CN106164686B - A kind of leakage current test system of terminal - Google Patents
A kind of leakage current test system of terminal Download PDFInfo
- Publication number
- CN106164686B CN106164686B CN201480071964.3A CN201480071964A CN106164686B CN 106164686 B CN106164686 B CN 106164686B CN 201480071964 A CN201480071964 A CN 201480071964A CN 106164686 B CN106164686 B CN 106164686B
- Authority
- CN
- China
- Prior art keywords
- terminal
- power
- leakage current
- core system
- supply device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 28
- 238000001514 detection method Methods 0.000 claims abstract description 18
- 238000000034 method Methods 0.000 claims description 7
- 230000005611 electricity Effects 0.000 claims description 4
- 238000010586 diagram Methods 0.000 description 5
- 238000012986 modification Methods 0.000 description 5
- 230000004048 modification Effects 0.000 description 5
- 239000007795 chemical reaction product Substances 0.000 description 3
- 238000012790 confirmation Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- -1 mobile phone Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
- G01R31/52—Testing for short-circuits, leakage current or ground faults
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Secondary Cells (AREA)
- Power Sources (AREA)
- Telephone Function (AREA)
Abstract
A kind of leakage current test system of terminal, comprising: control equipment (201) is disconnected for the connection between the core system (101) of controlling terminal and the battery (102) of terminal;Power-supply device (202) connects core system (101), for powering for core system (101);Detection device (203), when being disconnected for the connection between equipment (201) the control core system (101) of control and battery (102), being that core system (101) power and terminal is designated state by power-supply device (202), the output electric current of the power-supply device (202) is detected, the electric current detected is the leakage current of terminal under prescribed conditions.The detection of terminal leakage current just can be realized without dismantling lower battery (102) using leakage current test system provided in an embodiment of the present invention.
Description
Technical field
The present invention relates to field of terminal, in particular to the leakage current test system of a kind of terminal.
Background technique
Terminal leakage current be examine end product (such as mobile phone, tablet computer) whether a He Ge major criterion.Mesh
Preceding common end product structure is as shown in Figure 1, comprising:
Core system 101, terminal realize the core of various functions;
Battery 102, for providing working power for core system 101;
USB (Universal Serial Bus, universal serial bus) interface 103, for connecting terminal charger;
Intelligent charge chip 104 connects above-mentioned core system 101, battery 102 and usb 1 03;Work as USB interface
When 103 not connected terminal charger, the battery switch S in intelligent charge chip 104 is closed, core system 101 and battery
Connecting between 102, battery 102 are the power supply of core system 101;When usb 1 03 connects terminal charger, if filling
Electric current is smaller, not up to setting value, battery switch S is disconnected, and terminal charger is only that core system 101 is powered, if charging
Electric current is larger, reaches setting value, battery switch S closure, terminal charger for core system 101 power while, also for
Battery 102 charges.
In the prior art, the leakage current test of terminal can only the progress when terminal does not install battery.However, at present very
Multiple terminals is the non-removable structure design of battery, i.e., can not carry out the leakage current test of terminal.
Summary of the invention
The embodiment of the present invention provides a kind of leakage current test system of terminal, and terminal can be realized when not dismantling battery
The detection of leakage current.
In a first aspect, providing a kind of leakage current test system of terminal, comprising:
Equipment is controlled, is disconnected for the connection between the core system of controlling terminal and the battery of terminal;
Power-supply device connects the core system, for powering for the core system;
Detection device, for the control equipment control the connection between the core system and the battery disconnect,
When by the power-supply device be the core system power supply and the terminal is designated state, the defeated of the power-supply device is detected
Electric current out, the electric current detected are leakage current of the terminal under the designated state.
With reference to first aspect, in the first possible implementation, the power-supply device, especially by the terminal
General-purpose serial bus USB interface connects the core system.
With reference to first aspect, in the second possible implementation, the power-supply device, especially by the terminal
Audio interface connects the core system.
With reference to first aspect, in the third possible implementation, the power-supply device, especially by the terminal
Client identification module sim card slot connects the core system.
With reference to first aspect, in the fourth possible implementation, the power-supply device, especially by the terminal
Memory card slot connects the core system.
With reference to first aspect, the first possible implementation of first aspect, the possible reality of second of first aspect
Existing mode, the third possible implementation of first aspect or the 4th kind of possible implementation of first aspect, the
In five kinds of possible implementations, the power-supply device is specially programmable power supply.
With reference to first aspect, the first possible implementation of first aspect, the possible reality of second of first aspect
Existing mode, the third possible implementation of first aspect, the 4th kind of possible implementation or first of first aspect
5th kind of possible implementation of aspect, in a sixth possible implementation, the designated state be off-mode or
Standby mode.
According to the leakage current test system for the terminal that first aspect provides, between the core system and battery of controlling terminal
Connection disconnects, and is core system power supply merely with power-supply device, the output electricity of detection power-supply device when terminal is designated state
Stream, the electric current detected is leakage current of the terminal under the designated state;Obviously, using leakage provided in an embodiment of the present invention
Current detecting system, terminal just can be realized the detection of leakage current without dismantling lower battery.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and constitutes part of specification, is implemented with the present invention
Example is used to explain the present invention together, is not construed as limiting the invention.In the accompanying drawings:
Fig. 1 is terminal structure schematic diagram common at present;
Fig. 2 is one of the schematic diagram of the leakage current test system of terminal provided in an embodiment of the present invention;
Fig. 3 is the two of the schematic diagram of the leakage current test system of terminal provided in an embodiment of the present invention;
Fig. 4 is the schematic diagram of the detection process of terminal closedown leakage current provided in an embodiment of the present invention;
Fig. 5 is the schematic diagram of the detection process of terminal standby leakage current provided in an embodiment of the present invention.
Specific embodiment
It is not necessarily to dismantle lower battery to provide, is just able to carry out the implementation of terminal leakage current test, the present invention is real
It applies example and provides a kind of leakage current test system of terminal, the preferred embodiment of the present invention is carried out below in conjunction with Figure of description
Explanation, it should be understood that preferred embodiments described herein are only used to illustrate and explain the present invention, is not used to limit this hair
It is bright.And in the absence of conflict, the features in the embodiments and the embodiments of the present application can be combined with each other.
The embodiment of the present invention provides a kind of leakage current test system of terminal, as shown in Figure 2, comprising:
Equipment 201 is controlled, is disconnected for the connection between the core system 101 of controlling terminal and the battery 102 of terminal;
Power-supply device 202 connects core system 101, for powering for core system 101;
Detection device 203, disconnected for the connection between control 201 control core system 101 of equipment and battery 102,
When by power-supply device 202 be the power supply of core system 101 and terminal is designated state, the output electric current of power-supply device 202 is detected,
Detecting obtained electric current is the leakage current of terminal under prescribed conditions.
It is each that leakage current test system provided in an embodiment of the present invention can be applied to mobile phone, tablet computer, music player etc.
Kind terminal.
When actual implementation, control equipment 201 is specifically as follows the PC connecting with terminal by the usb 1 03 of terminal
(Personal Computer, personal computer) issues control command from PC to terminal when terminal is open state, controls
Connection between core system 101 and battery 102 disconnects.
Further, above-mentioned power-supply device 202 is specifically as follows programmable power supply, and safety, reliability are higher.
And the connection between power-supply device 202 and the core system 101 of terminal, it can specifically be realized using various ways.
For example, power-supply device 202 can connect core system 101 by usb 1 03;When terminal has audio interface, such as ear
When machine, microphone interface, power-supply device 202 can connect core system 101 by audio interface;When terminal has SIM
When (Subscriber Identity Module, client identification module) card slot, power-supply device 202 can be connected by sim card slot
Connect core system 101;When terminal has memory card slot, when such as SD (Secure Digital, secure digital) card slot, power supply is set
Standby 202 can also connect core system 101 by memory card slot.
Power-supply device 202 and core system are realized above by USB interface, audio interface, sim card slot or memory card slot
The scheme connected between 101 is merely illustrative, is not intended to limit the present invention.It is of course also possible to which increasing interface newly in terminal realizes electricity
Connection between source device 202 and core system 101.I.e. actual implementation when, can be determined according to practical application scene specific
Implementation.
Further, above-mentioned detection device 203 is specifically as follows existing various current detecting instruments.The embodiment of the present invention
The leakage current test system of offer both can detecte the shutdown leakage current of terminal, also can detecte the standby leakage current of terminal.I.e.
Above-mentioned designated state is specifically as follows off-mode, or standby mode.
When leakage current test system provided in an embodiment of the present invention is used to detect the shutdown leakage current of terminal, detection device
203, it disconnects, specifically for the connection between control 201 control core system 101 of equipment and battery 102 by power-supply device 202
For the power supply of core system 101 and when terminal closedown, the output electric current of power-supply device 202 is detected, the electric current detected is eventually
The shutdown leakage current at end;When leakage current test system provided in an embodiment of the present invention is used to detect the standby leakage current of terminal,
Detection device 203 disconnects, specifically for the connection between control 201 control core system 101 of equipment and battery 102 by electricity
When source device 202 is the power supply of core system 101 and terminal standby, the output electric current of power-supply device 202 is detected, is detected
Electric current is the standby leakage current of terminal.
With reference to the accompanying drawing, it is retouched to using the process of above-mentioned leakage current test system detection terminal closedown leakage current
It states.The leakage current test system of use is as shown in figure 3, above-mentioned control equipment 201 is specially PC, and PC is by usb 1 03 and eventually
End is connected, and can be communicated with terminal, and can power for terminal;Power-supply device 202 is specially programmable power supply.Terminal is closed
The detection process of machine leakage current is as shown in Figure 4, comprising:
Step 401, in terminal booting, PC issues control command to terminal, control core system 101 and battery 102
Between connection disconnect, battery switch S as in the intelligent charge chip 104 of controlling terminal is disconnected in the present embodiment.
Step 402, by terminal closedown.
The step can issue shutdown command to terminal from PC and realize, can also directly be realized by manual operation.
Step 403, the connection for disconnecting PC and terminal.
If PC is connect with terminal, PC can power for core system 101, it is therefore desirable to which the connection for disconnecting PC and terminal is cut
Except other power supply units of the core system 101 in addition to programmable power supply.
If above-mentioned steps 402 are directly realized terminal closedown by manual operation, can also first carry out step 403 disconnect PC with
The connection of terminal, then execute step 402 manual operation terminal closedown.
Step 404, confirmation terminal complete shutdown, and the output electric current for detecting programmable power supply is the shutdown leakage current of terminal.
It is described below to using the process of leakage current test system detection terminal standby leakage current shown in Fig. 3, such as
Shown in Fig. 5, comprising:
Step 501, in terminal booting, PC issues control command to terminal, control core system 101 and battery 102
Between connection disconnect.
Step 502, the connection for disconnecting PC and terminal.
Step 503, in terminal standby, the output electric current for detecting programmable power supply is the standby leakage current of terminal.
As it can be seen that connection between the core system and battery of controlling terminal is disconnected using scheme provided in an embodiment of the present invention
It opens, is core system power supply merely with power-supply device, the output electric current of power-supply device, detection are detected when terminal is designated state
Obtained electric current is leakage current of the terminal under the designated state, i.e., it is not necessary that battery 102 under dismantling in terminal, just can
The detection for enough realizing terminal leakage current, and then can guarantee the reliability of end product, and scheme is easily achieved, cost compared with
It is low.
Although preferred embodiments of the present invention have been described, it is created once a person skilled in the art knows basic
Property concept, then additional changes and modifications may be made to these embodiments.So it includes excellent that the following claims are intended to be interpreted as
It selects embodiment and falls into all change and modification of the scope of the invention.
Obviously, those skilled in the art can carry out various modification and variations without departing from this hair to the embodiment of the present invention
The spirit and scope of bright embodiment.In this way, if these modifications and variations of the embodiment of the present invention belong to the claims in the present invention
And its within the scope of equivalent technologies, then the present invention is also intended to include these modifications and variations.
Claims (6)
1. a kind of leakage current test system of terminal characterized by comprising
Equipment is controlled, is disconnected for the connection between the core system of controlling terminal and the battery of terminal;
Power-supply device connects the core system, for powering for the core system;
Detection device disconnects, for controlling the connection between the core system and the battery in the control equipment by institute
Stating power-supply device is core system power supply and when the terminal is designated state, detects the output electricity of the power-supply device
Stream, the electric current detected be leakage current of the terminal under the designated state, the designated state be off-mode or
Standby mode.
2. leakage current test system as described in claim 1, which is characterized in that the power-supply device, especially by the end
The general-purpose serial bus USB interface at end connects the core system.
3. leakage current test system as described in claim 1, which is characterized in that the power-supply device, especially by the end
The audio interface at end connects the core system.
4. leakage current test system as described in claim 1, which is characterized in that the power-supply device, especially by the end
The client identification module sim card slot at end connects the core system.
5. leakage current test system as described in claim 1, which is characterized in that the power-supply device, especially by the end
The memory card slot at end connects the core system.
6. leakage current test system a method as claimed in any one of claims 1 to 5, which is characterized in that the power-supply device is specially program-controlled
Power supply.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2014/095003 WO2016101224A1 (en) | 2014-12-25 | 2014-12-25 | Terminal leaked current detection system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106164686A CN106164686A (en) | 2016-11-23 |
CN106164686B true CN106164686B (en) | 2019-10-22 |
Family
ID=56148954
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201480071964.3A Expired - Fee Related CN106164686B (en) | 2014-12-25 | 2014-12-25 | A kind of leakage current test system of terminal |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN106164686B (en) |
WO (1) | WO2016101224A1 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106291060B (en) * | 2016-08-29 | 2023-12-12 | 唯科终端技术(东莞)有限公司 | Mobile phone current testing system and mobile phone current testing method |
CN106526403B (en) * | 2016-12-07 | 2019-06-11 | 宇龙计算机通信科技(深圳)有限公司 | A kind of terminal leakage current detection circuit, terminal and terminal leakage current test system |
CN106646085B (en) * | 2017-01-13 | 2019-04-16 | Oppo广东移动通信有限公司 | Leakage tests method, apparatus and equipment |
CN114487914B (en) * | 2022-04-13 | 2022-08-19 | 荣耀终端有限公司 | Electronic equipment and leakage current testing method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101923110A (en) * | 2009-06-09 | 2010-12-22 | 比亚迪股份有限公司 | Method and device for detecting abnormal current of circuit |
CN103176091A (en) * | 2011-12-21 | 2013-06-26 | 深圳富泰宏精密工业有限公司 | System and method for electric leakage detection of electronic device |
WO2013111414A1 (en) * | 2012-01-25 | 2013-08-01 | 株式会社豊田自動織機 | Electrical leak detection device |
CN104237796A (en) * | 2013-06-20 | 2014-12-24 | 通用汽车环球科技运作有限责任公司 | Systems and methods for detecting leakage paths in a battery sensing circuit |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2541715Y (en) * | 2002-05-16 | 2003-03-26 | 邹德荣 | Lamp shade of high lighting vision health desk lamp |
CN101399864B (en) * | 2007-09-29 | 2011-09-21 | 中兴通讯股份有限公司 | Test system and method for standby current of mobile terminal |
TWM411572U (en) * | 2011-05-20 | 2011-09-11 | Eneraiser Technology Co Ltd | D. C. Power supply insulation breakdown detection apparatus |
WO2011144098A2 (en) * | 2011-05-26 | 2011-11-24 | 华为终端有限公司 | Mobile terminal and load power measuring method thereof |
CN202435459U (en) * | 2011-12-26 | 2012-09-12 | 惠州Tcl移动通信有限公司 | Test system for mobile phones |
CN103369084A (en) * | 2012-04-06 | 2013-10-23 | 联芯科技有限公司 | Automatic test system and method of mobile phone |
CN103728547A (en) * | 2012-10-12 | 2014-04-16 | 技嘉科技股份有限公司 | Testing system used for testing circuit board and leakage current testing method |
CN102883012B (en) * | 2012-10-15 | 2015-05-27 | 东莞华贝电子科技有限公司 | Test system and test method of mobile terminal current |
-
2014
- 2014-12-25 CN CN201480071964.3A patent/CN106164686B/en not_active Expired - Fee Related
- 2014-12-25 WO PCT/CN2014/095003 patent/WO2016101224A1/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101923110A (en) * | 2009-06-09 | 2010-12-22 | 比亚迪股份有限公司 | Method and device for detecting abnormal current of circuit |
CN103176091A (en) * | 2011-12-21 | 2013-06-26 | 深圳富泰宏精密工业有限公司 | System and method for electric leakage detection of electronic device |
WO2013111414A1 (en) * | 2012-01-25 | 2013-08-01 | 株式会社豊田自動織機 | Electrical leak detection device |
CN104237796A (en) * | 2013-06-20 | 2014-12-24 | 通用汽车环球科技运作有限责任公司 | Systems and methods for detecting leakage paths in a battery sensing circuit |
Also Published As
Publication number | Publication date |
---|---|
WO2016101224A1 (en) | 2016-06-30 |
CN106164686A (en) | 2016-11-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3131171B1 (en) | Power adaptor, terminal and charging system | |
US10554060B2 (en) | Systems and methods for charging via USB port | |
CN105576727B (en) | Method, device and system for quick charging | |
CN103178583B (en) | Mobile phone USB (Universal Serial Bus) interface charging system supporting charging for other mobile devices and charging realization method of mobile phone USB interface charging system | |
CN106164686B (en) | A kind of leakage current test system of terminal | |
CN105896655B (en) | Method for charging for electronic equipment and electronic equipment | |
EP3285356A1 (en) | Charger, electronic device, and charging method | |
CN104104135A (en) | Charging apparatus, charging method and device | |
CN105762883B (en) | Method and electronic equipment for charging for electronic equipment | |
CN113949167A (en) | Charging device and electronic equipment | |
CN106797414B (en) | A kind of leakage current detection circuit and terminal of terminal | |
CN204103517U (en) | Charging device and electronic equipment | |
CN204030207U (en) | A kind of data wire with automatic pressure-transforming function | |
JP2018529301A (en) | Power adapter, terminal device, charging system, and charging method | |
CN104345859A (en) | Power supply method and device and charging method and electronic device | |
CN104505921A (en) | Charging device and charging management method | |
CN105811554A (en) | Battery bridging and charging device and method | |
CN106200442A (en) | A kind of realization connects the method and device controlled | |
CN106487061B (en) | Charging circuit and method | |
CN105450843A (en) | Method and device of arranging operation mode of mobile terminal | |
CN105743180B (en) | Method and electronic equipment for charging for electronic equipment | |
CN105304951A (en) | Application method of assembled battery | |
CN203275907U (en) | Power supply identification system | |
CN202488201U (en) | Portable back-up power supply capable of automatically identifying and outputting voltage and current | |
CN105867571A (en) | Information processing method and electronic device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191022 |
|
CF01 | Termination of patent right due to non-payment of annual fee |