CN106121115B - The prefabricated roof slab of modularization and method of construction - Google Patents

The prefabricated roof slab of modularization and method of construction Download PDF

Info

Publication number
CN106121115B
CN106121115B CN201610677843.4A CN201610677843A CN106121115B CN 106121115 B CN106121115 B CN 106121115B CN 201610677843 A CN201610677843 A CN 201610677843A CN 106121115 B CN106121115 B CN 106121115B
Authority
CN
China
Prior art keywords
wooden
prefabricated
thermal insulation
combination
wooden frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610677843.4A
Other languages
Chinese (zh)
Other versions
CN106121115A (en
Inventor
张延年
王月华
汪青杰
丁晓雯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangshui Kedi concrete products Co., Ltd
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201610677843.4A priority Critical patent/CN106121115B/en
Publication of CN106121115A publication Critical patent/CN106121115A/en
Application granted granted Critical
Publication of CN106121115B publication Critical patent/CN106121115B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/02Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/20Roofs consisting of self-supporting slabs, e.g. able to be loaded
    • E04B7/22Roofs consisting of self-supporting slabs, e.g. able to be loaded the slabs having insulating properties, e.g. laminated with layers of insulating material

Abstract

A kind of prefabricated roof slab of modularization, including prefabricated thermal insulation roof slab, concave combination wooden frame, wooden frame and Mu Qiang:Two prefabricated thermal insulation roof slabs are connected into angle-style and set, and angle-style junction is provided with concave combination wooden frame;The both ends of two prefabricated thermal insulation roof slabs are respectively arranged with wooden wall, and several wooden frames are provided between concave combination wooden frame and the wooden wall;A kind of method of construction of the prefabricated roof slab of modularization:The stitching wood alignment of two pieces of prefabricated thermal insulation roof slabs is set first, the connection trip of two pieces of prefabricated thermal insulation roof slabs is both placed in the spine card fourth of the twelve Earthly Branches of concave combination wooden frame, using nail connection at the stitching flange of two pieces of prefabricated thermal insulation roof slabs;Two pieces of prefabricated thermal insulation roof slabs are provided with several horizontal mouths, and wooden frame and Mu Qiang are placed at horizontal mouth.Installation operation of the present invention significantly simplifies, and assembling speed is fast, and using big component general assembly, industrialization degree is high, good economical benefit, reduces a large amount of field operations, is constructed by series, has good stress performance.

Description

The prefabricated roof slab of modularization and method of construction
Technical field
The invention belongs to technical field of buildings, more particularly to the prefabricated roof slab of modularization and method of construction.
Background technology
According to statistics, construction industry consumes about 50% energy on the earth, 42% water resource, 50% material and 48% Arable land, cause disruption of ecological balance, generate the whole world 24% air pollution, 50% greenhouse effects, 40% pollution of waterhead and 50% CFC etc..
At this stage, China is in terms of building, and the use of an emphasis steel construction and concrete structure, stress performance is poor, processing Complex procedures, in addition, steel, cement, plastics are non-renewable, unsustainable development material, cause serious sky Gas is polluted, and serious influence is caused for the curbing environmental pollution of China, energy-saving and emission-reduction, industry restructuring etc.;
Now, developed country has been recognized that Wood construction and the building materials using agricultural wastes processing, is that building industry can The correct direction of sustainable development, however the extensive use of department of the Chinese government and various circles of society for new Wood construction also there is Many mistaken ideas.For this reason, it is necessary to carry out systematic research and development for timber structure green building and its industrialization, make China's building production Industry really realizes the green, recyclable, sustainable of overall process.
The content of the invention
It is an object of the invention to provide a kind of usage time length, environmental protection, a kind of modularization prefabricated building that can be recycled Cover plate, without setting sound insulating layer in addition, a large amount of field operations are reduced, while ensure that manufacturing procedure is simple, it is good more to ensure that it has Good stress performance.
To achieve these goals, the technical solution adopted by the present invention is:A kind of prefabricated roof slab of modularization, including it is prefabricated It is incubated roof slab, concave combination wooden frame, wooden frame and Mu Qiang:
Two prefabricated thermal insulation roof slabs are connected into angle-style and set, and the angle-style junction is provided with concave combination wooden frame;Institute The both ends for stating two prefabricated thermal insulation roof slabs are respectively arranged with wooden wall, are provided between the concave combination wooden frame and the wooden wall Several wooden frames;
The prefabricated thermal insulation roof slab include joist plate, horizontal mouth, end-blocking wood, stitching wood, stitching flange, connect trip and The connection card fourth of the twelve Earthly Branches;One end of the joist plate is provided with end-blocking wood, and the other end of the joist plate is provided with stitching wood;The stitching Wood has upper extension and lower extension respectively relative to joist plate, and the upper extension is arranged to stitching flange, described Lower extension is arranged to connect trip;Rectangular indentation, the rectangle are provided between the connection trip and the joist plate Breach is the connection card fourth of the twelve Earthly Branches;The bottom of the joist plate opens up several horizontal mouths;
The concave combination wooden frame includes height and combines wooden, low combination wood, the spine card fourth of the twelve Earthly Branches, spine trip and insertion groove;Institute It is symmetrical into vertical center line to state concave combination wooden frame;It is wooden that two pieces of low combinations are provided between the concave combination wooden frame, described two pieces The both ends of low combination wood are respectively arranged with several height combination wood;The ground of the wooden and described low combination wood of the high combination is arranged to It is horizontal;The high combination wood is arranged to spine trip, the top of the spine trip relative to the low high part out of combination wood Insertion groove is provided with, the spine card fourth of the twelve Earthly Branches is formed between the wooden and described low combination wood of the high combination.
As preferable several technical schemes:The height of the insertion groove is arranged to 1/3rd of spine trip height To between half, the gradient of the insertion groove is arranged between 10 ° ~ 20 °.
As preferable several technical schemes:The horizontal mouth, it is arranged to orthogonal opening.
As preferable several technical schemes:The top of the stitching wood is higher by between 10 ~ 30mm of joist plate.
A kind of method of construction of the prefabricated roof slab of modularization:The stitching wood alignment of two pieces of prefabricated thermal insulation roof slabs is set first Put, the connection trip of two pieces of prefabricated thermal insulation roof slabs is both placed in the spine card fourth of the twelve Earthly Branches of concave combination wooden frame, two pieces of prefabricated guarantors Using nail connection at the stitching flange of warm roof slab;Two pieces of prefabricated thermal insulation roof slabs are provided with several horizontal mouths, horizontal mouth Place wooden frame and Mu Qiang in place.
As preferable several technical schemes:Preferentially connected between trip and spine the card fourth of the twelve Earthly Branches using structure glue connected mode Connect.
As preferable several technical schemes:The top of wooden frame (3) He Muqiang (4) is preferentially arranged to horizontal plane.
Compared with prior art, the beneficial effects of the present invention are:(1):Installation operation significantly simplifies, assembling speed It hurry up, big component general assembly can be used;(2)Industrialization degree is higher, good economical benefit;(3)Avoid environment dirt:(4)Especially It can reduce a large amount of field operations with highly integrated, constructed by series, make it have good stress performance.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the prefabricated roof slab of modularization of the present invention;
Fig. 2 is the structural representation of the prefabricated thermal insulation roof slab of the prefabricated roof slab of modularization;
Fig. 3 is the structural representation of the concave combination wooden frame of the prefabricated roof slab of modularization.
In figure:1 is prefabricated thermal insulation roof slab;2 be concave combination wooden frame;3 be wooden frame;4 be wooden wall;1-1 is joist plate;1- 2 be horizontal mouth;1-3 is end-blocking wood;1-4 is stitching wood;1-5 is stitching flange;1-6 is connection trip;1-7 is the connection card fourth of the twelve Earthly Branches; 2-1 is high combination wood;2-2 is low combination wood;2-3 is the spine card fourth of the twelve Earthly Branches;2-4 is spine trip;2-5 is insertion groove.
Embodiment
In order to further illustrate the present invention, below in conjunction with the accompanying drawings and embodiment is to the prefabricated roof system of modularization provided by the invention Plate is described in detail, but they can not be interpreted as into limiting the scope of the present invention.
With reference to Fig. 1, Fig. 2 and Fig. 3:A kind of prefabricated roof slab of modularization, including prefabricated thermal insulation roof slab 1, concave combination Wooden frame 2, wooden frame 3 and wooden wall 4;
Two prefabricated thermal insulation roof slabs 1 are connected into angle-style and set, and the angle-style junction is provided with concave combination wooden frame 2 ;The both ends of described two prefabricated thermal insulation roof slabs 1 are respectively arranged with wooden wall 4, the concave combination wooden frame 2 and described Several wooden frames 3 are provided between wooden wall 4;
The prefabricated thermal insulation roof slab 1 includes joist plate 1-1, horizontal mouth 1-2, the wooden 1-3 of end-blocking, stitching wood 1-4, stitching flange 1-5, connection trip 1-6 and connection card fourth of the twelve Earthly Branches 1-7;One end of the joist plate 1-1 is provided with envelope Duanmu 1-3, the other end of the joist plate 1-1 are provided with stitching wood 1-4;The stitching wood 1-4 is relative to joist Plate 1-1 has upper extension and lower extension respectively, and the upper extension is arranged to stitching flange 1-5, under described Extension is arranged to connect trip 1-6;Rectangle is provided between the connection trip 1-6 and the joist plate 1-1 Breach, the rectangular indentation are connection card fourth of the twelve Earthly Branches 1-7;The bottom of the joist plate 1-1 opens up several horizontal mouth 1-2;
The concave combination wooden frame 2 includes the wooden 2-1 of high combination, the wooden 2-2 of low combination, spine card fourth of the twelve Earthly Branches 2-3, spine Trip 2-4 and insertion groove 2-5;The concave combination wooden frame 2 is symmetrical into vertical center line;The concave combination wooden frame 2 Between be provided with two pieces of wooden 2-2 of low combination, the both ends of two pieces of low wooden 2-2 of combination are respectively arranged with several height combinations Wooden 2-1;The ground of the wooden 2-1 and low wooden 2-2 of combination of high combination is arranged to horizontal;The high wooden 2-1 of combination It is arranged to set at the top of spine trip 2-4, the spine trip 2-4 relative to the low high parts out of the wooden 2-2 of combination Insertion groove 2-5 is equipped with, high combine forms spine card fourth of the twelve Earthly Branches 2-3 between wooden 2-1 and the low wooden 2-2 of combination.
The height of the insertion groove 2-5 be arranged to 1/3rd of spine trip 2-4 height to half it Between, the gradient of the insertion groove 2-5 is arranged between 10 ° ~ 20 °.
The horizontal mouth 1-2 is arranged to orthogonal opening.
The top of the stitching wood 1-4 is higher by between 10 ~ 30mm of joist plate 1-1.
A kind of method of construction of the prefabricated roof slab of modularization:First by the stitching wood 1- of two pieces of prefabricated thermal insulation roof slabs 1 4 alignment are set, and the connection trip 1-6 of two pieces of prefabricated thermal insulation roof slabs 1 is both placed in the ridge of concave combination wooden frame 2 In beam card fourth of the twelve Earthly Branches 2-3, using nail connection at the stitching flange 1-5 of two pieces of prefabricated thermal insulation roof slabs 1;Two pieces of prefabricated thermal insulation rooms Cover plate 1 is provided with several horizontal mouth 1-2, and wooden frame 3 and wooden wall 4 are placed at horizontal mouth 1-2.
Preferentially connected between trip 1-6 and spine the card fourth of the twelve Earthly Branches 2-3 using structure glue connected mode.
The top of the wooden frame 3 and wooden wall 4 is preferentially arranged to horizontal plane.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (7)

1. a kind of prefabricated roof slab of modularization, including prefabricated thermal insulation roof slab (1), concave combination wooden frame (2), wooden frame (3) and wood Wall (4), it is characterised in that:
Two prefabricated thermal insulation roof slabs (1) connect into angle-style and set, and the angle-style junction is provided with concave combination wooden frame (2); The both ends of described two prefabricated thermal insulation roof slabs (1) are respectively arranged with wooden wall (4), the concave combination wooden frame (2) and the wood Several wooden frames (3) are provided between wall (4);
The prefabricated thermal insulation roof slab (1) include joist plate (1-1), horizontal mouth (1-2), end-blocking wooden (1-3), stitching wooden (1-4), Stitching flange (1-5), connection trip (1-6) and the connection card fourth of the twelve Earthly Branches (1-7);One end of the joist plate (1-1) is provided with end-blocking wood (1-3), the other end of the joist plate (1-1) are provided with stitching wood (1-4);The stitching wooden (1-4) is relative to joist plate (1- 1) there are upper extension and lower extension respectively, the upper extension is arranged to stitching flange (1-5), the lower extension Set up separately and be set to connection trip (1-6);Rectangular indentation is provided between the connection trip (1-6) and the joist plate (1-1), The rectangular indentation is the connection card fourth of the twelve Earthly Branches (1-7);The bottom of the joist plate (1-1) opens up several horizontal mouths (1-2);
The concave combination wooden frame (2) includes high combination wooden (2-1), low combination wooden (2-2), the spine card fourth of the twelve Earthly Branches (2-3), spine trip (2-4) and insertion groove (2-5);The concave combination wooden frame (2) is symmetrical into vertical center line;The concave combination wooden frame (2) it Between be provided with that two pieces of low combinations are wooden (2-2), the both ends of two pieces of low combinations wooden (2-2) are respectively arranged with several height combination wood (2-1);The ground of the high combination wooden (2-1) and the low combination wooden (2-2) is arranged to horizontal;The high combination is wooden (2-1) Spine trip (2-4) is arranged to relative to low combination wooden (2-2) high part out, is set at the top of the spine trip (2-4) Insertion groove (2-5) is equipped with, the spine card fourth of the twelve Earthly Branches (2-3) is formed between the high combination wooden (2-1) and the low combination wooden (2-2).
A kind of 2. prefabricated roof slab of modularization according to claim 1, it is characterised in that:The insertion groove (2-5) 1/3rd of spine trip (2-4) height are highly arranged to between half, the gradient of the insertion groove (2-5) is set Put between 10 ° ~ 20 °.
A kind of 3. prefabricated roof slab of modularization according to claim 1, it is characterised in that:The horizontal mouth (1-2) is set For orthogonal opening.
A kind of 4. prefabricated roof slab of modularization according to claim 1, it is characterised in that:The top of the stitching wooden (1-4) End is higher by between joist plate (1-1) 10 ~ 30mm.
A kind of 5. method of construction of the prefabricated roof slab of modularization according to claim 1, it is characterised in that:
The stitching of two pieces of prefabricated thermal insulation roof slabs (1) wooden (1-4) alignment is set first, by two pieces of prefabricated thermal insulation roof slabs (1) Connection trip (1-6) be both placed in the spine card fourth of the twelve Earthly Branches (2-3) of concave combination wooden frame (2), two pieces of prefabricated thermal insulation roof slabs (1) Stitching flange (1-5) place using nail connect;Two pieces of prefabricated thermal insulation roof slabs (1) are provided with several horizontal mouths (1-2), Place wooden frame (3) He Muqiang (4) in horizontal mouth (1-2) place.
A kind of 6. method of construction of the prefabricated roof slab of modularization according to claim 5, it is characterised in that:The connection card It is connected between tenon (1-6) and the spine card fourth of the twelve Earthly Branches (2-3) using structure glue connected mode.
A kind of 7. method of construction of the prefabricated roof slab of modularization according to claim 5, it is characterised in that:The wooden frame (3) it is disposed as horizontal plane at the top of He Muqiang (4).
CN201610677843.4A 2016-08-17 2016-08-17 The prefabricated roof slab of modularization and method of construction Active CN106121115B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610677843.4A CN106121115B (en) 2016-08-17 2016-08-17 The prefabricated roof slab of modularization and method of construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610677843.4A CN106121115B (en) 2016-08-17 2016-08-17 The prefabricated roof slab of modularization and method of construction

Publications (2)

Publication Number Publication Date
CN106121115A CN106121115A (en) 2016-11-16
CN106121115B true CN106121115B (en) 2018-03-09

Family

ID=57279562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610677843.4A Active CN106121115B (en) 2016-08-17 2016-08-17 The prefabricated roof slab of modularization and method of construction

Country Status (1)

Country Link
CN (1) CN106121115B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108049531B (en) * 2018-01-19 2023-06-23 辽宁工业大学 Modularized balsa structure gable and mountain plate and installation method thereof
CN108049576B (en) * 2018-01-19 2023-07-14 辽宁工业大学 Special wood beam for modularized roof board and installation method thereof
CN110761467A (en) * 2019-10-22 2020-02-07 上海宝冶建筑装饰有限公司 Double-curved roof system of sleigh track and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1698395A1 (en) * 1989-10-30 1991-12-15 Центральный Научно-Исследовательский И Проектно-Экспериментальный Институт Комплексных Проблем Строительных Конструкций И Сооружений Им.В.А.Кучеренко Glued bearing timber and its manufacture procedure
JP2004011281A (en) * 2002-06-07 2004-01-15 Nobuyuki Mizukawa Venting constant humidity structure for venting heat-insulating building according to wood frame construction
CN101644084A (en) * 2008-08-05 2010-02-10 苏州皇家整体住宅系统有限公司 Light-duty wooden roof truss and construction method thereof
CN202031221U (en) * 2011-03-30 2011-11-09 天津摩力达生态建筑股份有限公司 Wood truss roof
CN103938879A (en) * 2014-04-23 2014-07-23 浙江元森态家具有限公司 Wood plastic house assembling method
CN206110432U (en) * 2016-08-17 2017-04-19 沈阳建筑大学 Prefabricated room of modularization apron

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1698395A1 (en) * 1989-10-30 1991-12-15 Центральный Научно-Исследовательский И Проектно-Экспериментальный Институт Комплексных Проблем Строительных Конструкций И Сооружений Им.В.А.Кучеренко Glued bearing timber and its manufacture procedure
JP2004011281A (en) * 2002-06-07 2004-01-15 Nobuyuki Mizukawa Venting constant humidity structure for venting heat-insulating building according to wood frame construction
CN101644084A (en) * 2008-08-05 2010-02-10 苏州皇家整体住宅系统有限公司 Light-duty wooden roof truss and construction method thereof
CN202031221U (en) * 2011-03-30 2011-11-09 天津摩力达生态建筑股份有限公司 Wood truss roof
CN103938879A (en) * 2014-04-23 2014-07-23 浙江元森态家具有限公司 Wood plastic house assembling method
CN206110432U (en) * 2016-08-17 2017-04-19 沈阳建筑大学 Prefabricated room of modularization apron

Also Published As

Publication number Publication date
CN106121115A (en) 2016-11-16

Similar Documents

Publication Publication Date Title
CN106121115B (en) The prefabricated roof slab of modularization and method of construction
CN105256921B (en) Modularization cork wood structure environmental protection energy-saving wall
CN105421649A (en) Staggered laminated wood material
CN206110432U (en) Prefabricated room of modularization apron
CN205954830U (en) Log cabin structure
CN205259441U (en) Crisscross lamination timber
CN107587656A (en) Steel and wood composite structure load bearing heat preserving wallboard
CN108060733A (en) Ridge standard roof boarding and its installation method under modularization
CN205206140U (en) Compound web plate power consumption wood joist
CN205421621U (en) Timber structure bearing diagonal shear force wall
CN206128426U (en) Integrated quadrature lamination wood wallboard of pipeline
CN208309953U (en) Modularization cork wood structure gable trapezoidal plate
CN107443515B (en) Assembled bamboo rib and solid wood combined hollow slab and manufacturing method thereof
CN206091052U (en) Modularization timber structure board
CN105926830B (en) Pipeline integrates orthogonal lamination wood wallboard
CN205742721U (en) Across intermediate plate in a kind of prefabricated acoustical insulation floor of modularity
CN105926839B (en) The prefabricated acoustical insulation floor gusset of modularization
CN205857521U (en) A kind of modularity prefabricated acoustical insulation floor end bay intermediate plate
CN105178508B (en) Compound web plate power consumption wood joist
CN206205264U (en) A kind of light steel room of novel assembled
CN105696731B (en) A kind of timber structure bearing diagonal shear wall
CN212295029U (en) Counterweight type assembled balcony
CN108049531A (en) Modularization cork wood structure gable gable plate and its installation method
CN108035471A (en) Modularization cork wood structure gable trapezoidal plate and its installation method
CN208137121U (en) Ridge gable roof boarding under modularization

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191225

Address after: 224600 north of Guanchao 1st Road and east of Huanghai 3rd road, Chenjiagang coastal economic zone, Xiangshui County, Yancheng City, Jiangsu Province

Patentee after: Xiangshui Kedi concrete products Co., Ltd

Address before: 110168 Liaoning province Shenyang Hunnan Hunnan Road No. 9

Patentee before: Shenyang Building Univ.