CN204996990U - Forging die economizer bank - Google Patents

Forging die economizer bank Download PDF

Info

Publication number
CN204996990U
CN204996990U CN201520735029.4U CN201520735029U CN204996990U CN 204996990 U CN204996990 U CN 204996990U CN 201520735029 U CN201520735029 U CN 201520735029U CN 204996990 U CN204996990 U CN 204996990U
Authority
CN
China
Prior art keywords
shower nozzle
economizer bank
connector
forging die
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520735029.4U
Other languages
Chinese (zh)
Inventor
扶香荣
姬传堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Force Source Of Rail Transit Equipment Co ltd
Original Assignee
NANJING LIYUAN FORGING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING LIYUAN FORGING Co Ltd filed Critical NANJING LIYUAN FORGING Co Ltd
Priority to CN201520735029.4U priority Critical patent/CN204996990U/en
Application granted granted Critical
Publication of CN204996990U publication Critical patent/CN204996990U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forging (AREA)

Abstract

The utility model discloses a forging die economizer bank, it includes that steel pipe, elbow, shower nozzle and shower nozzle connect four the steel pipe passes through the heating member of elbow interconnect and form a rectangle form, and the steel pipe in shower nozzle joint and this heating member is linked together, and the shower nozzle connects with the shower nozzle and is linked together, the shower nozzle connects and to have a connector, is equipped with the shower nozzle on this connector and connects the chamber, and the up end of connector is equipped with two bosss, all inwards bend in the upper end of two bosss, the shower nozzle has a body, is equipped with on this body and spouts the chamber, is equipped with two location connection platforms on the outer wall of this body, the body up end is equipped with the threaded connection hole. The utility model discloses can obviously shorten and forge mould preheating time for it is even to forge mould preheating temperature, and the energy saving does not destroy the die cavity hardness of forging the mould.

Description

Forging die economizer bank
Technical field:
The utility model relates to a kind of forging die economizer bank.
Background technology:
Forging mold before manufacture, must be preheated to 150 ~ 300 DEG C to mould.Now general at present method is that iron is dried in heating, be exactly by behind blank electrical heating or oil-furnace heating to 800 ~ 900 DEG C, the baking iron (blank) reaching above temperature is put again around mould with on mold plane, after making heating, blank heat trnasfer is on mould, so not only waste energy, cause mould and die preheating uneven, in production process, mould is easy to crack, as being easy to cause die cavity hardness to decline with die cavity contact portion, affect die life.
Therefore, necessary the deficiency solving prior art is improved to prior art.
Utility model content:
The utility model provides a kind of forging die economizer bank to solve above-mentioned prior art Problems existing.
The technical scheme that the utility model adopts has: a kind of forging die economizer bank, it comprises steel pipe, elbow, shower nozzle and shower nozzle joint, four described steel pipes are interconnected by elbow and form rectangular-shaped calandria, shower nozzle joint is connected with the steel pipe in this calandria, shower nozzle is connected with shower nozzle joint, described shower nozzle joint has a connector, this connector is provided with shower nozzle connection chamber, the upper surface of connector is provided with two boss, the upper end all inwardly bending of described two boss, described shower nozzle has a body, this body is provided with spray chamber, the outer wall of this body is provided with two and is located by connecting platform, described body upper surface is provided with threaded connection hole.
Further, the bending angle of described boss upper end is 90 °.
Further, in described calandria, adjacent two steel pipes are provided with louvre.
Further, described steel pipe adopts stainless steel tube to make.
Further, described shower nozzle and shower nozzle joint all adopt hot-rolled steel to make.
The utility model has following beneficial effect: the utility model obviously can shorten forging mold preheating time, and make forging mold preheat temperature even, economize energy, does not destroy the die cavity hardness of forging mold.
Accompanying drawing illustrates:
Fig. 1 is the structure chart of the utility model forging die economizer bank.
Fig. 2 is shower nozzle junction composition in the utility model forging die economizer bank.
Fig. 3 is the top view of Fig. 2 shower nozzle joint.
Fig. 4 is nozzle structure figure in the utility model forging die economizer bank.
Wherein:
1-steel pipe; 2-elbow; 3-shower nozzle; 4-shower nozzle joint; 5-calandria; 11-louvre; 31-spray chamber; 32-is located by connecting platform; 33-threaded connection hole; 41-shower nozzle connection chamber; 42-boss; 43-boss groove.
Detailed description of the invention:
Below in conjunction with accompanying drawing, the utility model is further described.
As shown in Figure 1, a kind of forging die economizer bank of the utility model, comprise steel pipe 1, elbow 2, shower nozzle 3 and shower nozzle joint 4, four steel pipes 1 and be interconnected by elbow 2 and form rectangular-shaped calandria 5, this calandria 5 is arranged in the die cavity of forging mold.Shower nozzle joint 4 is connected with the steel pipe 1 in calandria 5, and shower nozzle 3 is connected with shower nozzle joint 4.
As shown in Figures 2 and 3, shower nozzle joint 4 has a connector, and this connector is provided with shower nozzle connection chamber 41, and the upper surface of connector is provided with two boss 42, the inside 90 ° of bendings in upper end of each boss 42 also form bending edges, bending edges and shower nozzle joint 4 above between form boss groove 43.
As shown in Figure 4, shower nozzle 3 has a body, and this body is provided with spray chamber 31, and the outer wall of this body is provided with two and is located by connecting platform 32, is provided with threaded connection hole 33 in body upper surface.Shower nozzle 3 is inserted in the shower nozzle connection chamber 41 of shower nozzle joint 4, then shower nozzle 3 is rotated an angle, the platform 32 that is located by connecting on shower nozzle 3 is snapped in the boss groove 43 of the boss 42 of shower nozzle joint 4.
For increasing spray thermal effect of the present utility model, in calandria 5, adjacent two steel pipes 1 are provided with louvre 11.
Steel pipe 1 in the utility model adopts stainless steel to make, and shower nozzle 3 and shower nozzle joint 4 all adopt hot-rolled steel to make.Calandria 5 is arranged in the die cavity of forging mold, shower nozzle 3 is connected with baking rifle head, then shower nozzle 3 is inserted in shower nozzle joint 4, dry rifle and be connected with liquefied gas bottle, open air valve, carry out preheating forging mold by heating calandria 5.
The above is only preferred embodiment of the present utility model; should be understood that; for those skilled in the art, can also make some improvement under the prerequisite not departing from the utility model principle, these improvement also should be considered as protection domain of the present utility model.

Claims (5)

1. a forging die economizer bank, it is characterized in that: comprise steel pipe (1), elbow (2), shower nozzle (3) and shower nozzle joint (4), four described steel pipes (1) are interconnected by elbow (2) and form rectangular-shaped calandria (5), shower nozzle joint (4) is connected with the steel pipe (1) in this calandria (5), shower nozzle (3) is connected with shower nozzle joint (4), described shower nozzle joint (4) has a connector, this connector is provided with shower nozzle connection chamber (41), the upper surface of connector is provided with two boss (42), the upper end all inwardly bending of described two boss (42), described shower nozzle (3) has a body, this body is provided with spray chamber (31), the outer wall of this body is provided with two and is located by connecting platform (32), described body upper surface is provided with threaded connection hole (33).
2. forging die economizer bank as claimed in claim 1, is characterized in that: the bending angle of described boss (42) upper end is 90 °.
3. forging die economizer bank as claimed in claim 1, is characterized in that: in described calandria (5), adjacent two steel pipes (1) are provided with louvre (11).
4. forging die economizer bank as claimed in claim 1, is characterized in that: described steel pipe (1) adopts stainless steel tube to make.
5. forging die economizer bank as claimed in claim 1, is characterized in that: described shower nozzle (3) and shower nozzle joint (4) all adopt hot-rolled steel to make.
CN201520735029.4U 2015-09-21 2015-09-21 Forging die economizer bank Expired - Fee Related CN204996990U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520735029.4U CN204996990U (en) 2015-09-21 2015-09-21 Forging die economizer bank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520735029.4U CN204996990U (en) 2015-09-21 2015-09-21 Forging die economizer bank

Publications (1)

Publication Number Publication Date
CN204996990U true CN204996990U (en) 2016-01-27

Family

ID=55153895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520735029.4U Expired - Fee Related CN204996990U (en) 2015-09-21 2015-09-21 Forging die economizer bank

Country Status (1)

Country Link
CN (1) CN204996990U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105149491A (en) * 2015-09-21 2015-12-16 南京力源锻造有限公司 Forging die preheating tube

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105149491A (en) * 2015-09-21 2015-12-16 南京力源锻造有限公司 Forging die preheating tube

Similar Documents

Publication Publication Date Title
CN204996990U (en) Forging die economizer bank
CN105149491A (en) Forging die preheating tube
CN204171129U (en) Electric arc furnaces cooling water pipe elbow-making device
CN204022927U (en) Blow gun in improved hot-dip galvanized steel pipe production line
CN103292111A (en) Anti-corrosion composite oil pipe
CN103363665A (en) Interlayer water tank for water heater and manufacture method thereof
CN105195625A (en) Necking tee joint processing die and method of processing tee joint by using same
CN208804368U (en) A kind of connecting device of oxygen lance
CN207746592U (en) Thermal after the welding preheating of major-diameter thick-wall end socket piece
CN205991723U (en) A kind of hot-water heating heat riser
CN203231003U (en) Novel hot-extrusion tee joint for steam pipelines of 600 MW and 1000 MW ultra-supercritical generator sets
CN104180093A (en) Seamless steel tube for boiler
CN204227399U (en) Steam generator
CN204020253U (en) For the air ducting of mobile phone shell colored drawing machine
CN103143893A (en) Manufacture method of non-right-angle horseshoe seal head
CN207778793U (en) Hot-water boiler with supply water injector device
CN201793595U (en) Cooling wall of blast furnace
CN204248258U (en) A kind of corrugated plating robot with welding gun
CN107894165A (en) A kind of Full high-alumina insulating brick muffle-free steam treatment furnace
CN201935602U (en) Radiator
CN214829913U (en) Glass quality 3D hot bending processing device
CN202521149U (en) Special anchoring part for high-temperature expansion joint
CN202521118U (en) Large-caliber hot-push system single-slit elbow
CN207169671U (en) Quenching oil reactor
CN205101692U (en) Stainless steel outlet pipe with post forming structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Lishui District of Nanjing City, Jiangsu province 211200 Honglan Town Industrial Zone

Patentee after: NANJING FORCE SOURCE OF RAIL TRANSIT EQUIPMENT Co.,Ltd.

Address before: Lishui District of Nanjing City, Jiangsu province 211200 Honglan Town Industrial Zone

Patentee before: NANJING LIYUAN FORGING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160127