CN106149757A - 一种水分养分试验小区隔挡墙的安装方法 - Google Patents
一种水分养分试验小区隔挡墙的安装方法 Download PDFInfo
- Publication number
- CN106149757A CN106149757A CN201610711113.1A CN201610711113A CN106149757A CN 106149757 A CN106149757 A CN 106149757A CN 201610711113 A CN201610711113 A CN 201610711113A CN 106149757 A CN106149757 A CN 106149757A
- Authority
- CN
- China
- Prior art keywords
- vertical shaft
- community
- experimental plot
- water
- cell boarder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
本发明公开了一种水分试验小区隔水墙的安装方法,该方法包括以下步骤:先在小区的四角打直径60cm竖井,在用10cm的锄头沿小区边界向竖井里刨土,小区边界开挖槽的土全部由竖井吊出;竖井间距离最大为7m,竖井的布置按试验小区大小确定;挖好后把制作好的PVC隔水板放置到小区边界槽里;回填竖井和边界槽,小区隔水墙就安装完毕。本发明具有破坏小区原状土面积小,施工方便,费用低廉,和试验准确性高等特点,适合推广应用。
Description
技术领域
本发明属于建筑工程技术领域,具体地说,涉及一种水分养分试验小区隔挡墙的安装方法.
背景技术
目前水分养分小区隔挡墙开挖传统做法破坏小区原状土面积大,小区边界槽基本开挖在80cm以上,现有技术中,存在施工难度大,费用高,破坏扰动原状土面积大和试验准确性低等缺陷。
发明内容
本发明的目的在于克服上述技术存在的缺陷,提供一种水分养分试验小区隔挡墙的安装方法,该方法具有破坏扰动小区原状土面积小,施工方便,费用低廉,和试验准确性高等特点,适合推广应用。
其具体技术方案为:
一种水分养分试验小区隔挡墙的安装方法,包括以下步骤:先在小区的四角打直径60cm竖井,在用自制可伸缩的10cm的锄头沿小区边界向竖井里刨土,小区边界开挖槽的土全部由竖井吊出;竖井间距离最大为7m,竖井的布置按试验小区大小确定;挖好后把制作好的PVC隔水板或制作好的彩钢隔水板放置到小区边界槽里;回填竖井和边界槽,小区隔挡墙就安装完毕。
与现有技术相比,本发明的有益效果:
本发明的技术方案相对于传统的开挖土方减少了10倍以上,PVC隔水板或彩钢板隔水板在试验区外制作减少了人为对小区原状的扰动,减少试验费用,大大提高试验的准确性。
本发明具有破坏小区原状土面积非常小,施工方便,费用低廉,和试验准确性高等特点,适合推广应用。
附图说明
图1是本发明水分养分试验小区隔挡墙的安装方法操作示意图。
具体实施方式
下面结合附图和具体实施方案对本发明的技术方案作进一步详细地说明。
如图1所示,一种水分养分试验小区隔挡墙的安装方法,包括以下步骤:先在小区的四角打直径60cm竖井,在用10cm的锄头沿小区边界向竖井里刨土,小区边界开挖槽的土全部由竖井吊出;竖井间距离最大为7m,竖井的布置按试验小区大小确定;挖好后把制作好的PVC隔水板或彩钢隔水板放置到小区边界槽里;回填竖井和边界槽,小区隔挡墙就安装完毕。
本发明能够在现有的试验小区内方便实施,保证试验小区原有状态,减少了施工对小区原状的扰动,减少试验费用,大大提高试验的准确性。
以上所述,仅为本发明较佳的具体实施方式,本发明的保护范围不限于此,任何熟悉本技术领域的技术人员在本发明披露的技术范围内,可显而易见地得到的技术方案的简单变化或等效替换均落入本发明的保护范围内。
Claims (1)
1.一种水分养分试验小区隔挡墙的安装方法,其特征在于,包括以下步骤:
先在确定好的试验小区的四角打直径60cm竖井,在用10cm的锄头沿小区边界向竖井里刨土,小区边界开挖槽的土全部由竖井吊出;竖井间距离最大为7m,竖井的布置按试验小区大小确定;挖好后把制作好的PVC隔水板或彩钢隔水板放置到小区边界槽里;回填竖井和边界槽,小区隔挡墙就安装完毕。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610711113.1A CN106149757A (zh) | 2016-08-23 | 2016-08-23 | 一种水分养分试验小区隔挡墙的安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610711113.1A CN106149757A (zh) | 2016-08-23 | 2016-08-23 | 一种水分养分试验小区隔挡墙的安装方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106149757A true CN106149757A (zh) | 2016-11-23 |
Family
ID=57341843
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610711113.1A Pending CN106149757A (zh) | 2016-08-23 | 2016-08-23 | 一种水分养分试验小区隔挡墙的安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106149757A (zh) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102113461A (zh) * | 2009-12-30 | 2011-07-06 | 中国科学院沈阳应用生态研究所 | 一种田地试验小区土壤隔水的方法 |
KR20140050813A (ko) * | 2012-10-22 | 2014-04-30 | 박상현 | 축대옹벽블럭 조립체 및 그 시공방법 |
CN104912097A (zh) * | 2015-06-08 | 2015-09-16 | 四川睿铁科技有限责任公司 | 一种新型的挡墙反滤排水系统及施工方法 |
-
2016
- 2016-08-23 CN CN201610711113.1A patent/CN106149757A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102113461A (zh) * | 2009-12-30 | 2011-07-06 | 中国科学院沈阳应用生态研究所 | 一种田地试验小区土壤隔水的方法 |
KR20140050813A (ko) * | 2012-10-22 | 2014-04-30 | 박상현 | 축대옹벽블럭 조립체 및 그 시공방법 |
CN104912097A (zh) * | 2015-06-08 | 2015-09-16 | 四川睿铁科技有限责任公司 | 一种新型的挡墙反滤排水系统及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103290836B (zh) | 一种真空降压击实固结软基处理施工方法 | |
CN102926376A (zh) | 一种围海造地区域软土地基处理方法 | |
CN104569341A (zh) | 真空预压联合电渗试验装置以及真空预压联合电渗试验的方法 | |
CN103290848B (zh) | 一种大直径弧形钢板桩组合基坑支护结构及其施工方法 | |
CN103742157A (zh) | 用顶管法在地下新建地下空间的方法 | |
CN103290850A (zh) | 一种拱形组合基坑支护体系及施工方法 | |
CN105239554A (zh) | 用低透水性砂层的真空联合堆载预压排水结构及施工方法 | |
CN204112378U (zh) | 一种具有仿真隔离作用的桩基检测双护筒装置 | |
CN104695457A (zh) | 一种新型竖井水平旋喷桩基坑封底隔水层的施工方法 | |
CN106777974B (zh) | 一种基坑开挖对周围临近建筑物的沉降计算方法 | |
CN101463601A (zh) | 预置式“高真空击密”软地基处理方法 | |
CN107724399A (zh) | 中等富水地区开挖受限地段深基坑开挖施工的方法 | |
CN105257318B (zh) | 一种衬砌局部渗漏引起隧道结构变形的安全保护方法 | |
CN110241870A (zh) | 一种基坑开挖监测系统的布置方法以及基坑开挖监测系统 | |
CN103741726B (zh) | 一种沉井沉降量测量方法 | |
CN108487253A (zh) | 一种临轨久置超深基坑后加分坑及清障工法 | |
CN106149757A (zh) | 一种水分养分试验小区隔挡墙的安装方法 | |
CN105569063A (zh) | 地下室挡土墙周边地下水的收集利用方法及集水结构 | |
CN204609897U (zh) | 一种管幕冻结法支护结构 | |
CN102061701A (zh) | 利用冲孔灌注桩安装垂直接地极的施工方法 | |
CN204608798U (zh) | 一种止水桩/墙内插h型钢与预制管桩构成的基坑支护结构 | |
CN105970909B (zh) | 井点塑排真空预压渗流固结联合降水预压动力固结法 | |
CN205591202U (zh) | 一种用于软土地基的加固桩 | |
CN211922745U (zh) | 一种用于基坑围护结构渗漏隐患检测的观测系统 | |
CN202925540U (zh) | 一种围海造地区域软土地基处理装置的布设结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161123 |