CN106159940B - The optimal points distributing methods of PMU based on network load specificity analysis - Google Patents

The optimal points distributing methods of PMU based on network load specificity analysis Download PDF

Info

Publication number
CN106159940B
CN106159940B CN201610515978.0A CN201610515978A CN106159940B CN 106159940 B CN106159940 B CN 106159940B CN 201610515978 A CN201610515978 A CN 201610515978A CN 106159940 B CN106159940 B CN 106159940B
Authority
CN
China
Prior art keywords
substation
class
load
pmu
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610515978.0A
Other languages
Chinese (zh)
Other versions
CN106159940A (en
Inventor
徐衍会
王晨语
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power University
Original Assignee
North China Electric Power University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power University filed Critical North China Electric Power University
Priority to CN201610515978.0A priority Critical patent/CN106159940B/en
Publication of CN106159940A publication Critical patent/CN106159940A/en
Application granted granted Critical
Publication of CN106159940B publication Critical patent/CN106159940B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/22Flexible AC transmission systems [FACTS] or power factor or reactive power compensating or correcting units

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention belongs to power system modelings and emulation field more particularly to a kind of optimal points distributing methods of PMU based on network load specificity analysis.It is characterized in that, carrying out load composition and specificity analysis to each Load Substation of regional power grid first, the CURE algorithms in application level clustering methodology cluster substation.Is chosen by substation progress PMU that is representative and can extracting more multiple faults and noisy data and is layouted based on the probability statistical analysis for carrying out fault data on the basis of protection information system for each grouping of substation after cluster.The method of the present invention can be reduced PMU installation numbers to the greatest extent, promote economy and be suitable for production practices on the basis of the load for fully taking into account each substation is formed with part throttle characteristics.

Description

The optimal points distributing methods of PMU based on network load specificity analysis
Technical field
It is the invention belongs to power system modeling and emulation field, more particularly to a kind of based on network load specificity analysis The optimal points distributing methods of PMU.
Background technology
Electric system simulation is Power System Planning, operation and the basis of research, and accurate model parameter ties emulation The confidence level of fruit has great influence.For generator, transformer and transmission line of electricity, the model parameter phase of electric load To coarse, the precision of emulation is seriously constrained.For the simulation analysis of electric system, load refers under 220kV substations All electrical equipments, including low voltage power distribution network, reactive power compensator etc., composition is sufficiently complex.Establish big regional power grid Load model is extremely difficult.
Power system load modeling method is divided into Component Based and Measurement-based approach.Component Based load by inquiry The load of substation forms, and electrical equipment is constituted and electrical equipment average characteristics obtain load model, and this method physics is general It is clear to read, but statistical data is huge, can not solve the problems, such as electrical equipment simultaneity factor, and is difficult often to carry out.Another method, Measurement-based approach obtains the lower dynamic load characteristic data of disturbance, by distinguishing by installing part throttle characteristics measuring device in substation Know and obtain load model parameters, this method is simple and practical, widely used in network load modeling.
Synchronous phasor measurement unit (Phasor Measurement Unit, PMU) is to rise nineteen nineties Measuring device achievees the purpose that synchro measure by receiving GPS signal, has been widely used in the power system. Currently, the substation of the 500kV main grid structures of the major regional power grid in China is assembled with PMU devices substantially, for detecting power grid electricity Tolerance provides basis for stability analysis and control etc..There are also installed PMU devices for part 220kV substations, practice have shown that can profit Measurement-based load modeling is carried out with PMU.The reason of considering economy, it is impossible to all 220kV substations installation PMU come into Row load modeling, thus need to study the optimal points distributing methods of PMU for big regional power grid measurement-based load modeling.
Invention content
To solve the above-mentioned problems, the technical solution that the present invention takes is as follows:
The optimal points distributing methods of PMU based on network load specificity analysis, which is characterized in that the detailed process of the method is
Step 1 carries out investigation statistics to the part throttle characteristics of each Load Substation of regional power grid, and it is special to analyze each substation's load Property composition, using substation's load structure percentage as feature vector;
Step 2, according to the CURE algorithms in Hierarchical Cluster to the load of substation composition situation to substation into Row cluster;
Step 3 obtains each power transformation to each grouping of substation after cluster based on the logging data for protecting letter system The fault data stood carries out failure probability analysis;
Step 4 sorts by size the probability of malfunction of each group, and failure rate is more than that 30%, voltage change ratio belongs to when being more than 3% More effective load measurement data can be obtained in disturbing larger substation, more multiple faults and disturbance number can be extracted by choosing such According to substation carry out PMU layout.
According to the CURE algorithms of hierarchical clustering method in the step 2, with Y ∈ Yn×mIt is original to describe substation's part throttle characteristics Data matrix Y=[y1,…,yi,…,yn]T
Wherein:yi=[yi1,…,yij,…,yim], yiFor i-th of substation, i=1 ..., n, n is the number of substation, yijIndicate that the composition j=1 ..., m, m of the jth type load of i-th of substation are the number of Overload Class;Initially, cluster As soon as each is a class to data, n part throttle characteristics data are n class, and data n to be clustered is a, it is contemplated that cluster numbers be set as k;
The distance between step 201, calculating each two class indicate the central point of class U for any one class U, u.mean, U.rep indicates the representative point of class U;Belong to the data item p and data item q, dist (p, q) table of class U and class V for any two Show the distance between p and q, the computational methods of distance are using Euclidean distance, manhatton distance or Lagrangian distance;It calculates The distance between two clusters U, V dist (U, V)=min dist (p, q);
Two minimum classes of distance are successively merged, a new classes of n ' are formed;
The central point of step 202, new class WWherein u, v indicate step The number of contained data item in two classes U, V merged in rapid 1;V.mean indicates the central point of class V;
The representative point w.rep=p+ α * (w.mean-p) of step 203, new class, wherein α takes 0.5;W.mean indicates new class W Central point, w.rep indicates the representative point of new class W;
If the number n ' of step 204, new class is more than expected cluster numbers k, return to step 1, until last n '≤k.
One kind is classified by hierarchical clustering method according to Load Characteristic Analysis, using substation's load structure percentage as Feature vector.The realization process of CURE clustering procedures is divided into following steps:
(1) a random sample S is extracted from source data object.
(2) sample S is divided into one group of division.
(3) to each cluster for dividing part.
(4) isolated point is rejected by grab sample.As soon as if class growth is too slow, remove it.
(5) class of part is clustered.The representative point in each newly formed class is fallen according to user-defined one Contraction factor shrinks or is moved to class center.These points represent and capture the shape of class.
(6) with corresponding class label come flag data.
Advantageous effect
The optimal points distributing methods of PMU that modeling and Load Characteristic Analysis are surveyed based on network load of the present invention can be abundant In view of the load composition of each substation is on the basis of part throttle characteristics, PMU installation numbers are reduced to the greatest extent, promote warp Ji property and be suitable for production practices.
Description of the drawings
Fig. 1 is the flow chart of the optimal points distributing methods of PMU based on network load specificity analysis.
Specific implementation mode
Below in conjunction with the accompanying drawings, it elaborates to the present invention.Fig. 1 is the optimal cloth of PMU based on network load specificity analysis The flow chart of point methods.
By taking the load characteristics investigation statistical result that 101 220KV substations of somewhere power grid stand as an example, attached drawing pair is compareed The present invention is further described.
(1) load composition and specificity analysis are carried out to each Load Substation of regional power grid, is clustered according to analysis result;
According to the CURE algorithms of hierarchical clustering method, Y ∈ Y are used heren×mTo describe substation's part throttle characteristics initial data square Battle array:
Y=[y1,…,yi,…,yn]T
Wherein, yi=[yi1,…,yij,…,yim], yiFor i-th of substation, i=1 ..., n;N=111;yilIndicate i-th The composition of i-th type load of a substation, l=1 ..., m;M=5;Respectively represent industry, agricultural, business, resident, other Deng 5 type load ingredients.Initially, as soon as the data of cluster each be a class, therefore 101 part throttle characteristics data are 101 Class.Data 101 wherein to be clustered, and expected cluster numbers are set as 4 i.e. k=4.The first step calculate each two cluster between away from From, dist (p, q) therein is calculated with Euclidean distance, it will successively merging apart from minimum.The central point of new class presses formula (1) institute The formula shown calculates, and wherein u indicates the number of contained data item in cluster u.
The representative point calculating method of new class is shown in that formula (2), wherein α take 0.5, represents point and is indicated with rep.
W.rep=p+ α * (w.mean-p) (2)
After iterative calculation, when the number of class is more than the number of expected class, the between class distance for continuing to calculate each class is needed And merge, until 111 class iteration are finally merged into 4 classes.It is calculated by many experiments, cluster result is as shown in table 1.
The cluster result of 1 CURE clustering algorithms of table
(2) probability statistical analysis is carried out to each substation of regional power grid
Protection information management and trouble analysis system can obtain online power system operating mode information and relay protected operation Point information neatly considers and formulates the various rules of definite value assessment and on-line tuning comprehensively, realizes protection performance of relay setting Online evaluation and on-line tuning, there is abundant standardization result output function, help relay protection personnel, dispatching of power netwoks people Member, method of operation personnel grasp the operating status of relay protection in time, improve the reliability and system operation of relay protected operation Safety.By the development of more than ten years, the utilization rate for protecting letter system in 220kV and the above substation in China reaches 90%, interior communication stipulations and protection communication protocol are increasingly unified and standard, are a set of systems having tended to be perfect, are with it The application study that platform is carried out has stability and practicability, also avoids repeated construction.Power grid can be acquired by protecting letter system Secondary device action message when failure, but the self-test that can collect the secondary devices such as protective relaying device, fault oscillograph is accused Alert information.Protect letter system is to the basic application of substation relay protection device implementation repair based on condition of component:Collect data, analysis instead It reflects, wherein it is the basis that entire repair based on condition of component work is implemented to collect data with data reflection is inquired.
By the clustering of step (1), substation is divided into 4 classes, based on the logging data for protecting letter system, is obtained each The fault data and probability of malfunction of substation.Analysis is ranked up to the failure rate of each group, failure rate is more than 30%, voltage change Rate, which is more than 3% substation, can obtain more effective load measurement data.
(3) carry out that PMU is optimal to layout according to Load Characteristic Analysis and substation fault probability analysis result;
In view of the economy problems that PMU layouts, PMU needs of layouting select most representative substation's installation, to reach To highest efficiency.It can be obtained per the substation that in one kind substation, selection failure rate is higher and disturbance is larger more effective Load measurement data, in terms of being applied to the engineering practices such as load modeling.It selects in 4 class substations, the higher substation of failure rate, The four highest substations of class substation fault rate are respectively y9, y55, y30 and y26, carry out PMU cloth according to the needs of actual conditions Point.Under the premise of ensureing economy, the prioritization scheme of layouting of this PMU both can guarantee that the part throttle characteristics layouted was representative Can guarantee again can obtain enough data applications in production practices.

Claims (2)

1. the optimal points distributing methods of PMU based on network load specificity analysis, which is characterized in that the detailed process of the method is
Step 1 carries out investigation statistics to the part throttle characteristics of each substation of regional power grid, analyzes each substation's part throttle characteristics composition ratio Example, using substation's load structure percentage as feature vector;
Step 2 clusters the load composition situation of substation according to the CURE algorithms in Hierarchical Cluster;
Step 3 obtains each change for each grouping of substation after cluster based on the logging data of protection information system The fault data in power station carries out failure probability analysis;
Step 4 sorts by size the probability of malfunction of each group, and failure rate is more than to belong to disturb when 30%, voltage change ratio is more than 3% Dynamic larger substation chooses the substation that such can extract more multiple faults and noisy data and carries out PMU and layouts.
2. the optimal points distributing methods of the PMU according to claim 1 based on network load specificity analysis, which is characterized in that institute It states according to the CURE algorithms in Hierarchical Cluster in step 2, with Y ∈ Yn×mTo describe substation's part throttle characteristics initial data Matrix Y=[y1,…,yi,…,yn]T
Wherein:yi=[yi1,…,yij,…,yim], yiFor i-th of substation, i=1 ..., n, n are the number of substation, yijTable Show the composition of the jth type load of i-th of substation, j=1 ..., the number that m, m are Overload Class;Initially, the number of cluster As soon as being a class according to each, n part throttle characteristics data are n class, and data n to be clustered is a, it is contemplated that cluster numbers be set as k;
The distance between step 201, calculating each two class indicate the central point of class U for any one class U, u.mean, U.rep indicates the representative point of class U;Belong to the data item p and data item q, dist (p, q) table of class U and class V for any two Show the distance between p and q, the computational methods of distance are using Euclidean distance, manhatton distance or Lagrangian distance;It calculates The distance between two clusters U, V dist (U, V)=min dist (p, q);
Two minimum classes of distance are successively merged, a new classes of n ' are formed;
The central point of step 202, new class WWherein u, v indicate step 201 The number of contained data item in two classes U, V of middle merging;V.mean indicates the central point of class V;
The representative point w.rep=p+ α * (w.mean-p) of step 203, new class W, wherein setting value α take 0.5;
If the number n ' of step 204, new class is more than expected cluster numbers k, return to step 201, until last n '≤k.
CN201610515978.0A 2016-07-01 2016-07-01 The optimal points distributing methods of PMU based on network load specificity analysis Active CN106159940B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610515978.0A CN106159940B (en) 2016-07-01 2016-07-01 The optimal points distributing methods of PMU based on network load specificity analysis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610515978.0A CN106159940B (en) 2016-07-01 2016-07-01 The optimal points distributing methods of PMU based on network load specificity analysis

Publications (2)

Publication Number Publication Date
CN106159940A CN106159940A (en) 2016-11-23
CN106159940B true CN106159940B (en) 2018-10-16

Family

ID=58061080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610515978.0A Active CN106159940B (en) 2016-07-01 2016-07-01 The optimal points distributing methods of PMU based on network load specificity analysis

Country Status (1)

Country Link
CN (1) CN106159940B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110165657A (en) * 2018-08-30 2019-08-23 中国南方电网有限责任公司 Consider substation's load characteristics clustering analysis method of user's industry attribute
WO2020232716A1 (en) * 2019-05-23 2020-11-26 西门子股份公司 Method and device for assessing state of health of transformer, and storage medium
CN110676940B (en) * 2019-10-21 2021-02-02 国网上海市电力公司 Power distribution network PMU configuration method and system for improving parameter identification precision

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103323742A (en) * 2013-05-31 2013-09-25 华北电力大学 System and method for grid fault identification based on random point distribution PMU
CN103869102A (en) * 2014-03-11 2014-06-18 广东电网公司电网规划研究中心 Statistical and classifying method for loads of large regional power grid
CN104967151A (en) * 2015-08-07 2015-10-07 南方电网科学研究院有限责任公司 Method and system for PMU (power management unit) distribution of electric power system and selection of generator by corresponding bus
CN105305507A (en) * 2015-09-29 2016-02-03 南方电网科学研究院有限责任公司 PMU (phasor measurement Unit) distribution optimization method and system for AC-DC interconnected power grid

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103323742A (en) * 2013-05-31 2013-09-25 华北电力大学 System and method for grid fault identification based on random point distribution PMU
CN103869102A (en) * 2014-03-11 2014-06-18 广东电网公司电网规划研究中心 Statistical and classifying method for loads of large regional power grid
CN104967151A (en) * 2015-08-07 2015-10-07 南方电网科学研究院有限责任公司 Method and system for PMU (power management unit) distribution of electric power system and selection of generator by corresponding bus
CN105305507A (en) * 2015-09-29 2016-02-03 南方电网科学研究院有限责任公司 PMU (phasor measurement Unit) distribution optimization method and system for AC-DC interconnected power grid

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
基于01 整数规划的多目标最优PMU配置算法;蒋正威等;《电力系统保护与控制》;20081101;第12-17页 *
基于系统同调性的PMU最优布点;许剑冰等;《电力系统自动化》;20041010;第22-26页 *

Also Published As

Publication number Publication date
CN106159940A (en) 2016-11-23

Similar Documents

Publication Publication Date Title
CN106124935B (en) Middle and low voltage network Fault Locating Method
Zhang et al. Fault localization in electrical power systems: A pattern recognition approach
Shahsavari et al. Fault indicator deployment in distribution systems considering available control and protection devices: a multi-objective formulation approach
CN110311376A (en) A kind of Electrical Power System Dynamic security evaluation collective model and space-time method for visualizing
CN109655712A (en) A kind of distribution network line fault analysis of causes method and system
CN105117532B (en) A kind of modeling method of secondary equipment of intelligent converting station interval information model
CN110084466A (en) A kind of method and system for extracting the critical transient stability boundary characteristic of bulk power grid
CN106159940B (en) The optimal points distributing methods of PMU based on network load specificity analysis
CN106990325B (en) Distribution small current grounding fault determination method based on mutation logic array
Fang et al. A statistical approach to estimate imbalance-induced energy losses for data-scarce low voltage networks
CN108614192B (en) Distribution decision method for lightning monitoring device of power distribution network
CN102930408B (en) A kind of 750kV electric grid secondary equipment state appraisal procedure based on information fusion
CN106952178B (en) Telemetry bad data identification and reason distinguishing method based on measurement balance
CN116845971A (en) Automatic identification method for topological structure of photovoltaic grid-connected low-voltage transformer area
Junaidi et al. Big data applications in electric energy systems
CN116169778A (en) Processing method and system based on power distribution network anomaly analysis
Khare et al. Optimal PMU placement using matrix modification based integer linear programming
CN103810340A (en) Fault vector analysis and fault diagnosis method based on mapping of instation main wiring diagram
Duan et al. Data mining & pattern recognition of voltage sag based on K-means clustering algorithm
Liu Short-term operational reliability evaluation for power systems under extreme weather conditions
CN106202814B (en) The mapping method of automatic safety device acquisition data and EMS system primary equipment model
CN107749623B (en) Single-bus tripping and load loss accident grade determination method in double-bus connection mode
Shah et al. Review of power quality monitoring web-based techniques
CN111614083B (en) Big data analysis method suitable for 400V power supply network topology identification
CN102708279B (en) The modeling method of lightning location system substation and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant