CN106120837A - A kind of positioning tool for pre-embedded bolt group to connecting - Google Patents

A kind of positioning tool for pre-embedded bolt group to connecting Download PDF

Info

Publication number
CN106120837A
CN106120837A CN201610501169.4A CN201610501169A CN106120837A CN 106120837 A CN106120837 A CN 106120837A CN 201610501169 A CN201610501169 A CN 201610501169A CN 106120837 A CN106120837 A CN 106120837A
Authority
CN
China
Prior art keywords
proofreading board
bolt
embedded bolt
proofreading
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610501169.4A
Other languages
Chinese (zh)
Other versions
CN106120837B (en
Inventor
吕云
卢华林
邹庆刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201610501169.4A priority Critical patent/CN106120837B/en
Publication of CN106120837A publication Critical patent/CN106120837A/en
Application granted granted Critical
Publication of CN106120837B publication Critical patent/CN106120837B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Electromagnetism (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of positioning tool for pre-embedded bolt group to connecting, including a bearing, the sidewall that two rectangle steelframes are relative is from top to bottom sequentially provided with two row's support bars, upper proofreading board, lower proofreading board are correspondingly placed on two row's support bars respectively, upper proofreading board has hole on multiple, lower proofreading board has the lower opening that multiple and upper hole is concentric.Lower proofreading board is held in place on the support bar of lower row, by the thread segment of multiple pre-embedded bolts being sequentially passed through corresponding lower opening on lower proofreading board, then upper proofreading board is held in place on the support bar of upper row, and the thread segment of pre-embedded bolt runs through hole, by nut, pre-embedded bolt is fixed on upper proofreading board, the supporting section part of pre-embedded bolt is the most unsettled, multiple pre-embedded bolts utilize the gravity of self to make it ensure the perpendicularity of in the vertical direction, to facilitate staff to utilize reinforcing bar that multiple pre-embedded bolts are grouping connection, it is allowed to form a bolt assembly.

Description

A kind of positioning tool for pre-embedded bolt group to connecting
Technical field
The present invention relates to the realm of building construction, be specifically related to a kind of positioning tool for pre-embedded bolt group to connecting.
Background technology
Steel-structure factory building possesses following characteristics, 1, dead load light: refer to steel construction light.In same span, equally Load under, steel construction is more light than reinforced concrete structure, thus also allow for transport and install.2, reliability is higher (relatively In other structure);It is 3, easy to manufacture, easy for installation: the material used by steel construction merely and is to become a useful person, and processes easier, And can use mechanically actuated, the most substantial amounts of steel construction is usually and makes component, degree of accuracy at specialized hardware Higher, with then needing formwork erection during armored concrete, prick muscle etc..The welding that is connected by of steel construction connects with bolt, in a short time The engineering used.4, short construction period: the mechanization manufactured due to steel structure member, automaticity is high, and assembling speed Hurry up, therefore speed of application is fast, and the cycle is short, can shorten time of completion compared with the Factory Building using reinforced concrete structure.
The construction technology of steel-structure factory building includes pre-embedded bolt → (steel construction processing system in the construction line-putting → base concrete Make) portal-rigid frames lifting → crane girder installation → steel girder erection → roof truss, roof boarding and eaves board installation → shingle nail installation → Steel structure coating.And in base concrete in pre-embedded bolt step, it is many that steel column pre-embedded bolt installs kind, such as M27, M30, M33, M39, M42, M56, the substance of pre-embedded bolt is relatively big, wherein M27 substance be 4Kg, M56 substance be 27Kg, in turn result in steel It is big that the pre-embedded bolt of structure workshop installs total amount;And in prior art in the short column of basis, multiple pre-embedded bolts are transported to install Position needs to expend substantial amounts of man-hour and manpower, and the working strength of man-handling of materials is big, and then causes the installation of pre-embedded bolt Efficiency is substantially reduced.
Summary of the invention
Present invention aim at providing a kind of positioning tool for pre-embedded bolt group to connecting, quickly realize multiple bolt Group is to connection, and bolt group is to degree of accuracy when connecting simultaneously.
The present invention is achieved through the following technical solutions:
A kind of positioning tool for pre-embedded bolt group to connecting, including the supporting being configured to by two rectangle steels being oppositely arranged Seat, is from top to bottom sequentially provided with two row's support bars, upper proofreading board, lower proofreading board on the sidewall that two described rectangle steelframes are relative Be correspondingly placed at respectively on two row's support bars, upper proofreading board have hole on multiple, lower proofreading board has multiple with on The lower opening that hole is concentric.Connection is referred to be welded together by multiple pre-embedded bolts by reinforcing bar by the group of multiple pre-embedded bolts, is formed With the basis bolt group structure that matches of short column, will multiple bolt uniform weldings inside two minor faces of rectangular frame on, Wherein pre-embedded bolt includes supporting section and thread segment, and rectangular frame is then welded on supporting section, to facilitate the peace of pre-embedded bolt It is filled with and the connection of bolt and steel column;And when welding, the pre-embedded bolt weight of monomer is big, when mobile, workload is big, and And multiple pre-embedded bolt is when welding side by side, it is necessary to assure position is in the homogeneity of the pre-embedded bolt with row, right with guarantee group After bolt in the short column of basis, keep correct station, improve steel column and the stability of steel-structure factory building.
Concrete group is as follows to connection procedure: be held in place on the support bar of lower row by lower proofreading board, by by multiple The thread segment of pre-embedded bolt sequentially pass through corresponding lower opening on lower proofreading board, then upper proofreading board is held in place On the support bar of row, and the thread segment of pre-embedded bolt runs through hole, now by nut, pre-embedded bolt is fixed on upper proofreading board On, the supporting section part of pre-embedded bolt is the most unsettled, and multiple pre-embedded bolts utilize the gravity of self to make it ensure at vertical direction On perpendicularity, to facilitate staff to utilize reinforcing bar that multiple pre-embedded bolts are grouping connection, be allowed to form a bolt Assembly.After connection is completed by multiple bolt groups, after taking off nut, successively by upper proofreading board and lower proofreading board from rectangle steelframe Take out so that bolt assembly falls on ground, is now removed by two rectangle steelframes, then facilitate quickly turning of bolt assembly Fortune.
Bottom described rectangle steelframe, have chute, and described rectangle steelframe is arranged on guide rail by slide.Square Shaped steel frame itself has certain weight, and i.e. after connection is terminated by bolt group, the difficulty of mobile rectangle steelframe is relatively big, therefore exists The bottom of rectangle steelframe has chute, and is provided with guide rail on the ground, by chute on guide rail slidably so that square Shaped steel frame quickly moves, to facilitate the transhipment of bolt assembly.
Described support bar includes central shaft, is arranged with roller on described central shaft, axially opens along it on roller inwall Limited location groove, is provided with the projection coordinated with stopper slot on central shaft outer wall.In bolt group to connection procedure, need bolt is entered Row is finely tuned definitely, and now bolt is fixed on upper proofreading board by nut, runs through lower opening simultaneously, and upper proofreading board then passes through On the gravity of the bolt tightly row's of being fitted in support bar, the mobile relative difficulty of himself, lower proofreading board is then set in bolt On, the supporting section to bolt can be realized by mobile lower proofreading board and be simultaneously on the direction being perpendicular to horizontal plane with thread segment, To ensure that the bolt assembly of molding maintains the rectangular configuration of its standard, make it to agree with completely with basis short column.During regulation, mobile Lower proofreading board so that roller relatively rotates around central shaft, and has stopper slot at roller inwall, central shaft is provided with spacing The projection of slot fit, the end face at stopper slot two ends is two extreme positions that projection rotates, it is to avoid the most mobile artificial lower school Plate causes upper proofreading board deviation occur with the most corresponding position of lower proofreading board, i.e. ensures that upper proofreading board is at lower proofreading board On projection overlap with lower proofreading board completely.
Described stopper slot is minor arc arcuate groove.As preferably, stopper slot arc length shared by roller inner peripheral wall is bad Arc, i.e. stopper slot are minor arc arcuate groove, and proofreading board is when mobile instantly, and minor arc arcuate groove can ensure the moving range of lower proofreading board Being confined in a less scope, inclining occurs in the position of supporting section with its thread segment in the vertical direction to prevent bolt Tiltedly, prevent the nut at proofreading board from being lost its effect fastened by radial stress.
The aperture in described upper hole is more than the aperture of described lower opening.As preferably, outside the aperture in upper hole is with the thread segment of bolt Footpath is identical, and the aperture in upper hole is set greater than the aperture of lower opening, while the thread segment facilitating bolt quickly runs through, also The sensitivity during regulation of bolt support section can be reduced, i.e. avoid just causing tilt bolt during proofreading board under slight movement.
Gap length between width and two rectangle steelframes of described upper proofreading board is identical.Further, upper proofreading board Can be completely fixed in the supporting and space of row's support bar and two rectangle steelframe two side formation, i.e. ensure that multiple bolt Produce after being fixed on by nut on proofreading board and rock, and then ensure in bolt group accuracy when connecting.
The width of described lower proofreading board is less than the gap length between two rectangle steelframes.As preferably, lower proofreading board is put Put in the supporting and space of lower row's support bar and two rectangle steelframe two side formation, and when bolt is finely adjusted, need Debug from the multiple directions of lower proofreading board so that the supporting section of bolt and thread segment remain the shape being perpendicular to horizontal plane State.
The present invention compared with prior art, has such advantages as and beneficial effect:
1, lower proofreading board is held in place on the support bar of lower row by the present invention, by being depended on by the thread segment of multiple pre-embedded bolts Secondary then upper proofreading board is held in place on the support bar of upper row through corresponding lower opening on lower proofreading board, and pre-buried The thread segment of bolt runs through hole, is fixed on upper proofreading board by pre-embedded bolt now by nut, and the support of pre-embedded bolt Section part is the most unsettled, and multiple pre-embedded bolts utilize the gravity of self to make it ensure the perpendicularity of in the vertical direction, to facilitate work Utilize reinforcing bar that multiple pre-embedded bolts are grouping connection as personnel, be allowed to form a bolt assembly;
2, the present invention is when regulation, mobile lower proofreading board so that roller relatively rotates around central shaft, and has limit at roller inwall Position groove, central shaft is provided with the projection coordinated with stopper slot, and the end face at stopper slot two ends is two limit that projection rotates Position, it is to avoid the most excessive position appearance moving lower proofreading board and cause proofreading board the most corresponding with lower proofreading board is inclined Difference, i.e. ensures that upper proofreading board projection on lower proofreading board overlaps with lower proofreading board completely;
3, in the present invention, lower proofreading board is placed on the supporting and space of lower row's support bar and two rectangle steelframe two side formation, and When bolt is finely adjusted, the multiple directions from lower proofreading board are needed to debug so that the supporting section of bolt and thread segment Remain the state being perpendicular to horizontal plane.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing being further appreciated by the embodiment of the present invention, constitutes of the application Point, it is not intended that the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is present configuration schematic diagram;
Fig. 2 is the structural representation of support bar;
Fig. 3 is that group is to the bolt assembly after connecting.
The parts title of labelling and correspondence in accompanying drawing:
1-prop up bearing, the upper proofreading board of 2-, 3-support bar, 31-central shaft, 32-stopper slot, 33-projection, 34-roller, the upper hole of 4-, Proofreading board, 6-lower opening, 7-guide rail under 5-.
Detailed description of the invention
For making the object, technical solutions and advantages of the present invention clearer, below in conjunction with embodiment and accompanying drawing, to this Invention is described in further detail, and the exemplary embodiment of the present invention and explanation thereof are only used for explaining the present invention, do not make For limitation of the invention.
Embodiment 1
As shown in figures 1 and 3, the present embodiment includes the bearing 1 being configured to by two rectangle steels being oppositely arranged, two institutes State and on the sidewall that rectangle steelframe is relative, be from top to bottom sequentially provided with two row's support bars 3, upper proofreading board 2, lower proofreading board 5 correspondence respectively It is placed on two row's support bars 3, upper proofreading board 2 has hole 4 on multiple, lower proofreading board 5 has multiple and upper hole 4 same The lower opening 6 of the heart.Connection is referred to be welded together by multiple pre-embedded bolts by reinforcing bar by the group of multiple pre-embedded bolts, is formed and base The bolt group structure that plinth short column matches, will multiple bolt uniform weldings inside two minor faces of rectangular frame on, wherein Pre-embedded bolt includes supporting section and thread segment, and rectangular frame is then welded on supporting section, with facilitate the installation of pre-embedded bolt with And the connection of bolt and steel column;And when welding, the pre-embedded bolt weight of monomer is big, when mobile, workload is big, and many Individual pre-embedded bolt is when welding side by side, it is necessary to assure position is in the homogeneity of pre-embedded bolt with row, with ensure group to after Bolt keeps correct station in the short column of basis, improves steel column and the stability of steel-structure factory building.
Concrete group is as follows to connection procedure: be held in place on the support bar 3 of lower row by lower proofreading board 5, by will be many The thread segment of individual pre-embedded bolt sequentially passes through corresponding lower opening 6 on lower proofreading board 5, is then placed on by upper proofreading board 2 It is positioned on the support bar 3 of row, and the thread segment of pre-embedded bolt runs through hole 4, now by nut, pre-embedded bolt is fixed on On upper proofreading board 2, the supporting section part of pre-embedded bolt is the most unsettled, and multiple pre-embedded bolts utilize the gravity of self to make it ensure Perpendicularity on vertical direction, to facilitate staff to utilize reinforcing bar that multiple pre-embedded bolts are grouping connection, is allowed to be formed One bolt assembly.After connection is completed by multiple bolt groups, after taking off nut, successively by upper proofreading board 2 and lower proofreading board 5 from Take out on rectangle steelframe so that bolt assembly falls on ground, is now removed by two rectangle steelframes, then facilitates bolt assembly Rapid transport.
Further, rectangle steelframe itself has certain weight, i.e. after connection is terminated by bolt group, and mobile rectangle steel The difficulty of frame is relatively big, and therefore the bottom at rectangle steelframe has chute, and is provided with guide rail 7 on the ground, is being led by chute On rail 7 slidably so that rectangle steelframe quickly moves, to facilitate the transhipment of bolt assembly.
As preferably, the aperture in upper hole 4 is identical with the thread segment external diameter of bolt, and is set greater than in the aperture in upper hole 4 The aperture of lower opening 6, while the thread segment facilitating bolt quickly runs through, moreover it is possible to reduce bolt support section regulation time sensitive Degree, i.e. avoids just causing tilt bolt during proofreading board 5 under slight movement.
Embodiment 2
As depicted in figs. 1 and 2, the present embodiment is on the basis of embodiment 1, and described support bar 3 includes central shaft 31, in described It is arranged with roller 34 in mandrel 31, roller 34 inwall axially has along it stopper slot 32, central shaft 31 outer wall is provided with The projection 33 coordinated with stopper slot 32.In bolt group to connection procedure, need bolt is finely tuned definitely, and now bolt Being fixed on upper proofreading board 2 by nut, run through lower opening 6 simultaneously, upper proofreading board 2 is then tightly fitted in by the gravity of bolt On upper row's support bar 3, the mobile relative difficulty of himself, lower proofreading board 5 is then set on bolt, by mobile lower proofreading board 5 can realize the supporting section to bolt is simultaneously on the direction being perpendicular to horizontal plane with thread segment, to ensure the bolt group of molding Part maintains the rectangular configuration of its standard, makes it to agree with completely with basis short column.During regulation, mobile lower proofreading board 5 so that roller 34 relatively rotate around central shaft 31, and have stopper slot 32 at roller 34 inwall, central shaft 31 is provided with and joins with stopper slot 32 The projection 33 closed, the end face at stopper slot 32 two ends is two extreme positions that projection 33 rotates, it is to avoid under the most mobile Proofreading board 5 and cause proofreading board 2 that deviation occurs with the most corresponding position of lower proofreading board 5, i.e. ensure upper proofreading board 2 under Projection on proofreading board 5 overlaps with lower proofreading board 5 completely.
As preferably, the stopper slot 32 arc length shared by roller 34 inner peripheral wall is minor arc, i.e. stopper slot 32 is minor arc Arcuate groove, proofreading board 5 is when mobile instantly, minor arc arcuate groove can ensure the moving range of lower proofreading board 5 be confined to one less In the range of, the position of supporting section with its thread segment in the vertical direction to prevent bolt occurs, and prevents proofreading board 2 The nut at place is lost its effect fastened by radial stress.
Embodiment 3
As it is shown in figure 1, the present embodiment is on the basis of embodiment 1, between width and two rectangle steelframes of described upper proofreading board 2 Gap length identical.Upper proofreading board 2 can be completely fixed in row's support bar 3 and the support of two rectangle steelframe two side formation In space, i.e. ensure that multiple bolt is produced after being fixed on by nut on proofreading board 2 and rock, and then ensure in bolt group To accuracy when connecting.
As preferably, lower proofreading board 5 is placed on lower row's support bar 3 and the supporting and space of two rectangle steelframe two side formation In, and when bolt is finely adjusted, need the multiple directions from lower proofreading board 5 to debug so that the supporting section of bolt with Thread segment remains the state being perpendicular to horizontal plane.
Above-described detailed description of the invention, has been carried out the purpose of the present invention, technical scheme and beneficial effect further Describe in detail, be it should be understood that the detailed description of the invention that the foregoing is only the present invention, be not intended to limit the present invention Protection domain, all within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. done, all should comprise Within protection scope of the present invention.

Claims (7)

1. it is used for a pre-embedded bolt group positioning tool to connecting, including propping up of being configured to by two rectangle steels being oppositely arranged Bearing (1), it is characterised in that: on the sidewall that two described rectangle steelframes are relative, from top to bottom it is sequentially provided with two row's support bars (3), upper proofreading board (2), lower proofreading board (5) are correspondingly placed on two row's support bars (3) respectively, have on upper proofreading board (2) Multiple upper holes (4), have the lower opening (6) that multiple and upper hole (4) is concentric on lower proofreading board (5).
A kind of positioning tool for pre-embedded bolt group to connecting the most according to claim 1, it is characterised in that: described Have chute bottom rectangle steelframe, and described rectangle steelframe is arranged on guide rail (7) by slide.
A kind of positioning tool for pre-embedded bolt group to connecting the most according to claim 1, it is characterised in that: described Strut (3) includes central shaft (31), is arranged with roller (34) on described central shaft (31), along its axle on roller (34) inwall To having stopper slot (32), central shaft (31) outer wall is provided with the projection (33) coordinated with stopper slot (32).
A kind of positioning tool for pre-embedded bolt group to connecting the most according to claim 3, it is characterised in that: described limit Position groove (32) is minor arc arcuate groove.
A kind of positioning tool for pre-embedded bolt group to connecting the most according to claim 1, it is characterised in that: on described The aperture in hole (4) is more than the aperture of described lower opening (6).
A kind of positioning tool for pre-embedded bolt group to connecting the most according to claim 1, it is characterised in that: on described Gap length between width and two rectangle steelframes of proofreading board (2) is identical.
A kind of positioning tool for pre-embedded bolt group to connecting the most according to claim 1, it is characterised in that: under described The width of proofreading board (5) is less than the gap length between two rectangle steelframes.
CN201610501169.4A 2016-06-30 2016-06-30 It is a kind of for pre-embedded bolt group to the positioning tool of connection Active CN106120837B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610501169.4A CN106120837B (en) 2016-06-30 2016-06-30 It is a kind of for pre-embedded bolt group to the positioning tool of connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610501169.4A CN106120837B (en) 2016-06-30 2016-06-30 It is a kind of for pre-embedded bolt group to the positioning tool of connection

Publications (2)

Publication Number Publication Date
CN106120837A true CN106120837A (en) 2016-11-16
CN106120837B CN106120837B (en) 2019-02-26

Family

ID=57284824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610501169.4A Active CN106120837B (en) 2016-06-30 2016-06-30 It is a kind of for pre-embedded bolt group to the positioning tool of connection

Country Status (1)

Country Link
CN (1) CN106120837B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988340A (en) * 2017-03-30 2017-07-28 中铁六局集团有限公司 The construction method that reserved steel bar in cast-in-place concrete bottom plate is accurately positioned, installed
CN109763572A (en) * 2019-01-23 2019-05-17 浙江省送变电工程有限公司 A kind of device and its operating method of the quick pre-buried verticality of adjustment foundation bolt group

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005307701A (en) * 2004-04-26 2005-11-04 Taisei Corp Column steel frame supporting structure
CN202170636U (en) * 2011-07-14 2012-03-21 中建八局第四建设有限公司 Mould for pre-embedded foundation bolt of steel structural foundation
CN202884390U (en) * 2012-09-21 2013-04-17 中国化学工程第三建设有限公司 Fixing device for embedded bolt
CN203256760U (en) * 2013-04-16 2013-10-30 中冶天工上海十三冶建设有限公司 Formwork for quickly installing and positioning foundation bolt
CN203863275U (en) * 2014-05-29 2014-10-08 中国建筑土木建设有限公司 Die frame for welding embedded bolts of railway box girder
CN204040056U (en) * 2014-06-26 2014-12-24 中国建筑第八工程局有限公司 A kind of location and installation support of pre-embedded anchoring bolts
CN205713161U (en) * 2016-06-30 2016-11-23 中国五冶集团有限公司 A kind of positioner for bolt assembly docking

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005307701A (en) * 2004-04-26 2005-11-04 Taisei Corp Column steel frame supporting structure
CN202170636U (en) * 2011-07-14 2012-03-21 中建八局第四建设有限公司 Mould for pre-embedded foundation bolt of steel structural foundation
CN202884390U (en) * 2012-09-21 2013-04-17 中国化学工程第三建设有限公司 Fixing device for embedded bolt
CN203256760U (en) * 2013-04-16 2013-10-30 中冶天工上海十三冶建设有限公司 Formwork for quickly installing and positioning foundation bolt
CN203863275U (en) * 2014-05-29 2014-10-08 中国建筑土木建设有限公司 Die frame for welding embedded bolts of railway box girder
CN204040056U (en) * 2014-06-26 2014-12-24 中国建筑第八工程局有限公司 A kind of location and installation support of pre-embedded anchoring bolts
CN205713161U (en) * 2016-06-30 2016-11-23 中国五冶集团有限公司 A kind of positioner for bolt assembly docking

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988340A (en) * 2017-03-30 2017-07-28 中铁六局集团有限公司 The construction method that reserved steel bar in cast-in-place concrete bottom plate is accurately positioned, installed
CN106988340B (en) * 2017-03-30 2019-01-22 中铁六局集团有限公司 Reserved steel bar in cast-in-place concrete bottom plate is accurately positioned, the construction method of installation
CN109763572A (en) * 2019-01-23 2019-05-17 浙江省送变电工程有限公司 A kind of device and its operating method of the quick pre-buried verticality of adjustment foundation bolt group
CN109763572B (en) * 2019-01-23 2024-01-09 浙江省送变电工程有限公司 Device for quickly adjusting embedded verticality of foundation bolt group and operation method of device

Also Published As

Publication number Publication date
CN106120837B (en) 2019-02-26

Similar Documents

Publication Publication Date Title
CN105587130B (en) A kind of space net shell solder sphere positioner and its application method
CN101988308B (en) Non-support installation method of long-span spatial bolt ball steel reticulated shell dome
CN105951994A (en) Cylindrical latticed shell sealed canopy and expanded installation method thereof
CN102296858B (en) Roof steel structure for cement production line clinker warehouse and construction method thereof
CN104674665B (en) Large-spatial structures vestibule bridge installation method
CN105089152A (en) Reverse installation and construction method for large bifurcated column and complex curved net rack
CN112324156B (en) Ring beam joint combination and assembly method
CN106120837A (en) A kind of positioning tool for pre-embedded bolt group to connecting
CN115419277B (en) Construction method of heavy steel box type diagonal column
CN106284675A (en) A kind of symmetrical doubly-linked is across cylindrical reticulated shell structure integral slipping construction auxiliary device and construction method
KR101243178B1 (en) Apparatus for constructing scaffolding capable of complex process and safety ensurance
CN205713161U (en) A kind of positioner for bolt assembly docking
CN106522364B (en) 'garland' steel structure system for stadium periphery and installation process thereof
CN112554577B (en) Construction method of large-diameter thick-wall continuous Y-shaped steel pipe column
CN102605960A (en) Method for finely adjusting, locating and lifting hollow warehouse roof platform
CN105735477A (en) Latticed shell unit block and manufacturing method thereof
CN107963533B (en) Modular elevator shaft design method
CN109763660A (en) A kind of double ball nesting Construction of The Grids methods
JP2018199933A (en) Structure body and construction method of structure constructed on top of tower-like building
KR102242485B1 (en) Method for vertical transportation of a heavy module using of a module lifting system inculding of a strand jack
KR101508518B1 (en) Hanok side door and it's production and it's construction method
CN109057309B (en) Suspension type operating platform and assembling and disassembling method thereof
CN206846097U (en) A kind of Men Gangyu frameworks separately-loaded pipeline support structure
CN205839988U (en) A kind of built-in connection for steel-structure factory building steel column
CN220848854U (en) Cylinder reinforcing bar positioner

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant