CN106124814A - Intelligence changes meter apparatus - Google Patents

Intelligence changes meter apparatus Download PDF

Info

Publication number
CN106124814A
CN106124814A CN201610506544.4A CN201610506544A CN106124814A CN 106124814 A CN106124814 A CN 106124814A CN 201610506544 A CN201610506544 A CN 201610506544A CN 106124814 A CN106124814 A CN 106124814A
Authority
CN
China
Prior art keywords
electric energy
control unit
room
intelligence
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610506544.4A
Other languages
Chinese (zh)
Other versions
CN106124814B (en
Inventor
高林海
高瀚
高洁
杨乐新
王珂
鞠常荣
王素洁
王赞
张晨
赵寅梅
李菲菲
徐宴鹏
黄群声
杜欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Juancheng Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610506544.4A priority Critical patent/CN106124814B/en
Publication of CN106124814A publication Critical patent/CN106124814A/en
Application granted granted Critical
Publication of CN106124814B publication Critical patent/CN106124814B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/02Constructional details

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

Intelligence changes meter apparatus, belong to electric energy meter and change device technique field, including end cap, annular volume and base, base sets cylinder, annular volume is nested with outside cylinder, and end cap is located at annular volume upper end, arranging multiplayer floor room in annular volume, all lay multiple chamber on every room layer by layer, in chamber, each set electric energy gauge stand by drawing and pulling type rail structure;Setting control unit and the display screen of connection being connected with control unit, typing panel and USB on end cap, control unit includes data memory module, and USB connects scanning device and/or image recording device.It can improve in electric energy meter rotation work, the electric energy meter information table inefficient defect of forms data recording process, fill in inconvenience, afterwards the record information that exist when the scene of elimination carries out data record are difficult to the defect searched or recognize, realize electric energy meter data message recorded electronic, improving accuracy and the efficiency of logging data, it is convenient to search.

Description

Intelligence changes meter apparatus
Technical field
The present invention relates to electric energy meter and change device technique field, specifically a kind of intelligence changes meter apparatus.
Background technology
The rotation work of field electric energy table at present, is all to use manual filling out singly to carry out record.Before fill substance includes changing The information such as the model of rear two electric energy meters, voltage, asset number, capacity, electric energy meter registration, transformer multiplying power, lead sealing number.Change by hand During table during being operated and singly filling in, have that record efficiency is low, record accuracy rate is difficult to 100%, fills in data not The shortcomings such as easy identification, lookup.
When carrying out the new and old rotation of electric energy meter at the scene, the information of record is from the process getting typing marketing data system In, necessarily pass and on-the-spot manual fill out unirecord, this process not only efficiency is low and as easy as rolling off a log makes mistakes, if one digit number or one little The mistake of several points may cause company's electric quantity loss or make troubles to client, can make the working cycle of whole electric energy meter rotation Longer, the writing task list of papery is the most easy to store simultaneously, searches the most relatively difficult.
Summary of the invention
The efficiency existed for current field electric energy table rotation data recording process is low, fill in inconvenience, not easy-to-search, distinguish The defect such as recognize, the invention provides a kind of intelligence and change meter apparatus.
The present invention solves its technical problem and is adopted the technical scheme that:
A kind of intelligence changes meter apparatus, including end cap, annular volume and base;Base arranges vertical cylinder, annular Volume is nested with outside cylinder, and end cap is arranged on annular volume upper end;Vertically disposed multilayer layer in described annular volume Room, the most uniform on room the most layer by layer arranges multiple chamber;Corresponding each chamber arranges chamber door in outside, passes through in chamber Drawing and pulling type rail structure each arranges electric energy gauge stand;End cap arranges the aobvious of control unit and the connection that is connected with control unit Display screen, typing panel and multiple USB;Described control unit includes data memory module, and being connected by USB has scanning Equipment and/or image recording device;Power supply is set in base.
Described control unit also includes communication module, makes communication module carry out docking with long-range management system and is connected, real The transmission of existing data.
Described control unit also includes data detection module, and data detection module is to number necessary on electric energy meter information list According to carrying out the detection of complete property.
On described typing panel, fingerprint acquisition device is set.
In each chamber, arranging position sensor corresponding to electric energy gauge stand, position sensor connects control unit.Position is felt Device is answered to sense and the action message of sensing fed back to control unit to immigration, the removal action of electric energy gauge stand, and through control Follow-up operation indicating is shown on a display screen by unit processed.
Further, described annular volume is split-type structural, and the most each floor room forms separate unit, is divided into multiple overlapped layers room With an end layers room;Arranging locating groove vertically on cylinder on described base, corresponding locating groove is folded Put and on the internal ring wall of floor room and end layers room, be respectively provided with axial positioning convex;The upper surface of base be placed in foot Part corresponding to overlapped layers room arranges slot, arranges metal electrode in the bottom of slot;In the lower end of overlapped layers room, electrode is set Plug, arranging inner bottom surface in upper end has the slot of metal electrode;Electrode plug is set in the lower end of end layers room, in end layers room Internal ring wall on arrange annular metal electrode and by inner conductors connect lower end, described end layers room arrange electrode plug with The annular metal electrode arranged on it.The cylinder upper end of described base arranges the supply hub being connected with end cap, outside cylinder On wall, the annular metal electrode on corresponding end floor room is provided with electrode slice.
The invention has the beneficial effects as follows:
It can improve in electric energy meter rotation work, the electric energy meter information table inefficient defect of forms data recording process, eliminates Fill in inconvenience, afterwards the record information that exist when scene carries out data record are difficult to the defect searched or recognize.Realize electric energy Table rotation process, the electronization of electric energy meter data message record, make the accuracy of logging data and efficiency of inputting synchronize to obtain greatly Big raising.And data message stores simple orderly, it is convenient to search.
After arranging communication module, it is possible to realize remotely and the data transmission of management system, the reliability for record data is deposited Store up and search, management provides safeguard.Ensure that data, when management system carries, manage the standard of the data message that system obtains Really property, promptness, eliminate and manually carry out in management system in secondary data Input Process, because of misoperation or because reading Data fill in be difficult to identification time cause record data error risk, accomplish that data inputting, transmittance process are the most accurate, Simplify the workflow of electric energy meter field rotation.
Data detection module is set data necessary on electric energy meter information list are carried out the detection of complete property, it is possible to effectively Avoid the omission of significant data.
By position sensor to disposing electric energy meter to take use state in each chamber and storage configuration senses, just In realizing effectively and reliably supervising to the data message of chamber electric energy meter, specify this intelligence and change in meter apparatus electric energy in each chamber The state (i.e. distinguishing Xin Biao or old table) of table, in work process, this intelligence changes the electric energy meter that meter apparatus accommodated Data search provides convenient, makes when carrying out electric energy meter alternate operation, and operator can distinguish rapidly electric energy meter new, old, accurate Really select the new electric energy meter of needs.This intelligence can be changed the electric energy meter in meter apparatus with communication module after being particularly combined real The rapid renewal of existing data, provides convenient for follow-up management work and ensures.
After annular volume is set to Split type structure, on the one hand being easy to this intelligence changes the manufacturing of meter apparatus, is beneficial to reduce Manufacturing cost and the complexity of technique, on the other hand can extend this intelligence and change the service life that meter apparatus is overall, reduce and use Cost, i.e. when intelligence changes meter apparatus existence damage, only needs to carry out replacing or the dimension of appropriate section under split-type structural Repair.
Accompanying drawing explanation
Fig. 1 is present invention contour structures schematic diagram in main apparent direction;
Fig. 2 is the radial section schematic diagram that medium ring of the present invention describes body;
Fig. 3 is the schematic top plan view of base in the present invention;
Fig. 4 is the internal structure schematic diagram of annular volume upper chamber of the present invention;
Fig. 5 is the counter structure schematic diagram under annular volume split-type structural between each floor room;
In figure: 1 end cap, 2 annular volumes, 21 floor room, 21A overlapped layers room, 21B end layers room, 211 chambers, 212 chamber doors, 213 electric energy gauge stands, 214 position sensors, 22 electrode plugs, 23 metal electrodes, 24 annular metal electrodes, 3 bases, 31 cylinders, 311 locating grooves, 312 supply hubs.
Detailed description of the invention
For ease of understanding the technology contents of the present invention, the most just combine accompanying drawing and operating instruction and its technical scheme is made into one Step explanation.
A kind of intelligence as shown in Figures 1 to 4 changes meter apparatus, including end cap 1, annular volume 2 and base 3.
End cap 1 arranges control unit and the display screen of connection being connected with control unit, typing panel and multiple USB Socket.Described control unit includes data memory module, containing storage card grafting port in data memory module.Inserted by USB Mouth connects scanning device, by the bar code of scanning device scan both old electric energy meter by the asset number of old electric energy meter, model, electricity The Data Enters such as pressure, capacity are also stored in data memory module that (information can copy in storage card, can arrange data Copying encrypted function).If scanning device possesses infrared communication function, then can be copied from electric energy meter by infrared communication functional module Meter terminal reading power meters registration (always, point, peak, flat, paddy).Control unit is contained within programmable controller unit or single-chip microcomputer Etc. the part that can program.
In the case of necessity, it is also possible to connect image recording device by USB, by image recording device to scene Electric energy meter apparent condition and electric energy meter reading carry out necessity image or image collection and be sent to data storage mould Block, sets up the subfile under correspondence storage catalogue in data memory module.Carry out the collection of image or image, be in order to anti- The assisted acquisition means utilized when the limitation stopping language description or the textual collection that cannot be carried out information.The most only cannot Carry out accurately writing record time, for reduction scene, clearly defining responsibilities etc., the note of information can be carried out by collection picture or image Record.
Button is set on described typing panel and (includes but not limited to 10 alpha-numeric keys, 26 English alphabet keys, really Recognize key, delete key etc.) and fingerprint acquisition device.
After dress renews table, scanned all information of the new electric energy meter of bar code typing on new electric energy meter by scanning device, The information such as the transformer of on-the-spot confirmation, lead sealing seal new, old are also stored in data memory module through the input of typing panel.Work Make personnel, user can carry out validation of information by on-the-spot typing fingerprint.All information of above-mentioned formation are deposited in the data of control unit Storage module is changed the form storage of electronic worksheet with the electric energy meter dress generated, can be on-the-spot after USB connects printing device Print job list, is confirmed signature by user.The fingerprint acquisition device arranged can allow client's typing fingerprint confirm, to realize With no paper work.USB can be set up with external equipment by data wire and be connected, it is achieved the transmission between data.Described control Unit can also include GPRS communication module, thus be allowed to and be capable of remote data transmission between (marketing) management system, will The management system that electronic worksheet Data Enter is long-range.
As shown in Figures 2 and 3, on the base 3 along its axially arranged coaxial cylinder 31, annular volume 2 is nested with at cylinder Outside 31, the internal perisporium of annular volume 2 is made to coordinate with cylinder 31 wall contacts.End cap 1 is arranged on annular volume 2 upper end.In base 3 Setting power supply, power supply is connected to end cap 1 by built-in circuit.
As shown in Figure 1 to Figure 3, vertically disposed multilayer layer room 21 in described annular volume 2, the most layer by layer on room 21 The most uniform multiple chamber 211 be set (chamber 211 number arranged as shown in Fig. 2, Fig. 4 is different, only with this device Medium ring describes that the overall dimensions of body 2 is correlated with, and does not affect the art of this patent content);Corresponding each chamber 211 arranges chamber door in outside 212, in chamber 211, electric energy gauge stand 213 is each set by drawing and pulling type rail structure.So opening chamber door 212 just can be by Electric energy gauge stand 213 pulls out, and takes off electric energy meter thereon, is pushed back by electric energy gauge stand 213 after then putting the old electric energy meter unloaded, After turn off chamber door 212.In each chamber 211, position sensor 214, position sensor are set corresponding to electric energy gauge stand 213 214 connect control unit.Position sensor 214 in shown in Fig. 4 has been fixed on chamber 211 diapire, and sensing is electric energy meter Seat 213 pull-out and push action.It should be noted that it can also be arranged on electric energy gauge stand 213 and be placed in electric energy meter placement The bottom of position, being the removal of electric energy meter and put back to action of sensing.Involved by the above two installation site of position sensor 214 And mode should be understood as above-mentioned technical description and " in each chamber 211, position sense be set corresponding to electric energy gauge stand 213 Answer device 214 " comprised.
Illustrate as a example by the form of laying of position sensor 214 shown in Fig. 4: sensed at position sensor 214 During removal action (program setting carried out after equipment puts into new electric energy meter first), the signal of sensing can be fed back to control by it Unit, and demonstrate corresponding information on a display screen, control unit of (pressing acknowledgement key) after staff confirms The information list of the electric energy meter of this position correspondence will be transmitted, information corresponding in the data memory module of control unit Show on list that this electric energy meter state is for taking out application.After (newly) electric energy meter of correspondence position is removed, the old electricity that will disassemble Can be put back into this vacant locations by table, scan stripes shape code and by after typing panel typing information, the data in control unit store Module is set up fresh information list (corresponding with the old electric energy meter pulled down), in electric energy gauge stand 213 is pushed back chamber 21 and close chamber door After 212, the fresh information list of this foundation showing state reclaims for changing, similarly, now position sensor 214 can be by sensing Signal feeds back to control unit, and demonstrates corresponding information on a display screen, (presses really after staff confirms Recognize key) the information list of (old) electric energy meter of this position again correspondence will transmit by control unit.Carry out in control unit When information transmits, in its data memory module, at least to transmit a form information, after setting up long-range communication connection also Transmit a identical form information to management system simultaneously.
Data detection module can also be included in described control unit.The data detection module effect arranged is to typing Necessary data the most complete detect, prevent from omitting necessary record information.It is necessary record information for those, can It is set by program.When necessary information incomplete recording, warning can be provided on a display screen.Data detection module only detects The complete property of necessary information and do not detect the accuracy of information.
Different chamber 211 position of difference and same layer room 21 according to floor room 21, the chamber 211 place number of plies, in each chamber The chamber door 212 of 211 is provided with numbering, such as each chamber 211 numbered 1A, 1B, 1C, 1D.... of the floor room 21 of bottom one floor, Its last layer numbered 2A, 2B, 2C, 2D...., by that analogy.In the data memory module of control unit, formation is set File numbered 1A file, 1B file, 1C file, 1D file ...., 2A file, 2B file, 2C file Folder, 2D file .... etc..Corresponding file forms the subfile record list of all electric energy meters that this position was deposited also Made a distinction by the date, as defined 2016-5-5-2pm file, 2016-5-5-6pm file, 2016-in 1A file 5-15-9am file, 2016-5-25-1pm file etc..
As it is shown in figure 5, described annular volume 2 is split-type structural, the most each floor room 21 forms separate unit, is divided into multiple folded Put a floor room 21A and end layers room 21B.On cylinder 31 on described base 3, locating groove vertically is set 311, corresponding locating groove 311 is respectively provided with axial convex on the internal ring wall of overlapped layers room 21A and end layers room 21B Rise, effect be to ensure that up and down on each room 21 the most layer by layer A class numbering, B class numbering, C class numbering etc. (such as Fig. 4) respectively at same Vertical Square Upwards corresponding, in order to search.Arrange slotting in the upper surface of base 3 with the part corresponding for overlapped layers room 21A being placed in foot Groove, arranges metal electrode 23 in the bottom of slot.In the lower end of overlapped layers room 21A, electrode plug 22 is set, in upper end is arranged There is the slot of metal electrode 23 bottom surface.Electrode plug 22 is set in the lower end of end layers room 21B, on the internal ring wall of end layers room Arrange annular metal electrode 24 and by inner conductors connect electrode plug 22 that 21B lower end, described end layers room arranges with on it The annular metal electrode 24 arranged.Cylinder 31 upper end of described base 3 arranges the supply hub 312 being connected with end cap 1, at cylinder On the outer wall of 31, the annular metal electrode 24 on corresponding end floor room 21B is provided with electrode slice.Thus by room 21 the most layer by layer and end Lid 1 is connected with the power supply in base 3.Power supply in base 3 can be lithium battery, and is correspondingly arranged on charging socket or solar energy Charging panel.
In addition to the technical characteristic described in description, it is the known technology of those skilled in the art.

Claims (10)

1. an intelligence changes meter apparatus, it is characterised in that: include end cap, annular volume and base;Base is arranged vertical Cylinder, annular volume is nested with outside cylinder, and end cap is arranged on annular volume upper end;Vertically cloth in described annular volume Put multilayer layer room, the most uniform on room the most layer by layer multiple chamber is set;Corresponding each chamber arranges chamber door, in chamber in outside The indoor drawing and pulling type rail structure that passes through each arranges electric energy gauge stand;End cap arranges control unit and is connected with control unit Display screen, typing panel and the multiple USB connected;Described control unit includes data memory module, by USB even It is connected to scanning device and/or image recording device;Power supply is set in base.
Intelligence the most according to claim 1 changes meter apparatus, it is characterised in that: described control unit also includes communication module, Make communication module carry out docking with long-range management system to be connected.
Intelligence the most according to claim 1 and 2 changes meter apparatus, it is characterised in that: shown control unit also includes that data are examined Surveying module, data detection module carries out the detection of complete property to data necessary on electric energy meter information list.
Intelligence the most according to claim 3 changes meter apparatus, it is characterised in that: fingerprint collecting dress is set on described typing panel Put.
Intelligence the most according to claim 1 and 2 changes meter apparatus, it is characterised in that: on described typing panel, fingerprint is set and adopts Acquisition means.
Intelligence the most according to claim 1 and 2 changes meter apparatus, it is characterised in that: in each chamber, corresponding to electric energy gauge stand Arranging position sensor, position sensor connects control unit;Immigration, the removal action of electric energy gauge stand are carried out by position sensor The action message of sensing is also fed back to control unit, and show follow-up operation indicating at display screen through control unit by sensing On.
Intelligence the most according to claim 6 changes meter apparatus, it is characterised in that: shown control unit also includes Data Detection mould Block, data detection module carries out the detection of complete property to data necessary on electric energy meter information list.
Intelligence the most according to claim 6 changes meter apparatus, it is characterised in that: fingerprint collecting dress is set on described typing panel Put.
Intelligence the most according to claim 1 changes meter apparatus, it is characterised in that: described annular volume is split-type structural, i.e. Each floor room forms separate unit, is divided into multiple overlapped layers room and an end layers room;On cylinder on described base, edge is set The locating groove of vertical direction, corresponding locating groove is respectively provided with axial determining on the internal ring wall of overlapped layers room and end layers room Position is protruding;The part corresponding with the overlapped layers room being placed in foot in the upper surface of base arranges slot, sets in the bottom of slot Put metal electrode;Arranging electrode plug in the lower end of overlapped layers room, arranging inner bottom surface in upper end has the slot of metal electrode;At end The lower end of floor room, portion arranges electrode plug, arranges annular metal electrode and connected by inner conductors on the internal ring wall of end layers room Connect the electrode plug that lower end, described end layers room is arranged and the annular metal electrode arranged on it;The cylinder upper end of described base sets Putting the supply hub being connected with end cap, on the outer wall of cylinder, the annular metal electrode on corresponding end floor room is provided with electrode Sheet.
Intelligence the most according to claim 9 changes meter apparatus, it is characterised in that: in each chamber, set corresponding to electric energy gauge stand Seated position induction apparatus, position sensor connects control unit;Immigration, the removal action of electric energy gauge stand are felt by position sensor And the action message of sensing should be fed back to control unit, and through control unit, follow-up operation indicating is shown at display screen On.
CN201610506544.4A 2016-06-30 2016-06-30 Intelligence changes meter apparatus Expired - Fee Related CN106124814B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610506544.4A CN106124814B (en) 2016-06-30 2016-06-30 Intelligence changes meter apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610506544.4A CN106124814B (en) 2016-06-30 2016-06-30 Intelligence changes meter apparatus

Publications (2)

Publication Number Publication Date
CN106124814A true CN106124814A (en) 2016-11-16
CN106124814B CN106124814B (en) 2019-05-17

Family

ID=57468558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610506544.4A Expired - Fee Related CN106124814B (en) 2016-06-30 2016-06-30 Intelligence changes meter apparatus

Country Status (1)

Country Link
CN (1) CN106124814B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107045303A (en) * 2017-03-24 2017-08-15 天津市迅尔仪表科技有限公司 A kind of ADC data grafting device
CN110058067A (en) * 2019-04-24 2019-07-26 国网宁夏电力有限公司电力科学研究院 Information maintenance method and device when a kind of replacement electric energy meter

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203084032U (en) * 2013-02-04 2013-07-24 湖北东辰电气有限公司 Conductor-rail type integrated electric meter box
CN103354026A (en) * 2013-06-25 2013-10-16 国家电网公司 Meter reading instrument and method for replacing electric energy meter by virtue of meter reading instrument
CN203324335U (en) * 2013-06-24 2013-12-04 国家电网公司 Electric energy meter hanging apparatus for large-sized environment test system
CN103859832A (en) * 2014-03-28 2014-06-18 福建通力达实业有限公司 Novel electric energy meter recycle cabinet
CN203943329U (en) * 2014-06-12 2014-11-19 国家电网公司 Be exclusively used in the fast access shelf of intelligent electric meter

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203084032U (en) * 2013-02-04 2013-07-24 湖北东辰电气有限公司 Conductor-rail type integrated electric meter box
CN203324335U (en) * 2013-06-24 2013-12-04 国家电网公司 Electric energy meter hanging apparatus for large-sized environment test system
CN103354026A (en) * 2013-06-25 2013-10-16 国家电网公司 Meter reading instrument and method for replacing electric energy meter by virtue of meter reading instrument
CN103859832A (en) * 2014-03-28 2014-06-18 福建通力达实业有限公司 Novel electric energy meter recycle cabinet
CN203943329U (en) * 2014-06-12 2014-11-19 国家电网公司 Be exclusively used in the fast access shelf of intelligent electric meter

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107045303A (en) * 2017-03-24 2017-08-15 天津市迅尔仪表科技有限公司 A kind of ADC data grafting device
CN110058067A (en) * 2019-04-24 2019-07-26 国网宁夏电力有限公司电力科学研究院 Information maintenance method and device when a kind of replacement electric energy meter

Also Published As

Publication number Publication date
CN106124814B (en) 2019-05-17

Similar Documents

Publication Publication Date Title
CN102436624B (en) A kind of based on the power marketing live traffic treatment scheme of handheld terminal and the method for specification
CN104228374B (en) By print machine and control method, control device and system
CN104425299B (en) The method that chip manufacture device and application chip processing unit (plant) carry out chip manufacture
CN106124814A (en) Intelligence changes meter apparatus
CN103136551B (en) Second generation citizen ID certificate Information Authentication instrument and I.D. and fingerprint verification system
CN105891763A (en) Power meter operation fault intelligent processing system and a method thereof
CN108389334A (en) A kind of recyclable self-service reprographic printing system and its monitoring method that internet is shared
CN205507994U (en) Self -service terminal of finance
CN111929102B (en) Sampling equipment for measurement and sampling real-time recording tamper-proof method thereof
CN207068439U (en) Lighting machine
CN110109043A (en) Electric energy meter detection method, detection terminal and computer readable storage medium
CN101153893A (en) Electric motor intelligent test system
CN109374061A (en) A kind of switch cabinet electrified detection mobile job-oriented terminal
CN107424318A (en) Cell iris recognition charging pile for electric vehicle
CN209862775U (en) Intelligent tool management device
CN114701387A (en) Charging pile data acquisition method and system
CN207338565U (en) A kind of intelligent accummulator detector based on the cloud platform communication technology
CN207339999U (en) The automatic archive devices of purchase order
CN205681559U (en) A kind of intellectual kilowatt meter recorder
CN210534798U (en) Novel computer graphic recognition device
CN217588124U (en) Recording device is patrolled and examined in transformer operation and maintenance
CN109730453A (en) A kind of tool intelligent management apapratus and method
CN207051462U (en) A kind of Split type accumulator intelligent detecting instrument based on technology of Internet of things
CN201047990Y (en) Image recognition meter-reading machine
CN215006807U (en) Small-size intelligent bill access cabinet

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201102

Address after: 274600 No. 135 west the Yellow River Road, Juancheng County, Heze, Shandong

Patentee after: State Grid Shandong Electric Power Company Juancheng County Power Supply Co.

Address before: 250100 No. 31, Hualong Road, Licheng District, Shandong, Ji'nan

Patentee before: JINAN LICHENG DISTRICT POWER SUPPLY COMPANY, STATE GRID SHANDONG ELECTRIC POWER Co.

Patentee before: State Grid Corporation of China

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190517

CF01 Termination of patent right due to non-payment of annual fee