CN106127453A - A kind of architectural design based on BIM and VR management system and management method thereof - Google Patents
A kind of architectural design based on BIM and VR management system and management method thereof Download PDFInfo
- Publication number
- CN106127453A CN106127453A CN201610476383.9A CN201610476383A CN106127453A CN 106127453 A CN106127453 A CN 106127453A CN 201610476383 A CN201610476383 A CN 201610476383A CN 106127453 A CN106127453 A CN 106127453A
- Authority
- CN
- China
- Prior art keywords
- bim
- model
- central server
- design
- visualization
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000013461 design Methods 0.000 title claims abstract description 68
- 238000007726 management method Methods 0.000 title claims abstract description 17
- 238000012800 visualization Methods 0.000 claims abstract description 44
- 230000000694 effects Effects 0.000 claims abstract description 9
- 230000000007 visual effect Effects 0.000 claims abstract description 9
- 230000002452 interceptive effect Effects 0.000 claims description 12
- 238000012546 transfer Methods 0.000 claims description 12
- 238000013501 data transformation Methods 0.000 claims description 9
- 238000004891 communication Methods 0.000 abstract description 6
- 230000001755 vocal effect Effects 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000003111 delayed effect Effects 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 238000005457 optimization Methods 0.000 description 1
- 238000009428 plumbing Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/101—Collaborative creation, e.g. joint development of products or services
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Economics (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Data Mining & Analysis (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Processing Or Creating Images (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
nullThe present invention discloses a kind of architectural design based on BIM and VR management system and management method thereof,BIM model design completed presents design effect in client in the way of virtual reality,Client's if desired Amending design,In replacing part library, directly choose satisfied parts be replaced formula amendment to original design,Need not provide suggestion for revision by the way of artificial description,Lower owing to linking up the puzzlement causing design to delay that has some setbacks,Client revises intention and finally returns to designer with the modified visualization lightweight data corresponding with model,Designer can understand the amendment intention of client in visual mode,And according to this suggestion for revision, the BIM model of the former BIM of being stored in central server is modified,Finally amended BIM model is returned to BIM central server and updates former BIM model,Between change professional person and layman in the way of verbal communication,The intention of mutual cross streams is interacted by visual mode and presents,Improve and link up efficiency and accuracy.
Description
Technical field
The present invention relates to architectural design technical field, manage system particularly to a kind of architectural design based on BIM and VR
And management method.
Background technology
BIM BIM(Building Information Modeling) it is every with construction-engineering project
Relevant information data, as the basis of model, carries out the foundation of BUILDINGS MODELS, is had by digital information analogue simulation building
Some real informations.It has visualization, harmony, simulation, optimization property and the big feature of publishing picture property five.
BIM upgrades to three-dimensional revolutionary character from plane as building graph visualization, has become as building engineering field
Key technology, but BIM is applied in architectural design there is also some difficult points: first BIM model needs according to customer demand
Being designed, usually publishing picture after designing is supplied to client, client propose suggestion for revision after checking, this process is often
Inefficiency, because customer demand is difficult to unified with the thinking of design team, and the design result displaying published picture is three-dimensional not,
Substantially, further relate to artificial file during this and send to etc. to exist the operation of uncertainty, for designer, repeatedly revise
BIM model is more the increase in work difficulty.
In view of this, the present inventor proposes a kind of architectural design based on BIM and VR management system and management method thereof.
Summary of the invention
It is an object of the invention to provide a kind of architectural design based on BIM and VR management system and management method thereof, with
BIM central server is hinge, and virtual reality technology introduces client, and client can provide design amendment meaning accurately and efficiently
See so that professional can be visually known the amendment of client and be intended to, and BIM model is made the amendment met the requirements of the customers, carries
High BIM is applied in architectural engineering the work efficiency at design amendment end.
To achieve these goals, technical scheme is as follows:
A kind of architectural design based on BIM and VR management system, including:
BIM central server, storage have BIM model, comprise parameter corresponding to the model visualization data corresponding with model, with
And the replacement part library corresponding with model assembly;Transfer the visualization data corresponding with model for VR interactive display equipment, and connect
Receive the modified visualization lightweight data corresponding with model that VR interactive display equipment returns, and by this modified with
The visualization lightweight data that model is corresponding sends to Specialty Design platform;
Specialty Design platform, is connected with BIM central server, receives the modified and model that BIM central server sends
Corresponding visualization lightweight data, the amendment that designer understands client in visual mode is intended to, and is then stored in former
The BIM model of BIM central server is modified, and amended BIM model returns to BIM central server and updates former BIM
Model;And
VR interactive display equipment, is connected by data transformation interface with BIM central server, will be from by this data transformation interface
The visualization data corresponding with model that BIM central server is transferred are converted into visualization lightweight data, and with virtual reality
Mode presents design effect, if client needs Amending design, client transfers replace corresponding with model assembly by user interface
Change part library, in replacing part library, choose satisfied parts be replaced formula amendment to original design, eventually form modified
The visualization lightweight data corresponding with model, and return to BIM central server.
A kind of architectural design management method based on BIM and VR, comprises the following steps;
S1. the built-in replacement part library corresponding with model assembly of BIM central server;
S2. designer goes out each specialty BIM model, after having designed, design at Specialty Design platform according to Customer Requirement Design
Each specialty BIM model is sent to BIM central server and stores by personnel, BIM model include the parameter corresponding with model and
The visualization data corresponding with model;
S3. client transfers the visualization data corresponding with model by VR interactive display equipment to BIM central server, and this can
Be converted to visualize lightweight data by data transformation interface depending on changing data, in the way of virtual reality, present whole setting to client
Meter effect, if client needs Amending design scheme, client transfers the replacement part library corresponding with model assembly by user interface,
Choose satisfied parts and be replaced formula amendment replacing in part library to original design, eventually form modified with model pair
The visualization lightweight data answered, and return to BIM central server, by BIM central server by modified with model pair
The visualization lightweight data answered is forwarded to Specialty Design platform;
S4. designer obtains the modified visualization lightweight data corresponding with model at Specialty Design platform, with visually
The mode changed is understood the amendment of client and is intended to, and then modifies the BIM model of the former BIM of being stored in central server, will repair
BIM model after changing returns to BIM central server and updates former BIM model;
If the most amended specialty BIM model is also not up to customer requirement, then repeat step S3-S4, until customer satisfaction,
Complete final BIM modelling.
Use after technical scheme, the BIM model that design can be completed in the way of virtual reality client
End presents design effect, client's if desired Amending design, directly replace in part library choose satisfied parts to original design enter
Row alternate form is revised, it is not necessary to provide suggestion for revision by the way of artificial description, lowers and causes design owing to communication has some setbacks
The puzzlement delayed, client revises intention and finally returns to designer with the modified visualization lightweight data corresponding with model
Member, designer can understand the amendment intention of client, and be stored in BIM according to this suggestion for revision to former in visual mode
The BIM model of central server is modified, and amended BIM model finally returns to BIM central server and updates former BIM
Model, whole process change mode of verbal communication between professional person and layman, the intention of mutual cross streams led to
Cross visual mode to interact and present, improve communication efficiency and accuracy.
Below in conjunction with the drawings and specific embodiments, the present invention will be further described.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention.
Detailed description of the invention
As it is shown in figure 1, a kind of based on BIM and VR architectural design management system that the present invention discloses, including:
BIM central server 1, storage have BIM model, comprise parameter corresponding to the model visualization data corresponding with model, with
And the replacement part library corresponding with model assembly;Transfer the visualization data corresponding with model for VR interactive display equipment, and connect
Receive the modified visualization lightweight data corresponding with model that VR interactive display equipment returns, and by this modified with
The visualization lightweight data that model is corresponding sends to Specialty Design platform;
Specialty Design platform 2, is connected with BIM central server, receives the modified and model that BIM central server sends
Corresponding visualization lightweight data, the amendment that designer understands client in visual mode is intended to, and is then stored in former
The BIM model of BIM central server is modified, and amended BIM model returns to BIM central server and updates former BIM
Model;And
VR interactive display equipment 3, is connected by data transformation interface with BIM central server, will by this data transformation interface
The visualization data corresponding with model transferred from BIM central server are converted into visualization lightweight data, and with virtual reality
Mode present design effect, if client needs Amending design, client transfers corresponding with model assembly by user interface
Replace part library, in replacing part library, choose satisfied parts be replaced formula amendment to original design, eventually form through repairing
The visualization lightweight data corresponding with model changed, and return to BIM central server.
A kind of architectural design management method based on BIM and VR, comprises the following steps;
S1. the built-in replacement part library corresponding with model assembly of BIM central server;
S2. designer goes out each specialty BIM model at Specialty Design platform according to Customer Requirement Design, can according to intelligent, build
Build, structure, plumbing, electrically, ventilate, the aspect distribution design task such as indoor, after having designed, designer is by each specialty
BIM model sends to BIM central server and stores, and BIM model includes the parameter corresponding with model and corresponding with model
Visualization data;
S3. client transfers the visualization data corresponding with model by VR interactive display equipment to BIM central server, and this can
Be converted to visualize lightweight data by data transformation interface depending on changing data, in the way of virtual reality, present whole setting to client
Meter effect, if client needs Amending design scheme, client transfers the replacement part library corresponding with model assembly by user interface,
Choose satisfied parts and be replaced formula amendment replacing in part library to original design, eventually form modified with model pair
The visualization lightweight data answered, and return to BIM central server, by BIM central server by modified with model pair
The visualization lightweight data answered is forwarded to Specialty Design platform;
S4. designer obtains the modified visualization lightweight data corresponding with model at Specialty Design platform, with visually
The mode changed is understood the amendment of client and is intended to, and then modifies the BIM model of the former BIM of being stored in central server, will repair
BIM model after changing returns to BIM central server and updates former BIM model;
If the most amended specialty BIM model is also not up to customer requirement, then repeat step S3-S4, until customer satisfaction,
Complete final BIM modelling.
The present invention focuses on: can by answer customer requirement to design BIM model in the way of virtual reality
Client presents design effect, client's if desired Amending design, directly chooses satisfied parts in replacing part library and sets former
Meter is replaced formula amendment, it is not necessary to provide suggestion for revision by the way of artificial description, and attenuating causes owing to linking up to have some setbacks
The puzzlement that design is delayed, client revises intention and finally returns to set with the modified visualization lightweight data corresponding with model
Meter personnel, designer can understand the amendment intention of client in visual mode, and according to this suggestion for revision to former storage
BIM model at BIM central server is modified, and amended BIM model finally returns to BIM central server and updates
Former BIM model, whole process change mode of verbal communication between professional person and layman, by the meaning of mutual cross streams
Figure is interacted by visual mode and presents, and improves communication efficiency and accuracy.
These are only the specific embodiment of the present invention, the not restriction to protection scope of the present invention.All setting according to this case
The equivalent variations that meter thinking is done, each falls within the protection domain of this case.
Claims (2)
1. architectural design based on a BIM and VR management system, it is characterised in that including:
BIM central server, storage have BIM model, comprise parameter corresponding to the model visualization data corresponding with model, with
And the replacement part library corresponding with model assembly;Transfer the visualization data corresponding with model for VR interactive display equipment, and connect
Receive the modified visualization lightweight data corresponding with model that VR interactive display equipment returns, and by this modified with
The visualization lightweight data that model is corresponding sends to Specialty Design platform;
Specialty Design platform, is connected with BIM central server, receives the modified and model that BIM central server sends
Corresponding visualization lightweight data, the amendment that designer understands client in visual mode is intended to, and is then stored in former
The BIM model of BIM central server is modified, and amended BIM model returns to BIM central server and updates former BIM
Model;And
VR interactive display equipment, is connected by data transformation interface with BIM central server, will be from by this data transformation interface
The visualization data corresponding with model that BIM central server is transferred are converted into visualization lightweight data, and with virtual reality
Mode presents design effect, if client needs Amending design, client transfers replace corresponding with model assembly by user interface
Change part library, in replacing part library, choose satisfied parts be replaced formula amendment to original design, eventually form modified
The visualization lightweight data corresponding with model, and return to BIM central server.
2. an architectural design management method based on BIM and VR, it is characterised in that comprise the following steps;
S1. the built-in replacement part library corresponding with model assembly of BIM central server;
S2. designer goes out each specialty BIM model, after having designed, design at Specialty Design platform according to Customer Requirement Design
Each specialty BIM model is sent to BIM central server and stores by personnel, BIM model include the parameter corresponding with model and
The visualization data corresponding with model;
S3. client transfers the visualization data corresponding with model by VR interactive display equipment to BIM central server, and this can
Be converted to visualize lightweight data by data transformation interface depending on changing data, in the way of virtual reality, present whole setting to client
Meter effect, if client needs Amending design scheme, client transfers the replacement part library corresponding with model assembly by user interface,
Choose satisfied parts and be replaced formula amendment replacing in part library to original design, eventually form modified with model pair
The visualization lightweight data answered, and return to BIM central server, by BIM central server by modified with model pair
The visualization lightweight data answered is forwarded to Specialty Design platform;
S4. designer obtains the modified visualization lightweight data corresponding with model at Specialty Design platform, with visually
The mode changed is understood the amendment of client and is intended to, and then modifies the BIM model of the former BIM of being stored in central server, will repair
BIM model after changing returns to BIM central server and updates former BIM model;
If the most amended specialty BIM model is also not up to customer requirement, then repeat step S3-S4, until customer satisfaction,
Complete final BIM modelling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610476383.9A CN106127453B (en) | 2016-06-27 | 2016-06-27 | Building design management system based on BIM and VR and management method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610476383.9A CN106127453B (en) | 2016-06-27 | 2016-06-27 | Building design management system based on BIM and VR and management method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106127453A true CN106127453A (en) | 2016-11-16 |
CN106127453B CN106127453B (en) | 2021-08-20 |
Family
ID=57265642
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610476383.9A Active CN106127453B (en) | 2016-06-27 | 2016-06-27 | Building design management system based on BIM and VR and management method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106127453B (en) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106791629A (en) * | 2016-12-12 | 2017-05-31 | 大连文森特软件科技有限公司 | A kind of building based on AR virtual reality technologies builds design system |
CN106791630A (en) * | 2016-12-12 | 2017-05-31 | 大连文森特软件科技有限公司 | A kind of building based on AR virtual reality technologies builds supervisory systems |
CN107492050A (en) * | 2017-08-22 | 2017-12-19 | 汪小兵 | Big data platform application after a kind of resource consolidation |
CN107766428A (en) * | 2017-09-15 | 2018-03-06 | 北京大学 | A kind of automatic method and system for realizing data visualization |
CN107885328A (en) * | 2017-11-02 | 2018-04-06 | 杭州埃欧哲建设工程咨询有限公司 | A kind of architectural design management system based on BIM and VR |
CN108427791A (en) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | The design management method and device of erecting yard safety measure based on BIM |
CN109118114A (en) * | 2018-08-31 | 2019-01-01 | 辽宁科技大学 | Underground stereo storage architectural design managing device based on BIM |
CN109117583A (en) * | 2018-08-31 | 2019-01-01 | 辽宁科技大学 | Underground three-dimensional garage architectural design managing device based on BIM |
CN109408932A (en) * | 2018-10-15 | 2019-03-01 | 鼎宸建设管理有限公司 | A kind of architectural design management system based on BIM and VR |
CN109741010A (en) * | 2018-12-14 | 2019-05-10 | 四川省交通运输厅交通勘察设计研究院 | A kind of road interactive mode field investigation system based on BIM and AR technology |
CN109870987A (en) * | 2019-03-12 | 2019-06-11 | 中建三局第一建设工程有限责任公司 | Platform of internet of things management method and its system suitable for large-sized workshop site operation |
CN110022321A (en) * | 2019-04-09 | 2019-07-16 | 李丰 | A kind of VR building detection method and VR equipment based on virtual reality |
CN110942378A (en) * | 2018-12-29 | 2020-03-31 | 美宅科技(北京)有限公司 | Hard-set customization method and customization device |
CN111292409A (en) * | 2019-09-02 | 2020-06-16 | 温州大城建筑装饰工程有限公司 | Building design method based on VR technology |
CN115859426A (en) * | 2022-11-25 | 2023-03-28 | 甘肃旭阳智能工程有限公司 | Building design system based on BIM and VR technology and design method thereof |
CN117035365A (en) * | 2023-09-16 | 2023-11-10 | 海南华筑国际工程设计咨询管理有限公司 | Comprehensive management method and system for BIM building design |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103246951A (en) * | 2012-12-11 | 2013-08-14 | 中建三局第一建设工程有限责任公司 | Intelligent electromechanical equipment management system and method based on BIM (building information modeling) |
CN103500371A (en) * | 2013-08-08 | 2014-01-08 | 机械工业第六设计研究院有限公司 | Change control method based on BIM |
CN105446069A (en) * | 2016-01-07 | 2016-03-30 | 江苏建筑职业技术学院 | BIM-based holographic imaging full-decoration simulation display method and display system |
CN105653825A (en) * | 2016-02-16 | 2016-06-08 | 山东师范大学 | Building design component generation system and method based on Groningen model |
US20160312042A1 (en) * | 2013-12-16 | 2016-10-27 | Hilti Aktiengesellschaft | Insulation layer-forming composition and use thereof |
-
2016
- 2016-06-27 CN CN201610476383.9A patent/CN106127453B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103246951A (en) * | 2012-12-11 | 2013-08-14 | 中建三局第一建设工程有限责任公司 | Intelligent electromechanical equipment management system and method based on BIM (building information modeling) |
CN103500371A (en) * | 2013-08-08 | 2014-01-08 | 机械工业第六设计研究院有限公司 | Change control method based on BIM |
US20160312042A1 (en) * | 2013-12-16 | 2016-10-27 | Hilti Aktiengesellschaft | Insulation layer-forming composition and use thereof |
CN105446069A (en) * | 2016-01-07 | 2016-03-30 | 江苏建筑职业技术学院 | BIM-based holographic imaging full-decoration simulation display method and display system |
CN105653825A (en) * | 2016-02-16 | 2016-06-08 | 山东师范大学 | Building design component generation system and method based on Groningen model |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106791630A (en) * | 2016-12-12 | 2017-05-31 | 大连文森特软件科技有限公司 | A kind of building based on AR virtual reality technologies builds supervisory systems |
CN106791629A (en) * | 2016-12-12 | 2017-05-31 | 大连文森特软件科技有限公司 | A kind of building based on AR virtual reality technologies builds design system |
CN108427791A (en) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | The design management method and device of erecting yard safety measure based on BIM |
CN107492050A (en) * | 2017-08-22 | 2017-12-19 | 汪小兵 | Big data platform application after a kind of resource consolidation |
CN107766428A (en) * | 2017-09-15 | 2018-03-06 | 北京大学 | A kind of automatic method and system for realizing data visualization |
CN107766428B (en) * | 2017-09-15 | 2021-09-24 | 北京大学 | Method and system for automatically realizing data visualization |
CN107885328B (en) * | 2017-11-02 | 2020-12-15 | 杭州埃欧哲建设工程咨询有限公司 | Building design management system based on BIM and VR |
CN107885328A (en) * | 2017-11-02 | 2018-04-06 | 杭州埃欧哲建设工程咨询有限公司 | A kind of architectural design management system based on BIM and VR |
CN109118114A (en) * | 2018-08-31 | 2019-01-01 | 辽宁科技大学 | Underground stereo storage architectural design managing device based on BIM |
CN109117583A (en) * | 2018-08-31 | 2019-01-01 | 辽宁科技大学 | Underground three-dimensional garage architectural design managing device based on BIM |
CN109408932A (en) * | 2018-10-15 | 2019-03-01 | 鼎宸建设管理有限公司 | A kind of architectural design management system based on BIM and VR |
CN109741010A (en) * | 2018-12-14 | 2019-05-10 | 四川省交通运输厅交通勘察设计研究院 | A kind of road interactive mode field investigation system based on BIM and AR technology |
CN110942378A (en) * | 2018-12-29 | 2020-03-31 | 美宅科技(北京)有限公司 | Hard-set customization method and customization device |
CN109870987A (en) * | 2019-03-12 | 2019-06-11 | 中建三局第一建设工程有限责任公司 | Platform of internet of things management method and its system suitable for large-sized workshop site operation |
CN110022321A (en) * | 2019-04-09 | 2019-07-16 | 李丰 | A kind of VR building detection method and VR equipment based on virtual reality |
CN111292409A (en) * | 2019-09-02 | 2020-06-16 | 温州大城建筑装饰工程有限公司 | Building design method based on VR technology |
CN115859426A (en) * | 2022-11-25 | 2023-03-28 | 甘肃旭阳智能工程有限公司 | Building design system based on BIM and VR technology and design method thereof |
CN117035365A (en) * | 2023-09-16 | 2023-11-10 | 海南华筑国际工程设计咨询管理有限公司 | Comprehensive management method and system for BIM building design |
Also Published As
Publication number | Publication date |
---|---|
CN106127453B (en) | 2021-08-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106127453A (en) | A kind of architectural design based on BIM and VR management system and management method thereof | |
Gao et al. | Building information modelling based building energy modelling: A review | |
Sadeghi et al. | Developing building information models (BIM) for building handover, operation and maintenance | |
KR101752913B1 (en) | Building construction operating management system and method to use bim | |
CN103440357B (en) | Virtual reality roaming scence generates method and system | |
CN106372293B (en) | Building BIM (building information modeling) model establishing method based on three-dimensional datum line | |
Popov et al. | Complex usage of 4D information modelling concept for building design, estimation, sheduling and determination of effective variant | |
CN105046534A (en) | Internet aided design (iAD) | |
CN102651102A (en) | Product information modeling method in collaborative environment based on product entire life cycle | |
CN108153932B (en) | Desktop type three-dimensional virtual maintenance model modeling system | |
CN107368657B (en) | Production resource rapid configuration method based on process simulation | |
CN107229794B (en) | Model construction system based on CAE and VR and management method thereof | |
JP2009524887A (en) | Specification-based routing for utility network systems | |
Wong et al. | Research and application of building information modelling (BIM) in the architecture, engineering and construction (AEC) industry: a review and direction for future research | |
CN102243683A (en) | Method and device for realizing pipeline design | |
CN111105080A (en) | Construction progress prediction method and system based on BIM (building information modeling) | |
CN104598697A (en) | Construction method of product simulation three-dimensional model | |
CN206039647U (en) | Architectural design management system based on BIM and VR | |
CN111428310A (en) | Underground pipe gallery model construction method based on BIM and GIS | |
Seidenschnur et al. | A common data environment for HVAC design and engineering | |
Saraireh et al. | Understanding the conceptual of building information modeling: a literature review | |
Alzraiee | Cost estimate system using structured query language in BIM | |
CN105426601A (en) | Diversity design scheme reporting method and system based on BIM (Building Information Modeling) | |
CN111819564A (en) | Method and system for automatic work order creation | |
KR101087197B1 (en) | The method of linking computer aided design system with product data management system in real time |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200511 Address after: 361006 23 / F, 266 Lujiang Road, Siming District, Xiamen City, Fujian Province Applicant after: XIAMEN RUICHUANG ENERGY SAVING TECHNOLOGY Co.,Ltd. Address before: 063000 Hebei Province, Tangshan City Caofeidian Industrial Zone equipment manufacturing park Applicant before: RUICHUANG (TANGSHAN) ECOLOGICAL BUILDING TECHNOLOGY Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |