CN106149782B - A kind of mobile and combined suspension cable shovel of large span, which digs to grab, hangs traction transport system - Google Patents

A kind of mobile and combined suspension cable shovel of large span, which digs to grab, hangs traction transport system Download PDF

Info

Publication number
CN106149782B
CN106149782B CN201510902650.XA CN201510902650A CN106149782B CN 106149782 B CN106149782 B CN 106149782B CN 201510902650 A CN201510902650 A CN 201510902650A CN 106149782 B CN106149782 B CN 106149782B
Authority
CN
China
Prior art keywords
cableway
mobile
grab
digs
large span
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510902650.XA
Other languages
Chinese (zh)
Other versions
CN106149782A (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xu Shaogang
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510902650.XA priority Critical patent/CN106149782B/en
Publication of CN106149782A publication Critical patent/CN106149782A/en
Application granted granted Critical
Publication of CN106149782B publication Critical patent/CN106149782B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/28Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/30Auxiliary apparatus, e.g. for thawing, cracking, blowing-up, or other preparatory treatment of the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Control And Safety Of Cranes (AREA)
  • Earth Drilling (AREA)

Abstract

The patent provides a kind of large span, can on the ground, can underwater operation powerful combined hanging, integrate shovel digging and grabs the work system hung with traction transport.It includes at least a main working machine unit and a driven unit as cableway supporting point;Main computer unit assembly and is made of the assembly of getting on the bus of operation part (3), elevator and capstan winch part (13), stent (4), pulley blocks (5), Rail sliding car (12), counterweight (14) composition getting off of forming of engine base and running part (1), power and operation part (2);The selection of driven support unit can be set according to construction site condition, it can be set on natural forms or pulley is mechanically installed in heavy engineerings such as excavator, bull-dozer or loading machines and formed, as long as fixed guide rail cableway can be played and hawser is made to bypass the purpose that pulley goes and back running.It is guided between slave by cableway by pulley (5) and coaster (12) and connects at least one hopper.

Description

A kind of mobile and combined suspension cable shovel of large span, which digs to grab, hangs traction transport system
Technical field
It digs to grab to hang the present invention relates to a kind of large span vehicle-mounted mobile combined type suspension cable collection shovel and is with traction transport function The engineering machinery of complete set system.
Background technology
Earth scraper, also known as loading machine, scraper, earth scraper, bull-dozer, be one kind be widely used in highway, railway, building, Water conservancy, the earthwork construction machinery of the construction projects such as electric power, harbour, mine, it is mainly used for shovel and fills various collection bulk materials, shovels Digging and handling operation.It is one of main machine of restoration in earth-rock construction in engineering construction.
Excavator, also known as excavating machinery(Excavating machinery), it is to be excavated to be higher or lower than with scraper bowl to hold machine The material in face, and be packed into haulage vehicle or unload to the earthmoving machinery of rickyard.Excavator excavate material be mainly soil, coal, Silt and soil and rock after pre- pine.
Grab bucket crane, be it is a kind of takes object mechanical automatically, its crawl and to draw off material action grasped by ship unloaders driver It is vertical, support staff is not needed to, thus the heavy labor of worker is avoided, service working time is saved, substantially increases handling Efficiency.
Crane, also known as crane are a kind of lifting handlings for being widely used in the place such as harbour, workshop, water conservancy, electric power building site Machinery.This title of crane is the unified title of hoisting machinery.Frequently it is main or truck crane, crawler crane and the tire of crane It hangs
Above-mentioned machinery, referred to as general engineering machinery is all unit independently working in actual use, these engineering machinery by The limitation of self structure just can not carry out operation after the covered range of its mechanical arm institute, and traveling moving structure is also led Many soft areas is caused to cannot be introduced into operation.In conclusion engineering machinery of the prior art is there are work span is small, it is underwater to make Industry energy force difference, efficiency is low, high energy consumption, the not strong shortcoming of function.
Invention content
The technical problem to be solved by the present invention is to provide that a kind of work span is big, and underwater operation ability is strong, efficient, energy It consumes a kind of low, the powerful mobile and combined suspension cable of large span and integrates the work for shoveling and digging and grabbing and hang with traction transport function Journey mechanical combination system.
In order to solve the above technical problems, technical solution provided by the invention is:A kind of mobile and combined cableway of large span hangs Hang shovel and dig and grab and hangs traction transport system, it include at least two pairs of vehicle-mounted hoist engine units the configuration of double hosts combine or One be equipped with vehicle-mounted hoist engine host and another be equipped with pulley be used for support cableway track and drag rope The slave combination of driven machine configuration.Each board units include engine base and running gear, power section, stent, elevator part And pulley blocks, power section, stent and elevator part are mounted on engine base and running gear, the power of the power section Output mechanism is connected with the power input mechanism of elevator part;The stent is vertically arranged on engine base and running gear;Institute The pulley blocks stated are mounted on the upper end of stent;Guide rail cableway and traction cableway are also associated between every a pair of board units;It is described Guide rail cableway and traction cableway guided by pulley blocks, and be connected at least one hopper.
The present invention provides a kind of work span is big, underwater operation ability is strong, efficient, and low energy consumption, and powerful one The multi-functional large span Vehicular mobile multimachine combined type Ji Suodaoxuanguaji shovels of kind dig to grab to hang works in a set of group with traction transport Work mechanism equipment in collaboration system.It includes at least two vehicle-mounted working machine units;Two working machine units are configurable to Dual host system or host slave system(Have installation hoisting system on general host, slave by a digging mechanism into), Mei Gezhu Working machine unit includes engine base and running gear(1), power section(2), stent(3), elevator part(4)And pulley blocks(5), move Power part(2), stent(3)With elevator part(4)It is mounted on engine base and running gear(1)On, power section(2)Power it is defeated Go out mechanism and elevator part(4)Power input mechanism be connected;Stent(3)It is vertically arranged to engine base and running gear at work (1)On;Pulley blocks(5)Mounted on stent(3)Upper end;Guide rail cableway is also associated with per between a pair of working machine unit(6)With Draw cableway(7);Guide rail cableway(6)With traction cableway(7)Pass through pulley blocks(5)It guides and is connected at least one hopper.It is main Driven machine in slave configuration(12), pulley is installed(13), for supporting guide cableway and traction cableway.Under normal circumstances, Driven machine is installed pulley with an excavator and is formed, and the fixed object of other forms can also be used, as long as fixation can be played Guide rail cableway and the purpose that hawser is made reversely to walk around pulley.
Preferably, the hopper includes grab bucket, bucket, scraper bowl and suspension hook.
As an improvement, the bucket is openable and closable twin-bucket structure, the folding of bucket is controlled by traction cableway.
As an improvement, it further includes to find out underwater material form and architectonic remote sensing device and display Mechanism, the detection device are installed on cableway and hopper, and the remote sensing device and indication mechanism are installed on machine Seat and running gear(1)On operation and control room in;The detection device is shown with underwater material form and geological structure The wireless connection between processing unit.
As an improvement, it further includes reducing mechanism, for when hopper can not will be mined material and separate, will be mined object Cut crushing;The reducing mechanism with the functional components such as explosion, weight, the reducing mechanism it is removable be lifted on guide rail Cableway(6)On, the reducing mechanism is additionally provided with the elevating mechanism to move up and down for control device.
As an improvement, being designed with long distance wireless voice communication device in the control room of each excavator unit and video leads to Device is interrogated, the support of real-time communication is provided for the operating personnel between each unit.
As an improvement, for system is made to keep good stability at work,(1)From host upwall opposite direction Several ropes on ground can be fixed on by being equipped with,(2)Opposite direction in host work face installs movable counterweight system.
With the above structure, the present invention has the advantages that:The set digging system is suitable for carrying out big over long distances The excavation and movement of the especially underwater material of span.Two units are respectively placed in construction site both ends during work Stent is holded up at edge, is released by power section driving hoist engine and income is erected at cableway track on stent, and hopper by Another group of rolling control reaches collection along cableway track by being moved up and down before and after pulley, delivery and the construction mesh for releasing material , when using suspension hook, it can realize remote lifting and mobile material.
The present invention provides working, span is big, and underwater operation ability is strong, efficient, and low energy consumption, powerful in summary A kind of large span mobile and combined suspension cable shovel dig to grab and hang traction transport system.
Description of the drawings
Fig. 1 is that the large span vehicle-mounted mobile multimachine combined type suspension cable collection shovel of dual host system composition in the prior art is dug Grab the structure diagram for hanging the integrated system being integrated with traction transport function.
As shown in Figure 1:1st, engine base and running part, 2, power and operation part, 3, operation part, 4, stent, 5, Pulley blocks, 6, guide rail cableway, 7, traction cableway, 8, grab bucket, 9, bucket, 10, scraper bowl, 11, suspension hook.12nd, coaster, 13, elevator and Capstan winch part, 14, counterweight.
Fig. 2 is that the large span vehicle-mounted mobile multimachine combined type suspension cable collection shovel of host slave system composition in the prior art is dug Grab the structure diagram for hanging the integrated system being integrated with traction transport function.
As shown in Figure 1:1st, engine base and running part, 2, power and operation part, 3, operation part, 4, stent, 5, Pulley blocks, 6, guide rail cableway, 7, traction cableway, 8, grab bucket, 9, bucket, 10, scraper bowl, 11, suspension hook.12nd, coaster, 13, elevator and Capstan winch part, 14, counterweight, 15, driven machine unit
Fig. 3 is to be shoveled to dig in the prior art by the large span vehicle-mounted mobile multimachine combined type suspension cable collection that four units form Grab the structure diagram for hanging the integrated system being integrated with traction transport function.
As shown in Figure 3:1st, two mover units (each section is configured with shown in Fig. 1), 2, two driven machine units (can be made Any form acted on for hauling block and guide rail cableway supporting point), 3, the hopper of operational terminal.
Specific embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings.
With reference to attached drawing 1, a kind of mobile and combined suspension cable shovel of large span, which digs to grab, hangs traction transport system, it is included at least Two pairs of excavator units;Each excavator unit includes engine base and running gear 1, power section 2, stent 3, elevator portion Points 4 and pulley blocks 5, power section 2, stent 3 and elevator part 4 be mounted on engine base and running gear 1, the power part 2 power take-off mechanism is divided to be connected with the power input mechanism of elevator part 4;The stent 3 is vertically arranged to engine base and row It walks on part 1;The pulley blocks 5 are mounted on the upper end of stent 3;Guide rail cableway is also associated with per between a pair of excavator unit 6 and traction cableway 7;The guide rail cableway 6 and traction cableway 7 is guided, and be connected at least one hopper by pulley blocks 5.
Preferably, the hopper includes grab bucket 8, bucket 9, scraper bowl 10 and suspension hook 11.
As an improvement, the bucket 9 is openable and closable twin-bucket structure, the folding of bucket 9 is controlled by traction cableway 7.
As an improvement, it further includes to find out underwater material form and architectonic remote sensing device and display Mechanism, the detection device are installed on cableway and hopper, and the remote sensing device and indication mechanism are installed on machine Seat and running gear(1)On operation and control room in;The detection device is shown with underwater material form and geological structure The wireless connection between processing unit.
As an improvement, it further includes reducing mechanism, for when hopper can not will be mined material and separate, will be mined object Cut crushing;The reducing mechanism with the functional components such as explosion, weight, the reducing mechanism it is removable be lifted on guide rail Cableway(6)On, the reducing mechanism is additionally provided with the elevating mechanism to move up and down for control device.
As an improvement, being designed with long distance wireless voice communication device in the control room of each excavator unit and video leads to Device is interrogated, the support of real-time communication is provided for the operating personnel between each unit.
With reference to attached drawing 2, a kind of mobile and combined suspension cable shovel of large span digs traction transport system of hanging of grabbing, slave configuration Driven machine in system in combination(12), function as the opposite side of connection guide rails cableway and drag rope in working face Supporting point, be commonly used on a single armed excavator and pulley be installed(13)It forms, also can be other reaching constant weight, Ke Yiqi Object to fixed function replaces.
The present invention in the specific implementation, the engine base and running gear 1, power section 2, stent 3, elevator part 4 and Pulley blocks 5 and single armed excavator as driven machine have ripe commercially available component, and ingenious part of the invention is to realize Being applied in combination between multiple excavators breaches the too short limitation of traditional excavator arm of force, using runway structures, covering surface Product is wide, and depth of implements is big.Suspension cableway is built in on-vehicle machines realize remote-controlled operation the object of the present invention is to provide one kind Combined suspension cableway-type shovel dig and grab and hang traction transport change system, its structure is simply easily achieved, easy to use and function Powerful, less energy consumption is efficient.Only illustrate the situation of two excavators combination in a pair in additional embodiment, while can be with It is partnered by four excavators, four act on a hopper or are respectively acting on two hoppers simultaneously.User It can be voluntarily configured according to actual conditions.
It should be noted that system in combination mode has following 3 kinds:
1, slave combines, i.e. in two units, a mover, and a driven machine, under normal circumstances, when bucket works It is dragged by drawing or hanging to mover side mobile material.Attached drawing 2.
2, double host combinations, i.e. two units are all mover, and bucket can be to either side mobile working.Attached drawing 1.
3, four machine sets close, a:Four units are all mover.b:Or the mover of side two, two driven machines of opposite side. c:Or the mover of side one and a driven machine, opposite side are equally set.Attached drawing 3.
In addition when hopper can be worked with way moving, hopper cut-out direction can be turned to 180 degree, and go to action passes through outstanding The control of lashed cable rope is completed.
Above to the present invention and embodiments thereof be described, this describe it is no restricted, it is attached it is shown in figure also only It is one of embodiments of the present invention, practical structure is not limited thereto.All in all if the ordinary skill people of this field Member is enlightened by it, without departing from the spirit of the invention, is not inventively designed similar to the technical solution Frame mode and embodiment, be within the scope of protection of the invention.

Claims (9)

1. a kind of mobile and combined suspension cable shovel of large span, which digs to grab, hangs traction transport system, it is characterised in that:It is included at least Two vehicle-mounted working machine units;Two working machine units are configurable to dual host system or host slave system, are installed on host Hoisting system, driven machine by a Delta to constant weight and the fixed object that plays stabilization form, each main working machine Unit includes engine base and running gear (1), power section (2), stent (3), elevator part (4) and pulley blocks (5), power section (2), stent (3) and elevator part (4) are mounted on engine base and running gear (1), the power take-off mechanism of power section (2) It is connected with the power input mechanism of elevator part (4);Stent (3) is vertically arranged at work on engine base and running gear (1); Pulley blocks (5) are mounted on the upper end of stent (3);Guide rail cableway (6) and hauling rope are also associated with per between a pair of working machine unit Road (7);Guide rail cableway (6) and traction cableway (7) are guided by pulley blocks (5) and are connected at least one hopper, and slave is matched Driven machine (12) in putting, is equipped with pulley (13), and for supporting guide cableway and traction cableway, driven machine is by a Delta to one Fixed object that is determining weight and playing the role of stabilization is formed, and playing is fixed guide rail cableway and hawser is made to bypass pulley Inverted running.
2. the mobile and combined suspension cable shovel of large span according to claim 1, which digs to grab, hangs traction transport system, feature It is:The hopper includes grab bucket (8), bucket (9) scraper bowl (10) and suspension hook (11).
3. the mobile and combined suspension cable shovel of large span according to claim 2, which digs to grab, hangs traction transport system, feature It is:The bucket (9) is openable and closable twin-bucket structure, and the folding of bucket (9) is controlled by traction cableway (7).
4. the mobile and combined suspension cable shovel of large span according to claim 1, which digs to grab, hangs traction transport system, feature It is:It is further included for finding out underwater material form and architectonic remote sensing device and indication mechanism, described Detection device is installed on cableway and hopper, and the remote sensing device and indication mechanism are installed on engine base and running gear (1) in the operation and control room on;The detection device show with underwater material form and geological structure and processing unit it Between wireless connection.
5. the mobile and combined suspension cable shovel of large span according to claim 1, which digs to grab, hangs traction transport system, feature It is:It further includes reducing mechanism, for when hopper can not will be mined material and separate, will be mined object and cut crushing;It is described Reducing mechanism with the functional components such as explosion, weight, the reducing mechanism is removable to be lifted on guide rail cableway (6), The reducing mechanism is additionally provided with the elevating mechanism to move up and down for control device.
6. the mobile and combined suspension cable shovel of large span according to claim 1, which digs to grab, hangs traction transport system, feature It is:Long distance wireless voice communication device and video communication device are designed in the control room of each working machine unit, is used for Operating personnel between each working machine unit provide the support of real-time communication.
7. the mobile and combined suspension cable shovel of large span according to claim 1, which digs to grab, hangs traction transport system, feature It is:There are three types of main combination modes when system works, is respectively:(1) slave combines, i.e. in two units, a master Motivation, a driven machine, when system works, bucket is dragged by drawing or hanging to mover side mobile material, (2) double host groups It closes, i.e. two units are all mover, and bucket can be closed to either side mobile working, (3) four machine sets, a:Four units are all Mover, b:Or the mover of side two, two driven machines of opposite side, c:Or the mover of side one and a driven machine, separately Side is equally set.
8. the mobile and combined suspension cable shovel of large span according to claim 1, which digs to grab, hangs traction transport system, feature It is:When hopper way moving works, hopper cut-out direction can be turned to 180 degree, and go to action has been controlled by hanging hawser Into.
9. the mobile and combined suspension cable shovel of large span according to claim 1, which digs to grab, hangs traction transport system, feature It is:When system configuration is combined into slave, the branch for functioning as guiding cableway and drawing cableway of driven machine (12) Support point, driven machine by a Delta to constant weight and the fixed object that plays stabilization form or reach same purpose Assembly plays the role of being fixed guide rail cableway and hawser is made to bypass pulley inverted running.
CN201510902650.XA 2015-12-09 2015-12-09 A kind of mobile and combined suspension cable shovel of large span, which digs to grab, hangs traction transport system Active CN106149782B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510902650.XA CN106149782B (en) 2015-12-09 2015-12-09 A kind of mobile and combined suspension cable shovel of large span, which digs to grab, hangs traction transport system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510902650.XA CN106149782B (en) 2015-12-09 2015-12-09 A kind of mobile and combined suspension cable shovel of large span, which digs to grab, hangs traction transport system

Publications (2)

Publication Number Publication Date
CN106149782A CN106149782A (en) 2016-11-23
CN106149782B true CN106149782B (en) 2018-06-22

Family

ID=57348142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510902650.XA Active CN106149782B (en) 2015-12-09 2015-12-09 A kind of mobile and combined suspension cable shovel of large span, which digs to grab, hangs traction transport system

Country Status (1)

Country Link
CN (1) CN106149782B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108791318A (en) * 2018-04-11 2018-11-13 北京好运达智创科技有限公司 A kind of mobile shipping cable car suitable for complicated landform
CN110593344A (en) * 2019-10-08 2019-12-20 长沙矿冶研究院有限责任公司 Underwater obstacle removing vehicle
CN113338375A (en) * 2021-06-03 2021-09-03 全志君 Full-automatic fishpond silt digging equipment
CN115341602A (en) * 2022-08-30 2022-11-15 徐少钢 Flexible control soil feeding excavation system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101348161A (en) * 2008-05-21 2009-01-21 三一电气有限责任公司 Traction anchor vehicle and non-self propelling work platform traction system
EP2520726A1 (en) * 2011-05-06 2012-11-07 BRA turbo Ing AG Device and method for removing material deposits from the reservoir of a hydrotechnical structure
CN204532065U (en) * 2015-03-23 2015-08-05 徐州盾安重工机械制造有限公司 A kind of novel full-sleeve full-rotation drill work station
DE102014007827A1 (en) * 2014-06-02 2015-12-03 JOBO Spezial-Maschinen GmbH Crawler-drive amphibious working machine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101348161A (en) * 2008-05-21 2009-01-21 三一电气有限责任公司 Traction anchor vehicle and non-self propelling work platform traction system
EP2520726A1 (en) * 2011-05-06 2012-11-07 BRA turbo Ing AG Device and method for removing material deposits from the reservoir of a hydrotechnical structure
DE102014007827A1 (en) * 2014-06-02 2015-12-03 JOBO Spezial-Maschinen GmbH Crawler-drive amphibious working machine
CN204532065U (en) * 2015-03-23 2015-08-05 徐州盾安重工机械制造有限公司 A kind of novel full-sleeve full-rotation drill work station

Also Published As

Publication number Publication date
CN106149782A (en) 2016-11-23

Similar Documents

Publication Publication Date Title
CN106149782B (en) A kind of mobile and combined suspension cable shovel of large span, which digs to grab, hangs traction transport system
RU2396394C1 (en) Stripping aggregate
RU2456454C1 (en) Excavation-transportation system
CN101713191B (en) Device and method used for excavating foundation pit deep earthwork
CN102808623A (en) Coal mine underground multipurpose vehicle
CN107237649A (en) The long steep inclined shaft transportation system of light section and construction method
CN202296901U (en) Caterpillar crane for narrow and shallow tunnel
CN111335941B (en) Method for dredging and blocking inclined chute ore drawing and transferring equipment of strip mine
CN110106867A (en) Manual digging pile construction method between railcar station track
CN204418243U (en) A kind of large span suspension cable vehicle-mounted removable multimachine combination traction digging system
US2496101A (en) Deepwater dredge
CN209025120U (en) Mining multi-purpose crawler type draws excavator truck-mounted crane
RU153210U1 (en) FLAT UNIT FOR TRANSPORT-FREE DEVELOPMENT SYSTEM
CN115341602A (en) Flexible control soil feeding excavation system
CN102704514A (en) Loader-digger for inclined shaft
CN105317061A (en) Long-span cableway suspension vehicle-mounted movable multi-machine combined traction excavating system
CN214497621U (en) Loader capable of automatically stretching and retracting
RU188605U1 (en) Two-sided excavation-transporting complex
RU185542U1 (en) Excavation and transportation complex for cutting a trench
SU1247471A1 (en) Dragline working equipment
SU840246A1 (en) Soil-working machine
SU750078A1 (en) Machinery set for sinking vertical mine workings
RU2148714C1 (en) Device for excavation of rock in quarry
McDaniel Excavation: Machinery, Methods and Costs, Including a Revision of" Excavating Machinery,"
RU2255181C1 (en) Slack line cableway (tower) excavator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180212

Address after: 116023 digital road, Shahekou District, Liaoning, Dalian 70-27-02

Applicant after: Xu Shaogang

Address before: 221011 office building, Suzhou Avenue North office building, Xuzhou Industrial Park, Jiawang District, Xuzhou, Jiangsu Province, 208D

Applicant before: Qinhuai Xuzhou Hydraulic Engineering Machinery Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant