CN106126806B - Column foot drawing methods in a kind of configuration of transmission line foundation - Google Patents

Column foot drawing methods in a kind of configuration of transmission line foundation Download PDF

Info

Publication number
CN106126806B
CN106126806B CN201610455476.3A CN201610455476A CN106126806B CN 106126806 B CN106126806 B CN 106126806B CN 201610455476 A CN201610455476 A CN 201610455476A CN 106126806 B CN106126806 B CN 106126806B
Authority
CN
China
Prior art keywords
column foot
tower leg
drawn
leg
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610455476.3A
Other languages
Chinese (zh)
Other versions
CN106126806A (en
Inventor
汪楚清
侯鹏翔
张文军
周磊
张小宁
曹凯翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
The Ningxia Hui Autonomous Region Electric Power Design Institute Co., Ltd.
Original Assignee
NINGXIA HUI AUTONOMOUS REGION ELECTRIC POWER DESIGN INSTITUTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGXIA HUI AUTONOMOUS REGION ELECTRIC POWER DESIGN INSTITUTE filed Critical NINGXIA HUI AUTONOMOUS REGION ELECTRIC POWER DESIGN INSTITUTE
Priority to CN201610455476.3A priority Critical patent/CN106126806B/en
Publication of CN106126806A publication Critical patent/CN106126806A/en
Application granted granted Critical
Publication of CN106126806B publication Critical patent/CN106126806B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/30Circuit design
    • G06F30/39Circuit design at the physical level
    • G06F30/392Floor-planning or layout, e.g. partitioning or placement

Abstract

The invention discloses column foot drawing methods in a kind of configuration of transmission line foundation, and to solve the problems, such as to exist in the prior art the low efficiency of traditional design drawing, quality is difficult to ensure, is difficult to check.This method are as follows: data are arranged in the column foot geometric data and drawing format for receiving user's input;According to bar number, diagonal half root in basis opens, the long and gradient that connects leg calculates the tower leg graph key point coordinate of column foot to be drawn, opened according to bar number, diagonal half root in basis, crank degree, corner direction, principal post diameter and principal post center point hole graph key point coordinate for extending out distance and calculating column foot to be drawn;The tower leg graph key point coordinate of column foot to be drawn is handled as tower leg figure order, and by a point hole graph key point coordinate processing for column foot to be drawn is minute hole figure order;Data are set based on drawing format, according to the tower leg figure of tower leg figure order column foot to be drawn, and draw according to point hole figure order point hole figure of column foot to be drawn.Figure efficiency be can be improved into using this method.

Description

Column foot drawing methods in a kind of configuration of transmission line foundation
Technical field
The present invention relates to column foots in transmission line of electricity technical foundation design field more particularly to a kind of configuration of transmission line foundation Drawing methods.
Background technique
It needs to make tower leg arrangement and point hole figure according to design scheme in transmission line foundation configuration, is applied with guidance scene Work.Scheming traditional drawing method for tower leg arrangement and point hole is using manual plotting, and major defect has: one, serious to restrict Design efficiency., tower leg miscellaneous line project numerous for bar bit quantity, it is a large amount of that cumbersome operation need to expend designer Time;Two, designing quality is influenced.Mapping is easy to appear mistake manually, and precision is difficult to ensure, difficulty is checked, to mountain area steel tower The influence of configurations is particularly evident.
The method that existing auto-manual system draws tower leg arrangement and point hole figure, can only all draw point hole figure an of steel tower, Corresponding tower leg figure cannot directly be drawn, for miscellaneous tower leg figure drafting still expend designer's a couple of days when Between, it is not easy to the modification of drawing, also can not modify tower leg length according to landform.
Therefore, have very much to have and the traditional method of configurations is modified.
Summary of the invention
The embodiment of the present invention provides column foot drawing methods in a kind of configuration of transmission line foundation, to solve in the prior art There are problems that the low efficiency of traditional design drawing, quality are difficult to ensure, are difficult to check.
Column foot drawing methods in transmission line foundation configuration provided in an embodiment of the present invention, comprising:
Data are arranged in the column foot geometric data and drawing format for receiving user's input;
According to the bar number for the column foot to be drawn for including in the column foot geometric data, diagonal half root in basis opens, it is long to connect leg and The gradient calculates the tower leg graph key point coordinate of the column foot to be drawn, and according to including wait draw in the column foot geometric data The bar number of column foot processed, diagonal half root in basis open, crank degree, corner direction, principal post diameter and principal post center extend out distance meter Calculate point hole graph key point coordinate of the column foot to be drawn;
The tower leg graph key point coordinate of the column foot to be drawn is handled into the tower leg figure order for mapping software format identification, And a point hole graph key point coordinate for the column foot to be drawn is handled into minute hole figure order for mapping software format identification;
Data are set based on the drawing format, according to the tower leg figure of the tower leg figure order column foot to be drawn, Yi Jigen Point hole figure of column foot to be drawn is drawn according to described point of hole figure order.
Preferably, according to the bar number for the column foot to be drawn for including in the column foot geometric data, diagonal half root in basis is opened, is connect Leg is long and the gradient calculates the tower leg graph key point coordinate of the column foot to be drawn, and includes according in the column foot geometric data Column foot to be drawn bar number, diagonal half root in basis open, crank degree, corner direction, principal post diameter and principal post center extend out Distance calculates point hole graph key point coordinate of the column foot to be drawn:
The bar number of corresponding column foot to be drawn, determines the tower leg basic point coordinate of column foot to be drawn, and is based on tower leg basic point coordinate, root The extreme coordinates of determining tower leg bottom two are opened according to half root of basis;
It opened according to diagonal half root in basis, connect that leg is long and the gradient determines two, tower leg top extreme coordinates and two, top end The midpoint coordinates of point;
And the bar number of corresponding column foot to be drawn, it determines the Center stake coordinate of column foot to be drawn, is based on Center stake coordinate, root The coordinate at determining principal post center is opened according to diagonal half root in basis;
It is opened according to diagonal half root in basis, principal post diameter, principal post center extend out distance, crank degree and corner direction calculating Divide four extreme coordinates of hole figure.
Preferably, point hole graph key point coordinate of the column foot to be drawn is handled to minute hole for mapping software format identification Figure order, and the tower leg graph key point coordinate of the column foot to be drawn is handled into the tower leg figure life for mapping software format identification It enables, comprising:
The extreme coordinates of tower leg bottom two and two, tower leg top extreme coordinates are separately connected, by the end of tower leg bottom two The midpoint coordinates of point and two endpoints in tower leg top is separately connected, and the endpoint connection of two, tower leg top is handled for tower leg Figure order;
The coordinate of principal post diameter and principal post center is handled as four round orders where principal post position;
Point four extreme coordinates of hole figure are handled to the order on four sides for column foot point hole figure range;
Preferably, after the tower leg figure according to tower leg figure order column foot to be drawn, comprising:
Judge position that tower leg figure is placed for level land or mountainous region, when judgement tower leg figure placement location is mountainous region, according to Include in landform, column foot geometric data it is very poor and maximum subtract leg number adjustment tower leg figure to connect leg long.
Beneficial effect of the present invention includes: the low efficiency for solving traditional design drawing, quality is difficult to ensure, is difficult to check Disadvantage, it is high-efficient at scheming, for 200 kinds of tower legs, can need to only be completed less than 10s, and traditional often consuming a couple of days of mapping when Between, imaging quality is high, such as design alteration when facilitate the modification of drawing, facilitate and meet different drawing requirements, such as modify map sheet ratio There is height leg to map suggesting effect for example, line width, font style etc., prevents mountainous region tower differential process improper or to subtract leg number inadequate The case where using.
Detailed description of the invention
Fig. 1 is the flow chart of column foot drawing methods during the transmission line foundation in the embodiment of the present invention configures;
Fig. 2 is point hole figure in the embodiment of the present invention;
Fig. 3 is the tower leg figure in the embodiment of the present invention;
Fig. 4 is the tower leg figure drawn in batches in the embodiment of the present invention;
Fig. 5 is point hole figure drawn in batches in the embodiment of the present invention.
Specific embodiment
In order to provide the implementation for improving the efficiency for drawing column foot point hole figure and tower leg figure, the embodiment of the invention provides Column foot drawing methods in a kind of configuration of transmission line foundation carry out the preferred embodiment of the present invention below in conjunction with Figure of description Explanation.
According to the high efficiency of the interactivity of AutoCAD drawing and Excel data processing, a kind of automatic mapping method is proposed. The characteristics of AutoCAD charts is that all drawings are all that these fundamentals are constituted by point, line, surface etc., as long as therefore obtaining need The coordinate for doing the relevant control point, line, surface of figure, can draw required figure by way of order.However, The shortcomings that AutoCAD is that data-handling capacity is poor, therefore the present invention utilizes the high efficiency and AutoCAD of Excel processing data The interactivity of operation proposes a kind of automatic mapping method.
As shown in fig.1, the embodiment of the present invention provides column foot drawing methods in a kind of configuration of transmission line foundation, this method The following steps are included:
Step 110: data are arranged in the column foot geometric data and drawing format for receiving user's input.
Specifically, being based on Excel, column foot geometric data is inputted, column foot geometric data includes bar number, diagonal half root in basis It opens, crank degree, corner direction, principal post diameter, principal post center extends out range, column foot spacing, connects the leg length, gradient, differential, most Subtract leg number greatly;And data, including adjacent tower leg spacing, map sheet scale bar, skin outside line line width, font are arranged in input drawing format Form.
Step 120: according to the bar number for the column foot to be drawn for including in the column foot geometric data, diagonal half root in basis opens, The long tower leg graph key point coordinate for calculating the column foot to be drawn with the gradient of leg is connect, and is wrapped according in the column foot geometric data The bar number of the column foot to be drawn included, diagonal half root in basis open, crank degree, corner direction, principal post diameter and principal post center it is outer Expansion is from point hole graph key point coordinate for calculating the column foot to be drawn.
Specifically, including:
The bar number of corresponding column foot to be drawn, determines the tower leg basic point coordinate of column foot to be drawn, and is based on tower leg basic point coordinate, root The extreme coordinates of determining tower leg bottom two are opened according to half root of basis;
It opened according to diagonal half root in basis, connect that leg is long and the gradient determines two, tower leg top extreme coordinates and two, top end The midpoint coordinates of point;
And the bar number of corresponding column foot to be drawn, it determines the Center stake coordinate of column foot to be drawn, is based on Center stake coordinate, root The coordinate at determining principal post center is opened according to diagonal half root in basis;
It is opened according to diagonal half root in basis, principal post diameter, principal post center extend out distance, crank degree and corner direction calculating Divide four extreme coordinates of hole figure.
Step 130: the tower leg graph key point coordinate of the column foot to be drawn is handled as the tower of mapping software format identification Leg figure order, and a point hole graph key point coordinate for the column foot to be drawn is handled into minute hole figure for mapping software format identification Order.
The coordinate of principal post diameter and principal post center is handled as four round orders where principal post position;
Order by four extreme coordinates processing of point hole figure to surround four sides of the square in column foot point hole;
The extreme coordinates of tower leg bottom two and two, tower leg top extreme coordinates are separately connected, by the end of tower leg bottom two The midpoint coordinates of point and two endpoints in tower leg top is separately connected, and the endpoint connection of two, tower leg top is handled for tower leg Figure order.
Citing is described in detail below, as shown in fig.2, by the coordinate polar coordinate representation of all key points, if will be wait draw The Center stake coordinate of column foot processed is set as (0,0 °), and diagonal half root in basis is opened as a, and corner direction is to turn left, and offset direction is directed to Route direction of advance is left-hand rotation upwards, and downwards to turn right, crank degree is θ °, the angular bisector of crank degree and the one of square Side is vertical, θ is 22 ° in Fig. 2, wherein left-hand rotation angle is negative, and right-hand rotation angle is positive, it can be deduced that, four principal post centers at this time Coordinate is (a, 45 ° of+θ/2), (a, 135 ° of+θ/2), (a, 225 ° of+θ/2) and (a, 315 ° of+θ/2);If principal post diameter is b, principal post Center extend out distance be c, wherein principal post center extend out distance be used to indicate principal post position circle side and point hole figure The shortest distance on four sides, it can be deduced that, four endpoints of point hole figure are respectively, It will Four endpoints are sequentially connected, it is available should column foot be drawn the four edges for dividing hole figure, it is known that four principal post centre coordinates and Principal post diameter b, can draw the circle of four principal post positions.
As shown in fig.3, the drafting of tower leg figure is based on rectangular coordinate system, tower leg figure is two towers for being divided to hole figure diagonal position The sectional view of leg meets a length of d of leg if setting (0,0) for the Center stake coordinate of column foot to be drawn, and connects leg length and is used to indicate tower leg The distance for the straight line that the endpoint on top is practiced to two endpoints in tower leg bottom, the gradient are tan θ, and the gradient is used to indicate tower leg main material The tangent value at inclination angle, it can be deduced that, the coordinate E of the endpoint of tower leg bottom two is (a, 0) and F (- a, 0), two, tower leg top Extreme coordinates G is (a-d tan θ, d) and H (- a+d tan θ, d) }, the midpoint coordinates I of two, tower leg top endpoint is (0, d).
Step 140: data being arranged based on the drawing format, point of column foot to be drawn is drawn according to described point of hole figure order Hole figure, and according to the tower leg figure of the tower leg figure order column foot to be drawn.
After the tower leg figure according to tower leg figure order column foot to be drawn, comprising:
Judge position that tower leg figure is placed for level land or mountainous region, when judgement tower leg figure placement location is mountainous region, according to Include in landform, column foot geometric data it is very poor and maximum subtract leg number adjustment tower leg figure to connect leg long.
Above-mentioned drawing step specifically, being order by Excel program treated key point coordinate transformation, and pastes AutoCAD order line generates figure according to the auxiliary positioning point in figure and figure is moved to the bar position center of corresponding bar number, I.e. above-mentioned Center stake point coordinate for point hole figure and is placed in the tower leg figure on level land, does not need to be adjusted again, for being placed in The tower leg figure in mountainous region needs very poor according to landform and maximum subtract leg number and connect leg length to adjust, wherein if it is 5 that maximum, which subtracts leg number, Very poor when being 1m, when adjustment connects leg length according to adjustment 1m, 2m, 3m, 4m, 5m are adjusted;If it is 4 that maximum, which subtracts leg number, very poor to be When 1.5m, when adjustment connects leg length according to adjustment 1.5m, 3m, 4.5m, 6m is adjusted.
As shown in fig.4, column foot drawing methods in transmission line foundation provided in an embodiment of the present invention configuration can one Secondary property draws the tower leg figure of 20 kinds of different models, is furnished with certain explanatory note below tower leg figure, including bar number/very poor/maximum subtracts Leg number, as shown in fig.5, the column foot drawing methods in transmission line foundation provided in an embodiment of the present invention configuration can be disposable Point hole figure of 20 kinds of different models is drawn, a point hole figure lower section is furnished with explanatory note, including bar N2100~N2124, prompts With preventing from using with.
In conclusion scheme provided in an embodiment of the present invention, solves the low efficiency of traditional design drawing, quality is difficult to protect It demonstrate,proves, be difficult to the disadvantage checked, it is high-efficient at scheming, for 200 kinds of tower legs, need to can only be completed less than 10s, and tradition mapping is often Facilitate the modification of drawing when expending high time of a couple of days, imaging quality, such as design alteration, facilitate and meet different drawing requirements, It such as modifies map sheet ratio, line width, font style, there is height leg mapping suggesting effect, prevent mountainous region tower differential process improper Or subtract the not enough situation of leg number.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to include these modifications and variations.

Claims (3)

1. column foot drawing methods in a kind of transmission line foundation configuration, which is characterized in that the described method includes:
Data are arranged in the column foot geometric data and drawing format for receiving user's input;
The bar number for the column foot to be drawn for including in the corresponding column foot geometric data determines that the tower leg basic point of column foot to be drawn is sat Mark is based on tower leg basic point coordinate, opens the extreme coordinates of determining tower leg bottom two according to half root of basis;According to the column foot geometry number Diagonal half root in basis for including in opens, connects that leg is long and the gradient determines two, tower leg top extreme coordinates and two, top endpoint Midpoint coordinates;And the bar number according to the correspondence column foot to be drawn for including in the column foot geometric data, determine tower to be drawn The Center stake coordinate of base is based on Center stake coordinate, and the coordinate at determining principal post center is opened according to diagonal half root in basis;According to the tower Diagonal half root in basis for including in base geometric data opens, principal post diameter, principal post center extend out distance, crank degree and corner side Divide four extreme coordinates for cheating figure to calculating;
The tower leg graph key point coordinate of the column foot to be drawn is handled into the tower leg figure order for mapping software format identification, and A point hole graph key point coordinate for the column foot to be drawn is handled into minute hole figure order for mapping software format identification;
Data are set based on the drawing format, the tower leg figure of column foot to be drawn, Yi Jigen are drawn according to the tower leg figure order Point hole figure of column foot to be drawn is drawn according to described point of hole figure order.
2. the method as described in claim 1, which is characterized in that handle the tower leg graph key point coordinate of the column foot to be drawn For the tower leg figure order of mapping software format identification, and by point hole graph key point coordinate processing of the column foot to be drawn to draw Point hole figure order of figure software format identification, comprising:
The extreme coordinates of tower leg bottom two and two, tower leg top extreme coordinates are separately connected, by the endpoint of tower leg bottom two and The midpoint coordinates of two endpoints in tower leg top is separately connected, and the endpoint connection of two, tower leg top is handled for tower leg figure life It enables;
The coordinate of principal post diameter and principal post center is handled as four round orders where principal post position;
Point four extreme coordinates of hole figure are handled as the order of column foot point hole range.
3. the method as described in claim 1, which is characterized in that in the tower leg figure according to the tower leg figure order column foot to be drawn Later, comprising:
Judge position that the tower leg figure is placed for level land or mountainous region, when the judgement tower leg figure placement location is mountainous region, According to include in landform, column foot geometric data it is very poor and maximum subtract leg number adjustment tower leg figure to connect leg long.
CN201610455476.3A 2016-06-22 2016-06-22 Column foot drawing methods in a kind of configuration of transmission line foundation Active CN106126806B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610455476.3A CN106126806B (en) 2016-06-22 2016-06-22 Column foot drawing methods in a kind of configuration of transmission line foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610455476.3A CN106126806B (en) 2016-06-22 2016-06-22 Column foot drawing methods in a kind of configuration of transmission line foundation

Publications (2)

Publication Number Publication Date
CN106126806A CN106126806A (en) 2016-11-16
CN106126806B true CN106126806B (en) 2019-07-30

Family

ID=57268421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610455476.3A Active CN106126806B (en) 2016-06-22 2016-06-22 Column foot drawing methods in a kind of configuration of transmission line foundation

Country Status (1)

Country Link
CN (1) CN106126806B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113901551B (en) * 2021-10-09 2022-04-26 广东天联电力设计有限公司 Power transmission tower high-low leg configuration method and device, computer equipment and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102750413A (en) * 2012-06-19 2012-10-24 江苏省电力设计院 Data processing and mapping method of topographic surveying of electric transmission line tower positions
CN103198185A (en) * 2013-03-28 2013-07-10 国核电力规划设计研究院 Method and device for drawing tower footing cross-section diagram

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102750413A (en) * 2012-06-19 2012-10-24 江苏省电力设计院 Data processing and mapping method of topographic surveying of electric transmission line tower positions
CN103198185A (en) * 2013-03-28 2013-07-10 国核电力规划设计研究院 Method and device for drawing tower footing cross-section diagram

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
Excel和AutoCAD在方案设计计算中的应用;王勇 等;《价值工程》;20131118;第206-207页
VB和VBA for AutoCAD编程在电力勘测塔基断面数据处理中的应用;乐志豪;《测绘与空间地理信息》;20120725;第35卷(第7期);第169-170,175页
输电线路塔基断面自动成图方法研究;秦增忍;《中国科技纵横》;20150515(第9期);第162-163页

Also Published As

Publication number Publication date
CN106126806A (en) 2016-11-16

Similar Documents

Publication Publication Date Title
CN106126806B (en) Column foot drawing methods in a kind of configuration of transmission line foundation
CN107869249B (en) Arcuate structure high-formwork construction method
CN107012860A (en) A kind of construction method of the post Single Pile joint bar positioner based on BIM technology
CN108536973A (en) The construction drawing detailing method of curved surface steel box bridge
CN108334656A (en) A kind of Mountainous Building group based on BIM life of handling official business faces method for arranging greatly
CN103244134B (en) Anti-floating ballasting method for shield tunnel under negative earthing condition
CN106529039A (en) Method for generating two-dimensional reinforcing steel bar type drawing from three-dimensional reinforcing steel bars
CN106193330B (en) A kind of steel building construction land tenure foot bolt pre-embedded construction method
CN104931027B (en) A kind of projection line-putting method of decorative pattern
CN106840116A (en) Three-dimensional lofting method
CN106193094A (en) A kind of embedding anchor bolts construction mould and foundation bolt regulation construction method
CN103207923A (en) Computer aided design method for vertical design of road plane intersection
CN103500469B (en) A kind of urban afforestation modeling method
CN209585094U (en) A kind of bracket basis installation of embedded parts auxiliary mould
WO2020232978A1 (en) Method for assisting filling operation of subgrade and dam
CN116341090A (en) Automatic plotting method for farmland water conservancy channels
CN106557600A (en) A kind of power transmission tower unequal leg and the emulation mode on basis
CN106846432A (en) The method for drafting and device of a kind of tower base sectional drawing
CN103453884A (en) Integral ground feature mapping working method based on partitioning
CN206941968U (en) Reinforcing bar limiting card with the upper oblique bayonet socket being parallel to each other
CN110388049A (en) BIM technology is in irregular stand seat position preformed hole positioning measurement construction
CN109712235B (en) Construction method of digital land parcel map
CN206311103U (en) Three-dimensional lofting rod member
CN206311021U (en) Three-dimensional lofting platform
CN107724689A (en) A kind of steel structures in construction works measures construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 750001, No. 3120, Dalian Road, Jinfeng District, the Ningxia Hui Autonomous Region, Yinchuan

Patentee after: The Ningxia Hui Autonomous Region Electric Power Design Institute Co., Ltd.

Address before: 750001 No. 277, east the Great Wall Road, the Ningxia Hui Autonomous Region, Yinchuan

Patentee before: Ningxia Hui Autonomous Region Electric Power Design Institute

CP03 Change of name, title or address