CN106145436A - Thermal water processing equipment modular installation method - Google Patents

Thermal water processing equipment modular installation method Download PDF

Info

Publication number
CN106145436A
CN106145436A CN201510194933.3A CN201510194933A CN106145436A CN 106145436 A CN106145436 A CN 106145436A CN 201510194933 A CN201510194933 A CN 201510194933A CN 106145436 A CN106145436 A CN 106145436A
Authority
CN
China
Prior art keywords
module
equipment
substrate
installation diagram
heat exchanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510194933.3A
Other languages
Chinese (zh)
Inventor
饶邦林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201510194933.3A priority Critical patent/CN106145436A/en
Publication of CN106145436A publication Critical patent/CN106145436A/en
Pending legal-status Critical Current

Links

Abstract

A kind of thermal water processing equipment modular installation method, it is characterized in that comprising the following steps: (1) is a functional module according to system diagram with each functional unit, (2) SOLIDWORKS software is used to carry out three-dimensional modeling, (3) according to architectural drawing, structure chart, beam, plate, column dimension are checked after modeling, various pipelines all must not hit beam, Chuan Liang, carry out in the space that building structure allows, (4) module installation diagram is gone out after confirmation, (5) module substrate makes, (6) equipment is installed and is made, and (7) Pipe installing and (8) are electrically installed.The thermal water processing equipment modular installation method of the present invention has modularity installation method and introduces parallel operations in large quantities, by civil engineering, install, the operation such as debugging has been intersected with having carried out the degree of depth, thus significantly shorten duration and user's convenient daily management to equipment in the future, plant maintenance, go wrong the advantage being easy to search.

Description

Thermal water processing equipment modular installation method
Technical field
The present invention relates to a kind of water treatment facilities installation method, specifically, be a kind of thermal water processing equipment modular installation method.
Background technology
Tens bubble ponds that one hot spring bathing center is few, up to a hundred many bubble ponds, bubble pond is divided into again common bubble pond and Foam pond.Foam pond is consistent with common bubble pond in feedwater, draining, constant temperature and illumination, adds circulating pump or air pump provides power.Circulating pump or air pump make water or wind have certain kinetic energy, and by the outlet designed or air port, or human body is produced massage effect, or people's vision is produced impact, or produce the scene such as waterfall, streams.The body of people, the heart, god is made greatly to be met.Most common in functional pool have whirlpool, boiling pool, pond, streams, waterfall pond etc., and whether people knew enjoyment hot spring is comfortable, warm when also has a set of powerful mechanism support them after these, and that is with regard to thermal water processing equipment.
Hot spring will be through to bubble pond from hot spring well: original sub-block, constant pressure water supply, circulating filtration and secondary temperature raising and entering into each bubble pond by pipeline parallel connection after automatically controlling a few major part, and each bubble pond also has the equipment such as circulation constant temperature, ozone sterilization in addition to the said equipment.
Therefore thermal water processing equipment is various, if the technological process routinely of many equipment is installed, the later stage user daily management to equipment, plant maintenance, the lookup gone wrong etc. all can cause a lot of difficulty.
The most known thermal water processing equipment installation method also exists above-mentioned all inconvenience and problem.
Summary of the invention
The purpose of the present invention, it is to propose a kind of installation unit installed by equipment and become by technological process and function combinations, each unit has clear and definite function defined feature, geometry connects interface, and function input, the thermal water processing equipment modular installation method of output interface feature.
Another object of the present invention, be to propose a kind of in construction civil engineering when carrying out foundation construction, batch production can be carried out by system unit function and be assembled into module, just can install with in bulk after transferring basis etc. civil engineering, the intermediate connection tube road decreasing equipment room shortens the thermal water processing equipment modular installation method of construction period.
A further object of the present invention, is to propose a kind of user convenient daily management to equipment, plant maintenance in the future, and go wrong the thermal water processing equipment modular installation method being easy to search.
For achieving the above object, the technical solution of the present invention is:
A kind of thermal water processing equipment modular installation method, it is characterised in that comprise the following steps:
(1), foundation system diagram is a functional module with each functional unit;
(2), SOLIDWORKS software is used to carry out three-dimensional modeling;
(3), checking beam, plate, column dimension according to architectural drawing, structure chart after modeling, various pipelines all must not hit beam, Chuan Liang, carries out in the space that building structure allows;
(4), module installation diagram is gone out after confirmation;
(5), module substrate make, comprise the following steps:
1), module substrate be equivalent to equipment Foundations, all water pumps in unit, plate type heat exchanger, husky tank filter, ozone machine, switch board are fixedly arranged at module substrate;
2), module substrate select same specification channel-section steel or I-steel by installation diagram requirement, make frame, at frame upper berth checkered steel plate;
3), substrate anticorrosion is sprayed paint after can be selected for zinc-plated material or completing;
4), on substrate, various equipment layout is carried out by installation diagram;
5), installation bolt hole is opened according to equipment layout;
6), hanger is set in substrate corner, in order to transport later and installation;
(6), equipment install make, comprise the following steps:
1), water pump is installed
Checking the power of water pump, lift, flow by module installation diagram, water pump adds amortisseur with substrate junction, and bolt adds spring shim;
2), plate type heat exchanger is installed
Check the heat exchange area of plate type heat exchanger, flow by module installation diagram, confirm bore and the position of plate type heat exchanger first and second side;
3), husky cylinder filter is installed
Import and export caliber, filter area, flow, sand loading amount and material by the verification of module installation diagram, confirm errorless after fixedly mount by the mounting opening position on layout drawing;
(7), Pipe installing
1), by module installation diagram, the technology requirement of tubing and conduit fittings is carried out material inspection before Pipe installing;
2), pipe arrangement in the middle of equipment, middle pipe arrangement uses thin-wall stainless steel, ring pressure to connect;
(8), electrically install
Equipment room power and control circuit and use aluminum coil holder to DDC switch board, switch board needs to be provided with grounding device, and the electric wire that used, cable are by module installation diagram requirement.
The thermal water processing equipment modular installation method of the present invention can also be further achieved by the following technical measures.
Aforesaid method, wherein said water pump must band hair interceptor.
Aforesaid method, wherein said DDC switch board is provided with standard network communication interface, it is achieved on the spot with remote auto control.
After using technique scheme, the thermal water processing equipment modular installation method of the present invention has the advantage that
1, modularity installation method introduces parallel operations in large quantities, by civil engineering, install, the operation such as debugging has been intersected, thus has been significantly shortened the duration with having carried out the degree of depth;
2, the user's convenient daily management to equipment, plant maintenance in the future, goes wrong and is easy to search.
Accompanying drawing explanation
Fig. 1 be the embodiment of the present invention be completed module diagram;
Fig. 2 is the machine room schematic diagram of the module installation of the embodiment of the present invention.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing thereof, the present invention is illustrated further.
Embodiment 1
The thermal water processing equipment modular installation method of the present invention, it is characterised in that comprise the following steps:
1, foundation system diagram is a functional module with each functional unit;
2, SOLIDWORKS software is used to carry out three-dimensional modeling;
3, checking beam, plate, column dimension according to architectural drawing, structure chart after modeling, various pipelines all must not hit beam, Chuan Liang, carries out in the space that building structure allows;
4, module installation diagram is gone out after confirmation;
Fig. 1 is the module diagram that is completed of the embodiment of the present invention, and Fig. 2 is the machine room schematic diagram of the module installation of the embodiment of the present invention.
5, module substrate makes, and comprises the following steps:
(1), module substrate be equivalent to equipment Foundations, all water pumps in unit, plate type heat exchanger, husky tank filter, ozone machine, switch board etc. are fixedly arranged at module substrate;
(2), module substrate select same specification channel-section steel or I-steel by installation diagram requirement, make frame, at the checkered steel plate of frame upper berth δ=4-5mm;
(3), substrate anticorrosion spray paint after can be selected for zinc-plated material or completing, before spraying paint matrix rust cleaning use mechanical derusting, derusting grade ST3;
(4), on substrate, various equipment layout is carried out by installation diagram;
(5), installation bolt hole is opened according to equipment layout;
(6), hanger is set in substrate corner, in order to transport later and installation;
6, equipment is installed and is made, and comprises the following steps:
(1), water pump is installed
By module installation diagram check the power of water pump, lift, flow, water pump must also band hair interceptor, water pump adds amortisseur with substrate junction, and bolt adds spring shim, and water pump adds double nut after having corrected;
(2), plate type heat exchanger is installed
By module installation diagram the verification heat exchange area of plate type heat exchanger, flow etc., confirm bore and the position of plate type heat exchanger first and second side, confirm errorless after fixedly mount by the mounting opening position on layout drawing, add double spiral shell after correction;
(3), husky cylinder filter is installed
Import and export caliber, filter area, flow, sand loading amount and material etc. by the verification of module installation diagram, confirm errorless after fixedly mount by the mounting opening position on layout drawing, add double spiral shell after correction;
(4), miscellaneous equipment is installed
By the mounting opening position fixed installation pressed after module installation diagram confirmation on layout drawing, after correction, add double spiral shell;
7, Pipe installing
(1), by module installation diagram the technology requirement of tubing and conduit fittings carried out material inspection before Pipe installing:
1), tubing
The local pit of tube wall thickness tolerance, damaging, meet the requirements, non-metal pipe has the quality certification and coherent detection report;
2), valve
Valve housing surfaces externally and internally should smooth, clean, there is no sand holes, lime-ash, pore, shrinkage cavity, crackle, opening and closing flexibly, valve body bolt be connected firmly, all valves must have the quality certification;
Value pressure test valve 10%, but every batch and each specification at least one, valve pressure test housing parts strength test and seal tightness test, casing rigidity test pressure is 1.5 times of valve nominal pressures, test period 5min;Seal tightness test is valve nominal pressure, test period 15min, and carries out record;
3), flange
Flange surface should smooth, must not have crackle, speckle, peel ply, burr, sealing surface must reach the fineness of regulation, plane is only permitted there are belt tool marks.Must not there be sand holes and groove radially, seal line must not have pit, damage.Table 1 is the tolerance scope of flange each portion size.
The tolerance of table 1 flange each portion size
4), pad must not be lost, wrinkle, crackle, periphery should be neat, and shim size should be consistent with flange sealing surface.Table 2 is flange gasket tolerance scope.
Table 2 flange gasket tolerance
5), bolt
Bolt, nut screw thread should be complete, without indentation, burr and fracture of wire, the end face of nut should smooth and and central axis, bolts and nuts should be able to correctly coordinate, and nut should be able to be screwed into whole screw thread with hands, and must not rock on bolt.The flexibility of bolt cannot be greater than the 1/1000 of total length;
(2), pipe arrangement in the middle of equipment
Middle pipe arrangement uses thin-wall stainless steel, ring pressure to connect;
1), ring pressure interconnection technique requires to see table 3.
Table 3 presses interconnection technique requirement for ring
Nominal diameter DN Tube outer diameter D0 Band length L Locking slot outer diameter D 1 Sealed end outer diameter D 2
15 16.00±0.12 14.0±1.0 15.80-16.30 17.10-17.60
20 19.00±0.12 14.5±1.0 18.80-19.40 20.20-20.80
25 25.40±0.15 15.0±1.0 24.90-25.60 26.30-27.00
32 31.80±0.15 15.0±1.0 31.00-31.80 33.10-33.90
40 40.00±0.18 19.0±1.2 39.20-40.20 41.50-42.50
50 50.80±0.20 19.0±1.2 49.70-50.80 52.50-53.60
65 63.50±0.23 22.0±1.2 61.50-62.80 65.00-66.30
80 76.00±0.25 22.0±1.2 74.40-75.80 78.20-79.60
100 102.00±0.50 22.0±1.2 99.40-101.00 103.90-105.40
2), the incising pipes of tubing use mechanical means cutting, use special grinding wheel sheet when grinding wheel cutting or reconditioning;
Pipe notch quality should meet the following requirements:
A, otch end face should be smooth, flawless, burr, concavo-convex, reducing, residue etc.;
B, inclination (with the tube hub axis verticality) deviation of otch end face not should be greater than the 5% of tube outer diameter, and must not exceed 3mm;Concavo-convex error must not exceed 1mm;
C, tube end face lose circle, and when cannot insert pipe fitting, Special shaping device should be used to can be inserted into pipe fitting bellmouth bottom by tubing section shaping;
3), the selection of ring pressing tongs
Stainless steel pipes ring pressure connects, and should select the ring pressing tongs of dimension model according to pipeline nominal diameter.Ring pressing tongs specification sees table 4.
Table 4 is ring pressing tongs specification
4), ring pressure attended operation
A, choose ring pressing tongs corresponding with pipe part specification;Ring compression mould is installed on binding clip (upper and lower ring compression mould coloring face must be consistent), assembles jaw and briquetting can carry out ring pressure attended operation;
B, before crimping, often crimping 3 to 5 pipe fittings will add a little lubricating oil in the knob of upper and lower briquetting corner, upper and lower ring pressing tongs inner mold should be kept before operation to clean;
C, pipe fitting cannot be inserted because tubing is non-round and avoid when intubating tubing incised wound sealing ring for overcoming, with Special shaping device to processing tubing section shaping;
D, remove tubing protecting film, tubing is inserted pipe fitting bellmouth to bottom, and rule on outer pipe wall along tubing edge with bow pen, then pull out tubing;
E, first tubing is inserted pipe fitting bellmouth and to bottom, rule on tubing along tubing edge;Again sealing ring is enclosed within tubing, inserts bell and spigot bottom, make tubing sounding mark align with tubing edge, finally sealing ring is pushed in the gap between pipe fitting and tubing (in annular seal space);
F, the ring of pipe fitting is pressed connecting portion press tubing end towards the face of coloring, by pipe fitting sealing position between the upper lower lock block of upper and lower ring compression mould binding clip;Pipe fitting and tubing must be perpendicular to ring compression mould coloring face can ring press operation.
During g, ring pressure, ring pressing tongs is pressed by operation oil pump, until up and down ring compression mould is of completely closed, release after voltage stabilizing 3 seconds, ring press operation completes;
5) inspection after, ring press operation completes
A, sealed end crimp position 3600Impression should concavo-convex uniformly;
B, pipe fitting end face are combined with tubing should tight gapless;
The redundance of the sealing ring of extrusion is stitched in c, pipe fitting end face and tubing pressing can natural drop or easy removal;
D, as caused ring pressure not in place because of briquetting or tool damage, application normal tool tries again ring pressure, and should check again for crimping position quality;
E, when being connected with transition nipple, a secondary ring pressure should be carried out after tightening screw thread again;
F, the tubing of nominal diameter 65-100mm are pressed with the ring of pipe fitting and are connected, and in addition to by with aforesaid operations, must also do two secondary ring pressures, during two secondary ring pressures, ring pressing tongs is translated to tubing direction a band length, by briquetting near pipe fitting sealing ring root, is forced into lower lock block gapless;
G, when ring pressure quality of connection do not reach require time, answer whole set replacement ring pressing tongs die assembly or sent by mould to repair.Improper place pressed by card, and available normal tool does card pressure again, and should be again with the confirmation of hexagonal gauge;
6), thin-walled stainless steel tube system is connected with other pipe part
A, nominal diameter be the tubing of 15-50mm ring pressure should be used when being connected with other tubing to connect the special conversion connector of thin-wall stainless steel is threaded or Flange joint.
B, nominal diameter are that the tubing of 65-100mm should use Flange joint when being connected with other tubing.
7), the requirement that arranges of thin-walled stainless steel tube supporting member spacing sees table 5.
What table 5 was pipe supports spacing arranges requirement
Pipeline nominal diameter DN 15 20 25 32 40 50 65 80 100
Maximum spacing (m) standpipe 2.0 2.0 2.5 2.5 3.0 3.0 3.0 3.0 3.5
Horizontal tube (m) 1.8 2.0 2.5 2.5 3.0 3.0 3.0 3.0 3.5
8, electrically install
Equipment room power and control circuit use aluminum coil holder to DDC switch board, and switch board needs to be provided with grounding device, and the electric wire, the cable that are used are provided with standard network communication interface by module installation diagram requirement, DDC switch board, it is achieved on the spot with remote auto control.
The present invention has substantive distinguishing features and significant technological progress, and the thermal water processing equipment modular installation method of the present invention, its technological progress is that it introduces parallel operations in large quantities, thus significantly shortens the duration.Its marrow does not thoroughly overturn traditional construction theory, but it is optimized, and relies on current flourishing advanced technology, by civil engineering, install, the operation such as debugging is intersected with having carried out the degree of depth.
The thermal water processing equipment modular installation method of the present invention uses in hot spring holiday village, mountain, Zhenjiang, Katyuan hotel SPA swimming pool shop, Guizhou Province Gui Anxinqu new river bend engineering, and effect is notable.
Above example is used for illustrative purposes only, rather than limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, it is also possible to make various conversion or change.Therefore, the technical scheme of all equivalents also should belong to scope of the invention, should be limited by each claim.

Claims (4)

1. a thermal water processing equipment modular installation method, it is characterised in that comprise the following steps:
(1), foundation system diagram is a functional module with each functional unit;
(2), SOLIDWORKS software is used to carry out three-dimensional modeling;
(3), checking beam, plate, column dimension according to architectural drawing, structure chart after modeling, various pipelines all must not hit beam, Chuan Liang, carries out in the space that building structure allows;
(4), module installation diagram is gone out after confirmation;
(5), module substrate make, comprise the following steps:
1), module substrate be equivalent to equipment Foundations, all water pumps in unit, plate type heat exchanger, husky tank filter, ozone machine, switch board are fixedly arranged at module substrate;
2), module substrate select same specification channel-section steel or I-steel by installation diagram requirement, make frame, at frame upper berth checkered steel plate;
3), substrate anticorrosion is sprayed paint after can be selected for zinc-plated material or completing;
4), on substrate, various equipment layout is carried out by installation diagram;
5), installation bolt hole is opened according to equipment layout;
6), hanger is set in substrate corner, in order to transport later and installation;
(6), equipment install make, comprise the following steps:
1), water pump is installed
Checking the power of water pump, lift, flow by module installation diagram, water pump adds amortisseur with substrate junction, and bolt adds spring shim;
2), plate type heat exchanger is installed
Check the heat exchange area of plate type heat exchanger, flow by module installation diagram, confirm bore and the position of plate type heat exchanger first and second side;
3), husky cylinder filter is installed
Import and export caliber, filter area, flow, sand loading amount and material by the verification of module installation diagram, confirm errorless after fixedly mount by the mounting opening position on layout drawing;
(7), Pipe installing
1), by module installation diagram, the technology requirement of tubing and conduit fittings is carried out material inspection before Pipe installing;
2), pipe arrangement in the middle of equipment, middle pipe arrangement uses thin-wall stainless steel, ring pressure to connect;
(8), electrically install
Equipment room power and control circuit and use aluminum coil holder to DDC switch board, switch board needs to be provided with grounding device, and the electric wire that used, cable are by module installation diagram requirement.
2. a thermal water processing equipment modular installation method, it is characterised in that comprise the following steps:
(1), foundation system diagram is a functional module with each functional unit;
(2), SOLIDWORKS software is used to carry out three-dimensional modeling;
(3), checking beam, plate, column dimension according to architectural drawing, structure chart after modeling, various pipelines all must not hit beam, Chuan Liang, carries out in the space that building structure allows;
(4), module installation diagram is gone out after confirmation;
(5), module substrate make, comprise the following steps:
1), module substrate be equivalent to equipment Foundations, all water pumps in unit, plate type heat exchanger, husky tank filter, ozone machine, switch board are fixedly arranged at module substrate;
2), module substrate select same specification channel-section steel or I-steel by installation diagram requirement, make frame, at frame upper berth checkered steel plate;
3), substrate anticorrosion is sprayed paint after can be selected for zinc-plated material or completing;
4), on substrate, various equipment layout is carried out by installation diagram;
5), installation bolt hole is opened according to equipment layout;
6), hanger is set in substrate corner, in order to transport later and installation;
(6), equipment install make, comprise the following steps:
1), water pump is installed
Checking the power of water pump, lift, flow by module installation diagram, water pump adds amortisseur with substrate junction, and bolt adds spring shim;
2), plate type heat exchanger is installed
Check the heat exchange area of plate type heat exchanger, flow by module installation diagram, confirm bore and the position of plate type heat exchanger first and second side;
3), husky cylinder filter is installed
Import and export caliber, filter area, flow, sand loading amount and material by the verification of module installation diagram, confirm errorless after fixedly mount by the mounting opening position on layout drawing;
(7), Pipe installing
1), by module installation diagram, the technology requirement of tubing and conduit fittings is carried out material inspection before Pipe installing;
2), pipe arrangement in the middle of equipment, middle pipe arrangement uses thin-wall stainless steel, ring pressure to connect;
(8), electrically install
Equipment room power and control circuit and use aluminum coil holder to DDC switch board, switch board needs to be provided with grounding device, and the electric wire that used, cable are by module installation diagram requirement.
3. thermal water processing equipment modular installation method as claimed in claim 1, it is characterised in that described water pump must band hair interceptor.
4. thermal water processing equipment modular installation method as claimed in claim 1, it is characterised in that described DDC switch board is provided with standard network communication interface, it is achieved on the spot with remote auto control.
CN201510194933.3A 2015-04-23 2015-04-23 Thermal water processing equipment modular installation method Pending CN106145436A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510194933.3A CN106145436A (en) 2015-04-23 2015-04-23 Thermal water processing equipment modular installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510194933.3A CN106145436A (en) 2015-04-23 2015-04-23 Thermal water processing equipment modular installation method

Publications (1)

Publication Number Publication Date
CN106145436A true CN106145436A (en) 2016-11-23

Family

ID=57346808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510194933.3A Pending CN106145436A (en) 2015-04-23 2015-04-23 Thermal water processing equipment modular installation method

Country Status (1)

Country Link
CN (1) CN106145436A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1653004A (en) * 2002-05-10 2005-08-10 达格公司 Transportable water treatment apparatus
CN101777090A (en) * 2010-02-22 2010-07-14 中国二十二冶集团有限公司 Method for computer simulation of installation construction of oven protection equipment of coke oven
KR20140038602A (en) * 2012-09-20 2014-03-31 한국전력공사 Apparatus for inspecting electric power conduit in underground using mobile device
CN104100111A (en) * 2014-05-20 2014-10-15 江苏柏诚工程股份有限公司 Manufacturing method for integrated water cooling machine room
CN104166892A (en) * 2014-06-19 2014-11-26 国家电网公司 Engineering management and control method and system based on three-dimensional design system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1653004A (en) * 2002-05-10 2005-08-10 达格公司 Transportable water treatment apparatus
CN101777090A (en) * 2010-02-22 2010-07-14 中国二十二冶集团有限公司 Method for computer simulation of installation construction of oven protection equipment of coke oven
KR20140038602A (en) * 2012-09-20 2014-03-31 한국전력공사 Apparatus for inspecting electric power conduit in underground using mobile device
CN104100111A (en) * 2014-05-20 2014-10-15 江苏柏诚工程股份有限公司 Manufacturing method for integrated water cooling machine room
CN104166892A (en) * 2014-06-19 2014-11-26 国家电网公司 Engineering management and control method and system based on three-dimensional design system

Similar Documents

Publication Publication Date Title
CN101975699B (en) Hydraulic testing device for steel cylinder
CN103836228B (en) Two-way water feeding water tap preburying part and imbed wall type two-way water feeding water tap
CN104405973B (en) Flange steel-plastic multiple tube regulates short tube
CN106145436A (en) Thermal water processing equipment modular installation method
CN205001713U (en) Oil pipe quick connector
CN209334378U (en) Pipe flushing component
CN208186957U (en) A kind of hydraulic dynamometer water tank automatic cycle control reverse flow cooling system
CN203052053U (en) Fast connecting device for submerged arc furnace
CN205465941U (en) A installation repair tools for engine valve lock
CN209830775U (en) Device for disassembling valve seat ring
CN204076902U (en) Under enter upper draining press
CN107702859B (en) Shutoff frock is used in valve body intensity test
CN102773339A (en) Embedded pipeline type casting mould
US8807171B1 (en) Method and system for lining pipes
CN206527158U (en) A kind of milling train high pressure backwater throttling arrangement
CN219124637U (en) Water cooling device suitable for marine electric cabinet
CN201166125Y (en) Flap valve
CN214366577U (en) Low-pressure water source heating pump system
CN204996990U (en) Forging die economizer bank
CN214661078U (en) Fixing device and pressure water pump for water making workshop
CN104501432A (en) Automatic sealing exhaust equipment for solar vacuum pipe
CN2365492Y (en) Convenient loose joint
CN216421531U (en) Positioning and clamping device for welding processing of water tank of shower vehicle
CN207278538U (en) A kind of immersible pump with female footballer
CN204477546U (en) Flange steel-plastic composite pipe regulates short tube

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161123

RJ01 Rejection of invention patent application after publication