CN110058067A - Information maintenance method and device when a kind of replacement electric energy meter - Google Patents

Information maintenance method and device when a kind of replacement electric energy meter Download PDF

Info

Publication number
CN110058067A
CN110058067A CN201910332815.2A CN201910332815A CN110058067A CN 110058067 A CN110058067 A CN 110058067A CN 201910332815 A CN201910332815 A CN 201910332815A CN 110058067 A CN110058067 A CN 110058067A
Authority
CN
China
Prior art keywords
electric energy
energy meter
information
user
identification information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910332815.2A
Other languages
Chinese (zh)
Inventor
田瑞
窦圣霞
甄建辉
张磊
张耀男
买波
侯永宁
刘朋远
严绍奎
梁飞
王富对
朱小超
吴朝阳
王旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yinchuan Power Supply Co Of Ningxia Power Co Ltd
Electric Power Research Institute of State Grid Ningxia Electric Power Co Ltd
Original Assignee
Yinchuan Power Supply Co Of Ningxia Power Co Ltd
Electric Power Research Institute of State Grid Ningxia Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yinchuan Power Supply Co Of Ningxia Power Co Ltd, Electric Power Research Institute of State Grid Ningxia Electric Power Co Ltd filed Critical Yinchuan Power Supply Co Of Ningxia Power Co Ltd
Priority to CN201910332815.2A priority Critical patent/CN110058067A/en
Publication of CN110058067A publication Critical patent/CN110058067A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/02Constructional details
    • G01R11/25Arrangements for indicating or signalling faults
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • G01R22/06Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
    • G01R22/061Details of electronic electricity meters
    • G01R22/063Details of electronic electricity meters related to remote communication

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the present application provides the information maintenance method and device when a kind of replacement electric energy meter, is related to technical field of electric power.Information maintenance method when the replacement electric energy meter includes: that the corresponding power consumer archives of table user are changed in acquisition;Obtain the identification information of the operation information and new electric energy meter that change the old electric energy meter of table user;Generate the identification information including the power consumer archives, the operation information of the old electric energy meter and the new electric energy meter changes table job note;Table job note is changed described in transmission, so that receive terminal changes the operation information that table job note updates new electric energy meter according to.The information maintenance method and device when electric energy meter are replaced, by the communication or interaction of information, simplifies the workflow of replacement electric energy meter, improves the working efficiency of replacement electric energy meter.

Description

Information maintenance method and device when a kind of replacement electric energy meter
Technical field
This application involves technical field of electric power, a kind of information maintenance method when in particular to replacement electric energy meter and Device.
Background technique
Currently, the replacement of State Grid Corporation of China's electric energy meter mainly takes following two mode: first is that first completing replacement electric energy meter Business registration, then reach scene replacement electric energy meter.Specific workflow is that scene is copied the table number for taking old electric energy meter and remained Then the information such as the remaining amount of money complete the business registration of replacement electric energy meter in power supply station, then change table personnel hold new electric energy meter and Table is changed at electric card scene, and updated electric card is sent to user.Second is that arriving first scene changes electric energy meter, replacement electric energy meter is then completed Business registration.Specific workflow is that the information such as the table number for taking old electric energy meter and residual amount are copied at scene, then changes table personnel Electric energy meter is replaced, the business registration of replacement electric energy meter is then completed in power supply station, table personnel is finally changed and send updated electric card Up to user.
From the foregoing, it will be observed that the operating process for replacing electric energy meter in the prior art is cumbersome, working efficiency is low.
Summary of the invention
The embodiment of the present application be designed to provide it is a kind of replacement electric energy meter when information maintenance method and device, realize letter Table workflow is changed in change, improves the technical effect for changing table working efficiency.
For this purpose, the embodiment of the present application provides the following technical solutions:
In a first aspect, the embodiment of the present application provide it is a kind of replacement electric energy meter when information maintenance method, the method packet It includes:
The corresponding power consumer archives of table user are changed in acquisition;
Obtain the identification information of the operation information and new electric energy meter that change the old electric energy meter of table user;
Generate the mark including the power consumer archives, the operation information of the old electric energy meter and the new electric energy meter Information changes table job note;
Table job note is changed described in transmission, so that receive terminal changes the operation letter that table job note updates new electric energy meter according to Breath.
Information maintenance method when the replacement electric energy meter of the embodiment of the present application obtains immediately during replacing electric energy meter Take the corresponding power consumer archives of table user, the operation information of old electric energy meter and the identification information of new electric energy meter, generation pair That answers changes table job note, and sends and change list, updates new electric energy meter in real time so as to receive terminal and change table job note according to Operation information.The present processes are changed table job note and sent by above-mentioned generation changes table job note, while receiving terminal i.e. When simplify workflow by the communication or interaction of information according to the operation information for changing table job note and updating new electric energy meter, mention High working efficiency, saves manpower and time cost.
In the first possible implementation of the first aspect, the corresponding power consumer of table user is changed in the acquisition Before archives, the method also includes:
The notification information that table user needs replacing electric energy meter is changed in reception.
Before starting to replace electric energy meter workflow, changes table staff and receive the notice letter for needing replacing electric energy meter Breath.The action that table staff needs replacing electric energy meter is changed by prior notice, allows to change table staff according to work Make content and plan the path for changing table and time in advance, to have more flexible arrangement to the work of replacement electric energy meter, saves people Power and time.
In the second possible implementation of the first aspect, the corresponding power consumer shelves of table user are changed in the acquisition Case, comprising:
Obtain the identification information for changing the old electric energy meter of table user;
Using the identification information of the old electric energy meter as foundation, the corresponding power consumer archives of table user are changed described in acquisition.
In changing table workflow, the identification information that table staff obtains old electric energy meter is changed, then according to old electric energy meter Identification information, easily get and change the corresponding power consumer archives of table user.Due to changing the old electric energy meter of table user Identification information is corresponding with power consumer archives, can be convenient by the identification information of old electric energy meter, fast and accurately gets Corresponding power consumer archives.Changing table staff, to change table user corresponding according to the acquisition of the identification information of old electric energy meter Power consumer archives also improve the accuracy of information while table working efficiency is changed in raising.
In a third possible implementation of the first aspect, the method also includes:
The photo or video for changing the old electric energy meter of table user are obtained, the photo or video of the old electric energy meter include described The identification information and operation information of old electric energy meter;
Send the photo or video of the old electric energy meter.
In changing table workflow, due to a variety of causes such as human error, equipment faults, the mark of the old electric energy meter got There may be information errors or loss of learning for knowledge information and operation information.Therefore, to the identification information comprising electric energy meter of haveing been friends in the past and The photo or video of operation information stay shelves to collect evidence and upload, both may insure to change the old electric energy meter in table work identification information and The accuracy of operation information, while avoiding changing and go wrong during table or hair the case where error but can not be investigated, be proved It is raw.
In a fourth possible implementation of the first aspect, described before changing table job note described in the transmission Method further include:
Table user's stamped signature confirmation message is changed in acquisition;
By it is described change table user's stamped signature confirmation message and be updated to described change table job note.
Table job note is changed in changing table workflow, described in generation, receives terminal according to the content update for changing table job note The operation information of new electric energy meter, is the essential step in process, is directly related to the equity for changing table user, do not allow wrong.Therefore, It is obtaining changing table user's stamped signature confirmation message and update to after changing table job note, the table job note that changes is for updating new electric energy meter Operation information, so as to avoid the operation information for updating new electric energy meter without authorization in the case where changing the unwitting situation of table user;In addition, When in the future with table user generation dispute is changed, there are the table job notes that changes of user's signature information can be used as the foundation mediated an issue.
In the fifth possible implementation of the first aspect, the operation letter of the old electric energy meter of table user is changed in the acquisition After the identification information of breath and new electric energy meter, the method also includes:
By the update of identification information of the new electric energy meter to changing table user's electric card essential information.
Changing table user's electric card essential information includes electric energy meter registration, residual amount etc..It is completed in the work of dismounting electric energy meter Afterwards, table user's electric card will be changed by, which also needing, updates and gives user, and the workflow for replacing electric energy meter is just finally completed.Therefore, will Updated electric card is given immediately to table user's electric card essential information is changed and changes table use by the update of identification information of above-mentioned new electric energy meter Family improves and changes table efficiency, while avoiding and changing table user oneself and update electric card essential information in person, improves the satisfaction of user Degree.
Second aspect, the embodiment of the present application provide maintenance of information device when a kind of replacement electric energy meter, comprising:
First acquisition unit changes the corresponding power consumer archives of table user for obtaining;
Second acquisition unit, for obtaining the identification information of the operation information and new electric energy meter that change the old electric energy meter of table user;
Generation unit includes the power consumer archives, the operation information of the old electric energy meter and described for generating The identification information of new electric energy meter changes table job note;
Transmission unit, for send it is described change table job note, updated newly so as to receive terminal and change table job note according to The operation information of electric energy meter.
Maintenance of information device when the replacement electric energy meter of the embodiment of the present application obtains immediately during replacing electric energy meter Take the corresponding power consumer archives of table user, the operation information of old electric energy meter and the identification information of new electric energy meter, generation pair That answers changes table job note, and sends and change list, updates new electric energy meter in real time so as to receive terminal and change table job note according to Operation information.The device of the application is changed table job note and sent by above-mentioned generation changes table job note, while receiving terminal i.e. When simplify workflow by the communication or interaction of information according to the operation information for changing table job note and updating new electric energy meter, mention High working efficiency.
In the first possible implementation of the second aspect, the first acquisition unit is specifically used for:
Obtain the identification information for changing the old electric energy meter of table user;
Using the identification information of the old electric energy meter as foundation, the corresponding power consumer archives of table user are changed described in acquisition.
In changing table workflow, the identification information that table staff obtains old electric energy meter is changed, then according to old electric energy meter Identification information, easily get and change the corresponding power consumer archives of table user.Due to changing the old electric energy meter of table user Identification information is corresponding with power consumer archives, can be convenient by the identification information of old electric energy meter, fast and accurately gets Corresponding power consumer archives.Changing table staff, to change table user corresponding according to the acquisition of the identification information of old electric energy meter Power consumer archives also improve the accuracy of information while table working efficiency is changed in raising.
In a second possible implementation of the second aspect, described device further include:
Third acquiring unit, for obtaining the photo or video that change the old electric energy meter of table user, the photo of the old electric energy meter Or video includes the identification information and operation information of the old electric energy meter;
The transmission unit is also used to send the photo or video of the old electric energy meter.
In changing table workflow, due to a variety of causes such as human error, equipment faults, the mark of the old electric energy meter got There may be information errors or loss of learning for knowledge information and operation information.Therefore, to the identification information comprising electric energy meter of haveing been friends in the past and The photo or video of operation information stay shelves to collect evidence and upload, both may insure to change the old electric energy meter in table work identification information and The accuracy of operation information, while avoiding changing and go wrong during table or hair the case where error but can not be investigated, be proved It is raw.
In the third possible implementation of the second aspect, described device further include:
Updating unit, for by the update of identification information of the new electric energy meter to changing table user's electric card essential information.
Changing table user's electric card essential information includes electric energy meter registration, residual amount etc..It is completed in the work of dismounting electric energy meter Afterwards, table user's electric card will be changed by, which also needing, updates and gives user, and the workflow for replacing electric energy meter is just finally completed.Therefore, will Updated electric card is given immediately to table user's electric card essential information is changed and changes table use by the update of identification information of above-mentioned new electric energy meter Family improves and changes table efficiency, while avoiding and changing table user oneself and update electric card essential information in person, improves the satisfaction of user Degree.
The third aspect, the embodiment of the present application provide a kind of mobile terminal, including memory, processor and input unit, The memory runs the computer program so that the computer equipment is held for storing computer program, the processor Information maintenance method when the above-mentioned replacement electric energy meter of row, the input unit are used for the input of information.
Fourth aspect, the embodiment of the present application provide a kind of computer readable storage medium, are stored with above-mentioned calculating Computer program used in machine equipment.
Detailed description of the invention
Technical solution in ord to more clearly illustrate embodiments of the present application will make below to required in the embodiment of the present application Attached drawing is briefly described, it should be understood that the following drawings illustrates only some embodiments of the application, therefore should not be seen Work is the restriction to range, for those of ordinary skill in the art, without creative efforts, can be with Other relevant attached drawings are obtained according to these attached drawings.
The schematic flow of information maintenance method when a kind of replacement electric energy meter that Fig. 1 provides for the embodiment of the present application one Figure;
The schematic flow of information maintenance method when a kind of replacement electric energy meter that Fig. 2 provides for the embodiment of the present application two Figure;
The schematic block diagram of maintenance of information device when a kind of replacement electric energy meter that Fig. 3 provides for the embodiment of the present application three;
The schematic block diagram of maintenance of information device when a kind of replacement electric energy meter that Fig. 4 provides for the embodiment of the present application four.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application is described.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.Meanwhile the application's In description, term " first ", " second " etc. are only used for distinguishing description, are not understood to indicate or imply relative importance.
For the problems of the prior art, this application provides the methods and dress of maintenance of information when a kind of replacement electric energy meter It sets, has to simplify and change table workflow, improve the technical effect for changing table working efficiency, save manpower and time cost.
Embodiment one
Please refer to Fig. 1, the signal of information maintenance method when Fig. 1 is a kind of replacement electric energy meter provided by the embodiments of the present application Property flow chart.
Information maintenance method when the replacement electric energy meter of the embodiment of the present application, comprising:
The corresponding power consumer archives of table user are changed in step S110, acquisition.
Illustratively, above-mentioned power consumer archives can include: power consumer individual essential information and the mark of electric energy meter letter Breath etc..
Illustratively, above-mentioned power consumer archives can be obtained from terminal is received.Receive terminal storage, management electric power is used Family archives, each user correspond to unique power consumer archives.Mobile terminal sends corresponding power consumer shelves to terminal is received The solicited message of case;Terminal is received according to above-mentioned solicited message, sends the corresponding electricity of user to mobile terminal after being matched Power files on each of customers.
Optionally, it obtains and changes the corresponding power consumer archives of table user and include:
Obtain the identification information for changing the old electric energy meter of table user;
Using the identification information of above-mentioned old electric energy meter as foundation, acquisition is above-mentioned to change the corresponding power consumer archives of table user.
The identification information for changing the old electric energy meter of table user is used to characterize the unique identification of old electric energy meter, can be unique volume Number, the identification information for the old electric energy meter for changing table user that table staff is manually entered can be changed to obtain by reception, or Person changes two dimensional code, one-dimension code or the bar code on the old electric energy meter of table user by scanning, changes the old electricity of table user with this to obtain The identification information of energy table.The identification information of certain old electric energy meter also passes through the RFID (Radio read on old electric energy meter Frequency Identification) label acquisition.
Step S120 obtains the identification information of the operation information and new electric energy meter that change the old electric energy meter of table user.
Illustratively, the operation information of old electric energy meter includes: electric energy meter registration, residual amount etc..Table use is changed in above-mentioned acquisition The mode of the operation information of the old electric energy meter in family can there are many, for example, being equipped with infrared interface on electric energy meter, mobile terminal is by red The outer communication technology gets the operation information that old electric energy meter is sent.Or by receive change table staff be manually entered it is above-mentioned old The operation information of electric energy meter.
Illustratively, the identification information for obtaining new electric energy meter can be there are many mode.Change the mark of the new electric energy meter of table user Information is used to characterize the unique identification of new electric energy meter, can be unique number, can change table staff's hand by receiving The identification information of the new electric energy meter for changing table user of dynamic input changes on the new electric energy meter of table user to obtain, or by scanning Two dimensional code, one-dimension code or bar code obtain the identification information for changing the old electric energy meter of table user with this.Certainly the mark of new electric energy meter Information also passes through the RFID label tag read on old electric energy meter and obtains.
Step S130 generates operation information and above-mentioned new electricity including above-mentioned power consumer archives, above-mentioned old electric energy meter The identification information of energy table changes table job note.
Illustratively, mobile terminal obtain include above-mentioned power consumer archives, above-mentioned old electric energy meter operation information with And after the identification information of new electric energy meter, generation is corresponding to change table job note.
Optionally, the above-mentioned table job note that changes is sent to table user is changed, and is changed table user retention and is changed table job note as replacement electricity The authority of energy table.It should be understood that the table job note that changes for changing table user retention can be there are many existence form, such as electronic document or papery Document etc..
Step S140, transmission is above-mentioned to change table job note, updates new electric energy according to the above-mentioned table job note that changes so as to receive terminal The operation information of table.
Illustratively, mobile terminal generate it is above-mentioned change table job note after, send it is above-mentioned change table job note to receive eventually End receives terminal according to the above-mentioned operation information for changing table job note and updating new ammeter.
Illustratively, receiving terminal is storage, equipment, the server of management power consumer archives etc., receives terminal and receives The identification information for the old electric energy meter that mobile terminal is sent changes the information such as table job note;It receives terminal and is receiving mobile terminal transmission Old electric energy meter identification information after, send above-mentioned power consumer archives to mobile terminal.
Information maintenance method when the replacement electric energy meter of the embodiment of the present application obtains immediately during replacing electric energy meter Take the corresponding power consumer archives of table user, the operation information of old electric energy meter and the identification information of new electric energy meter, generation pair That answers changes table job note, and sends and change list, updates new electric energy meter in real time according to the above-mentioned table job note that changes so as to receive terminal Operation information.The present processes dismantle old electric energy meter, install the same of new electric energy meter by above-mentioned one-stoply convenient service When finishing service process, operate convenient, high efficient and reliable.
Therefore, it during replacing electric energy meter, by communicating or interacting with the information for receiving terminal, immediately completes to change Table workflow changes table workflow, improves and change table working efficiency to simplify.
Embodiment two
Please refer to Fig. 2, the signal of information maintenance method when Fig. 2 is a kind of replacement electric energy meter provided by the embodiments of the present application Property flow chart.
Information maintenance method when the replacement electric energy meter of the embodiment of the present application, comprising:
The notification information that table user needs replacing electric energy meter is changed in step S210, reception.
Illustratively, it receives and changes the notification information that table user needs replacing electric energy meter, can be mobile phone, mailbox etc. and receive It replaces electric energy meter or electric energy meter because of business demand inside State Grid Corporation of China and burns out, damage etc. to be not normally functioning and need more The notification information of meter is changed, notification information includes: short message or mail etc..
Before starting to replace electric energy meter workflow, the notification information that table user needs replacing electric energy meter is changed in reception.By Yu Huanbiao staff, which usually needs to change table user to more than one in real work in one day, replaces electric energy meter, due to linking up Not in time, changing table staff and need to returning to after power supply station can just learn and specifically change changing the table time, change table place etc. for table user User information leads to change table staff and changes between table user and power supply station back and forth repeatedly in Duo Jia, not only labor intensive, but also waste Time.
Therefore, by receiving the notification information for changing table user and needing replacing electric energy meter, according in the work in notification information Hold, path and the time that table staff replaces electric energy meter are changed in planning, to have more flexible peace to the work of replacement electric energy meter Row, saves manpower and time.
The corresponding power consumer archives of table user are changed in step S220, acquisition.
Step S230 obtains the identification information of the operation information and new electric energy meter that change the old electric energy meter of table user.
Step S240 generates operation information and above-mentioned new electricity including above-mentioned power consumer archives, above-mentioned old electric energy meter The identification information of energy table changes table job note.
Step S250, transmission is above-mentioned to change table job note, updates new electric energy according to the above-mentioned table job note that changes so as to receive terminal The operation information of table.
Step S110~S140 is identical as step S220~250, and details are not described herein again.
Step S260, by the update of identification information of above-mentioned new electric energy meter to changing table user's electric card essential information.
Illustratively, user's electric card essential information may include: power consumer archives, electric energy meter registration, residual amount etc.. By the update of identification information of above-mentioned new electric energy meter to table user's electric card essential information is changed, updated electric card is given immediately and changes table User.
After the completion of dismounting the work of electric energy meter, table user's electric card will be changed by, which also needing, updates and gives user, replaces electric energy meter Workflow be just finally completed.Therefore, the update of identification information of above-mentioned new electric energy meter is believed substantially to table user electric card is changed Breath, updated electric card is given immediately and changes table user, improved and change table efficiency, while avoiding and changing table user oneself in person more New electric card essential information, improves the satisfaction of user.
Optionally, the above method can also include:
The photo or video for changing the old electric energy meter of table user are obtained, the photo or video of above-mentioned old electric energy meter include above-mentioned The identification information and operation information of old electric energy meter;
Send the photo or video of above-mentioned old electric energy meter.
The photo or video of above-mentioned old electric energy meter stay shelves as evidence obtaining, are sent to reception terminal.
In changing table workflow, due to a variety of causes such as human error, equipment faults, the mark of the old electric energy meter got There may be information errors or loss of learning for knowledge information and operation information;If changing table user at this time to the operation information of old electric energy meter Accuracy has query or dispute, and due to lacking corresponding authority or proof, the query of user cannot answer or dispute obtains not To solution, reduce change table user change table experience, increase a possibility that changing table customer complaint.
Therefore, the photo to the identification information comprising electric energy meter of haveing been friends in the past and operation information or video stay shelves to collect evidence and upload, Ensure to change the identification information of the old electric energy meter of table work and the accuracy of operation information, while avoiding changing and go wrong during table Or error the case where but can not being investigated, be proved.
Optionally, the above method can also include:
Table user's stamped signature confirmation message is changed in acquisition;
By it is above-mentioned change table user's stamped signature confirmation message and be updated to above-mentioned change table job note.
Illustratively, user's stamped signature confirmation message can be the biological information of user, as fingerprint, face recognition are believed Breath etc. or user's signature, such as writing signature.For example, mobile terminal has fingerprint input function, table use can be changed with typing The finger print information at family;Mobile terminal has camera function, can shoot the mug shot for changing table user, changes table use to get The facial recognition information at family;Mobile terminal has hand-write input function, the handwritten signature for changing table user can be saved, to obtain To user's signature.
In changing table workflow, generation is above-mentioned to change table job note, receives terminal according to the content update for changing table job note The operation information of new electric energy meter, is the essential step in process, is directly related to the equity for changing table user, do not allow wrong.But In real work, due to a variety of causes such as human error, equipment faults, still with the presence of change table job note content mistake can It can property;Alternatively, updating the operation information of new electric energy meter without authorization in the unwitting situation of user, invades and change knowing for table user Power.
Therefore, obtaining changing table user's stamped signature confirmation message and updating to changing table job note after, it is above-mentioned change table and work be applied alone In the operation information for updating new electric energy meter, new electric energy meter is updated without authorization so as to avoid in the case where changing the unwitting situation of table user Operation information;In addition, in the future with change table user generate dispute when, there are the table job notes that changes of user's signature information can be used as conciliation The foundation of dispute.
Embodiment three
Please refer to Fig. 3, the signal of maintenance of information device when Fig. 3 is a kind of replacement electric energy meter provided by the embodiments of the present application Property block diagram.
Maintenance of information device when the replacement electric energy meter of the embodiment of the present application, comprising:
First acquisition unit 310 changes the corresponding power consumer archives of table user for obtaining.
Illustratively, above-mentioned power consumer archives can include: power consumer individual essential information and the mark of electric energy meter letter Breath etc..
Illustratively, above-mentioned power consumer archives can be obtained from terminal is received.For example, mobile terminal to receive terminal Send the solicited message of power consumer archives;Terminal is received according to solicited message, it is corresponding to change table user to mobile terminal transmission Power consumer archives.
Second acquisition unit 320, for obtaining the mark letter of the operation information and new electric energy meter that change the old electric energy meter of table user Breath.
Illustratively, the operation information of old electric energy meter includes: electric energy meter registration, residual amount etc..Table use is changed in above-mentioned acquisition The mode of the operation information of the old electric energy meter in family can there are many, for example, being equipped with infrared interface on electric energy meter, mobile terminal is by red The outer communication technology gets the operation information that old electric energy meter is sent.Or by receive change table staff be manually entered it is above-mentioned old The operation information of electric energy meter.
Illustratively, the identification information for obtaining new electric energy meter can be there are many mode.For example, changing table work people by receiving Member is manually entered or scans the identification information of new electric energy meter, and identification information can be two dimensional code, bar code, number etc., to obtain Take the identification information of new electric energy meter.
Generation unit 330, for generate include above-mentioned power consumer archives, above-mentioned old electric energy meter operation information and That states the identification information of new electric energy meter changes table job note.
Illustratively, mobile terminal obtain include above-mentioned power consumer archives, above-mentioned old electric energy meter operation information with And after the identification information of new electric energy meter, generation is corresponding to change table job note.
Optionally, the above-mentioned table job note that changes is sent to table user is changed, and is changed table user retention and is changed table job note as replacement electricity The authority of energy table.It should be understood that the table job note that changes for changing table user retention can be there are many existence form, such as electronic document or papery Document etc..
Transmission unit 340, for send it is above-mentioned change table job note so that receive terminal according to it is above-mentioned change table job note update The operation information of new electric energy meter.
Illustratively, mobile terminal generate it is above-mentioned change table job note after, send it is above-mentioned change table job note to receive eventually End receives terminal according to the above-mentioned operation information for changing table job note and updating new ammeter.
Illustratively, receiving terminal is storage, equipment, the server of management power consumer archives etc., receives terminal and receives The identification information for the old electric energy meter that mobile terminal is sent changes the information such as table job note;It receives terminal and is receiving mobile terminal transmission Old electric energy meter identification information after, send above-mentioned power consumer archives to mobile terminal.
Optionally, above-mentioned first acquisition unit is specifically used for:
Obtain the identification information for changing the old electric energy meter of table user;
Using the identification information of above-mentioned old electric energy meter as foundation, acquisition is above-mentioned to change the corresponding power consumer archives of table user.
The identification information for changing the old electric energy meter of table user is obtained, table staff can be changed by reception and be manually entered or sweep The identification information for changing the old electric energy meter of table user is retouched, identification information can be two dimensional code, bar code, number etc., change to obtain The identification information of the old electric energy meter of table user;According to the identification information for changing the old electric energy meter of table user, obtain that above-mentioned to change table user opposite The power consumer archives answered.
Optionally, which can also include:
Third acquiring unit, for obtaining the photo or video that change the old electric energy meter of table user, the photo of above-mentioned old electric energy meter Or video includes the identification information and operation information of above-mentioned old electric energy meter;
Above-mentioned transmission unit is also used to send the photo or video of above-mentioned old electric energy meter.
In changing table workflow, due to a variety of causes such as human error, equipment faults, the mark of the old electric energy meter got There may be information errors or loss of learning for knowledge information and operation information;If changing table user at this time to the operation information of old electric energy meter Accuracy has query or dispute, and due to lacking corresponding authority or proof, the query of user cannot answer or dispute obtains not To solution, reduce change table user change table experience, increase a possibility that changing table customer complaint.
Therefore, the photo to the identification information comprising electric energy meter of haveing been friends in the past and operation information or video stay shelves to collect evidence and upload, Ensure to change the identification information of the old electric energy meter of table work and the accuracy of operation information, while avoiding changing and go wrong during table Or error the case where but can not being investigated, be proved.
Maintenance of information device when the replacement electric energy meter of the embodiment of the present application obtains immediately during replacing electric energy meter Take the corresponding power consumer archives of table user, the operation information of old electric energy meter and the identification information of new electric energy meter, generation pair That answers changes table job note, and sends and change list, updates new electric energy meter in real time according to the above-mentioned table job note that changes so as to receive terminal Operation information.The device of the application dismantles old electric energy meter, installs the same of new electric energy meter by above-mentioned one-stoply convenient service When finishing service process, operate convenient, high efficient and reliable.
Maintenance of information device when the replacement electric energy meter of the embodiment of the present application changes table job note by above-mentioned generation and sends Table job note is changed, while receiving terminal immediately according to the operation information that table job note updates new electric energy meter is changed, passes through the logical of information Letter or interaction, simplify workflow, improve working efficiency.
Example IV
Please refer to Fig. 4, the signal of maintenance of information device when Fig. 4 is a kind of replacement electric energy meter provided by the embodiments of the present application Property block diagram.
Maintenance of information device when the replacement electric energy meter of the embodiment of the present application, comprising:
First acquisition unit 410 changes the corresponding power consumer archives of table user for obtaining;
Second acquisition unit 420, for obtaining the mark letter of the operation information and new electric energy meter that change the old electric energy meter of table user Breath;
Generation unit 430, for generate include above-mentioned power consumer archives, above-mentioned old electric energy meter operation information and That states the identification information of new electric energy meter changes table job note;
Transmission unit 440, for send it is above-mentioned change table job note so that receive terminal according to it is above-mentioned change table job note update The operation information of new electric energy meter.
Unit 310~340 is identical as 410~440 function of unit and effect, and details are not described herein again.
Updating unit 450, for by the update of identification information of above-mentioned new electric energy meter to changing table user's electric card essential information.
Illustratively, user's electric card essential information may include: power consumer archives, electric energy meter registration, residual amount etc.. By the update of identification information of above-mentioned new electric energy meter to table user's electric card essential information is changed, updated electric card is given immediately and changes table User.
After the completion of dismounting the work of electric energy meter, table user's electric card will be changed by, which also needing, updates and gives user, replaces electric energy meter Workflow be just finally completed.Therefore, the update of identification information of above-mentioned new electric energy meter is believed substantially to table user electric card is changed Breath, updated electric card is given immediately and changes table user, improved and change table efficiency, while avoiding and changing table user oneself in person more New electric card essential information, improves the satisfaction of user.
Embodiment five
The embodiment of the present application provides a kind of mobile terminal, including memory, processor and input unit, above-mentioned memory For storing computer program, above-mentioned processor run above-mentioned computer program so that above-mentioned computer equipment execute it is above-mentioned more Information maintenance method when electric energy meter is changed, above-mentioned input unit is used for the input of information.
Illustratively, input unit is used for the input of information, identification information and operation information, the new electric energy of electric energy meter as usual The operation information of table includes that the identification information of above-mentioned old electric energy meter and photo or video, the user's stamped signature of operation information confirm Information etc..
In addition, being stored with above-mentioned computer the embodiment of the present application also provides a kind of computer readable storage medium Computer program used in equipment.
In several embodiments provided herein, it should be understood that disclosed device and method can also pass through Other modes are realized.The apparatus embodiments described above are merely exemplary, for example, flow chart and block diagram in attached drawing Show the device of multiple embodiments according to the application, the architectural framework in the cards of method and computer program product, Function and operation.In this regard, each box in flowchart or block diagram can represent the one of a module, section or code Part, a part of the module, section or code, which includes that one or more is for implementing the specified logical function, to be held Row instruction.It should also be noted that function marked in the box can also be to be different from some implementations as replacement The sequence marked in attached drawing occurs.For example, two continuous boxes can actually be basically executed in parallel, they are sometimes It can execute in the opposite order, this depends on the function involved.It is also noted that every in block diagram and or flow chart The combination of box in a box and block diagram and or flow chart can use the dedicated base for executing defined function or movement It realizes, or can realize using a combination of dedicated hardware and computer instructions in the system of hardware.
In addition, each functional module in each embodiment of the application can integrate one independent portion of formation together Point, it is also possible to modules individualism, an independent part can also be integrated to form with two or more modules.
It, can be with if the function is realized and when sold or used as an independent product in the form of software function module It is stored in a computer readable storage medium.Based on this understanding, the technical solution of the application is substantially in other words The part of the part that contributes to existing technology or the technical solution can be embodied in the form of software products, the meter Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be a People's computer, server or network equipment etc.) execute each embodiment the method for the application all or part of the steps. And storage medium above-mentioned includes: that USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited The various media that can store program code such as reservoir (RAM, Random Access Memory), magnetic or disk.
The above description is only an example of the present application, the protection scope being not intended to limit this application, for ability For the technical staff in domain, various changes and changes are possible in this application.Within the spirit and principles of this application, made Any modification, equivalent substitution, improvement and etc. should be included within the scope of protection of this application.It should also be noted that similar label and Letter indicates similar terms in following attached drawing, therefore, once it is defined in a certain Xiang Yi attached drawing, then in subsequent attached drawing In do not need that it is further defined and explained.
The above, the only specific embodiment of the application, but the protection scope of the application is not limited thereto, it is any Those familiar with the art within the technical scope of the present application, can easily think of the change or the replacement, and should all contain Lid is within the scope of protection of this application.Therefore, the protection scope of the application shall be subject to the protection scope of the claim.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.

Claims (10)

1. information maintenance method when a kind of replacement electric energy meter characterized by comprising
The corresponding power consumer archives of table user are changed in acquisition;
Obtain the identification information of the operation information and new electric energy meter that change the old electric energy meter of table user;
Generate the identification information including the power consumer archives, the operation information of the old electric energy meter and the new electric energy meter Change table job note;
Table job note is changed described in transmission, so that receive terminal changes the operation information that table job note updates new electric energy meter according to.
2. the method according to claim 1, wherein changing the corresponding power consumer shelves of table user in the acquisition Before case, the method also includes:
The notification information that table user needs replacing electric energy meter is changed in reception.
3. the method according to claim 1, wherein the corresponding power consumer shelves of table user are changed in the acquisition Case, comprising:
Obtain the identification information for changing the old electric energy meter of table user;
Using the identification information of the old electric energy meter as foundation, the corresponding power consumer archives of table user are changed described in acquisition.
4. the method according to claim 1, wherein the method also includes:
The photo or video for changing the old electric energy meter of table user are obtained, the photo or video of the old electric energy meter include the old electricity The identification information and operation information of energy table;
Send the photo or video of the old electric energy meter.
5. the method according to claim 1, wherein before changing table job note described in the transmission, the side Method further include:
Table user's stamped signature confirmation message is changed in acquisition;
By it is described change table user's stamped signature confirmation message and be updated to described change table job note.
6. the method according to claim 1, wherein changing the operation information of the old electric energy meter of table user in the acquisition And after the identification information of new electric energy meter, the method also includes:
By the update of identification information of the new electric energy meter to changing table user's electric card essential information.
7. maintenance of information device when a kind of replacement electric energy meter characterized by comprising
First acquisition unit changes the corresponding power consumer archives of table user for obtaining;
Second acquisition unit, for obtaining the identification information of the operation information and new electric energy meter that change the old electric energy meter of table user;
Generation unit, for generating operation information and the new electricity including the power consumer archives, the old electric energy meter The identification information of energy table changes table job note;
Transmission unit, for send it is described change table job note so that receive terminal changes table job note update new electric energy according to The operation information of table.
8. device according to claim 7, which is characterized in that the first acquisition unit is specifically used for:
Obtain the identification information for changing the old electric energy meter of table user;
Using the identification information of the old electric energy meter as foundation, the corresponding power consumer archives of table user are changed described in acquisition.
9. device according to claim 7, which is characterized in that described device further include:
Third acquiring unit, for obtaining the photo or video that change the old electric energy meter of table user, the photo or view of the old electric energy meter Frequency includes the identification information and operation information of the old electric energy meter;
The transmission unit is also used to send the photo or video of the old electric energy meter.
10. device according to claim 7, which is characterized in that described device further include:
Updating unit, for by the update of identification information of the new electric energy meter to changing table user's electric card essential information.
CN201910332815.2A 2019-04-24 2019-04-24 Information maintenance method and device when a kind of replacement electric energy meter Pending CN110058067A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910332815.2A CN110058067A (en) 2019-04-24 2019-04-24 Information maintenance method and device when a kind of replacement electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910332815.2A CN110058067A (en) 2019-04-24 2019-04-24 Information maintenance method and device when a kind of replacement electric energy meter

Publications (1)

Publication Number Publication Date
CN110058067A true CN110058067A (en) 2019-07-26

Family

ID=67320387

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910332815.2A Pending CN110058067A (en) 2019-04-24 2019-04-24 Information maintenance method and device when a kind of replacement electric energy meter

Country Status (1)

Country Link
CN (1) CN110058067A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110929492A (en) * 2019-11-07 2020-03-27 国网冀北电力有限公司秦皇岛供电公司 Table-changing information recording method and device
CN113095520A (en) * 2021-05-08 2021-07-09 国网宁夏电力有限公司 Meter replacing method, meter replacing device, mobile terminal and storage medium
CN113298269A (en) * 2020-12-25 2021-08-24 国网宁夏电力有限公司营销服务中心(国网宁夏电力有限公司计量中心) One-key type electric energy meter assembling, disassembling and replacing method
CN115169613A (en) * 2022-07-27 2022-10-11 云南电网有限责任公司 Ammeter maintenance scheme determination method and device, electronic equipment and storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104008194A (en) * 2014-06-13 2014-08-27 国网上海市电力公司 PDA-based electric energy meter rotation data processing system
CN104978627A (en) * 2015-06-13 2015-10-14 烟台东方威思顿电气股份有限公司 Inner energy meter file updating method of electric force acquisition terminal
CN106124814A (en) * 2016-06-30 2016-11-16 国网山东省电力公司济南市历城区供电公司 Intelligence changes meter apparatus
CN106681967A (en) * 2016-12-13 2017-05-17 南京林洋电力科技有限公司 Meter changing operation method based on data backtracking mechanism
CN106886731A (en) * 2015-12-15 2017-06-23 国网北京市电力公司 The acquisition methods of electric energy meter information, apparatus and system
CN206946699U (en) * 2017-06-07 2018-01-30 国网福建省电力有限公司泉州供电公司 A kind of intelligent electric meter rotation information harvester

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104008194A (en) * 2014-06-13 2014-08-27 国网上海市电力公司 PDA-based electric energy meter rotation data processing system
CN104978627A (en) * 2015-06-13 2015-10-14 烟台东方威思顿电气股份有限公司 Inner energy meter file updating method of electric force acquisition terminal
CN106886731A (en) * 2015-12-15 2017-06-23 国网北京市电力公司 The acquisition methods of electric energy meter information, apparatus and system
CN106124814A (en) * 2016-06-30 2016-11-16 国网山东省电力公司济南市历城区供电公司 Intelligence changes meter apparatus
CN106681967A (en) * 2016-12-13 2017-05-17 南京林洋电力科技有限公司 Meter changing operation method based on data backtracking mechanism
CN206946699U (en) * 2017-06-07 2018-01-30 国网福建省电力有限公司泉州供电公司 A kind of intelligent electric meter rotation information harvester

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110929492A (en) * 2019-11-07 2020-03-27 国网冀北电力有限公司秦皇岛供电公司 Table-changing information recording method and device
CN110929492B (en) * 2019-11-07 2024-05-17 国网冀北电力有限公司秦皇岛供电公司 Meter changing information recording method and device
CN113298269A (en) * 2020-12-25 2021-08-24 国网宁夏电力有限公司营销服务中心(国网宁夏电力有限公司计量中心) One-key type electric energy meter assembling, disassembling and replacing method
CN113095520A (en) * 2021-05-08 2021-07-09 国网宁夏电力有限公司 Meter replacing method, meter replacing device, mobile terminal and storage medium
CN115169613A (en) * 2022-07-27 2022-10-11 云南电网有限责任公司 Ammeter maintenance scheme determination method and device, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
CN110058067A (en) Information maintenance method and device when a kind of replacement electric energy meter
CN203882339U (en) Hotel self-service check-in and check-out system
JP5873236B2 (en) Attendance management method and system
CN208834377U (en) A kind of self-service queue machine and system with face identification functions
CN104495545B (en) Electronic elevator maintenance supervision and management system and method for elevator maintenance based on dynamic two-dimensional codes
CN105303632A (en) Mobile signing monitoring system and working method
CN104506562A (en) Two-dimension code and face recognition fused conference identity authentication device and method
CN108256817A (en) Registration management method, device, computer equipment and readable storage medium storing program for executing
CN105654219A (en) Two-dimensional-code-based intelligent instrument life-cycle management system
CN111192019A (en) Reimbursement processing method of target bill and related equipment
CN106843032A (en) A kind of wisdom Design of Laboratory Management System and method based on cloud platform
CN101582175A (en) Attendance checking device and attendance checking method
US11853966B2 (en) Internet-based management of displayed printed media
CN204066147U (en) A kind of electronic attendance based on near-field communication and planar bar code technology and inquiry system
CN110033399A (en) A kind of information publication, extracting method and the system of the wisdom class board based on recognition of face
CN206147770U (en) Classroom management equipment of registering based on two -dimensional code and fingerprint identification
CN104166891B (en) A kind of electric network information asset management system of double RFID tag management and control and its implementation
CN109919617A (en) A kind of endorsement method, system, device and electronic equipment
CN109299759A (en) Using the method and system of two dimensional code management production Work tool
CN106886731A (en) The acquisition methods of electric energy meter information, apparatus and system
CN203941531U (en) Tradeshows management system
CN109272083A (en) A kind of Work attendance method and attendance checking system based on Bluetooth communication
Tan et al. JomRFID attendance management system
CN113870062A (en) Hotel check-in method, system and readable storage medium for team meeting personnel
CN212208326U (en) Networking identification system for sampling and submission of constructional engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190726