CN106127616A CN201610631437.4A CN201610631437A CN106127616A CN 106127616 A CN106127616 A CN 106127616A CN 201610631437 A CN201610631437 A CN 201610631437A CN 106127616 A CN106127616 A CN 106127616A
Authority
CN
China
Prior art keywords
organization plan
construction organization
layer
quantities
duplicating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610631437.4A
Other languages
Chinese (zh)
Inventor
江顺
文芳芳
罗仕清
赵耀宗
郑丹辉
罗詠炽
王伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Li Bo Software Co
Guangzhou Tuo Ou Information Technology Co Ltd
Original Assignee
Li Bo Software Co
Guangzhou Tuo Ou Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Li Bo Software Co, Guangzhou Tuo Ou Information Technology Co Ltd filed Critical Li Bo Software Co
Priority to CN201610631437.4A priority Critical patent/CN106127616A/en
Publication of CN106127616A publication Critical patent/CN106127616A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to collocation method and the system of a kind of floor construction organization plan, method includes: the construction organization plan of reference layer in A1, Criterion layer, and associates with component relevant in corresponding bill of quantities, BIM model;A2, arrange reference layer and duplicating layer construction organization plan replicate parameter;A3, replicate parameter according to the construction organization plan of reference layer and duplicating layer, replicate the construction organization plan of reference layer and generate the construction organization plan of duplicating layer;A4, based on replicate component screening rule, from BIM model, filter out relevant component associate with the construction organization plan of duplicating layer;And replicate the bill of quantities generating duplicating layer, and associate with the construction organization plan of duplicating layer;A5, complete to belong to the configuration of each duplicating layer construction organization plan of index bed.The present invention can automatically generate construction organization plan and association bill of quantities and component, to reduce repetitive operation, improves efficiency.

Description

The collocation method of floor construction organization plan and system
Technical field
The present invention relates to construction engineering technical field, be specifically related to a kind of based on index bed feature to belonging to index bed The construction organization plan of floor carries out the method and system configured.
Background technology
Architectural engineering all must carry out detailed construction organization meter according to project concrete condition before practice of construction is built Draw, arrange the manpower required for each construction link and the goods and materials such as material, plant equipment, thus manage whole work progress Progress and fund.Construction organization plan is the heaviest with the project management of turnkey company and final structural quality for owner Want.In detail and reasonably construction organization plan can not only ensure that project is timely completed, moreover it is possible to uses manpower and material resources sparingly to greatest extent Cost and accelerating construction progress.
Configuration construction organization plan is a loaded down with trivial details system engineering, needs to coordinate various factors and considers.Existing skill Art is to be operated on software by staff, inputs the beginning of each construction task, continues and the end time, and each construction is appointed Business associates with corresponding bill of quantities, the resource quantity such as the people of inventory estimation, material, machine of reallocating and income and budget The amount of money to each construction task, thus realize the management of progress and fund.
Prior art configures construction organization plan there is problems in that
(1) existing technology otherwise do not possess association inventory specific item component function, or need clear from great amount of work Single structure filters out required bill of quantities associate with construction organization plan again, it is therefore desirable to expend substantial amounts of manpower and Time.
(2) for the general the most fabricated residential housing of residential housing, except floor number is in place with model component institute Beyond putting, often there is multiple construction sequence, required material, engineering time and the most on all four index bed of construction content (the different floors of same group of index bed, in addition to floor number difference, its construction organization plan, construction organization plan associate Bill of quantities and be assigned to the number of components of construction organization plan and each attribute is the most corresponding identical, if each index bed is each From setting up construction organization plan, then can produce many repetitive operation.Therefore the index bed construction organization plan can will set up Essential information (construction organization plan framework the most substantially, period planning table etc.) copy to it is set up by another kind of same floor Construction organization plan, to improve efficiency.But owing to the component of each floor is different, each component still needs with construction organization plan Want staff to be associated operation, cause wasting time and energy.
Summary of the invention
It is an object of the invention to, propose the collocation method of a kind of floor construction organization plan, can be according to having set up Typical floor construction organization plan automatically generates the construction organization plan with remaining floor organizing index bed and association quantities is clear List and component, to reduce repetitive operation, improve efficiency.The present invention proposes joining of a kind of floor construction organization plan accordingly simultaneously Putting system, it can quickly associate bill of quantities by screening component.
In order to realize object above, the collocation method of a kind of floor construction organization plan that the present invention proposes, mainly include Following steps:
The construction organization plan of reference layer in A1, Criterion layer, and by the construction organization plan of described reference layer and phase Component association relevant in the bill of quantities answered, BIM model;
A2, the construction organization plan arranging described reference layer replicate parameter and belong to the executing of duplicating layer of index bed Parameter replicates in work organization planning;
A3, the construction organization plan replicating parameter and duplicating layer according to the construction organization plan of reference layer replicate parameter, multiple Make the construction organization plan of described reference layer and generate the construction organization plan of described duplicating layer;
A4, based on replicate component screening rule, from BIM model, filter out the construction organization of relevant component and duplicating layer Plan association;And replicate the bill of quantities of the construction organization plan association of reference layer, generate the bill of quantities of duplicating layer, And associate with the construction organization plan of duplicating layer;
A5, complete to belong to the configuration of each duplicating layer construction organization plan of index bed.
In present invention further optimization scheme, step A1 comprises the following steps:
The construction organization plan of reference layer in A11, Criterion layer, and select corresponding to the construction organization plan of reference layer The bill of quantities of many types;
A12, according to preset structure attribute, from bill of quantities, screen relevant component information, described component information with Corresponding component association in BIM model;
A13, the construction organization plan of reference layer is associated with described component information, and by component described in bill of quantities Inventory specific item belonging to information is closed under the corresponding construction task of construction organization plan being coupled to reference layer.
In present invention further optimization scheme, it is additionally included in after step A12 in threedimensional model visualization window and checks Component corresponding in BIM model, carries out visualization checking to the correctness of the component information screened.
In present invention further optimization scheme, the construction organization plan arranging described reference layer in step A2 replicates parameter Specifically include: the floor number at reference layer place is set, the class of the bill of quantities that reference layer construction organization plan comprises is set Type and bill of quantities copy rule;The construction organization plan duplication parameter arranging duplicating layer specifically includes: arrange the one of configuration The start-stop floor number of series duplicating layer and the construction organization plan of correspondence position in system engineering.
In present invention further optimization scheme, also include after step A2:
In A23, the inspection duplication setting of parameter, reference layer construction organization plan and BIM model, whether the component of duplicating layer Meeting and replicate requirement, being modified if otherwise returning step A2.
In present invention further optimization scheme, step A4 includes: extracts and replicates component screening rule, by reference layer The duplicating layer numbering of structure attribute value and setting, filters out the component information under duplicating layer construction task, by this component information pair The BIM model component answered is associated with the construction organization plan of duplicating layer;And the construction organization plan replicating reference layer is closed The bill of quantities of connection, the construction organization plan of the bill of quantities and duplicating layer that generate duplicating layer is associated.
In present invention further optimization scheme, in step A4, bill of quantities precentagewise or the distribution of absolute value form, When the remaining quantities of bill of quantities is not enough to distribution to duplicating layer, only distribute remaining quantities;Work as bill of quantities Quantities when being assigned, do not carry out the duplication distribution of bill of quantities and quantities, and feed back to user and inquire about And amendment.
In present invention further optimization scheme, step A5 comprises the following steps:
A51, in threedimensional model visualization window, check in BIM model corresponding component, first configure is answered The construction organization plan of preparative layer carries out visualization checking;
A52, be verified after, allocation plan based on the first duplicating layer construction organization plan, complete to belong to index bed The configuration of other each duplicating layer construction organization plans.
The configuration system of a kind of floor construction organization plan that the present invention proposes accordingly, mainly includes reference layer construction organization Plan is set up module, reference layer component relating module, reference layer bill of quantities relating module, duplication parameter setting module, is answered Preparative layer construction organization plan sets up module, duplicating layer component relating module and duplicating layer bill of quantities relating module;
Reference layer construction organization plan sets up module, the construction organization plan of reference layer in Criterion layer;
Reference layer component relating module, for closing component relevant to BIM model for the construction organization plan of reference layer Connection;
Reference layer bill of quantities relating module, for by the construction organization plan of reference layer and corresponding bill of quantities It is associated;
Replicate parameter setting module, replicate parameter for arranging the construction organization plan of described reference layer and belong to The construction organization plan of the duplicating layer of index bed replicates parameter;
Duplicating layer construction organization plan sets up module, replicates parameter and duplication for the construction organization plan according to reference layer The construction organization plan of layer replicates parameter, replicates the construction organization plan of described reference layer and generates the construction group of described duplicating layer Knit plan;
Duplicating layer component relating module, for based on replicating component screening rule, filtering out relevant structure from BIM model Part associates with the construction organization plan of duplicating layer;
Duplicating layer bill of quantities relating module is clear for replicating the quantities of the construction organization plan association of reference layer Single, generate the bill of quantities of duplicating layer, and associate with the construction organization plan of duplicating layer.
In present invention further optimization scheme, also include data checking module, for checking the duplication setting of parameter, ginseng Examining whether the component of duplicating layer in layer construction organization plan and BIM model meets duplication requirement, setting if otherwise returning duplication parameter Put module to be modified.
The present invention at least possesses following beneficial effect:
1, by Criterion layer reference layer construction organization plan and with the associating of bill of quantities and component System, according to copy rule parameter to automatically generate construction organization plan and the association quantities of other floors belonging to index bed Inventory and component, reduce repetitive operation, improves efficiency.
2, directly allocation member and affiliated bill of quantities the construction associated can extremely be needed based on duplication component screening rule Organization planning more conforms to actual service logic and operating habit, is simultaneously based on BIM model and can visualize window at threedimensional model Being directly viewable or select the component that will distribute to verify in Kou, the foundation making construction organization plan is more directly perceived and high Effect.
3, decrease handling time, it is to avoid the mistake produced in loaded down with trivial details repetitive operation, improve whole The efficiency of individual construction organization plan configuration, is particularly well-suited to the prefabricated housing project that according to industrial standard metaplasia is produced Enforcement.
Accompanying drawing explanation
Fig. 1 is the collocation method overall flow schematic diagram of the floor construction organization plan that embodiment one proposes.
Fig. 2 is the configuration system architecture diagram of the floor construction organization plan that embodiment two proposes.
Detailed description of the invention
The present invention is carried out further below in conjunction with accompanying drawing and embodiment for the ease of it will be appreciated by those skilled in the art that Describe.
Embodiment one
Refer to Fig. 1, the collocation method of a kind of floor construction organization plan that embodiment one proposes, mainly include following step Rapid S100 to S500:
The construction organization plan of reference layer in S100, Criterion layer, and by the construction organization plan of described reference layer with Component association relevant in corresponding bill of quantities, BIM model.
In the present embodiment, step S100 may particularly include following can step S110 to S130 for reference:
The construction organization plan of reference layer in S110, Criterion layer, and select reference layer construction organization plan institute right Answer the bill of quantities of many types.
The construction organization plan of reference layer is set up in the usual way, and the corresponding different quantities of different majors type is clear Single, such as the bill of quantities of major structure of construction, construction need the bill of quantities etc. of the various equipments used.
S120, according to preset structure attribute, from bill of quantities, screen relevant component information, described component information with Corresponding component association in BIM model.
Component is each basic structural elements of composition building, the such as basic structural elements such as post or beam.Structure attribute is to structure The definition of part or explanation, a component has unique one group of corresponding property value, one group of property value uniquely corresponding component.Example As the attribute of post can include post position (be positioned at which district, which, which coordinate position of which floor) and the shape of post Specification etc..
It can be to be carried out by model attributes screening washer that step S120 screens relevant component information from bill of quantities Screening, it is also possible to be performed manually by selecting, such as, select corresponding component information by cursor of mouse and be directly dragged to corresponding Under construction task.
Component corresponding in BIM model also can be checked in threedimensional model visualization window, to being sieved after step S120 The correctness of the component information of choosing carries out visualization checking.Can directly observe by visualizing checking in BIM model and sentence Disconnected screening is the most correct.
S130, the construction organization plan of reference layer is associated with described component information, and by structure described in bill of quantities Inventory specific item belonging to part information is closed under the corresponding construction task of construction organization plan being coupled to reference layer.
After above-mentioned visualization is verified, the construction organization plan of reference layer is associated with component information, simultaneously by engineering Described in amount inventory, the inventory specific item belonging to component information is closed under the corresponding construction task of construction organization plan being coupled to reference layer. Other each construction tasks of reference layer construction organization perform according to this.
S200, the construction organization plan arranging described reference layer replicate parameter and belong to the duplicating layer of index bed Construction organization plan replicates parameter.
Step S200 arranges the construction organization plan of described reference layer replicate parameter and specifically comprise the steps that and arrange reference layer institute Floor number, the floor number of such as reference layer is 1 (i.e. the 1st layer), additionally includes and arranges reference layer construction organization meter Draw type and the bill of quantities copy rule of the bill of quantities comprised.The construction organization plan arranging duplicating layer replicates parameter Specifically comprise the steps that the construction organization plan of the start-stop floor number of a series of duplicating layers arranging configuration and correspondence is in system engineering In position;Such as this configures altogether the duplicating layer of three floors, and the start-stop floor number of these three duplicating layer is 3 to 5 (i.e. 3 to 5 layers), then the construction organization plan of these three duplicating layer (includes all of construction project to execute by being inserted in system engineering Work organization planning) in the 3rd to the 5th position below reference layer that is the 1st layer or afterwards.
Step S230 is further preferably included after step S200:
In S230, the inspection duplication setting of parameter, reference layer construction organization plan and BIM model, whether the component of duplicating layer Meeting and replicate requirement, being modified if otherwise returning step S200.
S300, the construction organization plan replicating parameter and duplicating layer according to the construction organization plan of reference layer replicate parameter, Replicate the construction organization plan of described reference layer and generate the construction organization plan of described duplicating layer.
The construction organization plan of the duplicating layer of generation is inserted in system engineering by step S300 and replicates what parameter was arranged On position.
S400, based on replicate component screening rule, from BIM model, filter out the construction group of relevant component and duplicating layer Knit plan association;And replicating the bill of quantities of the construction organization plan association of reference layer, the quantities generating duplicating layer is clear Single, and associate with the construction organization plan of duplicating layer.
Replicate the special of the bill of quantities that component screening rule specifically can include that floor number belonging to duplicating layer, needs mate Industry type, the need of accurately coupling, need the CPI attribute (attribute such as material, size) etc. that is used for screening.Wherein, accurate Join expression according to the CPI attribute specified, any one group of attribute is had in this reference layer and only only one component, be one Plant strict screening conditions, it is adaptable to same floor contains the situation of the on all four components of attribute such as multiple scantlings.
In the present embodiment, step S400 may particularly include below with reference to step: extracts and replicates component screening rule, by ginseng Examine the structure attribute value of layer and the duplicating layer numbering of setting, filter out the component information under duplicating layer construction task, by this component BIM model component corresponding to information is associated with the construction organization plan of duplicating layer;And replicate the construction organization of reference layer The bill of quantities of plan association, the construction organization plan of the bill of quantities and duplicating layer that generate duplicating layer is associated.
Bill of quantities can precentagewise or the distribution of absolute value form, when the remaining quantities of bill of quantities is not enough to point When being assigned to duplicating layer, only distribute remaining quantities;When the quantities of bill of quantities is assigned, do not carry out quantities The duplication distribution of inventory and quantities, and feed back to user and inquire about and revise.
S500, complete to belong to the configuration of each duplicating layer construction organization plan of index bed.
When index bed only has two-layer the most only to include described reference layer and a duplicating layer, perform i.e. by step S100 to S400 Can, step S500 is that step terminates explanation;And when i.e. duplicating layer is more than two-layer more than three layers for index bed, can be first to first Duplicating layer (i.e. carrying out first duplicating layer configured) carries out visualization checking, if being verified, according to joining of the first duplicating layer The mode of putting configures other duplicating layer, i.e. step S500 and can include below with reference to step S510 to S520:
S510, in threedimensional model visualization window, check in BIM model corresponding component, first configure is answered The construction organization plan of preparative layer carries out visualization checking.
S520, be verified after, allocation plan based on the first duplicating layer construction organization plan, complete to belong to index bed The configuration of other each duplicating layer construction organization plans.
So far, each floor belonging to index bed includes that reference layer all configures complete with the construction organization plan of duplicating layer.
As can be seen here, the present embodiment is by the construction organization plan of reference layer, executing in conjunction with reference layer in Criterion layer Work organization planning and its bill of quantities and the incidence relation of component;Other floors belonging to index bed can be automatically generated The construction organization plan of (duplicating layer) and association bill of quantities and component reduce repetitive operation, improve efficiency;And based on Replicate component screening rule and can directly distribute affiliated component, more conform to actual service logic and operating habit, be simultaneously based on BIM model can be directly viewable or select the component that will distribute in threedimensional model visualization window, makes construction organization plan Foundation more directly perceived and efficiently.Embodiment decreases handling time, it is to avoid produce in loaded down with trivial details repetitive operation Mistake, improves the efficiency of whole construction organization plan configuration, and be particularly well-suited to that according to industrial standard metaplasia produces is prefabricated The enforcement of assembled-type house construction project.
Embodiment two
Refer to Fig. 2, the configuration system of a kind of floor construction organization plan that embodiment two proposes, mainly include reference layer Construction organization plan is set up module 10, reference layer component relating module 20, reference layer bill of quantities relating module 30, is replicated ginseng Number arranges module 40, duplicating layer construction organization plan sets up module 50, duplicating layer component relating module 60 and duplicating layer engineering Amount inventory relating module 70;Each module is described below:
Reference layer construction organization plan sets up module 10, the construction organization plan of reference layer in Criterion layer;
Reference layer component relating module 20, for by component relevant to BIM model for the construction organization plan of reference layer Association;
Reference layer bill of quantities relating module 30, for by clear with corresponding quantities for the construction organization plan of reference layer Singly it is associated;
Replicate parameter setting module 40, replicate parameter for arranging the construction organization plan of described reference layer and belong to together Construction organization plan in the duplicating layer of index bed replicates parameter;
Duplicating layer construction organization plan sets up module 50, replicates parameter for the construction organization plan according to reference layer and answers The construction organization plan of preparative layer replicates parameter, replicates the construction organization plan of described reference layer and generates the construction of described duplicating layer Organization planning;
Duplicating layer component relating module 60, for based on replicating component screening rule, filtering out relevant from BIM model Component associates with the construction organization plan of duplicating layer;
Duplicating layer bill of quantities relating module 70 is clear for replicating the quantities of the construction organization plan association of reference layer Single, generate the bill of quantities of duplicating layer, and associate with the construction organization plan of duplicating layer.
Additionally, further preferably include after embodiment two replicates parameter setting module 40: data checking module 45, it is used for examining Test and replicate whether the component of duplicating layer in the setting of parameter, reference layer construction organization plan and BIM model meets duplication requirement, if Otherwise return duplication parameter setting module 40 to be modified.
In embodiment two, operation principle and the beneficial effect of each module are corresponding, here with embodiment one step S100 to S500 Repeat no more.
Embodiment described above only have expressed the several embodiments of the present invention, and it describes more concrete and detailed, but also Therefore the restriction to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that, for those of ordinary skill in the art For, without departing from the inventive concept of the premise, it is also possible to make some deformation and improvement, these broadly fall into the guarantor of the present invention Protect scope.Therefore, the protection domain of patent of the present invention should be as the criterion with claims.

Claims (10)

1. the collocation method of a floor construction organization plan, it is characterised in that comprise the following steps:
The construction organization plan of reference layer in A1, Criterion layer, and by the construction organization plan of described reference layer with corresponding Component association relevant in bill of quantities, BIM model;
A2, the construction organization plan arranging described reference layer replicate parameter and belong to the construction group of duplicating layer of index bed The plan of knitting replicates parameter;
A3, the construction organization plan replicating parameter and duplicating layer according to the construction organization plan of reference layer replicate parameter, replicate institute State the construction organization plan of reference layer and generate the construction organization plan of described duplicating layer;
A4, based on replicate component screening rule, from BIM model, filter out the construction organization plan of relevant component and duplicating layer Association;And the bill of quantities that the construction organization plan replicating reference layer associates, the bill of quantities of generation duplicating layer, and with The construction organization plan association of duplicating layer;
A5, complete to belong to the configuration of each duplicating layer construction organization plan of index bed.
The collocation method of floor construction organization plan the most according to claim 1, it is characterised in that step A1 includes following Step:
The construction organization plan of reference layer in A11, Criterion layer, and select specialty corresponding to the construction organization plan of reference layer The bill of quantities of type;
A12, according to preset structure attribute, from bill of quantities, screen relevant component information, described component information and BIM mould Corresponding component association in type;
A13, the construction organization plan of reference layer is associated with described component information, and by component information described in bill of quantities Affiliated inventory specific item is closed under the corresponding construction task of construction organization plan being coupled to reference layer.
The collocation method of floor construction organization plan the most according to claim 2, it is characterised in that after step A12 also It is included in threedimensional model visualization window and checks component corresponding in BIM model, the correctness to the component information screened Carry out visualization checking.
The collocation method of floor construction organization plan the most according to claim 1, it is characterised in that institute is set in step A2 The construction organization plan duplication parameter stating reference layer specifically includes: arranges the floor number at reference layer place, arranges reference layer and execute The type of the bill of quantities that work organization planning comprises and bill of quantities copy rule;The construction organization plan of duplicating layer is set Duplication parameter specifically includes: the construction organization plan of the start-stop floor number and correspondence that arrange a series of duplicating layers of configuration is being Position in system engineering.
The collocation method of floor construction organization plan the most according to claim 1, it is characterised in that also wrap after step A2 Include:
A23, inspection replicate whether the component of duplicating layer in the setting of parameter, reference layer construction organization plan and BIM model meets Replicating requirement, being modified if otherwise returning step A2.
The collocation method of floor construction organization plan the most according to claim 1, it is characterised in that step A4 includes: carry Take duplication component screening rule, numbered by the structure attribute value of reference layer and the duplicating layer of setting, filter out duplicating layer construction Component information under task, is associated the construction organization plan of BIM model component corresponding for this component information with duplicating layer; And replicate the bill of quantities of the construction organization plan association of reference layer, generate bill of quantities and the duplicating layer of duplicating layer Construction organization plan is associated.
The collocation method of floor construction organization plan the most according to claim 1, it is characterised in that in step A4, engineering Amount inventory precentagewise or the distribution of absolute value form, when the remaining quantities of bill of quantities is not enough to distribution to duplicating layer, Only distribute remaining quantities;When the quantities of bill of quantities is assigned, do not carry out bill of quantities and quantities Duplication distribution, and feed back to user and inquire about and revise.
The collocation method of floor construction organization plan the most according to claim 1, it is characterised in that step A5 includes following Step:
A51, in threedimensional model visualization window, check in BIM model corresponding component, to the first duplicating layer configured Construction organization plan carry out visualization checking;
A52, be verified after, allocation plan based on the first duplicating layer construction organization plan, complete to belong to its of index bed The configuration of his each duplicating layer construction organization plan.
9. the configuration system of a floor construction organization plan, it is characterised in that include that reference layer construction organization plan sets up mould Block, reference layer component relating module, reference layer bill of quantities relating module, duplication parameter setting module, duplicating layer construction group Module, duplicating layer component relating module and duplicating layer bill of quantities relating module are set up in the plan of knitting;
Reference layer construction organization plan sets up module, the construction organization plan of reference layer in Criterion layer;
Reference layer component relating module, for by component association relevant to BIM model for the construction organization plan of reference layer;
Reference layer bill of quantities relating module, for carrying out the construction organization plan of reference layer with corresponding bill of quantities Association;
Replicate parameter setting module, replicate parameter for arranging the construction organization plan of described reference layer and belong to standard The construction organization plan of the duplicating layer of layer replicates parameter;
Duplicating layer construction organization plan sets up module, for replicating parameter and duplicating layer according to the construction organization plan of reference layer Construction organization plan replicates parameter, replicates the construction organization plan of described reference layer and generates the construction organization meter of described duplicating layer Draw;
Duplicating layer component relating module, for based on replicate component screening rule, filter out from BIM model relevant component with The construction organization plan association of duplicating layer;
Duplicating layer bill of quantities relating module, for replicating the bill of quantities of the construction organization plan association of reference layer, raw Become the bill of quantities of duplicating layer, and associate with the construction organization plan of duplicating layer.
The collocation method of floor construction organization plan the most according to claim 9, it is characterised in that also include that data are examined Test module, for checking the component of duplicating layer in the duplication setting of parameter, reference layer construction organization plan and BIM model the fullest Foot replicates requirement, is modified if otherwise returning duplication parameter setting module.
CN201610631437.4A 2016-08-01 2016-08-01 The collocation method of floor construction organization plan and system Pending CN106127616A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610631437.4A CN106127616A (en) 2016-08-01 2016-08-01 The collocation method of floor construction organization plan and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610631437.4A CN106127616A (en) 2016-08-01 2016-08-01 The collocation method of floor construction organization plan and system

Publications (1)

Publication Number Publication Date
CN106127616A true CN106127616A (en) 2016-11-16

Family

ID=57255717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610631437.4A Pending CN106127616A (en) 2016-08-01 2016-08-01 The collocation method of floor construction organization plan and system

Country Status (1)

Country Link
CN (1) CN106127616A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107705100A (en) * 2017-11-02 2018-02-16 港珠澳大桥管理局 A kind of management system of Traffic Engineering Construction progress
CN109086516A (en) * 2018-07-31 2018-12-25 深圳市斯维尔科技股份有限公司 A kind of the project amount acquisition methods and device of assembled architecture
CN115114695A (en) * 2021-03-18 2022-09-27 广东博智林机器人有限公司 Component determination method, component determination device, electronic equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101930488A (en) * 2010-07-19 2010-12-29 杭州金刚建筑技术有限公司 Design reuse device and method in computer-aided design
CN103440364A (en) * 2013-07-31 2013-12-11 广联达软件股份有限公司 Method and system for automatically generating WBS (Work Breakdown Structure) node basing on BIM (Building Information Modeling)
CN105649196A (en) * 2016-01-15 2016-06-08 山东乾元泽孚科技股份有限公司 Modularized building system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101930488A (en) * 2010-07-19 2010-12-29 杭州金刚建筑技术有限公司 Design reuse device and method in computer-aided design
CN103440364A (en) * 2013-07-31 2013-12-11 广联达软件股份有限公司 Method and system for automatically generating WBS (Work Breakdown Structure) node basing on BIM (Building Information Modeling)
CN105649196A (en) * 2016-01-15 2016-06-08 山东乾元泽孚科技股份有限公司 Modularized building system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107705100A (en) * 2017-11-02 2018-02-16 港珠澳大桥管理局 A kind of management system of Traffic Engineering Construction progress
CN107705100B (en) * 2017-11-02 2022-04-26 港珠澳大桥管理局 Management system for traffic engineering construction progress
CN109086516A (en) * 2018-07-31 2018-12-25 深圳市斯维尔科技股份有限公司 A kind of the project amount acquisition methods and device of assembled architecture
CN109086516B (en) * 2018-07-31 2023-03-17 深圳市斯维尔科技股份有限公司 Method and device for acquiring engineering quantity of fabricated building
CN115114695A (en) * 2021-03-18 2022-09-27 广东博智林机器人有限公司 Component determination method, component determination device, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
Patacas et al. BIM for facilities management: Evaluating BIM standards in asset register creation and service life planning
Wy et al. A data-driven generic simulation model for logistics-embedded assembly manufacturing lines
CN104679488B (en) A kind of flow custom development platform and flow custom development approach
EP2778929B1 (en) Test script generation system
Rahmandad et al. Modeling the rework cycle: capturing multiple defects per task
Bengtsson et al. Sequence planning using multiple and coordinated sequences of operations
CN106127616A (en) The collocation method of floor construction organization plan and system
Labban et al. A discrete event simulation model of asphalt paving operations
CN106910004A (en) A kind of overall process blower fan workmanship monitoring system based on workflow
Patacas et al. Evaluation of IFC and COBie as data sources for asset register creation and service life planning
Kumar et al. Conceptualizing “COBieEvaluator” A rule based system for tracking asset changes using COBie datasheets
Zou et al. A cross-disciplinary model-based systems engineering workflow of automated production systems leveraging socio-technical aspects
Mangan et al. A constraint specification approach to building flexible workflows
US20130185047A1 (en) Simulation modelling
CN102591779B (en) Establishing method for workflow-based universal software testing process model
CN104517186A (en) Business process design method based on data drive
JP2024008022A (en) Digital twin cooperation method, digital twin cooperation system, and digital twin cooperation program
Ogata et al. A Tool to Edit and Verify IoT System Architecture Model.
Huang et al. Reference architecture for collaborative design
Ramakrishnan et al. An integrated lean 3P and modeling approach for service and product introduction
Lessmann et al. LVCAR enhancements for selecting gateways
Leygonie Data quality assessment of BIM models for facility management
Valunjkar Improve the Productivity of Building Construction Project using Clash detection Application in Building Information Modeling
Togay et al. Rule based axiomatic design theory guidance for software development
Chang et al. ViDA: developing a visualization system for a Design-Fabrication-Assembly (DFA) process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161116