper, temperature 260 DEG C, temperature retention time is carried out at well formula tempering furnace 20h, then air cooling.
Steel ball ball blast of the present invention removes surface oxide layer and burr, increases area density.Cold treatment is effectively improved inside it Organizational structure, greatly reduces its coefficient of expansion.Have employed new material Gcr15/9cr2mo and production technology is made pure domestic The product changed, substantially increases service life.
Detailed description of the invention
GCr15 hydraulic hammer piston production technology, includes following processing step:
1), selecting high-quality beating steel GCr15, use vacuum outgas steel ingot, ingot head opening position resection is more than 15%, and steel ingot is former After portion's resection is more than 2%, carries out being forged into circle, forging ratio >=5:1, then carry out spheroidizing, surface grinding, rough surface Degree must reach ultrasonic examination requirement: performs by JB/T5000.15-2007 standard, reaches two grades of flaw detections;
2), finishing operation:
After 1-2mm surplus is stayed in the rough turn molding of a, numerically controlled lathe, carry out cold-heat treatment processing;
After b, cold-heat treatment, carry out ultrasonic examination, detect a flaw and reach two grades of flaw detection requirements with reference to JB/T5000.15-2007, and do Hardness test, case hardness requires that at HRC58-62, core hardness requires at HRC42-44, and qualified rear numerical control carries out finish turning, Ask and leave 0.3-0.5mm allowance;
3), heat treatment
Workpiece after polish is put into well formula glowing furnace and carries out Quenching Treatment, hardening heat 350-400 DEG C, temperature retention time 3h, Hardening heat 450-500 DEG C, temperature retention time 7h;Temper, temperature 260 DEG C ± 5 DEG C, insulation is carried out at well formula tempering furnace Time 20h, then air cooling;
4), bead, cold treatment
Entering cooler bin after piston ball blast, in cooling the temperature inside the box is-140 DEG C, isothermal holding took out after 7 hours.
Described well formula glowing furnace of being put into by workpiece after polish carries out Quenching Treatment, hardening heat 380 DEG C, temperature retention time 3h, hardening heat 480 DEG C, temperature retention time 7h;Temper, temperature 260 DEG C, temperature retention time is carried out at well formula tempering furnace 20h, then air cooling.
GCr15 hydraulic hammer piston performance parameter prepared by embodiments of the invention is as follows:
1, under 80 DEG C of high temperature, modified difference is 0.01mm
2, tensile strength (Mpa) >=980
3, yield strength (Mpa) >=850
4, bending strength (Mpa) >=2300.

Claims (2)

1.GCr15 hydraulic hammer piston production technology, it is characterised in that include following processing step:
1), selecting high-quality beating steel GCr15, use vacuum outgas steel ingot, ingot head opening position resection is more than 15%, and steel ingot is former After portion's resection is more than 2%, carries out being forged into circle, forging ratio >=5:1, then carry out spheroidizing, surface grinding, rough surface Degree must reach ultrasonic examination requirement: performs by JB/T5000.15-2007 standard, reaches two grades of flaw detections;
2), finishing operation:
After 1-2mm surplus is stayed in the rough turn molding of a, numerically controlled lathe, carry out cold-heat treatment processing;
After b, cold-heat treatment, carry out ultrasonic examination, detect a flaw and reach two grades of flaw detection requirements with reference to JB/T5000.15-2007, and do Hardness test, case hardness requires that at HRC58-62, core hardness requires at HRC42-44, and qualified rear numerical control carries out finish turning, Ask and leave 0.3-0.5mm allowance;
3), heat treatment
Workpiece after polish is put into well formula glowing furnace and carries out Quenching Treatment, hardening heat 350-400 DEG C, temperature retention time 3h, Hardening heat 450-500 DEG C, temperature retention time 7h;Temper, temperature 260 DEG C ± 5 DEG C, insulation is carried out at well formula tempering furnace Time 20h, then air cooling;
4), bead, cold treatment
Entering cooler bin after piston ball blast, in cooling the temperature inside the box is-140 DEG C, isothermal holding took out after 7 hours.
GCr15 hydraulic hammer piston production technology the most according to claim 1, it is characterised in that: described by after polish Workpiece is put into well formula glowing furnace and is carried out Quenching Treatment, hardening heat 380 DEG C, temperature retention time 3h, and hardening heat 480 DEG C, during insulation Between 7h;Temper, temperature 260 DEG C, temperature retention time 20h, then air cooling is carried out at well formula tempering furnace.
CN201610532689.1A 2016-07-07 2016-07-07 GCr15 hydraulic hammer piston production technology Pending CN106181231A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610532689.1A CN106181231A (en) 2016-07-07 2016-07-07 GCr15 hydraulic hammer piston production technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610532689.1A CN106181231A (en) 2016-07-07 2016-07-07 GCr15 hydraulic hammer piston production technology

Publications (1)

Publication Number Publication Date
CN106181231A true CN106181231A (en) 2016-12-07

Family

ID=57473478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610532689.1A Pending CN106181231A (en) 2016-07-07 2016-07-07 GCr15 hydraulic hammer piston production technology

Country Status (1)

Country Link
CN (1) CN106181231A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1962177A (en) * 2006-12-06 2007-05-16 国营重庆重型铸锻厂 Method for making hammer stem for forging equipment
CN101574769A (en) * 2009-05-21 2009-11-11 天津辰龙重工机械有限公司 Surface treatment method of piston for quartering hammer
CN102796964A (en) * 2011-10-10 2012-11-28 江苏力博士机械股份有限公司 Novel material of piston of breaking hammer and manufacturing process of piston

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1962177A (en) * 2006-12-06 2007-05-16 国营重庆重型铸锻厂 Method for making hammer stem for forging equipment
CN101574769A (en) * 2009-05-21 2009-11-11 天津辰龙重工机械有限公司 Surface treatment method of piston for quartering hammer
CN102796964A (en) * 2011-10-10 2012-11-28 江苏力博士机械股份有限公司 Novel material of piston of breaking hammer and manufacturing process of piston

Similar Documents

Publication Publication Date Title
CN101890622B (en) Method for manufacturing hammer lever of electrohydraulic hammer
CN103009018B (en) A kind of Ultra-fine Grained, high-strength alloy blade forging manufacture method
CN110340327B (en) Alloy plate hammer production method based on chilling and liquid die forging
CN105063491B (en) A kind of preparation method of radial precision forging machine high rigidity tup
CN106736326A (en) Automobile die method for surface hardening
CN105525230A (en) Method for manufacturing cutting tools from high-speed W18Cr4Nb material
CN109652757A (en) A kind of high vacuum squeezes the surface recombination processing method of compression mod
CN103639648A (en) Machining process for internal combustion engine expansion breaking connecting rod
CN102380920B (en) Machining method of air valve forming die
CN109517967A (en) A kind of half production method of shaft of Micro Alloying of surface deformation strengthening
CN106041433A (en) Hydraulic hammer piston production technology
CN102586583A (en) Heat treatment process for free forging die for medium carbon steel
CN106181231A (en) GCr15 hydraulic hammer piston production technology
CN104498692A (en) Cold-drawn steel pipe mandrel and preparation method thereof
CN106078107A (en) The jump bit production technology of hydraulic pressure
CN114075642B (en) Water-cooled wall induction fusion welding following type surface strengthening method
CN113322370B (en) Long-life gray cast iron, method for prolonging service life of gray cast iron and application of gray cast iron
CN107541660B (en) A kind of high-performance crushing plant rear-bank rotor housing and its processing method
CN107326297B (en) A kind of manufacturing method of deep-sea oil recovery equipment connector steel and its forging
CN110000319A (en) A kind of band skirt non-hardened and tempered steel piston forging and forming technology
CN102936693B (en) Drawing die mold steel processing method
CN101363123A (en) Composite technique of steel member surface shot-blasting and plasma low-temperature boriding
CN103846635A (en) Forging method for automotive engine crankshaft
CN110293379B (en) Treatment method for martensite steel inlet valve disc conical surface
CN102989954A (en) Forging method of excavator engine crankshaft

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161207