CN106120566B - 在极限角度临近既有框架桥情况下顶进新框架桥施工方法 - Google Patents
在极限角度临近既有框架桥情况下顶进新框架桥施工方法 Download PDFInfo
- Publication number
- CN106120566B CN106120566B CN201610680402.XA CN201610680402A CN106120566B CN 106120566 B CN106120566 B CN 106120566B CN 201610680402 A CN201610680402 A CN 201610680402A CN 106120566 B CN106120566 B CN 106120566B
- Authority
- CN
- China
- Prior art keywords
- frame bridge
- new frame
- existing
- jacking
- railway circuit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
一种在极限角度临近既有框架桥情况下顶进新框架桥施工方法,其包括在既有框架桥上靠近待设置的新框架桥的侧面外部的土基中以垂直的方式间隔设置一排圆木;在既有铁路线路一侧土基中挖掘一个基坑,然后在基坑中预制前悬臂板加长的新框架桥;采用线路加固体系对既有铁路线路进行加固,并将工字钢横梁上突出在既有铁路线路外部且靠近新框架桥一端的长度加长;采用顶进法将新框架桥向既有铁路线路下方的预设位置处顶进等步骤。本发明施工方法能够满足施工各阶段的施工条件,保证施工连续进行,减少了施工过程中可能发生的各种不利条件,可在保证既有建筑物安全的同时减小成本,因此社会效益和经济效益突出。
Description
技术领域
本发明属于道路施工技术领域,特别是涉及一种在极限角度临近既有框架桥情况下顶进新框架桥施工方法。
背景技术
随着基础设施建设的飞速发展,汽车的保有量正在逐年增多,所以一批又一批的城市立交施工项目陆续开展,因此在施工中遇到的难题也越来越多。其中一个难题是在既有框架桥旁边顶进一个新框架桥,要求两桥之间的距离小于1m,并且新框架桥的桥体结构、形式以及与既有铁路路基的交角均与既有框架桥一致。由于既有框架桥和新框架桥之间的距离很近,两者之间无法设置常规的支护装置,因此新框架桥顶进时对既有框架桥的结构扰动很大,而且如果在顶进过程中新框架桥出现偏离顶进方向的情况,极易损坏既有框架桥的结构。
发明内容
为了解决上述问题,本发明的目的在于提供一种在极限角度临近既有框架桥情况下顶进新框架桥施工方法。
为了达到上述目的,本发明提供的在极限角度临近既有框架桥情况下顶进新框架桥施工方法包括按顺序进行的下列步骤:
1)首先在既有框架桥上靠近待设置的新框架桥的侧面外部的土基中以垂直的方式间隔设置一排圆木,以便在顶进中对既有框架桥进行保护;
2)在下方预设置新框架桥的既有铁路线路一侧的土基中挖掘一个基坑,然后在基坑中预制一个前悬臂板加长的新框架桥;
3)采用传统的由3-5-3吊轨及工字钢纵横梁构成的线路加固体系对既有铁路线路上受新框架桥顶进影响的部位进行加固,并且将工字钢横梁上突出在既有铁路线路外部且靠近新框架桥一端的长度加长,以便在顶进过程中使工字钢横梁能够尽早落位到新框架桥的前悬臂板上,以保证既有铁路线路的安全;
4)采用传统的顶进法将新框架桥向既有铁路线路下方的预设位置处顶进,在顶进过程中根据圆木的滚动趋势控制顶镐的顶力,直到顶进完成。
所述的圆木中相邻圆木之间的间距为3米。
所述的工字钢横梁的两端突出在既有铁路线路外部的长度相差2米。
本发明提供的在极限角度临近既有框架桥情况下顶进新框架桥施工方法能够满足施工各阶段的施工条件,保证施工连续进行,减少了施工过程中可能发生的各种不利条件,可在保证既有建筑物安全的同时减小成本,因此社会效益和经济效益突出。
附图说明
图1为采用本发明提供的在极限角度临近既有框架桥情况下顶进新框架桥施工方法时既有框架桥和新框架桥正向结构示意图。
图2为采用本发明提供的在极限角度临近既有框架桥情况下顶进新框架桥施工方法时既有框架桥与铁路线路结构俯视图。
图3为采用本发明提供的在极限角度临近既有框架桥情况下顶进新框架桥施工方法时新框架桥与线路加固体系结构俯视图。
图4为采用本发明提供的在极限角度临近既有框架桥情况下顶进新框架桥施工方法时新框架桥与线路加固体系结构侧视图。
具体实施方式
下面结合附图和具体实施例对本发明提供的在极限角度临近既有框架桥情况下顶进新框架桥施工方法进行详细说明。
如图1—图4所示,本发明提供的在极限角度临近既有框架桥情况下顶进新框架桥施工方法包括按顺序进行的下列步骤:
1)首先在既有框架桥1上靠近待设置的新框架桥2的侧面外部的土基中以垂直的方式间隔设置一排圆木3,以便在顶进中对既有框架桥1进行保护;相邻圆木3之间的间距为3米;
2)在下方预设置新框架桥2的既有铁路线路4一侧的土基中挖掘一个基坑,然后在基坑中预制一个前悬臂板5加长的新框架桥2;
3)采用传统的由3-5-3吊轨及工字钢纵横梁构成的线路加固体系6对既有铁路线路4上受新框架桥2顶进影响的部位进行加固,并且将工字钢横梁7上突出在既有铁路线路4外部且靠近新框架桥2一端的长度加长,以便在顶进过程中使工字钢横梁7能够尽早落位到新框架桥2的前悬臂板5上,以保证既有铁路线路4的安全;通常情况下工字钢横梁7的两端突出在既有铁路线路4外部的长度相差2米;
4)采用传统的顶进法将新框架桥2向既有铁路线路4下方的预设位置处顶进,在顶进过程中根据圆木3的滚动趋势控制顶镐的顶力,直到顶进完成。
Claims (3)
1.一种在极限角度临近既有框架桥情况下顶进新框架桥施工方法,其特征在于:所述的施工方法包括按顺序进行的下列步骤:
1)首先在既有框架桥(1)上靠近待设置的新框架桥(2)的侧面外部的土基中以垂直的方式间隔设置一排圆木(3),以便在顶进中对既有框架桥(1)进行保护;
2)在下方预设置新框架桥(2)的既有铁路线路(4)一侧的土基中挖掘一个基坑,然后在基坑中预制一个前悬臂板(5)加长的新框架桥(2);
3)采用由3-5-3吊轨及工字钢纵横梁构成的线路加固体系(6)对既有铁路线路(4)上受新框架桥(2)顶进影响的部位进行加固,并且将工字钢横梁(7)上突出在既有铁路线路(4)外部且靠近新框架桥(2)一端的长度加长,以便在顶进过程中使工字钢横梁(7)能够尽早落位到新框架桥(2)的前悬臂板(5)上,以保证既有铁路线路(4)的安全;
4)采用顶进法将新框架桥(2)向既有铁路线路(4)下方的预设位置处顶进,在顶进过程中根据圆木(3)的滚动趋势控制顶镐的顶力,直到顶进完成。
2.根据权利要求1所述的在极限角度临近既有框架桥情况下顶进新框架桥施工方法,其特征在于:所述的圆木(3)中相邻圆木(3)之间的间距为3米。
3.根据权利要求1所述的在极限角度临近既有框架桥情况下顶进新框架桥施工方法,其特征在于:所述的工字钢横梁(7)的两端突出在既有铁路线路(4)外部的长度相差2米。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610680402.XA CN106120566B (zh) | 2016-08-16 | 2016-08-16 | 在极限角度临近既有框架桥情况下顶进新框架桥施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610680402.XA CN106120566B (zh) | 2016-08-16 | 2016-08-16 | 在极限角度临近既有框架桥情况下顶进新框架桥施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106120566A CN106120566A (zh) | 2016-11-16 |
CN106120566B true CN106120566B (zh) | 2017-10-20 |
Family
ID=57279751
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610680402.XA Active CN106120566B (zh) | 2016-08-16 | 2016-08-16 | 在极限角度临近既有框架桥情况下顶进新框架桥施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106120566B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006214109A (ja) * | 2005-02-02 | 2006-08-17 | Makoto Uemura | 地下構造物の構築方法 |
CN102926299A (zh) * | 2012-11-19 | 2013-02-13 | 房士杰 | 一种铁路架空固定装置及采用此装置增建铁路桥涵的方法 |
CN103866694A (zh) * | 2014-03-18 | 2014-06-18 | 中铁二十二局集团第一工程有限公司 | 深水粉砂层地质大跨度多线路加固系统及顶进涵施工方法 |
CN104652279A (zh) * | 2013-11-25 | 2015-05-27 | 北京城建设计发展集团股份有限公司 | 一种新建框架桥上穿既有地铁结构箱涵顶进施工方法 |
CN204940141U (zh) * | 2015-07-31 | 2016-01-06 | 中铁六局集团有限公司 | 框架桥顶进过程中既有线路的加固体系 |
-
2016
- 2016-08-16 CN CN201610680402.XA patent/CN106120566B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006214109A (ja) * | 2005-02-02 | 2006-08-17 | Makoto Uemura | 地下構造物の構築方法 |
CN102926299A (zh) * | 2012-11-19 | 2013-02-13 | 房士杰 | 一种铁路架空固定装置及采用此装置增建铁路桥涵的方法 |
CN104652279A (zh) * | 2013-11-25 | 2015-05-27 | 北京城建设计发展集团股份有限公司 | 一种新建框架桥上穿既有地铁结构箱涵顶进施工方法 |
CN103866694A (zh) * | 2014-03-18 | 2014-06-18 | 中铁二十二局集团第一工程有限公司 | 深水粉砂层地质大跨度多线路加固系统及顶进涵施工方法 |
CN204940141U (zh) * | 2015-07-31 | 2016-01-06 | 中铁六局集团有限公司 | 框架桥顶进过程中既有线路的加固体系 |
Also Published As
Publication number | Publication date |
---|---|
CN106120566A (zh) | 2016-11-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103643640B (zh) | 一种先顶进后加固线路的框架桥顶进施工方法 | |
CN102979041B (zh) | 下穿铁路道岔群顶进大跨度箱桥施工的软架空加固顶进法 | |
CN101831873B (zh) | 一种运营轨道交通地面线下方修建箱涵的便桥盖挖法 | |
CN103362073B (zh) | 一种框架桥顶进方法 | |
CN102758387B (zh) | H型钢线路加固施工方法 | |
CN204662279U (zh) | 带防护体系的滚动式砼箱梁桥转体施工合拢吊架装置 | |
CN104389261B (zh) | 预制超高性能混凝土π形梁单元、桥梁结构及其施工方法 | |
CN106978777B (zh) | 一种临时便桥装置 | |
CN105155428B (zh) | 跨运营铁路大型装配式预应力混凝土连续t梁施工方法 | |
CN104480846A (zh) | 一种拼接桥梁及其施工方法 | |
CN104481546A (zh) | 一种软岩隧道斜井进入正洞的双曲拱的施工方法 | |
CN103147389B (zh) | 一种桥梁防护设施 | |
CN102518034B (zh) | 双向预弯多梁式钢梁与混凝土桥面板组合的小箱梁桥结构 | |
CN204676374U (zh) | 一种铁路线路的加固机构 | |
RU2495184C1 (ru) | Способ разборки пролетного строения моста и устройство для осуществления этого способа | |
CN104110002A (zh) | 一种更换钢桁梁桥桥面板的方法 | |
CN106592449A (zh) | 一种d型梁加固既有双线线路结构及施工方法 | |
CN108166395A (zh) | 一种跨越营业线修建梁桥的施工方法 | |
CN106120566B (zh) | 在极限角度临近既有框架桥情况下顶进新框架桥施工方法 | |
CN208949745U (zh) | 一种满足新旧桥沉降差的桥梁拼宽构造 | |
CN217300589U (zh) | 地铁盾构隧道下穿运营铁路框架桥的加固体系 | |
CN105672145A (zh) | 一种墩顶增设钢盖梁拓宽桥梁的结构 | |
CN109056738A (zh) | 高速铁路下方基坑开挖施工方法 | |
CN105735056A (zh) | 排桩梁结合工字钢横梁加固铁路的方法 | |
CN104746434A (zh) | 一种不拆除外模的合龙段模板系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |