CN106153482B - Focus layer hardness is distributed on-line analysis in a kind of hydraulic decoking process coke drum - Google Patents

Focus layer hardness is distributed on-line analysis in a kind of hydraulic decoking process coke drum Download PDF

Info

Publication number
CN106153482B
CN106153482B CN201610548946.0A CN201610548946A CN106153482B CN 106153482 B CN106153482 B CN 106153482B CN 201610548946 A CN201610548946 A CN 201610548946A CN 106153482 B CN106153482 B CN 106153482B
Authority
CN
China
Prior art keywords
coke
hardness
focus layer
real
decoking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610548946.0A
Other languages
Chinese (zh)
Other versions
CN106153482A (en
Inventor
童杏林
周超然
黄迪
邓承伟
郭倩
陈亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Technology WUT
Original Assignee
Wuhan University of Technology WUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Technology WUT filed Critical Wuhan University of Technology WUT
Priority to CN201610548946.0A priority Critical patent/CN106153482B/en
Publication of CN106153482A publication Critical patent/CN106153482A/en
Application granted granted Critical
Publication of CN106153482B publication Critical patent/CN106153482B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/40Investigating hardness or rebound hardness

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Coke Industry (AREA)
  • Earth Drilling (AREA)

Abstract

Focus layer hardness is distributed on-line analysis in a kind of hydraulic decoking process coke drum of present invention offer, acquires the voice signal of the altitude signal, high-pressure water jet of hydraulic decoking drilling rod in decoking process on coke, carries out denoising and simultaneously stores;Establish the real-time data base of the sound of sampling time, the height of hydraulic decoking drilling rod, high-pressure water jet on coke;Using sound of the preset high-pressure water jet on coke and the relationship between hardness, it is associated with real-time data base, obtains the hardness regularity of distribution of coke drum different height focus layer;According to the hardness regularity of distribution of hardness measurement standard and coke drum different height focus layer, the hardness of online real-time display different height focus layer.Analyze the distribution of different height focus layer hardness by establishing real-time data base, can Real time displaying focus layer hardness, carry out decoking work to auxiliary direction operator, energy consumption can be reduced, shorten the decoking process time, avoids embracing the decokings accidents such as brill, bit freezing caused by the coke that collapses, reduce security risk.

Description

Focus layer hardness is distributed on-line analysis in a kind of hydraulic decoking process coke drum
Technical field
The present invention relates to focus layer hardness distribution on-line analysis field, tools in petroleum chemical industry hydraulic decoking process coke drum Body is related to focus layer hardness distribution on-line analysis in a kind of hydraulic decoking process coke drum.
Background technology
Currently, during petrochemical industry coke drum hydraulic decoking, decoking process is relatively fixed.However, due to coking raw material and The quality of the difference of green coke technique, each green coke has difference, causes the hardness of different height focus layer in coke drum to be distributed different. Under relatively-stationary decoking process, since enterprise technology establishment person can not predict the hardness distribution of focus layer, usually with operative employee The repetition of people cuts coke to ensure normally to produce.This can cause water power loss huge, and devoke relatively inefficient.Also, by The hardness distribution of different height focus layer in coke drum is not known about in operator, only carries out cutting burnt operation by rule of thumb, it can be very big Ground occurs embracing the risk of the decoking accident such as brill, bit freezing caused by the coke that collapses during increasing hydraulic decoking, if found not in time And it is pocessed and can cause great production and safety accident.
Invention content
The technical problem to be solved by the present invention is to:It is online to provide focus layer hardness distribution in a kind of hydraulic decoking process coke drum Analysis method, for different height focus layer hardness in online real-time display hydraulic decoking process coke drum.
The technical solution taken by the invention to solve the above technical problem is:It is burnt in a kind of hydraulic decoking process coke drum Layer hardness is distributed on-line analysis, it is characterised in that:It includes the following steps:
The acquisition and pretreatment of S1, signal:Acquire the altitude signal and high pressure water of hydraulic decoking drilling rod in decoking process The voice signal being injected on coke carries out denoising to altitude signal and voice signal and stores;The coke refers to The coke of coke inner wall of tower;
S2, real-time data base is established:Using the sampling time as sequence, establish the sampling time, corresponding hydraulic decoking drilling rod height The real-time data base of degree, sound of the high-pressure water jet on coke;
S3, sound of the high-pressure water jet on coke and the relationship between hardness, association real-time data base, acquisition coke are utilized The hardness regularity of distribution of charcoal tower different height focus layer;
S4, according to the hardness regularity of distribution of hardness measurement standard and the coke drum different height focus layer obtained, it is online real When show the hardness of different height focus layer.
As stated above, the S1 is utilized using the altitude signal of hydraulic decoking drilling rod in cable transmission decoking process Along sound letter of the equally distributed fiber F-P acoustic sensor acquisition high-pressure water jet of coke drum outer wall short transverse on coke Number, by optical cable transmission voice signal to control centre, electric signal is demodulated by the demodulating unit positioned at control centre.
As stated above, it is added using the time as the de-coking operations flow of sequence, to obtain sampling time, corresponding decoking behaviour Make the real-time data base of the sound of step, the height, high-pressure water jet of corresponding hydraulic decoking drilling rod on coke.
As stated above, lossless using the progress of self-adapting compressing algorithm to the data in real-time data base in the S2 Compression processing.
As stated above, in the S3, by the hardness regularity of distribution of coke drum different height focus layer, analysis petrochemical industry is every The coke quality that secondary green coke generates.
As stated above, in the S3, the data of each decoking process are stored, and carry out lateral comparison analysis, to life Burnt technique optimizes guidance.
As stated above, it further includes S5, the hardness according to the different height focus layer of online real-time display, instructs operative employee People carries out decoking work.
Beneficial effects of the present invention are:
1, it is distributed come on-line analysis different height focus layer hardness by establishing real-time data base, and Real time displaying focus layer is hard Degree, according to the real-time focus layer hardness of display, auxiliary direction operator carries out decoking work, can reduce energy consumption, shortens decoking Activity duration avoids embracing the decokings accidents such as brill, bit freezing caused by the coke that collapses, reduces security risk;Real-time of the present invention is good, especially Suitable for requirement of real-time higher Industry Control scene.
2, by optical fiber sensor, the passive propagation of signal is realized, water failure may be met by avoiding electrical sensor, Reduce the installation requirement of sensor.
3, since the data that real-time data base generates are magnanimity, lossless pressure is carried out to data using self-adapting compressing algorithm Contracting is handled, and can reject repetition or extra data, saves memory space.
4, by the method for the invention, horizontal and vertical extension can also be carried out, petrochemical iy produced personnel is helped to analyze green coke The changing rule of process optimizes guidance to green coke technique.
Description of the drawings
Fig. 1 is the method flow diagram of one embodiment of the invention.
Specific implementation mode
With reference to specific example and attached drawing, the invention will be further described.
Focus layer hardness is distributed on-line analysis in a kind of hydraulic decoking process coke drum of present invention offer, as shown in Figure 1, Include the following steps:
The acquisition and pretreatment of S1, signal:Acquire the altitude signal and high pressure water of hydraulic decoking drilling rod in decoking process The voice signal being injected on coke carries out denoising to altitude signal and voice signal and stores;The coke refers to The coke of coke inner wall of tower.
S2, real-time data base is established:Using the sampling time as sequence, establish the sampling time, corresponding hydraulic decoking drilling rod height The real-time data base of degree, sound of the high-pressure water jet on coke.
In the present embodiment, manage real time data one group is write under 2010 platforms of Microsoft Visual Studio Program may be implemented definition to real time data, modification by this group of program, inquire and lay down a regulation, and then establishes a reality When database.
S3, sound of the high-pressure water jet on coke and the relationship between hardness, association real-time data base, acquisition coke are utilized The hardness regularity of distribution of charcoal tower different height focus layer.It is detailed, pass through the place to hydraulic decoking status data in real-time data base Reason obtains the characteristic information of focus layer hardness in coke drum, analyzes characteristic parameter, petrochemical industry green coke technological parameter index and field working conditions, Obtain the hardness regularity of distribution of different height focus layer in the tower.
Herein, the relationship between sound and hardness of the preset high-pressure water jet on coke, according to test result and behaviour The experience for making worker is configured, and can also be carried out continuing to optimize adjustment according to historical data.
S4, according to the hardness regularity of distribution of hardness measurement standard and the coke drum different height focus layer obtained, it is online real When show the hardness of different height focus layer.
Preferably, it further includes S5, the hardness according to the different height focus layer of online real-time display, instruct operator into Row decoking work.If specifically, finding that the hardness of present level focus layer is harder, drill bit here more to stay for some time;If It was found that the hardness of present level focus layer is softer, then drill bit stays for some time less here.
Preferably, the S1 utilizes the altitude signal of hydraulic decoking drilling rod in cable transmission decoking process, using along coke Voice signal of the equally distributed fiber F-P acoustic sensor acquisition high-pressure water jet of charcoal tower outer wall short transverse on coke, By optical cable transmission voice signal to control centre, electric signal is demodulated by the demodulating unit positioned at control centre.Electric signal passes through Cross denoising(Such as Wavelet Denoising Method principle etc.)Afterwards, it acquires and stores by data collecting card.
Preferably, it in the S2, is added using the time as the de-coking operations flow of sequence, to obtain sampling time, correspondence Sound on coke of de-coking operations step, the height, high-pressure water jet of corresponding hydraulic decoking drilling rod real-time data base. More specifically, S2 includes i. definition, according to the information for the reflection coke state that processing in step S2 obtains, in Microsoft The management tool of real-time data base is used under 2010 platforms of Visual Studio, the data of all acquisitions are categorizedly fixed Justice is entered;Ii. change, in the operational process of real-time data base, by real-time data base provide the specific data of function pair into Row write operation;Iii. it inquires, in the operational process of real-time data base, the function pair provided by real-time data base specifically counts According to being read;Iv. it lays down a regulation, by the management tool of real-time data base, number in real time is written into de-coking operations flow According to library, a rule logic rules are formed.
Herein, de-coking operations flow is the flow of those skilled in the art's routine, is specifically included:Uncap, drill, reaming, Brill is carried, coke is cut, sweeps the several steps of tower.When practical operation, according to the height of current de-coking operations step and hydraulic decoking drilling rod Degree, sound of the high-pressure water jet on coke preferably know the decoking work of operator which kind of operation judged to need.
Preferably, in the S2, lossless compression is carried out using self-adapting compressing algorithm to the data in real-time data base Processing.
It further expands, in the S3, by the hardness regularity of distribution of coke drum different height focus layer, analyzes petrochemical industry The coke quality that each green coke generates.
It is further expansible, in the S3, the data of each decoking process are stored, and carry out lateral comparison analysis, Guidance is optimized to green coke technique.
Above example is merely to illustrate the design philosophy and feature of the present invention, and its object is to make technology in the art Personnel can understand the content of the present invention and implement it accordingly, and protection scope of the present invention is not limited to the above embodiments.So it is all according to According to equivalent variations or modification made by disclosed principle, mentality of designing, within protection scope of the present invention.

Claims (6)

1. focus layer hardness is distributed on-line analysis in a kind of hydraulic decoking process coke drum, it is characterised in that:It includes following Step:
The acquisition and pretreatment of S1, signal:Acquire the altitude signal and high-pressure water jet of hydraulic decoking drilling rod in decoking process Voice signal on coke carries out denoising to altitude signal and voice signal and stores;The coke refers to coke The coke of inner wall of tower;
S2, real-time data base is established:Using the sampling time as sequence, sampling time, the height of corresponding hydraulic decoking drilling rod, height are established Press the real-time data base of sound of the water injection on coke;
S3, sound of the high-pressure water jet on coke and the relationship between hardness, association real-time data base, acquisition coke drum are utilized The hardness regularity of distribution of different height focus layer;
S4, according to the hardness regularity of distribution of hardness measurement standard and the coke drum different height focus layer obtained, it is online aobvious in real time Show the hardness of different height focus layer;
The S1 utilizes the altitude signal of hydraulic decoking drilling rod in cable transmission decoking process, using along coke drum outer wall height Voice signal of the equally distributed fiber F-P acoustic sensor acquisition high-pressure water jet in direction on coke, passes through optical cable transmission Voice signal is demodulated into electric signal to control centre, by the demodulating unit positioned at control centre.
2. focus layer hardness is distributed on-line analysis in a kind of hydraulic decoking process coke drum according to claim 1, It is characterized in that:In the S2, it is added using the time as the de-coking operations flow of sequence, to obtain sampling time, corresponding decoking The real-time data base of the sound of operating procedure, the height, high-pressure water jet of corresponding hydraulic decoking drilling rod on coke.
3. focus layer hardness is distributed on-line analysis in a kind of hydraulic decoking process coke drum according to claim 1 or 2, It is characterized in that:In the S2, lossless compression processing is carried out using self-adapting compressing algorithm to the data in real-time data base.
4. focus layer hardness is distributed on-line analysis in a kind of hydraulic decoking process coke drum according to claim 3, It is characterized in that:In the S3, by the hardness regularity of distribution of coke drum different height focus layer, each green coke of analysis petrochemical industry generates Coke quality.
5. focus layer hardness is distributed on-line analysis in a kind of hydraulic decoking process coke drum according to claim 3, It is characterized in that:In the S3, the data of each decoking process are stored, and carry out lateral comparison analysis, green coke technique is carried out Optimization guidance.
6. focus layer hardness is distributed on-line analysis in a kind of hydraulic decoking process coke drum according to claim 1, It is characterized in that:It further includes S5, the hardness according to the different height focus layer of online real-time display, and operator is instructed to devoke Work.
CN201610548946.0A 2016-07-13 2016-07-13 Focus layer hardness is distributed on-line analysis in a kind of hydraulic decoking process coke drum Active CN106153482B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610548946.0A CN106153482B (en) 2016-07-13 2016-07-13 Focus layer hardness is distributed on-line analysis in a kind of hydraulic decoking process coke drum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610548946.0A CN106153482B (en) 2016-07-13 2016-07-13 Focus layer hardness is distributed on-line analysis in a kind of hydraulic decoking process coke drum

Publications (2)

Publication Number Publication Date
CN106153482A CN106153482A (en) 2016-11-23
CN106153482B true CN106153482B (en) 2018-11-06

Family

ID=58061654

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610548946.0A Active CN106153482B (en) 2016-07-13 2016-07-13 Focus layer hardness is distributed on-line analysis in a kind of hydraulic decoking process coke drum

Country Status (1)

Country Link
CN (1) CN106153482B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109507055B (en) * 2019-01-14 2021-05-28 航天精工股份有限公司 Method for measuring hardness distribution of fastener
CN110261313A (en) * 2019-05-06 2019-09-20 武汉理工大学 A kind of distributed optical fiber acoustic sensor-based system for monitoring coke drum operation conditions on-line

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1247390A1 (en) * 1985-01-24 1986-07-30 Башкирское специальное конструкторское бюро Научно-производственного объединения "Нефтехимавтоматика" Device for monitoring of coke hydraulic cutting
CN102221353A (en) * 2011-04-12 2011-10-19 洛阳涧光石化设备有限公司 Automatic detecting system for detecting coke thickness by hydraulic decoking
CN202968488U (en) * 2012-12-17 2013-06-05 襄阳航生石化环保设备有限公司 Monitoring and judging system for hydraulic decoking of delayed coking device
CN203011337U (en) * 2012-12-17 2013-06-19 襄阳航生石化环保设备有限公司 Hydraulic decoking development monitor in coke tower of delayed coking device
CN103256897A (en) * 2013-04-19 2013-08-21 武汉理工大学 Optical fiber sensing on-line monitoring system and method for hydraulic decoking operating state of petrochemical coking tower
KR101305858B1 (en) * 2011-11-28 2013-09-06 한국과학기술원 Method, apparatus for estimating rigidity of objective using mobile device and operating method for mobile device
CN203274720U (en) * 2013-06-06 2013-11-06 洛阳涧光石化设备有限公司 Hydraulic power decoking state detection system
CN105631435A (en) * 2016-01-18 2016-06-01 武汉理工大学 Mode identification method and device for coke tower automatic remote decoking

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1247390A1 (en) * 1985-01-24 1986-07-30 Башкирское специальное конструкторское бюро Научно-производственного объединения "Нефтехимавтоматика" Device for monitoring of coke hydraulic cutting
CN102221353A (en) * 2011-04-12 2011-10-19 洛阳涧光石化设备有限公司 Automatic detecting system for detecting coke thickness by hydraulic decoking
KR101305858B1 (en) * 2011-11-28 2013-09-06 한국과학기술원 Method, apparatus for estimating rigidity of objective using mobile device and operating method for mobile device
CN202968488U (en) * 2012-12-17 2013-06-05 襄阳航生石化环保设备有限公司 Monitoring and judging system for hydraulic decoking of delayed coking device
CN203011337U (en) * 2012-12-17 2013-06-19 襄阳航生石化环保设备有限公司 Hydraulic decoking development monitor in coke tower of delayed coking device
CN103256897A (en) * 2013-04-19 2013-08-21 武汉理工大学 Optical fiber sensing on-line monitoring system and method for hydraulic decoking operating state of petrochemical coking tower
CN203274720U (en) * 2013-06-06 2013-11-06 洛阳涧光石化设备有限公司 Hydraulic power decoking state detection system
CN105631435A (en) * 2016-01-18 2016-06-01 武汉理工大学 Mode identification method and device for coke tower automatic remote decoking

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"水力除焦检测系统的研究";常培龙 等;《机械科学与技术》;20131231;第32卷(第12期);第1817-1820页 *

Also Published As

Publication number Publication date
CN106153482A (en) 2016-11-23

Similar Documents

Publication Publication Date Title
CN106153482B (en) Focus layer hardness is distributed on-line analysis in a kind of hydraulic decoking process coke drum
US7261167B2 (en) Method and system for predicting performance of a drilling system for a given formation
CN103256897B (en) Petrochemical industry coking tower hydraulic decoking running status Fibre Optical Sensor on-line monitoring system and method
RU2014148318A (en) SYSTEM AND METHOD FOR PERFORMING A WELL INTENSIFICATION OPERATION
AU6359401A (en) Method and system for predicting performance of a drilling system of a given formation
AU2019100966A4 (en) Automatic coal drawing control system and method
US11448068B2 (en) Optimization of boring by a tunnel boring machine as a function of ground/machine interactions
CN107194101A (en) Horizontal well fracturing crack layer-crossing layer number diagnosis method
CN114427430B (en) Multi-well real-time collaborative drilling parameter optimization method and system
CN109681180A (en) Coal mine ground vertical well pressure break tight roof controls the strong mine of stope and presses effect pre-evaluation method
CN112633611A (en) Submarine cable state maintenance strategy optimization method and system based on big data analysis
CN116990344B (en) Fluorination reaction heat testing method and system
CN105631435B (en) A kind of mode identification method for coke drum Full-automatic remote decoking and device
CN105160147A (en) State space model and fuzzy theory based tool change time decision method
CN111579501A (en) Coal rock medium identification system and identification method based on hydrogen bond fracture
CN108872391B (en) Geophysical prospecting analysis method for evaluating stable state of rock mass
CN114370284B (en) Method and system for real-time sensing of stratum properties of shield excavation surface and adjustment of excavation parameters
CN110806859A (en) Modular drilling data monitoring and design system based on machine learning
CN111598366A (en) Real-time drilling auxiliary decision-making method and system
CN113158561B (en) TBM operation parameter optimization method and system suitable for various rock mass conditions
Cai et al. Mining method optimisation of Bayi gold mine based on the value engineering principle
WO2021059303A3 (en) Method and system for industrial data mining
CN110925022A (en) Trend and state-based gas dynamic disaster acoustic emission monitoring and early warning method
CN110261313A (en) A kind of distributed optical fiber acoustic sensor-based system for monitoring coke drum operation conditions on-line
CN110979397A (en) Real-time monitoring and early warning system and method for high-speed rail crossing inverted arch floating area in operation period

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant