CN106149571A - 一种成型桥梁顶面安装塔吊的方法 - Google Patents

一种成型桥梁顶面安装塔吊的方法 Download PDF

Info

Publication number
CN106149571A
CN106149571A CN201510205666.5A CN201510205666A CN106149571A CN 106149571 A CN106149571 A CN 106149571A CN 201510205666 A CN201510205666 A CN 201510205666A CN 106149571 A CN106149571 A CN 106149571A
Authority
CN
China
Prior art keywords
tower crane
face
building
bridge
installs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510205666.5A
Other languages
English (en)
Inventor
胡茂刚
赵良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wujiang City Minggang Road & Bridge Co Ltd
Original Assignee
Wujiang City Minggang Road & Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wujiang City Minggang Road & Bridge Co Ltd filed Critical Wujiang City Minggang Road & Bridge Co Ltd
Priority to CN201510205666.5A priority Critical patent/CN106149571A/zh
Publication of CN106149571A publication Critical patent/CN106149571A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种成型桥梁顶面安装塔吊的方法,其包括以下步骤:(1)制作钢结构塔吊基础,在塔吊基础上焊接标准节底座,制成钢结构底座;(2)在既有桥梁或结构物顶面钻若干孔洞,或者在钢筋混凝土内埋植锚固螺栓,将钢结构底座用高强螺栓锚固在桥梁顶面或者建筑物顶面;(3)把塔吊安装在步骤(1)中的钢结构底座上;(4)按照常规方法完成塔吊的安装。本发明利用现成的结构物做基础,无需另外构筑塔吊基础。在建筑周围地基承载力差、水面或水岸等不具备布设塔吊基础的条件下,利用既有建筑物布设塔吊,可以节省塔吊基础的费用。无需在混凝土中埋入钢构件,各项材料均可重复利用,减少材料损耗,节约成本。

Description

一种成型桥梁顶面安装塔吊的方法
技术领域
本发明涉及一种成型桥梁顶面安装塔吊的方法。
背景技术
塔吊因其具有良好的水平、垂直运输功能及经济节约性在挂篮悬灌桥梁施工中受到广泛应用,尤其是大跨径挂篮悬灌桥,塔吊已是不二选择。对于已经完成墩顶0号块、没有预埋塔吊安装底座且桥墩周围地面、水面不具备安设塔吊的条件下或者安装在地面成本较大时,如何布置塔吊是施工企业面对的难题,有的企业认为现场已经不具备塔吊安装条件从而放弃选用塔吊的方案。因此,开发一种在已经成型的桥梁顶面安装塔吊的方法,成为亟待解决的技术问题。
发明内容
本发明要解决的技术问题是克服现有技术的缺陷,提供一种成型桥梁顶面安装塔吊的方法。
为了解决上述技术问题,本发明提供了如下的技术方案:
本发明一种成型桥梁顶面安装塔吊的方法,其包括以下步骤:
(1)制作钢结构塔吊基础,在塔吊基础上焊接标准节底座,制成钢结构底座;
(2)在既有桥梁或结构物顶面钻若干孔洞,或者在钢筋混凝土内埋植锚固螺栓,将钢结构底座用高强螺栓锚固在桥梁顶面或者建筑物顶面;
(3)把塔吊安装在步骤(1)中的钢结构底座上;
(4)按照常规方法完成塔吊的安装。
进一步地,在步骤(1)中,所述的钢结构塔吊基础采用型钢与钢板制作。
进一步地,需要将塔吊的荷载施加在对既有建筑物进行稳定性验算以及在保证既有建筑物安全的前提下,方可安装塔吊,解决方法:如果既有建筑物安全储备不足,可以对既有建筑物进行必要的加固、加强。
本发明在既有建筑物上布置塔吊,没有预埋塔吊基础的条件下,可以布置塔吊,当构筑物或建筑物已经完成,在既有建筑物上布置塔吊,没有预埋塔吊基础的条件下,可以布置塔吊,当构筑物或建筑物已经完成,通过本方法仍然可以布置塔吊。本发明为施工组织者提供多样性选择方案。在建筑周围地基承载力差、水面或水岸等不具备布设塔吊基础的条件下,利用既有建筑物布设塔吊,可以节省塔吊基础的费用。
本发明所达到的有益效果是:
本发明利用现成的结构物做基础,无需另外构筑塔吊基础。在建筑周围地基承载力差、水面或水岸等不具备布设塔吊基础的条件下,利用既有建筑物布设塔吊,可以节省塔吊基础的费用。无需在混凝土中埋入钢构件,各项材料均可重复利用,减少材料损耗,节约成本。各项材料皆为工地常用材料,无需特殊定制,可以就地取材。将塔吊底座用螺栓锚固在既有建筑物顶部,原理清楚、施工方便,施工速度快,制约因素少。受力明确直观、便于检查,施工方案可靠,安全。拆装与运输方便快捷,混凝土湿作业较少,施工周期短,节省工期。与落地塔吊相比,减少塔吊标准节用量,减少或节省塔吊附墙件。
附图说明
附图用来提供对本发明的进一步理解,并且构成说明书的一部分,与本发明的实施例一起用于解释本发明,并不构成对本发明的限制。在附图中:
图1是本发明的结构示意图。
具体实施方式
以下结合附图对本发明的优选实施例进行说明,应当理解,此处所描述的优选实施例仅用于说明和解释本发明,并不用于限定本发明。
如图1所示,本发明一种成型桥梁顶面安装塔吊的方法,其包括以下步骤:
(1)制作钢结构塔吊基础,在塔吊基础上焊接标准节底座,制成钢结构底座1;
(2)在既有桥梁或结构物顶面钻若干孔洞,或者在钢筋混凝土内埋植锚固螺栓,将钢结构底座1用高强螺栓锚固在桥梁顶面或者建筑物顶面;
(3)把塔吊安装在步骤(1)中的钢结构底座1上;
(4)按照常规方法完成塔吊的安装。
在步骤(1)中,所述的钢结构塔吊基础采用型钢与钢板制作。
需要将塔吊的荷载施加在对既有建筑物进行稳定性验算以及在保证既有建筑物安全的前提下,方可安装塔吊,解决方法:如果既有建筑物安全储备不足,可以对既有建筑物进行必要的加固、加强。
本发明在既有建筑物上布置塔吊,没有预埋塔吊基础的条件下,可以布置塔吊,当构筑物或建筑物已经完成,在既有建筑物上布置塔吊,没有预埋塔吊基础的条件下,可以布置塔吊,当构筑物或建筑物已经完成,通过本方法仍然可以布置塔吊。本发明为施工组织者提供多样性选择方案。在建筑周围地基承载力差、水面或水岸等不具备布设塔吊基础的条件下,利用既有建筑物布设塔吊,可以节省塔吊基础的费用。
本发明所达到的有益效果是:
本发明利用现成的结构物做基础,无需另外构筑塔吊基础。在建筑周围地基承载力差、水面或水岸等不具备布设塔吊基础的条件下,利用既有建筑物布设塔吊,可以节省塔吊基础的费用。无需在混凝土中埋入钢构件,各项材料均可重复利用,减少材料损耗,节约成本。各项材料皆为工地常用材料,无需特殊定制,可以就地取材。将塔吊底座用螺栓锚固在既有建筑物顶部,原理清楚、施工方便,施工速度快,制约因素少。受力明确直观、便于检查,施工方案可靠,安全。拆装与运输方便快捷,混凝土湿作业较少,施工周期短,节省工期。与落地塔吊相比,减少塔吊标准节用量,减少或节省塔吊附墙件。
最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (3)

1.一种成型桥梁顶面安装塔吊的方法,其特征在于,包括以下步骤:
(1)制作钢结构塔吊基础,在塔吊基础上焊接标准节底座,制成钢结构底座;
(2)在既有桥梁或结构物顶面钻若干孔洞,或者在钢筋混凝土内埋植锚固螺栓,将钢结构底座用高强螺栓锚固在桥梁顶面或者建筑物顶面;
(3)把塔吊安装在步骤(1)中的钢结构底座上;
(4)按照常规方法完成塔吊的安装。
2.根据权利要求1所述的一种成型桥梁顶面安装塔吊的方法,其特征在于,在步骤(1)中,所述的钢结构塔吊基础采用型钢与钢板制作。
3.根据权利要求1所述的一种成型桥梁顶面安装塔吊的方法,其特征在于,在步骤(4)安装塔吊前,需要将塔吊的荷载施加在对既有建筑物进行稳定性验算以及保证既有建筑物安全的前提下进行。
CN201510205666.5A 2015-04-27 2015-04-27 一种成型桥梁顶面安装塔吊的方法 Pending CN106149571A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510205666.5A CN106149571A (zh) 2015-04-27 2015-04-27 一种成型桥梁顶面安装塔吊的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510205666.5A CN106149571A (zh) 2015-04-27 2015-04-27 一种成型桥梁顶面安装塔吊的方法

Publications (1)

Publication Number Publication Date
CN106149571A true CN106149571A (zh) 2016-11-23

Family

ID=57347416

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510205666.5A Pending CN106149571A (zh) 2015-04-27 2015-04-27 一种成型桥梁顶面安装塔吊的方法

Country Status (1)

Country Link
CN (1) CN106149571A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107574833A (zh) * 2017-07-28 2018-01-12 中国建筑第二工程局有限公司 一种屋面塔吊型钢基础梁及施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09287112A (ja) * 1996-04-24 1997-11-04 Kajima Corp Pc橋梁の主桁鉄筋施工法およびその装置
CN101122115A (zh) * 2007-08-03 2008-02-13 中铁一局集团有限公司 一种塔吊移位的施工方法
CN101177932A (zh) * 2007-11-28 2008-05-14 贵州省桥梁工程总公司 移动塔吊桥面运行施工方法及装置
CN101333802A (zh) * 2008-07-18 2008-12-31 中铁十七局集团第二工程有限公司 高墩大跨桥施工中tc5015塔吊的竖向转换方法
CN103410101A (zh) * 2013-08-23 2013-11-27 中南大学 抛物线形超高型桥墩施工中的塔吊转换方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09287112A (ja) * 1996-04-24 1997-11-04 Kajima Corp Pc橋梁の主桁鉄筋施工法およびその装置
CN101122115A (zh) * 2007-08-03 2008-02-13 中铁一局集团有限公司 一种塔吊移位的施工方法
CN101177932A (zh) * 2007-11-28 2008-05-14 贵州省桥梁工程总公司 移动塔吊桥面运行施工方法及装置
CN101333802A (zh) * 2008-07-18 2008-12-31 中铁十七局集团第二工程有限公司 高墩大跨桥施工中tc5015塔吊的竖向转换方法
CN103410101A (zh) * 2013-08-23 2013-11-27 中南大学 抛物线形超高型桥墩施工中的塔吊转换方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
徐天良: "超高墩施工塔吊基础置换技术研究与探讨", 《湖南交通科技》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107574833A (zh) * 2017-07-28 2018-01-12 中国建筑第二工程局有限公司 一种屋面塔吊型钢基础梁及施工方法

Similar Documents

Publication Publication Date Title
US8359793B2 (en) Earthquake force absorption system
CN104866659A (zh) 基于bim的钢结构整体吊装方法
CN104963354B (zh) 一种整体埋入式刚性柱脚及其施工方法
US11480267B2 (en) System and method for protection of under-slab utilities from changes in soil volume
CN108118689B (zh) 一种可部分循环使用预制地下连续墙、吊具以及施工方法
KR101653606B1 (ko) 일체식 교대 교량 시공방법
CN106149571A (zh) 一种成型桥梁顶面安装塔吊的方法
CN204608843U (zh) 既有砌体结构伸缩缝处隔震支座托换结构
CN104878871B (zh) 全干式连接预制混凝土板、楼盖及其抗震性能提升方法
CN104727307B (zh) 用于地下的变截面桩柱施工方法
KR100926300B1 (ko) 말뚝보강 지내력기초구조물 및 그 시공방법
CN213805443U (zh) 一种钢结构、框架梁结构、边坡加固结构及加固支护结构
JP6541255B2 (ja) 杭の設計方法および構造物の支持構造
CN108221954B (zh) 一种易拆卸的预制地下连续墙、吊具以及施工方法
KR102464479B1 (ko) 걸이식 교량 점검시설용 단일 결속수단의 사방결속브래킷
CN108221955B (zh) 一种可整体循环使用预制地下连续墙、吊具以及施工方法
Morcous et al. Circular shear pocket connection for full-depth precast concrete deck construction
CN105909280A (zh) 一种用于超大断面隧道拱墙衬砌钢筋定位加固的安装结构
JP2014080824A (ja) 既設構造物の躯体を利用する基礎構造の構築工法及び基礎構造
CN201513193U (zh) 在隧道内采用预应力锚杆安装射流风机的结构
KR102268736B1 (ko) 뼈대 보강구조를 가진 다각 콘크리트 배수관
CN204715362U (zh) 一种深基坑埋入式柱脚支撑架
KR102054628B1 (ko) 말뚝 상단 합성효과에 의한 강성 보강 및 선단 확장형 말뚝
CN106049279A (zh) 钢箱梁内的拉索锚固结构
CN205776205U (zh) 一种提供反力的地锚

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161123